1. Summarizes how the project manager or team exhibited exceptional and ethical project management practices.
Often, the project manager (PM) is faced with an issue that is not easily resolved by theory or the knowledge acquired from formal training. These types of problems are usually not of a technical nature and more often tend to be ethical or human resource issues (Stare, 2011). The satisfactory answer is often debatable and may suit one set of circumstances and yet not another. It is these difficult issues where the PM must draw from their practical experiences, moral and ethical obligations, and sometimes the rule of law. For example, international projects take the PM out of the comfort zone of the local laws and customs that they are used to working at home. In many host countries, doing business results in uncertainty and inconsistencies from the way business is conducted at home. Sometimes a practice that is permissible in the foreign country is not at home (Stare, 2011). Will making a payment to a foreign government official to obtain permits, licenses or police protection be seen as a bribe or just facilitating and expediting to get things done? That is why it is useful to have a set of guidelines. Companies should have a set of best practices or code of conduct to assist them, however, many do not. Here is a list of questions to use and may be proven useful in deciding a correct approach:
Are you following rules that are generally understood and accepted for the task taking place? For example, in poker, bluffing is accepted as part of the game.
Are you comfortable publicly discussing and defending your action? Would you be comfortable if your friends were aware of it? Is your family ok with it?
Would you want

Similar Documents

Premium Essay

Cis 517 Http: //Www.Helperstudy.Com/Products/Cis-517

...CIS 517 WEEK 5 MIDTERM download here Question 1 A(n) ____ is a formal group of people responsible for approving or rejecting changes to a project. Question 2 The project procurement management knowledge area maps to the ____ process group through the activity of administering procurements. Question 3 The first step in determining the NPV is to ____. Question 4 Some people say that ____ achieve the vision of a project. Question 5 4 out of 4 points A(n) ____ is a document that formally recognizes the existence of a project and provides direction on the project’s objectives and management. Question 6 Many companies have realized that information technology is integral to their business and have created a vice president or equivalent-level position for the head of information technology, often called the ____. Question 7 The ____ model uses an approach in which developers work with an evolving prototype. Question 8 During ____ processes for a new project, the organization recognizes that a new project exists, and completes a project charter as part of this recognition. Question 9 The ____ should list and describe all of the deliverables required for the project. Question 10 The goal of ____ is to influence the factors that cause scope changes, assure changes are processed according to procedures developed as part of integrated change control, and manage changes when they occur. Question 11 The project scope management knowledge area maps to the ____ process...

Words: 531 - Pages: 3

Premium Essay

Cis 517 Http: //Www.Helperstudy.Com/Products/Cis-517

...CIS 517 WEEK 5 MIDTERM download here Question 1 A(n) ____ is a formal group of people responsible for approving or rejecting changes to a project. Question 2 The project procurement management knowledge area maps to the ____ process group through the activity of administering procurements. Question 3 The first step in determining the NPV is to ____. Question 4 Some people say that ____ achieve the vision of a project. Question 5 4 out of 4 points A(n) ____ is a document that formally recognizes the existence of a project and provides direction on the project’s objectives and management. Question 6 Many companies have realized that information technology is integral to their business and have created a vice president or equivalent-level position for the head of information technology, often called the ____. Question 7 The ____ model uses an approach in which developers work with an evolving prototype. Question 8 During ____ processes for a new project, the organization recognizes that a new project exists, and completes a project charter as part of this recognition. Question 9 The ____ should list and describe all of the deliverables required for the project. Question 10 The goal of ____ is to influence the factors that cause scope changes, assure changes are processed according to procedures developed as part of integrated change control, and manage changes when they occur. Question 11 The project scope management knowledge area maps to the ____ process...

Words: 531 - Pages: 3

Premium Essay

Cis 517 Assignment 2

...February 17, 2013 CIS 517 Project Management Dr. Huang Project Title: Green Computing Research Project Project Manager: Rotunda Robinson rrobinson@GCRS.com Requirements Traceability Matrix Requirement No. Name Category Source Status 1 Data Center Building Project Charter Accepted 2 Recycling Building Project Charter Accepted 3 Office Material Operations Project Charter Accepted 4 User Support and Training Operations Project Charter Accepted 5 Working from home Operations Project Charter Accepted 6 Hours of Operation Operations Project Charter Accepted 7 Environmental Friendly Operations Project Charter Accepted 8 CPU & Laptops Hardware Project Charter Accepted 9 Cloud and Virtualization Software Project Charter Accepted 10 Open Source Software Software Project Charter Accepted 11 Solar Computing Energy Source Project Charter Accepted 12 Electricity Outputting Energy Source Project Charter Accepted 13 Power Management Energy Source Project Charter Accepted List of Questions to ask the Sponsors I. When will you expect this project to be completed? II. What are your expectations? III. Do you have any additional resources that could be of assistance to the project? IV. How strenuous will be the training on the new hardware and software? V. Do you have any suggestions? VI. Are there any green technologies available in the area? Project Charter: • Helping to improve the environment...

