Background: The I-35W Bridge ran over the Mississippi river in Minneapolis, Minnesota. It was about 1,900 feet long and was eight lanes wide (MPR News, 2007). The bridge was made up of three parts of steel truss, the deck, superstructure, and substructure. The formation of it was a split deck, meaning the longitudinal trusses were parallel to traffic. The bridge was built and ready for traffic by 1967. The bridge on average would have about 150,000 cars drive across it each day (MPR News, 2007). As years went on, the bridge started to show signs of wear and tear. The concrete was starting to cracks and there were signs of failure all along the bridge. Minnesota Department of Transportation had a decision to make about this bridge. They could either fix the bridge by spending money on it, or leave the bridge alone, saving money but leaving some doubts about it. Well obviously, they choose to leave the bridge the way it was and save some money. On August 1, 2007 the bridge finally collapsed killing and harming innocent citizens.
Topics of Interest:
Materials Engineering: The material engineers probably faced one of the biggest problems out of the whole construction period. They had to make sure the bridge was built with all the correct materials with the right support, but done under the low budget they were given. The components or materials they selected to use had to be able to withstand every day’s wear and tear; as much as the bridge was used they obviously knew that was going to be a hard task to accomplish. In doing so, they knew that eventually some of the materials would start to fail or rust or any type of disruption, meaning that they needed to get materials that could easily be fixed or easily be repaired at a low cost. Most of the materials will need to uphold all the natural weather that will automatically occur on the bridge such as acid rain which could rust or erode pieces of steel. In thinking of this, the engineers needed to come up with a addition to the steel component they were using to at least fight off this acid rain or other weather phases. If the engineers would have came up with these new materials or materials to solve these problems, the bridge most likely could have had a longer life and it would have been easier and cheaper to fix if a problem did go wrong with the bridge.
Mechanical Engineering: Structurally the I-35W Bridge is a force to be reckoned with, with dimensions of 1,900 feet long and eight lanes wide. As stated before, the bridge is a major interstate traffic flow with carrying many people across it every day to and from Minneapolis. The constructors of the bridge knew before building it that it would need to be heavily relied on with safety because of the amount of traffic and how much traffic it could actually get on it at one point. The issue with the engineers and all other skilled workers that were used to come up with this design was that lack of or the technique of trying to save money. The reason for the less money method was that the money being used to build the bridge was a good portion of tax payer money. The engineers had to think of every think possible that could happen to the bridge and fix it to where it would not cause a problem if this thing did happen. They had to take into account all different types of ways to build the bridge, in which they finally decided on a solution of making longitudinal trusses. Also, the engineers had to think about any weather conditions that could cause this bridge a problem. So, the engineers have to design a bridge that could withstand the load of everyday traffic flow and any other scenarios that could arrive.
Engineering economics and ethics: Obviously, since the bridge collapsed the main issue was whether this bridge was built safely for the money that was available. The safety of the citizens and people driving this bridge are always the first priority over the money issue. The NSPE code of ethics states that and makes sure that safety is their major deal. They made sure there was no blurred numbers in the design of the bridge that could possibly cause a failure and that would lessen the expense of the bridge. The designs of the I-35 Bridge somehow snuck in a false or skewed number that allowed them to continue the building of this bridge with the low cost. Eventually it caught up to them, and in result many innocent bystanders were killed and injured as they saved money. The Code of Ethics is there to prevent any company from doing this now and obviously the Code of Ethics was broken by these engineers that allowed the building of the catastrophic I-35W Bridge.
Ethics Violations under NSPE:
Code Violations – Minnesota Department of Transportation
The thing with the Minnesota Department of Transportation was that they did not have to follow the exact rules that all the engineers did. They still have a code of ethics they have to follow and obviously with the bridge collapsing they did not follow them. Some of the things they did wrong were mainly just involving themselves with the engineers and deciding on some of the questions being arose. Since they were grouped together so much, the problems or non following of the code of ethics was put on both of them. The main gut of the problems came from the groups not follow the fundamental ethics which is in Section 1 of NSPE stating that the department was only looking out for what was right for them, not the safety of the citizens being involved. The engineers discussed with the Minnesota DOT about the bridge having some flaws in it and it not being in the best possible shape it can be. After their discussion, they decided to leave the bridge just like it is and save money by not repairing it. The DOT violated Section II.1.d. by associating themselves with this fake business that is not following the code of ethics and trying to slide by to save money. Section II.1.e. states that a company or firm will not aid businesses that they have found to have problems like the engineers during the bridge design which means that since the Minnesota DOT aided them, they violated this code of ethics.
Code Violations – Engineers
Again, along with the DOT the engineers failed to comply with many sections in the NSPE making this bridge design a complete unlawful thing to do. The first section they didn’t comply with is Section I just like the Minnesota DOT. The engineering firm was looking to improve their profit in the project by lowering the safety of the bridge and not putting the well-being of citizens in first. The engineers as well violated Section II.3.a by not providing all the information pertaining to the bridge design and how the testing on it was going. The engineers found flaws with the design and continued to leave them alone and hid that information from everyone which Section II.3.a states that all information must be reported in a objective and informative way.

