Smith’s House
Project Progress Report

12/16/2012
ABC Construction Inc.
Project Manager

TABLE OF CONTENTS

introductioN 1 Major Project activities 1 ASSUMPTIONS 2 ORIGINAL PROJECT Network schedule 3 Project Responsibility Matrix 4 Project cost summary 5 COST ASSUMPTIONS 5 CHANGE REQUEST format 7 revised schedule analysis 7 REVISED PROJECT SCHEDULE 8 REVISED COST SUMMARY 9 SUMMARY 10 REFERENCES 11

introductioN
Mr Smith wants to build a 2-storey framed house and so he has appointed ABC construction Inc. for construction of the house. Mr Smith has got the blue prints ready through XYZ architects and has issued the letter of intent to ABC Inc. with a project deadline of 14 weeks. The contract clauses include penalty for delays and bonus for early completion. The material procurement is excluded from the scope of ABC Inc. and it’s a free issue material through a local vendor fixed by Mr Smith. The project has progressed into its 6 week and activity 9 is under progress. Mr Smith now wants to change the original configuration of the house by adding a wing to it. A formal change request has been raised and this report analyses the effect of the change on the schedule and cost of the project. A copy of the change request form is also attached. The main stake holders in this project are: * Mr Smith as investors and owner. * XYZ architects as consultants. * Material supplier * ABC Construction Inc. as project construction contractors. * Civic authorities involved in approving the project.
Major Project activities

Activity No | Activity description | Duration(days) | Effort Staff days | Predecessor | Remark | 1 | Get a building permit. | 5 | 1 | | | 2 | Clear the site. | 5 | 20 | 1 | | 3 | Dig the foundation and footings. | 3 | 9 | 2 | | 4 | Install forms. | 3 | 9 | 3 | | 5 | Pour concrete. | 1 | 5 | 4 | | 6 | Wait for the concrete to harden. | 5 | 0 | 5 | Not an activity | 7 | Remove forms. | 1 | 3 | 6 | | 8 | Back-fill and compact | 2 | 2 | 7 | | 9 | Build the floor. | 1 | 5 | 8 | | 10 | Frame the first floor. | 2 | 10 | 9 | | 11 | Build the second floor. | 2 | 10 | 10 | | 12 | Frame the second floor. | 3 | 15 | 11 | | 13 | Sheath the house. | 3 | 12 | 12 | | 14 | Install windows and doors. | 4 | 8 | 13 | | 15 | Install siding. | 2 | 6 | 14 | | 16 | Put up roof framing. | 2 | 8 | 12 | | 17 | Shingle the roof. | 1 | 4 | 16 | | 18 | Install plumbing. | 4 | 8 | 17 | | 19 | Inspect the plumbing. | 1 | 0 | 18 | | 20 | Install wiring. | 6 | 12 | 17 | | 21 | Inspect the wiring. | 1 | 0 | 20 | | 22 | Hang and finish sheetrock. | 4 | 12 | 18, 21 | | 23 | Paint the interior. | 3 | 9 | 22 | | 24 | Install the hardwood flooring. | 3 | 6 | 23 | Before carpet | 25 | Lay the carpet. | 2 | 6 | 24 | After flooring | 26 | Install trim. | 3 | 6 | 24 | After paint | 27 | Procure the certificate of occupancy. | 5 | 0 | 25,26 | Final activity |

ASSUMPTIONS * Materials along with transportation are excluded from scope of ABC Inc. * All debris and construction waste shall be collected at one corner of the plot. The disposal of the same is excluded from the scope. * Project start Date is 12th July 2012. * Back-fill and compaction has been considered as an activity after removal of form work. * Lay of carpet has been considered after installation of hardwood flooring. * Saturday and Sunday are weekly holidays.

