BCA Section and Part BCA Performance requirements Proposed Project Complies Y/N FIRE RESISTANCE BCA Part C2 Compartmentation and Separation
C2.0
Deemed to Satisfy Provisions This Clause specifies that the planned development complies with BCA Section C Performance Requirements if the deem to satisfy provisions are met. ---- NA
C2.1
Application of Part Fire section sizes and volumes do not apply to either a carpark provided with a sprinkler system, an open deck carpark or a spectator stand, or residential occupancies. All other classes of building to comply as required. Deemed to Satisfy
C2.2
General Floor Area &
Volume Limitations This Clause specifies the maximum floor areas and volumes for all classes of buildings and for each type of construction. …show more content…
----
C2.5
Class 9a buildings Additional fire and smoke compartmentation is required for Class 9a healthcare buildings. ----
C2.6
Vertical separation of openings in external walls This Clause stipulates how vertical separation can be reached for buildings of Type A Construction. ----
C2.7
Separation by fire walls This clause stipulates how you accomplish fire separation by fire walls. Performance
C2.8
Separation of classifications in the same storey This clause stipulates how you can treat diverse groupings in the same storey. ----
C2.9
Separation of Classifications in Different Storeys This Clause states how fire separate classifications in different storeys. ----
C2.10
Separation of lift shafts Lift shafts are required in Specification C1.1 (Type A Construction) to achieve an FRL as stated where lifts are not solely within a hall. Deemed to Satisfy
C2.11
Stairway and lifts in one shaft A stairway and lift must not be in the same shaft if either the stairway or the lift is necessary to be in a fire-resisting shaft. Performance