Works Cited
(2007). Collapse of I-35W Highway Bridge Minneapolis, Minnesota August 1, 2007. Washington D.C.: National Transportation Safety Board.
MPR News. (2007, August 3). I-35W bridge fact sheet. Retrieved August 25, 2011, from Minnesota Public Radio: http://minnesota.publicradio.org/display/web/2007/08/03/bridge_background/?rsssource=1

Similar Documents

Premium Essay

Truss Bridge Paper

...Truss Bridge Project Research Paper Our class has been assigned a project about the history and structure of Truss Bridges.In order for us to become more familiar and have a better understanding about truss bridges, we had do to some research.While there is a lot of logical engineering that goes into building a truss bridge,our teacher has instructed us to research 2 types of engineering behind the building of truss bridges and answer a few questions about our bridge.The two types we were told to look up and learn about were geotechnical engineering and materials engineering,both of which none of us had ever heard of.As for the geotechnical engineering,we we were to research the environmental and geological factors that should be considered...

Words: 1306 - Pages: 6

Free Essay

State of the Science on Aluminum Structural Bridge Components

...State of the Science Although research on in-place aluminum bridge decks is scant, bridge failures and deteriorations over the past decade inspired engineers toward determining the structural integrity of aluminum alloys in bridge rehabilitation. Recent studies, examining the corrosive effects of acidic and salt atmosphere on aluminum bridge decks indicates the material is expected to endure for at least 30-years (Li, et al., 2010). Furthermore, the Virginia Department of Transportation conducted a series of tests, including service and ultimate load test using Reynold’s deck system (Dobmeier, 2001). The results of Dobmeier, et al.’s (2001) experiment, “clearly demonstrates that aluminum bridge decks are a feasible alternative to reinforced concrete decks”. When considering alternatives for bridge deck replacements, the structural engineer must evaluate the life cost of materials chosen. Specifically, although the material cost for aluminum bridge decks is higher than for structural steel, the cost for fabrication, construction and length of serviceability prove cost effective when compared to steel (Ghaswala, 2010; Tindall, 2008; Walbridge & de la Chevrotiere, 2012). Specifically, with a per unit weight that is about one-third that of structural steel, construction methods are simplified and time for rehabilitation reduced (Ghaswala, 2010). Furthermore, maintenance costs are greatly reduced with aluminum decks, which eliminate the need for protective coating (beyond...