ORIGINAL PROJECT Network schedule

Project Responsibility Matrix

Resources | General contractor | Heavy-equipment operator | Concrete worker | Framer | Siding installer | Window/door installer | Roofer | Painter | Electrician | Flooring installer | Trim carpenter | Plumber | No | Task | | | | | | | | | | | | | 1 | Get a building permit. | 1 | | | | | | | | | | | | 2 | Clear the site. | | 1 | | | | | | | | | | | 3 | Dig the foundation and footings. | | 1 | | | | | | | | | | | 4 | Install forms. | | | 1 | | | | | | | | | | 5 | Pour concrete. | | | 1 | | | | | | | | | | 6 | Wait for the concrete to harden. | | | | | | | | | | | | | 7 | Remove forms. | | | 1 | | | | | | | | | | 8 | Back-fill and compact | | 1 | | | | | | | | | | | 9 | Build the floor. | | | 1 | | | | | | | | | | 10 | Frame the first floor. | | | | 1 | | | | | | | | | 11 | Build the second floor. | | | 1 | | | | | | | | | | 12 | Frame the second floor. | | | | 1 | | | | | | | | | 13 | Sheath the house. | | | | | 1 | | | | | | | | 14 | Install windows and doors. | | | | | | 1 | | | | | | | 15 | Install siding. | | | | | 1 | | | | | | | | 16 | Put up roof framing. | | | | | | | 1 | | | | | | 17 | Shingle the roof. | | | | | | | 1 | | | | | | 18 | Install plumbing. | | | | | | | | | | | | 1 | 19 | Inspect the plumbing. | | | | | | | | | | | | 1 | 20 | Install wiring. | | | | | | | | | 1 | | | | 21 | Inspect the wiring. | | | | | | | | | 1 | | | | 22 | Hang and finish sheetrock. | | | | | 1 | | | | | | | | 23 | Paint the interior. | | | | | | | | 1 | | | | | 24 | Install the hardwood flooring. | | | | | | | | | | 1 | | | 25 | Lay the carpet. | | | | | | | | | | 1 | | | 26 | Install trim. | | | | | | | | | | | 1 | | 27 | Procure the certificate of occupancy. | 1 | | | | | | | | | | | | 1: Actual responsibility |
Project cost summary
Rate Table: Resource | Hourly Rate $/hour | General contractor | 40.00 | Heavy-equipment operator | 50.00 | Concrete worker | 30.00 | Framer | 20.00 | Siding installer | 20.00 | Window/door installer | 30.00 | Roofer | 20.00 | Painter | 20.00 | Electrician | 35.00 | Flooring installer | 20.00 | Trim carpenter | 35.00 | Plumber | 35.00 |
COST ASSUMPTIONS * Rates as per table above * All resources with Actual responsibility are assigned 100 % loading. * All cost is based on 9-hours per day basis. * All over-heads and direct cost are assumed to be taken care in Man-hour rate. * Man-hour rate includes contractors profit also. * Inspection days are reduced to single days for both wings. | | Effort (staff days) | General contractor | Heavy-equipment operator | Concrete worker | Framer | Siding installer | Window/door installer | Roofer | Painter | Electrician | Flooring installer | Trim carpenter | Plumber | No | Task | | Man-hours | 1 | Get a building permit. | 1 | 9 | | | | | | | | | | | | 2 | Clear the site. | 20 | | 180 | | | | | | | | | | | 3 | Dig the foundation and footings. | 9 | | 81 | | | | | | | | | | | 4 | Install forms. | 9 | | | 81 | | | | | | | | | | 5 | Pour concrete. | 5 | | | 45 | | | | | | | | | | 7 | Remove forms. | 3 | | | 27 | | | | | | | | | | 8 | Back-fill and compact | 2 | | 18 | | | | | | | | | | | 9 | Build the floor. | 5 | | | 45 | | | | | | | | | | 10 | Frame the first floor. | 10 | | | | 90 | | | | | | | | | 11 | Build the second floor. | 10 | | | 90 | | | | | | | | | | 12 | Frame the second floor. | 15 | | | | 135 | | | | | | | | | 13 | Sheath the house. | 12 | | | | | 108 | | | | | | | | 14 | Install windows and doors. | 8 | | | | | | 72 | | | | | | | 15 | Install siding. | 6 | | | | | 54 | | | | | | | | 16 | Put up roof framing. | 8 | | | | | | | 72 | | | | | | 17 | Shingle the roof. | 4 | | | | | | | 36 | | | | | | 18 | Install plumbing. | 8 | | | | | | | | | | | | 72 | 20 | Install wiring. | 12 | | | | | | | | | 108 | | | | 22 | Hang and finish sheetrock. | 12 | | | | | 108 | | | | | | | | 23 | Paint the interior. | 9 | | | | | | | | 81 | | | | | 24 | Install the hardwood flooring. | 6 | | | | | | | | | | 54 | | | 25 | Lay the carpet. | 6 | | | | | | | | | | 54 | | | 26 | Install trim. | 6 | | | | | | | | | | | 54 | | | Total Man-hours | 9 | 279 | 288 | 225 | 270 | 72 | 108 | 81 | 108 | 108 | 54 | 72 | | MH Rate | 40 | 50 | 30 | 20 | 20 | 30 | 20 | 20 | 35 | 20 | 35 | 35 | | Total cost | $ 49140.0 | | | | | | | | | |

