Building Construction Analysis

This assignment is elaborated through the construction process and detailed six logical stages of our residential buildings being constructed. Readers will be given a rough picture of how and why our home house comes into being step by step gradually in the way we are familiar. Also, technical data related to the construction materials are discussed. So the reason why the materials are chosen and the methodology of construction are to be carried out.

Many pictures used in this assignment were taken in some real construction sites (Dunraven Drive and Winchester Crescent, Pimpama, QLD, 4209) while some were employed by internet searching.

Section Zero – Pre-construction Preparation

Before a formal construction process can commence there are lots of matters needing to be considered and relevant documentation should be completed. Some legal requirements are also to be met.

In the pre-design stage, a family/stakeholders conference is an ideal way to determine every party’s needs so that individual requirements, house parts’ size and their priority could be finalized, which in turn leads to the real designing stage. Some professional consultants could be employed, e.g. architects, valuers, surveyors, structural/electrical/mechanical/hydraulic/geo-technical engineers. The output documentation includes but not limited to design drawings, building drawings (floor plan, roof plan, etc.), service diagram, wet area details, geo-technical report, flora and fauna assessments and construction specifications. Local government authorities are to be consulted to get necessary documentation for legal compliance. A DA (Development Application) and a BCC (Building Construction Certificate) issued by the local council are compulsory before a development can begin physically.

Section One - Site Preparation

After all design and legal

Similar Documents

Premium Essay

Business

...Department of Building Masters | Philosophy of the Department | Vision & Mission Statement | Admission Requirements | Course Outline | Course Description | Career Prospects | Student Welfare | Teaching & Research Facilities | Staff | List of Students | Publications | Course Evaluation & Exams | Msc Construction Project Management | Admission into the Masters of Science programme can be obtained through: (a) Candidates with B. Sc or B. Tech. (Building) with a minimum of second class lower or GPA not less than 2.50 (on a 5-point scale) (b) HND Building plus PGD (with upper credit) from any recognized university Duration and Mode of Study. The programme is a full time programme which runs for a minimum of 18 months. The mode of study for the programme is through a comprehensive course work to be examined in both oral and written papers, seminars and other necessary work to be contained in a submitted thesis. Employment Opportunities Graduate of the programme will have further relevance in the following areas: (a) Public sector, government ministries, parastatals and research institutes (b) Private sector employments and related industries, oil and gas, power and steel, telecommunications.   COURSE CODE | COURSE TITLE | UNIT | BD 701 | Construction Plants and Equipments | 2 | BD 703 | Construction Planning and Contract Practice | 2 | BD 705 | Construction Finance | 2 | BD 707 | Research Methodology | 2 | BD 709 | Project Feasibility Analysis/Studies...

Words: 1384 - Pages: 6

Free Essay

Assessment of Bim in the Aec Industry

...ASSESSMENT OF THE USE OF BUILDING INFORMATION MODELING (BIM) IN THE NIGERIAN AEC INDUSTRY. A case study of selected firms. BY GYET, DAVID U11AT1038 PROJECT SUBMITTED TO THE DEPARTMENT OF ARCHITECTURE, FACULTY OF ENVIRONMENTAL DESIGN, AHMADU BELLO UNIVERSITY ZARIA IN PARTIAL FULFILLMENT FOR THE AWARD OF BACHELOR OF SCIENCE (BSc.) DEGREE IN ARCHITECTURE AUGUST 2015 DECLARATION I hereby declare that the work in this project titled “ASSESSMENT OF THE USE OF BUILDING INFORMATION MODELING (BIM) IN THE NIGERIAN AEC INDUSTRY. A case study of selected firms.” has been performed by me in the department of Architecture, Ahmadu Bello University Zaria under the supervision of Arc A.S Salisu. The information derived from the literature has been duly acknowledged in the text and a list of references provided. No part of this project report was previously presented for another degree or diploma at this or any other institution. ____________________________ _______________________ Gyet David Date (U11AT1038) . CERTIFICATION This project report entitled “ASSESSMENT OF THE USE OF BUILDING INFORMATION MODELING (BIM) IN THE NIGERIAN AEC INDUSTRY. A case study of selected firms.” By GYET DAVID (U11AT1038) meets the regulations governing the award of the degree of Bachelor of Science in Architecture (BSc. Architecture) of Ahmadu Bello University, and is approved for...