Words: 1490 - Pages: 6

Free Essay

Lab Report

...to complete a toothpick bridge. Some of the requirements were that the entire bridge had to span 12 inches apart and 2 inches off the surface, with the support of piers. While we worked together with our teammates we got to know more about the people we are working with. We researched different structures of other bridges in class as well as at home. We also gathered information on how we would use the supplies we are provided to promote good strength on the base of the bridge. The purpose of labs are: to work well with a good amount of people in a group, gain better knowledge of the scientific method, and to also have fun. Working with other people gave me more ideas on how to construct different models of bridges. To gain better knowledge and understanding of the scientific method, actually writing it out and following the procedure helped. The lab was very fun, it wasn’t like any ordinary class where you’d take notes and read from a book. Our hypothesis stated, if the pillars and base were thick and strong then it would hold more books and not break. The materials we used were also apart of the requirements and constraints. We were only given a certain amount of toothpicks and other than that just glue and our open mind. Steps throughout lab: 1) Group drafted blueprint 2) Got materials from teacher 3) Start constructing the pillars/piers of the bridge 4) Let pillars sit and dry while brainstorm more ideas on other structures of bridges 5) Buy extra toothpicks...

Words: 523 - Pages: 3

Free Essay

Concrete

...333 STUDY ON REACTIVE POWDER CONCRETE USED IN THE SIDEWALK SYSTEM OF THE QINGHAI-TIBET RAILWAY BRIDGE Ji Wen-yu,1 An Ming-zhe,1 Yan Gui-ping,1 and Wang Jun-min2 1 College of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing, 100044, PRC 2 Beijing Municipal Engineering Research Institute, Beijing, 100007, PRC Abstract The Qinghai-Tibet railway lies in the west area of China at an altitude of more than 4,000 meters. The 576-km railway is being built on frozen earth. The bad climate and sandstorms of the tundra require the concrete of the bridge to have superior mechanical properties and high durability. By adding portland cement, silica fume, superfine fly ash, and superplasticizers, reactive powder concrete (RPC) is used in the sidewalk systems of bridges with compressive strength of 160 MPa. The research shows that RPC has high strength, excellent frost durability, and impermeability. Therefore, RPC is the best choice for the Qinghai-Tibet railway. 1. Introduction The Qinghai-Tibet railway lies in Qinghai-Tibet plateau in the west area of China, at an altitude of more than 4,000 meters and in a high intensity earthquake region. The 576-km railway is being built on frozen earth. The climate conditions are harsh in that area: low air temperature, concentrated rain and snow, and heavy sandstorms. The area also has complicated geology conditions, and groundwater causes corrosion. The 334 International Workshop on Sustainable...

Words: 1723 - Pages: 7

Premium Essay

Pratt Truss Bridge Research Paper

...Pratt Truss Bridge Research Paper The Pratt Truss bridge was a very unique bridge. This particular truss bridge happens to have been an all wooden truss bridge when it was first built in 1844. This truss bridge has very unique features. This truss bridge is very popular and was yet the most important truss bridge because of it's amazing transformation. This bridge is up to hundreds of feet off the ground. The Pratt Truss Bridge was made was by Thomas and Caleb Pratt in 1844. It was a popular railway truss bridge because it had very long spans. It became popular for railway bridges because it was able to have long spans. The Pratt Truss Bridge Environmental factors have affected this specific tremendously. This Pratt truss bridge was all wooden until the Environmental area of this bridge weakened it. So, this bridge has to go from being all wooden to all copper to make. It's always windy and rains and that's what made the wood break down. Since the break down many workers improved it by changing it to all copper metal. The conditions were mainly natural disasters. The natural disasters included rainstorms and tornados. So therefore this bridge has been through a lot because of the change of all wood to all metal. The Pratt Pennsylvania Truss Bridge was made by Caleb and Thomas...

Words: 1157 - Pages: 5

Premium Essay

Shit

...OBJECTIVE [Implement the Model 60 accounting system on the network. Install the Model 60 software, including implementation and setup, training, conversion assistance, and post-conversion support of the library master, general ledger, accounts payable, and import master modules. Provide professional assistance related to this new system and coordinate the bridge to and from the Trey Research and Contoso, Ltd. software. Success of this project is dependent not only on the software, but also on your personnel's skill, effort, and willingness to work as a team.] SCOPE OF SERVICES Procedures [Assist in planning implementation of the Model 60 accounting system. Recommend steps required to successfully install the new system and assist in assembling setup information and accounting data used in the implementation process. Establish specifications for the bridge from the Trey Research software to capture cash receipt information. (Note: Trey Research software has a "general ledger distribution" file that contains information that can be bridged in detail or summary format. The interface (export file) will be written by Trey Research staff.) Establish...