CHANGE REQUEST format

Change Request - GENERAL INFORMATION | CR | CR001 | Type of CR | Enhancement | Defect | | Project/Program/Initiative | | Submitter Name | Mr. Smith | Brief Description of Request | Addition of another wing with the existing under-construction framed structure. | Date Submitted | [08/10/2012] | Date Required | [08/16/2012] | Priority | Low | Medium | High | Mandatory | Reason for Change | Owners Preference | Other Artifacts Impacted | All works after sheathing i.e. activity 13 | Assumptions and Notes | All change in schedule and cost are accountable to the Owner. | Comments | 6- Weeks of delay. | Attachments or References | Yes | No | | | Link: Blue prints of new house | Approval Signature | ABC. Inc. | Date Signed | 08/10/2012 | revised schedule analysis
The change request has been submitted on 10th August 2012 and after approval from Change Board the work for the new wing will commence on 20th August 2012. The activity of the original building will continue till sheathing and stop till the new-wing sheathing is completed. From week 8-12 there will be no work in the original building. The work for installing doors and windows along with other activities will commence after week 13 and end by week 20. A total delay of 6-weeks is expected.

REVISED PROJECT SCHEDULE

REVISED COST SUMMARY

| | Effort (staff days) | General contractor | Heavy-equipment operator | Concrete worker | Framer | Siding installer | Window/door installer | Roofer | Painter | Electrician | Flooring installer | Trim carpenter | Plumber | No | Task | | Man-hours | 1 | Get a building permit. | 2 | 18 | | | | | | | | | | | | 2 | Clear the site. | 20 | | 180 | | | | | | | | | | | 3 | Dig the foundation and footings | 15 | | 135 | | | | | | | | | | | 4 | Install forms. | 15 | | | 135 | | | | | | | | | | 5 | Pour concrete. | 8 | | | 72 | | | | | | | | | | 7 | Remove forms. | 5 | | | 45 | | | | | | | | | | 8 | Back-fill and compact | 4 | | 36 | | | | | | | | | | | 9 | Build the floor. | 9 | | | 81 | | | | | | | | | | 10 | Frame the first floor. | 14 | | | | 126 | | | | | | | | | 11 | Build the second floor. | 14 | | | 126 | | | | | | | | | | 12 | Frame the second floor. | 23 | | | | 207 | | | | | | | | | 13 | Sheath the house. | 18 | | | | | 162 | | | | | | | | 14 | Install windows and doors. | 12 | | | | | | 108 | | | | | | | 15 | Install siding. | 9 | | | | | 81 | | | | | | | | 16 | Put up roof framing. | 14 | | | | | | | 126 | | | | | | 17 | Shingle the roof. | 7 | | | | | | | 63 | | | | | | 18 | Install plumbing. | 12 | | | | | | | | | | | | 108 | 20 | Install wiring. | 16 | | | | | | | | | 144 | | | | 22 | Hang and finish sheetrock. | 18 | | | | | 162 | | | | | | | | 23 | Paint the interior. | 12 | | | | | | | | 108 | | | | | 24 | Install the hardwood flooring. | 9 | | | | | | | | | | 54 | | | 25 | Lay the carpet. | 6 | | | | | | | | | | 54 | | | 26 | Install trim. | 9 | | | | | | | | | | | 81 | | | Total Man-hours | 18 | 351 | 459 | 333 | 405 | 108 | 189 | 108 | 144 | 108 | 81 | 108 | | MH Rate | 40 | 50 | 30 | 20 | 20 | 30 | 20 | 20 | 35 | 20 | 35 | 35 | | Total cost | $ 69795.0 | | | | | | | | | |