Words: 12168 - Pages: 49

Premium Essay

Ocean Paper

...Defining an Industry: What is the size and scope of the Australian Building and Construction Industry? By Gerard de Valence DEFINING AN INDUSTRY: WHAT IS THE SIZE AND SCOPE OF THE AUSTRALIAN BUILDING AND CONSTRUCTION INDUSTRY? Gerard de Valence Construction Economics, Faculty of Design, Architecture and Building, University of Technology, Sydney, Australia Introduction The traditional structure-conductperformance approach to industry economics originated in the US in the 1930s with the work of Mason (1939) and Bain (1959). This is now the standard framework for analysing the dynamics of an industry. However, the size and scope of the Australian construction industry at the turn of the millennium may be better understood using an alternative model that highlights the diversity of the industry and the range of actors involved. Industry analysis has traditionally focused on groups of firms with similar characteristics in their production processes, goods or services produced, and markets served in the wider economy. The distinction has been between firms and industries, and the analysis has emphasised the importance of economies of scale and scope (Sutton 1991) or organisational structure (Williamson 1979). One major difficulty in the standard structure-conduct-performance approach has been the definition of industries within the theoretical criteria of product homogeneity. Further, some analysts see the construction industry as a manufacturing system, similar to the automotive industry...

Words: 6294 - Pages: 26

Premium Essay

Economic Evaluation of Investment

...CRAWFORD UNIVERSITY, IGBESA, OGUN STATE PGD ACCOUNTING ECONOMIC EVALUATION OF INVESTMENT “A SYSTEM FOR BUILDING CONSTRUCTION PROJECTS IN THE CONCEPTUAL PHASE” BY ADENUGA OLUFEMI SOLOMON MATRIC NO: PG14/05/005 JUNE 2015 ECONOMIC EVALUATION OF INVESTMEST “A SYSTEM FOR BUILDING CONSTRUCTION PROJECTS IN THE CONCEPUTAL PHASE” ABSTRACT The conceptual phase of capital projects is of strategic importance – an economic evaluation at this early stage is critical to the owners’ decision-making with limited information. The current study developed a comprehensive but practical system that can be used in such an early phase for economic evaluation of capital building construction projects. The system integrates four analytical steps: (i) Project planning, (ii) Construction costs estimation, (iii) Projection of incomes and expenditures and; (iv) Economic evaluation. Due to the integration, the system effectively manages the information flow from the planning to the evaluation, in which any changes from the initial plan are fully accounted for multiple alternates. In the system, users predict construction cost using a combined estimating method with historical project data and assembly costs. The system performs the tabulation of all incomes and expenditures based on the automated calculation as well as users’ inputs and then the economic evaluation based on project cash flow, which is generated using an automated scheduling method. System performance has been...

Words: 3364 - Pages: 14

Premium Essay

Risk Management

...……………………………………………………..10 4. Conclusion 12 5. References 13 1. Introduction “This project is to introduce a new construction facility to house a state-of-the-art student union for MSOE, focusing on sustainability, green technologies, and renewable energy”. The Campus Center, or “CC” at Milwaukee School of Engineering (MSOE) is currently home to the student bookstore, administrative offices, a small café, a variety of classrooms for different disciplines, and a third-floor lounge area for students to gather to study or relax (Milwaukee School of Engineering, 2016). This aging building has served MSOE well for many years, but the growing school requires a proper student union to remain competitive with other top ranked schools in the Midwest. This project will provide a new construction facility to house a state-of-the-art student union for MSOE, focusing on sustainability, green technologies, and renewable energy sources to showcase the commitment of MSOE to the future health and well being of the Milwaukee area. 2. Risk Management Planning When analyzing the risks that takes place during the project planning phase. what is sometimes dificult to access is how the risk analysis should take place. The most dificult part of a project is getting things started. This plan is very detialed and it will take you through the steps of risk analysis in a graghic way. and using the example of this project which is to enhance and improve the overall project. The project...