Words: 1002 - Pages: 5

Premium Essay

Piop;

..."H"-byte header is added. What fraction of the network bandwidth is filled with headers? ANS: Message length = M bytes Header length = H bytes Protocol layers = n Header bytes per packet = aH Total bytes per packet = M+aH Fraction of bandwidth filled with header= aH / ( M+aH) If the packets were fragmented it would result in a larger fraction of the bandwidth filled with header information since fragments would have to replicate header information. So this extra header information would increase message overhead. Q2. Research the terms IEEE, IAB, IETF, IRTF, ANSI, EIA, RFC and describe their importance ANS: IAB (The Internet Architecture Board): It is the Internet Society overseer of the technical evolution of the Internet. The IAB supervises the Internet Engineering Task Force (IETF), which oversees the evolution of TCP/IP, and the Internet Research Task Force ( IRTF ),which works on network technology. IEEE (Institute of Electrical and Electronics Engineers): It was formed in 1963 when AIEE merged with IRE. IEEE is an organization composed of engineers, scientists, and students. The IEEE is best known for developing standards for the computer and electronics industry. In particular, the IEEE 802 standards for local-area networks are widely followed. IEEE 802 project which defines popular network technology. A set of network standards developed by the IEEE. They include: IEEE 802.1:-Standards related to network management...

Words: 2790 - Pages: 12

Free Essay

Seismic Assessment

...basin of the Pacific Ocean. There are already many records of strong earthquakes that happened especially in the most populated region of Philippines, National Capital Region (NCR), where casualty reports due to the damage and collapse of structures are about 34,000 people recorded after the strike of Casiguran Earthquake with magnitude 7.2 which landed in Metro Manila in 1968. Considering the event, people nowadays are less concerned about lifelines like bridges as they focus on the danger that vertical structure’s failure can lead to while people are lacking of preparedness and assessment. Bridges allows people to move from remote location by connecting them therefore these play important role in the society (Imhof, 2004). Regarding this, when bridges matter it is subjected to Seismic loading where it is one of the basic concepts of earthquake engineering there are factors to consider like the people who use the bridge and the residents nearby to attain the safety at all cost. Retrofitting is the strengthening of the bridges’ foundation by driving additional piles and reinforcing its columns thus there will be the increase of strength of the foundation. Substantial data cited that Metro Manila will possibly be separated into four regions following the earthquake. The study pointed out that separation into four regions is summarized as: Western part of Metro Manila will be isolated from other parts of Metro Manila by fire and building collapse; northern and southern part of Metro...

Words: 1262 - Pages: 6

Free Essay

Employee Attitudes

...Introduction Many organizations have pondered the subject of employee attitudes and job satisfaction. Research has been done on this subject, and it has been determined that there are 3 major knowledge gaps between HR practice and the scientific research. The article by Saari and Judge , “Employee Attitudes and Job Satisfaction” (2004), discusses not only what those gaps are but what could be done to bridge those gaps. Employee Attitudes The first of the 3 knowledge gaps between HR practice and the scientific research is finding out what the causes of employee attitudes are. The most crucial of the employee attitudes is job satisfaction. The definition of satisfaction as seen by E.A. Locke in his 1976 published article was “a pleasurable or positive emotional state resulting from the appraisal of one’s job or job experiences” (Saari & Judge, 2004). We tend to use both feeling and thinking when we appraise our jobs, just like when we evaluate something of importance to us in our lives,. One of the influences that is usually overlooked by HR specialists when considering job satisfaction is the work itself (Saari & Judge, 2004). There have even been a number of studies that show how one’s job satisfaction can be influenced by one’s temperament. It has also been indicated that the differences in temperament or disposition of some employees can be linked to their differences in job satisfaction, although that relationship has not been fully understood yet. An employee’s...