SUMMARY
Original Project End Date: 24th sept 2012
Original Project Cost: $49140.0
Revised Project End Date: 15th Nov 2012
Revised Project Cost: $69795.0

REFERENCES
Meredith, Jack and Mantel, Samuel (2008) Project Management: A Managerial Approach, London: John Wiley & sons
Leach, Lawrence (2000) Critical Chain Project Management, Norwood: Artech House, Inc.

Similar Documents

Premium Essay

Nt1310 Request for Proposal

...Request for Proposal 1. Summary and Background: Springfield Municipal Library is currently accepting proposals to develop design and launch a new computer networking system. The current system is seriously antiquated. Currently, the library is using a 100BaseT system, which has been in use since 1998. In an effort to achieve better results for our patrons, we would like to upgrade our system to reflect a new direction for our library; capable of providing more information and better results for our students to learn. The purpose of this Request for Proposal (RFP) is to solicit proposal from various candidate organizations, conduct a fair and extensive evaluation based on criteria listed herein and select the candidate who best represents the direction Springfield Municipal Library wishes to go. Springfield Municipal Library was founded in 1955 and has undergone structural upgrades in the 70’s and 80’s. With these changes in the 70’s, came the computer systems using 10BaseT. In the 90’s was another upgrade to 100BaseT. This system is now quite inadequate for our customers and desperately needs an improvement. Springfield Municipal Library is located in Springfield, Illinois and has satellites buildings throughout the city. 2. Proposal Guidelines: This Request for Proposal (RFP) represents the requirement for an open and competitive process. Proposals will be accepted until 5pm EST, April 15, 2014. Any proposal received after this date and time will be returned to sender...

Words: 1004 - Pages: 5

Free Essay

Pm598 Rfp

...PM598 – Go Green Consulting’s RFP 2010 Go Green Consulting’s Headquarters Go Green Consulting 13591 SE Sunnyside Rd Clackamas, OR 97015 Telephone: 503.432.5864 E-mail: tnbackes@me.com Wikispaces: http://gogreenconsulting.wikispaces.com Tara Backes, Mandalyn Echols, Raj Rami PM598 – Fall 2010 Pg 1 of 14 PM598 – Go Green Consulting’s RFP 2010 TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS............................................................................................................3 1.1. General Description of Work..............................................................................................................3 1.2. What Must Be Included with Bid .......................................................................................................3 1.3. Schedule of Bid Period Activities.......................................................................................................3 1.4. Location of Work ................................................................................................................................3 1.5. Pre-Bid Meeting..................................................................................................................................4 1.6. Owner Contact for Questions..............................................................................................................4 1.7. Pre-Award Surveys ...........................................................................................