Words: 1718 - Pages: 7

Premium Essay

Design Cost Planning and Control

...on timetable) e.g. D17AA Lecturer Prince Arthur H00112430 Construction Project Management 2011 to2012 D39CC Andrew Jackson Coursework title Design Cost Planning and Control Coursework hand-in deadline (date specified for hand- in) June 22 2012 All students are advised to keep a duplicate copy of all work submitted for reference. DECLARATION I certify that this assignment is my original work expressed in my own words. Any reference made to the work of other authors in any form (eg ideas, figures, text, tables) are acknowledged at their point of use. Signature/s of student ……………………………… Date of submission: ……………………… Below this line for office use only ………………………………………………………………………………………………………………………………………… School of the Built Environment Heriot-Watt University Edinburgh EH14 4AS Scotland UK Tel: 0131 449 5111 Fax: 0131 451 3161 Date Stamp Assignment: A high –level report, advising the client on the viability of the proposed project, a three storey Health Center, 4500 m2 Gross Floor Area (GFA). 1 Table of Contents Introduction………………………………………………………………………………………………………………3 BCIS Analysis Data………………………………………………………………………………………………………4 Sustainability………………………………………………………………………………………………………………..6 Building Research Establishment Assessment Method………………………………………………8 Appendices…………………………………………………………………………………………………………………9 References……………………………………………………………………………………………………………………15 Introduction Construction Cost Estimating is considered one of the most essential tasks...

Words: 3580 - Pages: 15

Premium Essay

Industrialised Building System

...1.1 Introduction Industrialized Building System (IBS) is the phrase used by the industry and government in Malaysia which stand for the adoption of construction industry and the use of prefabrication of components in building construction. IBS is defined as a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site work [1-4]. It consists of precast component systems, fabricated steel structures, innovative mould systems, modular block systems and prefabricated timber structures as construction components [3]. Parts of the building that are repetitive but difficult and too time consuming and labor intensive to be casted onsite – are designed and detailed as standardized components at the factory and are then brought to the site to be assembled [3]. The onsite casting activities in IBS utilize innovative and clean mould technologies [1-3]. The construction industry has started to embrace IBS as a method of attaining better construction quality and productivity, reducing risks related to occupational safety and health, alleviating issues for skilled workers and dependency on manual foreign labor, and achieving the ultimate goal of reducing the overall cost of construction. Apart from this, it offers minimal...

Words: 3028 - Pages: 13

Premium Essay

Risks in a Home Building Project

...Estimating a Home Building Project Michael T Bell PMAN 637 Originality Score 6% A Review of Risks Associated With Estimating a Home Building Project Introduction In building and construction, there are risks associated with estimating a home building project. These risks in construction are all the same across the board regardless the construction. Therefore, a home building projects is confronted with the same risks as any other project in the construction industry. The risks involved are such as; project management risks. The project management risks are mainly because of improper schedule. The improper schedule may be caused by poor allocation of time in various projects that may be involved in a home building project. Poor resource planning is another management risk. This is because due to poor allocation of resources often lead to misuse and many unaccounted losses. In addition, improper and poor management of disciplines or methodologies result into management risks in a home building project. Disciplines and methodologies are tricky and need a lot of experience to manage. Therefore, a minor mistake in management of discipline and methodology is a risk that can cause a huge negative impact in a home building project. Such risks are better identified with scheduled risks. Organizational risk is a major risk that most building and construction projects have to face, Most organizational risks in home building projects results...