Words: 1275 - Pages: 6

Premium Essay

Assessment of Student Performance

...COURSE: RESEARCH METHODS PROPOSAL WRITING TOPIC: ASSESSMENT OF STUDENTS: WHETHER END OF SEMESTER EXAMINATION IS THE ONLY INDICATOR OF STUDENTS’ PERFORMANCE. (A CASE STUDY OF UNIVERSITY OF GHANA) INTRODUCTION Lecturers most often use assessment to obtain information that helps them improve their instruction. This in turn helps them to bridge the gap between curriculum standards and student achievement. Assessment is also used for accountability purposes, for both students and teachers. Classrooms are made up of a diversity of learners and so to help them to make appropriate instructional decisions and to provide valid information for accountability, teachers use a wide variety of assessments. PROBLEM DEFINITION Most tertiary institutions determine students’ performance only on the basis of examination at the end of each semester. The issue here is whether examination is enough to determine a student’s performance and whether it’s indeed gives a true and fair view of actual performance. LITERATURE REVIEW Veteran first grade teacher Debbi Beckhorn states "... I have seen many changes in the arena of assessment and monitoring of student progress. More and more, it seems, we need to 'check in' with students more frequently in order to carefully lead them in their next step in the learning process. I use a variety of assessment tools to 'dip in' to a student's progress..."(Beckhorn, 2000). For this first grade teacher, the use of assessment information helps...

Words: 1014 - Pages: 5

Free Essay

Sumbal

...Extension and Revision of the von Baeyer System for Naming Polycyclic Compounds (Including Bicyclic Compounds) (IUPAC Recommendations 1999) Synopsis, Preamble, VB-1 to VB-5 Contents of Section Synopsis Preamble VB-1 Definitions and Terminology VB-2 Main Ring VB-3 Naming Hydrocarbon Bicylic Systems VB-4 Numbering of Bicyclic Systems VB-5 Main Bridge References for this Section [pic] Synopsis These recommendations document the von Baeyer system for naming polycyclic ring systems described in Rules A-31, A-32 and B-14 of the Nomenclature of Organic Chemistry, Sections A, B, C, D, E, F and H, 1979 and R-2.4.2 of A Guide to IUPAC Nomenclature of Organic Compounds, 1993 and extend the system to cover more complex cases. It provides guidance on the naming of ring systems which previously the rules did not cover. The method is to identify the main ring and main bridge which provide the basic bicyclic system and to number these atoms. Then all further bridges, whether or not they include additional atoms, are identified by indicating not only the number of atoms but also the two atoms to which the bridge is attached. The final name also indicates the number of rings and the total number of skeletal atoms in the ring system. Heteroatoms, unsaturation and substituents are indicated in the usual way. Preamble This system of naming polycyclic compounds was first developed for bicyclic compounds by von Baeyer (ref 1) and was extended to tricyclic systems by Buchner and Weigand...

Words: 1366 - Pages: 6

Premium Essay

Definig Marketing Paper

...service. When thinking of marketing the best way to define it is to think of it as a bridge that stretches from the producer to the consumer. Throughout this paper the author will define marketing from two different sources, explain the importance of marketing in organizational success, based on these definitions, and provide at least three examples from the business world to support her explanation. Marketing Definitions Marketing is the management process through which goods and services move from one concept to the consumer (Business Dictionary.com, 2012). As a practice it consists of four different elements, such as the 4P’s. The first P is identification, selection, and development of a product. Secondly is the determination of the price. The third P is the selection of a distribution channel to reach the customers place. Last is development and implementation of a promotional strategy (Business Dictionary.com, 2012). According to the American Marketing Association (2011), “Marketing research is the function that links the consumer, customer, and public to the marketer through information--information used to identify and define marketing opportunities and problems; generate, refine, and evaluate marketing actions; monitor marketing performance; and improve understanding of marketing as a process. Marketing research specifies the information required to address these issues, designs the method for collecting information, manages and implements the data collection process,...