Words: 4241 - Pages: 17

Premium Essay

Contracts

...does not mean the contractor can start doing the work. Before the project can proceed, a contract must be signed between the customer and the contractor. A contract is a vehicle for establishing good customer–contractor communications and arriving at a mutual understanding and clear expectations to ensure project success. It is an agreement between the contractor, who agrees to perform the project and to provide a product or service (deliverables), and the customer, who agrees to pay the contractor a certain amount in return. The contract must clearly spell out the deliverables the contractor is expected to provide. For example, a contract will state that the project result will meet certain specifications or that certain documentation will be provided. The contract must also state the terms by which the customer will make payments to the contractor. There are basically two types of contracts: fixed-price and cost-reimbursement. FIXED-PRICE CONTRACTS In a fixed-price contract, the customer and the contractor agree on a price for the proposed work. The price remains fixed unless the customer and the contractor agree on changes. This type of contract provides low risk for the customer because the customer will not pay more than the fixed price, regardless of how much the project actually costs the contractor. However, a fixed-price contract is high risk for the contractor because if the cost of completing the project is more than originally planned, the contractor will make a lower...

Words: 3189 - Pages: 13

Premium Essay

Request for Propsal

...Request for Proposal for CALC Introduction: The CALC is seeking competitive proposals for a professional community planning and engineering firm to undertake the preparation of the following projects : * LC240- ESL and continuing education center, South Windsor (Dominion Area). Scope of the Project: * This project aims to build a new ESL and continuing education center in South Windsor area. * The building is one storey divided into two main sections; each section is divided into classrooms and office areas. * The area of the building is 22,000 sqft. * Building is classified as a type (D) building “Business and personal service occupancies” and applies to occupancy regulations of that section. * The occupant load is 150 people with 1:1 male to female ratio. * Barrier free design regulations must apply to the building. * The lot is classified as (CD 3.2) based on the city of Windsor zoning maps, zoning bylaws for this section must apply to the building. * The materials used for this building are brick veneer for exterior finish, concrete block, metal studs and dry wall for wall assembly, cast in place concrete for foundations, columns and beams. * Built-up roofing system will be used for this building. Background Information: The lot is located at the intersection of 532 Ojibway St. and Dominion Blvd, lot number is 185 and the postal code N9E 4T1. The land is vacant and it was part of woodland forest in 1942, after that...

Words: 693 - Pages: 3

Premium Essay

Requisition and Solicitation

...Requisition and Solicitation TS5333- Project Bdgt Procur & Quality November 22, 2015  Contents Introduction 2 Request for quotation 2 Request for Proposal 3 Request for Information 4 Invitation to Bid 5 What is Best for this Project 6 References 7   Introduction Procurement documents make up the package you send out to potential sellers. This package can be called a bid, tender, or quotation when the primary deciding factor is price. When the buyer is looking for a technical solution and is weighing factors other than price, you might hear the term proposal. (Phillips, 2010) Procurement planning is the process of identifying which project needs can be best met by procuring products or services outside the project organization. It involves consideration of whether to procure, how to procure, what to procure, how much to procure, and when to procure it. When the project obtains products and services from outside the performing organization, the processes from solicitation planning. (Project Management Institute) Request for quotation A request for quotation (RFQ) is a standard business process whose purpose is to invite suppliers into a bidding process to bid on specific products or services. RFQ generally means the same thing as IFB (Invitation for Bid). An RFQ typically involves more than the price per item. Information like payment terms, quality level per item or contract length are possible to be requested during the bidding process. (Rosemann, 2010) To...

Words: 1528 - Pages: 7

Premium Essay

Request for Proposal

...Running Head: REQUEST FOR PROPOSAL Read through the whole RFP and change words where needed, ie. change “Your Company” to a company name of your choosing. Add some clip art if you feel the need to. And erase this part before submitting. Request for Proposal for Microsoft Office Software Training John A. Smith (Your name) University of Phoenix ENG/221 Technical Writing Joseph Johnson (instructor name) Table of Contents 1. Overview – page 3 a. Introduction page 3 b. Business Goals page 3 2. Scope – page 4 c. Purpose of Request for Proposal page 4 d. Project Goal page 4-5 3. Vendor Information – page 5 e. Desired Qualifications page 5 f. Requirements for Formatting and Submitting Proposals page 5 g. Confidentiality Notice page 5 h. Proposal Evaluation Criteria page 5 i. Timeframe for Vendor Selection page 5 j. Company Contact Information page 5 OVERVIEW INTRODUCTION Your Company is a superior provider of emergency communications and technical consulting to the Federal, State, and County Governments as well as the private industry. BUSINESS GOALS Your Company sets specific goals for success in this business. * Provide the best service to its customers in the most efficient and cost effective way possible. * Mitigate possible future problems to maintain emergency satellite, telecommunication, and radio services to 98% or better. * Quickly identify problem areas and...