Words: 1501 - Pages: 7

Premium Essay

Variation Order In Construction

...Akitek Malaysia” (PAM 1998) standard form of building contract that are related with the variation orders. The data was analyzed by using mean score method and rank to conclude the findings. The result from questionnaires survey showed three most significant causes of variation orders which were: “Change of plan by owner”, “Substitution of materials by owner”, and “Changes of design by consultant”. The finding concluded that owner was the significant source of the variation orders in construction of building projects and suggested procedures to control the change orders by making a efficient and adequate planning, recourses must be available in the beginning of a project in order tominimize variation order during the construction stage. made a questionnaire that was developed to help the clients, consultants, and contractors by showing the relative importance of ceeffects of delay in Malaysian construction industry. They found that changing orders was an important factor in delaying projects but not among the top 10 factors in Malaysia. investigated the ce eoco on construction projects in india through a questionnaire surveys. The collected data is analyzed using Relative Importance Index...

Words: 1258 - Pages: 6

Premium Essay

Building Energy Analysis

...3 MATERIALS AND METHODOLOGY 3.0 INTRODUCTION Energy analysis of buildings helps to simulate the amount of energy used in a building. It is very important as it helps to discover and ascertain new ways of conserving energy and ensuring energy efficiency of building components. Building developers, construction engineers are increasingly interested in creating more energy efficient reason, and for this purpose whole building energy simulation programs are being used to determine strategies that save energy and are cost effective. The most common way available to perform this building energy analysis is to implement building information modelling(BIM). Building Information Modelling(BIM) consists of a digital representation of physical and functional...

Words: 1267 - Pages: 6

Free Essay

Resume and Cover Letter

... 4 Advanced Mathematics Mathematics Analysis: Series Limit, Calculus, General Theory of Series, Function Series and Power Series, Fourier series, Leaning Differential Coefficient, layer Integral, Curve Integral, Mapped Limit and Progression of Euclid Space. Advanced Algebra: Determinant, Linear Equation, Matrix, Linear Space, Linear Change, Euclid Space No.5 Descriptive Geometry and Mechanical Graphing Descriptive Geometry and Shadows, Perspective Drawing, Projection Standard, Axis Measure Chart Fundamentals of Architectural Design No.6 Building Materials This course teaches the nature, purpose, method of preparation and use, as well as civil engineering materials testing and quality control methods, and to understand the relationship between material properties and materials engineering structures, as well as ways to improve performance. Through this course, you should be able to reasonable selection of materials for different projects, and to work closely with the follow-up courses to understand the relationship between the material and the design parameters and construction measures chosen. No. 7 Metrology Construction Engineering Mechanics measure is specialized elective courses. Every stage of construction, are inseparable from survey work, should work as a pilot to measure. Therefore, any person engaged in engineering and construction technicians must master the knowledge and skills necessary measurements. Construction surveying measurements are an integral...

Words: 838 - Pages: 4

Premium Essay

Project Management 595

...associated with the construction of the Empire State Building. Risk is defined as the probability that an unfavorable outcome will occur. This paper will be addressing the possibilities of fire detection failure in the entire Empire State Building and the root cause of the failure, and also to mitigate the problem. Because of the size of the building and the number of level it is very important for the fire detection to be working perfectly. - It will also address possibility of power failure and the likely cause of the failure risk associated with the construction of the Empire State Building. Fault tree Analysis will be used to find the out the causes of the failures. The second risk is the possibility of water leakage in the building. Fault tree analysis is used to illustrate the likely problem and the root cause of the problem. Sources of construction project risk: The project manager will use the budget which was based on the historical data for similar project. Timeline of any project is very critical. Completing a project within the budget and schedule has always been the goal of a project manager, so for that reason the project manager will set the completion date with the callobration of the stakeholders of the project. The project manager will performing a realistic assessment of the project duration and sequence at the early stage or planning stage of the project. This schedule will be monitored throughout the design and construction. The project manager...