Words: 356 - Pages: 2

Premium Essay

Cis 517 - Case Study 1

...Week 3 Case Study 1: Green Computing Research Project – Part 1 James Johnson IT Project Management – CIS 517 Dr. Howell July 31, 2012 As technology increases through massive changes it becomes apparent that the individual user must also make changes that are environmentally safe. Green IT, also known as Green Computing, is the movement towards a more environmentally friendly and cost-effective use of power and production in technology. The crux of Green IT is to double or triple the bottom line investment costs by converting existing structures and systems to this more conservative mode of operation in green computing (eweek.com, 2012). The greening of information technology (IT) offers numerous ways for companies to significantly improve the bottom line, whether through energy efficiency of computers and printers via power management, smart e-waste or asset management, or greening data centers with virtualization or cloud computing (greenbiz.com, 2012). Maintaining efficiency throughout daily operations is high on the priority list in an effort for business to not only cut costs but manage their services in a much more streamlined fashion. The transformation to become green friendly is one that requires the coordination of many areas. To ensure that working groups are formed, timelines are established, and end results are defined based off of the recommendations and requirements of the stakeholders the formation of a project management team is required. At...

Words: 1068 - Pages: 5

Premium Essay

Cis 517 Wk 5 Midterm Exam

...CIS 517 WK 5 MIDTERM EXAM To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-5-midterm-exam/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 5 MIDTERM EXAM CIS 517 WK 5 Midterm Exam TRUE/FALSE 1. Project managers should lead projects in isolation in order to truly serve the needs of the organization. 2. Using a systems approach is critical to successful project management. 3. Systems analysis addresses the business, technological, and organizational issues associated with creating, maintaining, and modifying a system. CIS 517 WK 5 MIDTERM EXAM To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-5-midterm-exam/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 5 MIDTERM EXAM CIS 517 WK 5 Midterm Exam TRUE/FALSE 1. Project managers should lead projects in isolation in order to truly serve the needs of the organization. 2. Using a systems approach is critical to successful project management. 3. Systems analysis addresses the business, technological, and organizational issues associated with creating, maintaining, and modifying a system. CIS 517 WK 5 MIDTERM EXAM To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-5-midterm-exam/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 5 MIDTERM EXAM CIS 517 WK 5 Midterm Exam TRUE/FALSE 1. Project managers should lead projects in isolation in order to truly serve the needs of the organization. 2. Using a systems approach...

Words: 268 - Pages: 2

Premium Essay

Cis 517 Assignment 2 Waterfall and Agile

...CIS 517 ASSIGNMENT 2 WATERFALL AND AGILE To purchase this visit here: http://www.activitymode.com/product/cis-517-assignment-2-waterfall-and-agile/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 ASSIGNMENT 2 WATERFALL AND AGILE Research agile methodologies including SCRUM and extreme programming (XP). Write a two to three (2-3) page paper in which you:  Explain waterfall methodologies and identify their relationship to the PMBOK® process groups.  Explain agile methodologies and identify their relationship to the PMBOK® process groups.  Analyze the need for waterfall and agile methodologies.  Explain the advantages of extreme programming (XP) and analyze the advantages of its application in high-budget short-time projects.  Explain the factors to consider when selecting a project management methodology (Waterfall vs Agile).  Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Your assignment must follow these formatting requirements:  Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.  Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page...

Words: 760 - Pages: 4

Premium Essay

Cis 517 Wk 11 Final Exam

...CIS 517 WK 11 FINAL EXAM To purchase this visit here: http://www.activitymode.com/ product/cis-517-wk-11-final-exam/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 11 FINAL EXAM CIS 517 WK 11 Final Exam 1. Overrun is the additional percentage amount by which estimates exceed actual costs. 2. The primary output of the planning cost management process is a change request. 3. IT project managers must be able to present and discuss project information both in financial and technical terms. 4. Project managers must conduct cash flow analysis to determine net present value. 5. Intangible costs can be easily measured in monetary terms. 6. When deciding what projects to invest in or continue, one should include sunk costs. 7. It is important for project managers to focus on indirect costs because they can be easily controlled. 8. If an important supplier goes out of business, management reserves can be set aside to cover the resulting costs. 9. Contingency reserves are also known as unknown unknowns. 10. A cost management plan can include organizational procedures links, control thresholds, and process descriptions. 11. A budgetary estimate is the most accurate of the three types of estimates. 12. Budgetary estimates are made even before a project is officially started. 13. Definitive estimates are made one year or less prior to project completion. 14. Estimates should become more accurate as time progresses. 15. Supporting details for an estimate include...

Words: 879 - Pages: 4

Premium Essay

Cis 517 Wk 2 Assignment 1 It Project

...CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-2-assignment-1-it-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT CIS 517 WK 2 Assignment 1 - IT Project Management Assessment Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award. Write a two to three (2-3) page paper in which you: 1. Summarize how the project manager or team exhibited exceptional and ethical project management practices. 2. Discuss the role of the project manager or team, the organizational setting, the recipient’s approach to project integration management, and obstacles that had the potential of adversely impacting the triple constraints. More Details hidden... Activity mode aims to provide quality study notes and tutorials to the students of CIS 517 WK 2 Assignment 1 IT Project in order to ace their studies. CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-2-assignment-1-it-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 2 ASSIGNMENT 1 IT PROJECT CIS 517 WK 2 Assignment 1 - IT Project Management Assessment Research and read an article on recent recipients of the Project Management Institute’s Project of the Year Award. Write a two to three (2-3) page paper in which you: 1. Summarize how the project manager or team exhibited exceptional and ethical...