Words: 1042 - Pages: 5

Free Essay

Project Proposal

...Republic of the Philippines UNIVERSITY OF RIZAL SYSTEM Province of Rizal Antipolo City Office of the College of business administration Student council PROJECT PROPOSAL Title: Plants Proponent: College of Business Administration-Student Council Rationale: “The purpose of this project is to add beautification in the hallway and to advocate green environment.” Objectives: 1. To add beautification in the hallway. 2. To advocate green environment. Description of the Project: The proposed project are plants will be placed in the first to third floor of the hallway of Sumulong Building. There are two kinds of plants that will be placed in the hallway, and these are Champagne and Budgetary Requirements: Name of Materials | Quantity | Unit Price | Total Price | Champagne | 10 | 150.00 | 1,500.00 | Piccara (big) | 7 | 250.00 | 1,750.00 | P.Pot (Medium) | 10 | 60 | 600.00 | P.Pot (Large) | 7 | 70 | 700.00 | Total: 4,550.00 | Sources of Fund: The primary source of fund to be used in this project will come from the Council fund. Prepared by: EDLYN M. MASINSIN President Noted: HELEN B. LIBAO, Ph.D (Cand.) ARMANDO D. VALE, RAE Adviser Dean Recommending Approval: IMEE E. FLORES OSDS Coordinator Approved: DANILO M. PASCUAL, Ed.D. Campus Director ...

Words: 792 - Pages: 4

Premium Essay

Pm 598

...and Construction of an Army Reserve Center Proposal Project name: Design and Construct a 150-member Army Reserve Center (ARC) in Rockford, Illinois. Primary facilities consist of three buildings: 1. Training Building of approximately 31,239 SF; 2. Organizational Maintenance Shop (OMS) of approximately 5,294 SF; and 3. Unheated Storage (UHS) of approximately 1,520 SF. All buildings are located in Winnebago County, IL. Solicitation Number: W912QR-12-R-0025 Agency: Department of the Army Office: U.S. Army Corps of Engineers Location: USACE District, Louisville Introduction Thank you for allowing Lucky Construction CO the opportunity to bid this project fo you. Based on the Project plans dated February 9, 2012 and specifications dated January 6, 2012, Lucky Construction CO has put together a proposal with a breakdown of work included. The project ws priced based on the plans and specs unless other wise noted in below breakdown. Project Summary The project will be to design and construct a 150-member Army Reserve Center (ARC) in Rockford, Illinois. Primary facilities consist of three buildings: Training Building of approximately 31,239 SF Organizational Maintenance Shop (OMS) of approximately 5,294 SF Unheated Storage (UHS) of approximately 1,520 SF. All buildings are located in Winnebago County, IL. The project also includes privately owned vehicle (POV) and military equipment (MEP) parking. The Training building provides administrative and training space;...

