Premium Essay

Busi650 Quiz 2

In:

Submitted By Laynebaril
Words 622
Pages 3
BUSI650 Quiz 2 Click Link Below To Buy: http://hwcampus.com/shop/busi650-quiz-2/ • 2 out of 2 points Developing and evaluating solutions to reduce the gap between desired process performance and current performance is the final step in the six sigma DMAIC approach for process improvement.
Answer

• Question 2
2 out of 2 points Six Sigma is better applied on manufacturing than service operations.
Answer

• Question 3
2 out of 2 points Which of the following is FALSE about Quality Function Deployment (QFD)?
Answer

• Question 4
0 out of 2 points With respect to strategy maps and balanced scorecards, which of the following is FALSE?
Answer

• Question 5
0 out of 2 points Which of the following is NOT an original component of reengineering?
Answer

• Question 6
0 out of 2 points Which of the following characteristics makes it EASIER to measure the quality of a service, relative to that of a product or facilitating good?
Answer

• Question 7
0 out of 2 points Defects per million opportunities (DPMO) and Process Sigma are the most important tools for the Measure Phase of Six Sigma.
Answer

• Question 8
0 out of 2 points The following are shortcomings associated with analyzing problems “one factor at a time” (also known as OFAT and 1FAT) EXCEPT:
Answer

• Question 9
0 out of 2 points One aspect that differentiates Six Sigma from other earlier process improvement programs including total quality management and reengineering is that with Six Sigma:
Answer

• Question 10
2 out of 2 points As control involves both mechanistic and human elements, it is one of the manager’s most difficult tasks. Which of the following is the best answer about desirable

Similar Documents

Premium Essay

Busi650 Quiz 4

...BUSI650 Quiz 4 Click Link Below To Buy: http://hwcampus.com/shop/busi650-quiz-4/ • Question 1 2 out of 2 points The __________ plan is a preliminary, approximate schedule of an organization’s overall operations that will satisfy the demand forecast at minimum cost. Answer • Question 2 0 out of 2 points Which of the following is FALSE about supply chains? Answer • Question 3 2 out of 2 points The inventory turnover is calculated using the annual cost of goods sold and the aggregate inventory value on average. Answer • Question 4 0 out of 2 points Which of the following statements about Supply Chain Management (SCM) is correct? Answer • Question 5 2 out of 2 points It is not unusual for fire departments to use “slack months” for building inspections, conducting prevention programs and giving talks as a way to have anticyclic outputs. Answer • Question 6 2 out of 2 points Assume that Company F produces a variety of smart phones sequentially on three machines. The times required on each machine for one typical racket are as follows: M1: 3 minutes M2: 8 minutes, M3: 2 minutes, M4: 5 minutes. The throughput time for a smart phone is : Answer • Question 7 2 out of 2 points Purchasing tends to follow three practices; which of the following is NOT one of them? Answer • Question 8 2 out of 2 points In order...

Words: 681 - Pages: 3

Free Essay

Busi650 Quiz 3

...BUSI650 Quiz 3 Click Link Below To Buy: http://hwcampus.com/shop/busi650-quiz-3/ • Question 1 2 out of 2 points The lean tool to reduce setup times is SMED; this acronym stands for Answer • Question 2 0 out of 2 points When workers receive approval for a task based on inflated time estimate, they may perceive that they now have plenty of time to complete the task and therefore delay starting the task. What has this concept been called? Answer • Question 3 2 out of 2 points The project life cycle typically has a stretched-s or an exponential form. Answer • Question 4 2 out of 2 points Which of the following project categories might lead to the other project categories? Answer • Question 5 2 out of 2 points Which of the following terms provides the basis for the project schedule, often formatted as a project Gantt chart? Answer • Question 6 2 out of 2 points The amount of safety time needed to protect a particular path in a project is less than the sum of the safety times required to protect the individual activities making up the path. Answer • Question 7 2 out of 2 points Which of the following is NOT a direct benefit of lean? Answer • Question 8 2 out of 2 points The goal of Kaizen blitz is to mistake-proof work activities in a way that prevents errors from being committed in the first place. ...

Words: 639 - Pages: 3

Premium Essay

Busi650 Quiz 4

...BUSI650 Quiz 4 Click Link Below To Buy: http://hwcampus.com/shop/busi650-quiz-4/ • Question 1 2 out of 2 points The __________ plan is a preliminary, approximate schedule of an organization’s overall operations that will satisfy the demand forecast at minimum cost. Answer • Question 2 0 out of 2 points Which of the following is FALSE about supply chains? Answer • Question 3 2 out of 2 points The inventory turnover is calculated using the annual cost of goods sold and the aggregate inventory value on average. Answer • Question 4 0 out of 2 points Which of the following statements about Supply Chain Management (SCM) is correct? Answer • Question 5 2 out of 2 points It is not unusual for fire departments to use “slack months” for building inspections, conducting prevention programs and giving talks as a way to have anticyclic outputs. Answer • Question 6 2 out of 2 points Assume that Company F produces a variety of smart phones sequentially on three machines. The times required on each machine for one typical racket are as follows: M1: 3 minutes M2: 8 minutes, M3: 2 minutes, M4: 5 minutes. The throughput time for a smart phone is : Answer • Question 7 2 out of 2 points Purchasing tends to follow three practices; which of the following is NOT one of them? Answer • Question 8 2 out of 2 points In order...

Words: 681 - Pages: 3