Words: 853 - Pages: 4

Free Essay

Essay

...511-4422 Permanent Address: 21 School Avenue, Philadelphia, PA 19111 OBJECTIVE To obtain a summer internship in the field of civil engineering that will utilize my problem solving and leadership skills. EDUCATION Carnegie Mellon University Pittsburgh, PA Bachelor of Science in Civil Engineering, May 2013 Overall GPA: 3.20/4.0 Best High School Philadelphia, PA High School Diploma, June 2009 GPA 3.82/4.0 PROJECTS Cardboard Structure, Fall 2009 • Designed and constructed a cardboard bridge meant to support the average adult male. • Prepared scale models for analysis of alternatives, prior to final test. Brick Wall Scheduling, Fall 2009 • Developed a bid proposal for building a brick wall. • Conducted time studies and generated Gantt charts to investigate most economical method of using resources. Traffic Light Timing, Fall 2009 • Conducted studies on the flow of traffic through three intersections on Forbes Avenue. • Designed more efficient traffic light cycles based on collected data. WORK Pennsylvania Governor’s School for the Sciences Pittsburgh, PA EXPERIENCE Teaching Assistant, Summer 2010 • Graded papers, fielded questions and held review sessions for Organic Chemistry. • Led a group of students in the area of Spectroscopic...

Words: 1792 - Pages: 8

Premium Essay

Codebridge Problem Solving

...APPROACH MANAGEMENT AND ORGANIZATION( M&O) Realized by: Steven Pango (ADD YOURS NAME TOO) SAXION, INTERNATIONAL BUSINESS AND MANAGEMENT STUDIES Chapter 16, 8, 12 Supervisors: Mr. Bernard Berg van den Table of contents (Not knowing if we will add something more) 1. Introduction Code Bridge is a coding and web designing company, which was founded by Kevin Hoogerwerf and Niels van den Daas in the Netherlands in the year 2013 The company develop APIS and custom systems for individuals and also for cooperation functioning. Code Bridge is specialized in PHP, JavaScript, Laravel/Lumens, elastic search and various Amazon Systems as EC2, S3 and RDS. The business deals with other languages than dutch. Following the innovative stream CodeBridge builds app for IOS or Android, additionally they ensure that the app is placed in the store and the team is in continuous standby for extension or eventual problems. Reviewing business' site, repairing links, add new features are also other duties that CodeBridge can fulfill. During this plan of approach we will describe the main objective of the research, the central research question and the sub-questions. We will also express the research methods that will be used in order to answer the questions and come up with the strategies. 1.1. Problem description The main problem is that CodeBridge being in the market for 3 years hasn't fully completed its staff. The affluence of employees per year is low. People are considered as the best asset...

Words: 822 - Pages: 4

Premium Essay

Wormholes and the Possibility of Travel Through Space-Time

...through space-time. The research looked at understanding what wormhole is, and the findings were that this is a theoretical passage that happens through the specimen. It is possible of creating shortcuts for the long journeys that could take place in the universe. The general theory of general relativity has been used to explain and predict wormholes. Wormholes discovery The Wormholes theory can trace its root up to the year 1935 when a well-known genius and physicist Albert Einstein and Nathan Rosen discussed and used the theory of general relativity. It was used in proposing for the existences of bridges through space-time. It is these bridges or the pathways that were called the Einstein-Rosen bridges or the Wormholes. The main purpose of the two is to connect two different points in space-time thus when looked and explained theoretically they created a shortcut that could reduce the travel time and also the distance. There is something to worry about the wormholes is that they bring with them risks and dangers of sudden collapsing that is associated with high radiation and other hazardous dangers when in contact with exotic matter. Wormholes space-time in the scientific community The need to integrate wormholes into the scientific community did continue even after the wormhole theory was put across, and it was high accepted in the scientific community. The most recent research about wormholes was done by a US physicist Kip Thorne and his research have led to the introduction...

Words: 1098 - Pages: 5