Words: 3635 - Pages: 15

Free Essay

Jounal Review

...Ericka Palmer, Psychiatric Technician Date: May 25, 2012 Subject: Progress Report for Proposal of Transitional Living Program ______________________________________________________________________________ Purpose Statement: In order to keep you informed and updated on the progress of the proposal for the transitional living program, I have outlined primary subject areas for your viewing. The preparing of the proposal is going well and is currently on schedule. For clarification the proposal is for a program for young adults. The program would service adolescents that have recently been discharged from residential care, between the ages of 18 and 28. The estimated timeline for the completion of this project is 3 years for full operations. The ground work on the program should begin by late November of this year. Estimated finance cost for this project will be about $3,000,000. This will cover the cost the hiring of future employees, real estate, renovations, furniture, food supply, and expenses for the first year. I also wanted to bring to your attention to the Resource Material area of this memo, it last several things that I will need from the company in order to complete the proposal. Work Completed: I been able to hand select the members of the leadership team. The team consisting of 10 members and they have all been assigned to create different task teams for the project. There have been problems with collaborating schedules of leadership members. Each member...

Words: 588 - Pages: 3

Premium Essay

Project

...Assume you are the project manager for a new business venture. This venture will require financing, but once completed, will generate revenue and, eventually, a profit over cost. For CP-1, you are to write a Project Proposal with enough detail to convince investors to finance your idea. This Project Proposal will require detailed cost and revenue estimates and a credible schedule to win investor support. Select a venture of personal interest. Read the Proposal Requirements below to help you select a suitable idea. For example, select a venture where you can identify realistic cost and scheduling concerns. Opening a small retail storefront or a franchise is one example. Do NOT propose building a house, because investors typically already have financing before beginning such a project. When selecting your project, keep in mind the goal of CP-1 is to apply the techniques introduced during the course. Focus on detailed cost estimating, scheduling, and project justification. Estimating includes specific assumptions made during the estimating process, as well as quantities, unit prices, hourly rates for tasks, and accumulated totals. Justification will include an NPV analysis of costs vs. projected detailed revenue streams over a five year period with cash inflows and outflows over the project life. Start-up and other costs, and revenue streams, should be derived from detailed project cost estimates and sales forecasts. When you establish your financial data you must be reasonable....

Words: 628 - Pages: 3

Premium Essay

The Architecture Company

...to submit, until the end of February, two proposals regarding two new university buildings. The preparation of a proposal for the first building involves a cost of forty (40) thousand Euros. Preparing a proposal for the second building costs twenty (20) thousand Euros. If the proposal for the first building is accepted, the company will earn one hundred and twenty (120) thousand Euros. If the proposal for the second building is accepted the earnings will be seventy (70) thousand Euros. The final profit is given by the total earnings (resulting from the accepted proposals) minus the total costs of preparation of the proposals. The architecture company has the option to submit no proposal, to submit a proposal for only one of the buildings, or to submit proposals for the two buildings. Any of the submitted proposals may be accepted or rejected. If two proposals are submitted, it is possible that none is accepted, only one is accepted, or both are accepted. In the particular case that both proposals are submitted and both are accepted then there will be severe problems implementing both projects simultaneously implying an extra cost of fifty (50) thousand Euros (to be deducted from profits). There is a 50% probability that a proposal for the first building is accepted. The probability that a proposal for the second building is accepted is 50%. The acceptance of one proposal is independent of the acceptance of the other proposal. Answer the following questions by presenting...

Words: 733 - Pages: 3

Free Essay

A New Practice Field

... 1. INSTRUCTIONS TO BIDDERS Jones Sports Incorporated will start the process of accepting bids from contractors starting November 23, 2014 to build a new baseball field located at 5424 Rolling Meadows Drive, Fort Worth, Texas 76124.Jones Sports will accept proposals for the construction of a practice baseball field, a small parking lot and a clubhouse. 6 1.1. General Description of Work Jones Sports has purchased 20 acres of land for their semi pro baseball team to conduct practice. On this land Jones Sports has plans to build a practice field, a 50 space parking lot and a small clubhouse. These facilities will be designed for the use of the team and coaches only and does not require seating for spectators. The outcome of the project would have the construction of a practice field with artificial turf, a 4,000 square foot clubhouse that will consist of a locker room with restrooms and showers, a meeting room with a projector screen and projector, a lounge, a small room for storage and a 50 car parking lot where each space will hold a mid-size vehicle. The project will also consist of lighting for the baseball field and parking lot as well.as utilities. There will be no seating for spectators as part of this project. The layout of the practice field, clubhouse and parking lot will created by the winning contractor with the plans being approved before construction begins. A study has been done and it has shown that there is water and sewer taps available for construction...