Words: 285 - Pages: 2

Premium Essay

Ratio Analysis

...Industry Profile Introduction: Construction is the process of creating and building infrastructure or a facility. It differs from manufacturing in that manufacturing typically involves mass production of similar items without a designated purchaser and construction is typically done on location for a known client. Construction as an industry is six to nine percent of the gross domestic product of developed countries. Construction starts with planning, design, and financing and continues until the project is built and ready for use. Large scale construction is a feat of human multitasking. A Project manager normally manages the job, and a construction manager, design engineer, construction engineer or project architect supervises it. For the successful execution of a project, effective planning is essential. Those involved with the design and execution of the infrastructure in question must consider the zoning requirements, the environmental impact of the job, the successful scheduling, budgeting, construction site safety, availability and transportation of building materials, logistics, inconvenience to the public caused by construction delays and bidding, etc. Types of CONSTRUCTION: In general, there are three sectors of construction: buildings, infrastructure and industrial. Building construction is usually further divided into residential and non-residential (commercial/institutional). Infrastructure is often called heavy/highway, heavy civil or heavy engineering. It includes...

Words: 4818 - Pages: 20

Premium Essay

Marketing Plan

...company in tools and equipment in UK Speedy Hire Plc is looking to diversify its business for the growth and future presence in the competitive business environment. This report is about to research the global marketplace for the business sector and develop a revised strategic and tactical marketing plan. I define our marketing goal as “the diversification of the business” by entering into the market as a construction contractor in both target markets 1 and 2 i.e. House building and Infrastructure. The marketing objective focuses on the efficient service and quality by keeping the market’s demand into consideration. To fulfil our objectives company will follow different strategic approaches like cost-leadership, mixed strategy depending upon the target market demand and strengths of the company. The reason for selecting House building and Infrastructure construction as the target market is the past and forecasted growth and the growing demand in these sectors in coming years which provides ample opportunity to do business and gain profit and market share. Situational Analysis: Company profile: Speedy Hire PLC (www.speedyhire.plc.uk and www.speedyhire.co.uk) is the UK’s number one provider of tools and equipment for hire. The company operates from more than 350 depots in the UK and the Republic of Ireland. Speedy was traditionally focused on tool hire, but now also has complementary businesses specialising in portable accommodation, lifting, surveying, compressed air systems...

Words: 6288 - Pages: 26

Free Essay

Buildings

...Buildings 2013, 3, 506-531; doi:10.3390/buildings3030506 OPEN ACCESS buildings ISSN 2075-5309 www.mdpi.com/journal/buildings/ Review Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs Nuhu Braimah Civil Engineering Department, School of Engineering and Design, Brunel University, Uxbridge, Middlesex UB8 3PH, UK; E-Mail: nuhu.braimah@brunel.ac.uk; Tel.: +44-0-1895-265-919; Fax: +44-0-1895-269-782 Received: 8 May 2013; in revised form: 1 July 2013 / Accepted: 18 July 2013 / Published: 23 July 2013 Abstract: The time for performance of a project is usually of the essence to the employer and the contractor. This has made it quite imperative for contracting parties to analyse project delays for purposes of making right decisions on potential time and/or cost compensation claims. Over the years, existing delay analysis techniques (DATs) for aiding this decision-making have been helpful but have not succeeded in curbing the high incidence of disputes associated with delay claims resolutions. A major source of the disputes lies with the limitations and capabilities of the techniques in their practical use. Developing a good knowledge of these aspects of the techniques is of paramount importance in understanding the real problematic issues involved and their improvement needs. This paper seeks to develop such knowledge and understanding (as part of a wider research work) via: an evaluation of the most common DATs based on a case study...

Words: 9710 - Pages: 39