Words: 3898 - Pages: 16

Premium Essay

X-Philes Data Management Corporation

...Project Management and Analysis (MBA 721) Group Assignment I. Case Analysis (Group 7) Case 07: Lavasoft.com Lavasoft Company, a web site development firm, is developing new site software for one of its corporate clients. The project starts out well. Lavasoft staffers meet frequently with client representatives to produce a document of clearly stated client needs and requirements. There is no question about what the client needs; however, members of the Lavasoft development team disagree about the kind of system that would best satisfy these needs. The project manager, Mary West, is concerned about the time this project will take. She feels that the kind of system that would best satisfy the user needs is more or less obvious, and she asks a few people on the team to help her create some bullet points and general flowcharts to address the requirements. She also creates a project schedule. She then presents the charts and schedule to the rest of the development team and says that anyone is free to question her about them. Some people are concerned that the approach as stated by the bullet points and the high-level charts are too vague. Mary assures them that the vagueness will be worked out as details of the system are defined. A team of designers is selected to perform the detailed design and development work. To speed up decision making and reduce outside interference, the team’s size is kept small and relatively isolated from other development teams in the company. Daily the...

Words: 1760 - Pages: 8

Free Essay

Cross Cultural Management

...Business Proposal: “Lotus Lounge” [Sara Mohammed Bajahmom 201200161] [Prince Mohammed Bin Fahad University] [Section 211] [P.Dr. WiSi Elhassan] [March 9, 2016] Table of Contents: Executive Summary 3 Statement of Problem 3 Background 3 Benefits 4 Needs 4 Data Sources 4 Limitations and Contigencies/Scope 4 Objective and Methods 4 Time Table 5 Materials and Equipment 5 Cost and Budget 6 Expected Results 6 Summary 6 References 8 Executive Summary PMU staff and students have always dreamt about a place to sleep and relax peacefully during their long breaks. This business proposal focuses on constructing a lotus lounge and to locate it besides PMU building. The expected financial plan for this business proposal is 2,194,500 SR. This facility will create a better environment for both students and staff as they will be able to relax their bodies from daily stress. On the other hand, this proposal will also generates profit for PMU, as students and staff will be required to pay 10 SR/hour to enter the lounge. PMU is well known university in the Eastern Province and internationally, as it is one of the fast growing universities in the gulf region. Through its accreditation by national standards, PMU have been able to pull out an impressive standard. However, students and staff have been complaining about the long gaps between their classes. Statement of Problem One of the main important factors of any undergraduate is time management. As students are being stressed...

Words: 1139 - Pages: 5

Premium Essay

Cp1 Project

...Assume you are the project manager for a new business venture. This venture will require financing, but once completed, will generate revenue and, eventually, a profit over cost. For CP-1, you are to write a Project Proposal with enough detail to convince investors to finance your idea. This Project Proposal will require detailed cost and revenue estimates and a credible schedule to win investor support. Select a venture of personal interest. Read the Proposal Requirements below to help you select a suitable idea. For example, select a venture where you can identify realistic cost and scheduling concerns. Opening a small retail storefront or a franchise is one example. Do NOT propose building a house, because investors typically already have financing before beginning such a project. When selecting your project, keep in mind the goal of CP-1 is to apply the techniques introduced during the course. Focus on detailed cost estimating, scheduling, and project justification. Estimating includes specific assumptions made during the estimating process, as well as quantities, unit prices, hourly rates for tasks, and accumulated totals. Justification will include an NPV analysis of costs vs. projected detailed revenue streams over a five year period with cash inflows and outflows over the project life. Start-up and other costs, and revenue streams, should be derived from detailed project cost estimates and sales forecasts. When you establish your financial data you must be reasonable...

Words: 641 - Pages: 3