Words: 633 - Pages: 3

Free Essay

Cis 517 Wk 6 Case Study 2

...CIS 517 WK 6 CASE STUDY 2 To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-6-case-study-2/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 6 CASE STUDY 2 CIS 517 WK 6 Case Study 2 - Green Computing Research Project – Part 2 Read the Green Computing Research Project, Part 2 in Appendix C. Document the requirements and develop a scope statement. Write a two to three (2-3) page paper in which you: 1. Document the requirements based on the information provided and assumptions that you have made, including a requirements traceability matrix. 2. Include a list of questions to ask the sponsor about the project scope. Include at least six (6) questions for full credit. 3. Develop a scope statement for the project. More Details Included... Activity mode aims to provide quality study notes and tutorials to the students of CIS 517 WK 6 Case Study 2 in order to ace their studies. CIS 517 WK 6 CASE STUDY 2 To purchase this visit here: http://www.activitymode.com/product/cis-517-wk-6-case-study-2/ Contact us at: SUPPORT@ACTIVITYMODE.COM CIS 517 WK 6 CASE STUDY 2 CIS 517 WK 6 Case Study 2 - Green Computing Research Project – Part 2 Read the Green Computing Research Project, Part 2 in Appendix C. Document the requirements and develop a scope statement. Write a two to three (2-3) page paper in which you: 1. Document the requirements based on the information provided and assumptions that you have made, including a requirements traceability...

Words: 649 - Pages: 3

Free Essay

Cis 517 Final Project Chapter 10

...We must always try to improve the effectiveness of a solution, every weakness and loopholes should always be identified and dealt with. It is impossible to eliminate all possibility however, by addressing each issue, will pave ways for development and improvement. In the case of green computing, no matter how propitious and innovative the effort is, there always a desideratum to optically canvass the risks and potential quandary it will may cause later on. Similar with other technology, much consideration is accentuated on the security, cost and performance. If both security and performance are compromised, hence leads to cost overrun Meanwhile, from the sustainability aspect, it is essential to give it as much consideration as the other three aspects. If a technology has high level of sustainability, not only will it helps to save cost in the long run, but also improves the longevity of performance and security, without having to constantly keep up with the rapid growth of technology evolution. Based on the Figure 1, which is the cause-and-effect diagram of green computing, there are four aspects highlighted; security, cost, performance and sustainability. Cost is the backbone in a project, therefore it is important to ensure that cost is kept within the allocated budget. In green computing, considering its complexity and the fact that it is still new in the computing technology, thus it is vital to be prepared of the unknown unknowns. Unknown unknowns or sometimes...

Words: 595 - Pages: 3

Premium Essay

Director

...he problem with Compaq is that they developed too much IT architecture using financial advisory, where R&D and openness keys to development and the culture, while ignoring the environment. Open communication and trust was barricaded and destroyed by ASK (financial IS). The workers were being motivated by fear, much like Geneen in Morgan’s Images Of Organization. From an IT architecture standpoint, numbers based on the finance division depicted the entire company, even the organizational structure. The organizational structure did not align with the IT architecture, and the culture did not align with it either. Morgan stated, “The division of labor characteristic of industrial societies creates a problem of integration, or what may be more accurately described as a problem of integration, or what may be more accurately described as a problem of “cultural management.”” Compaq started as a functional structure, changed into a divisional fairly soon and then back to functional. Culture was strongly emphasized over anything else. CASH stated, “The process encompassed a whole range of ideas, including (1) the rule of inclusion, (2) teamwork, (3) “working the issue,” and (4) consensus building.” The IS system at Compaq did allow the free-flow of information through email named “B-mail.” ASK was used for financial services so that the company could easily track orders, and know where it stood financially. The culture felt monitored by ASK operators since it “becomes responsible for...

Words: 5841 - Pages: 24

Premium Essay

Scope and Time Management

...Assignment 2: Scope and Time Management CIS 517 Dr J.F. Manning July 24, 2011 How can this activity improve the chances of your future IT project being a success? Project planning is often the most difficult and unappreciated process in project management. The main purpose of project plans, however, is to guide project execution. To guide execution plans must be realistic and useful, so a fair amount of time and effort must go into the planning process (Schwalbe, pg. 96, 2011). The work break down structure is a useful tool to help project managers become better organized and execute projects effectively while minimizing risks involved with the project process. This activity emphasized the importance for project managers to make strategic decisions, while staying observant and detail oriented throughout the project process. The insight obtained from the activity will aid in the success of any future IT project. Following the five main steps timely and effectively resulted in a more efficient management process. Setting the guidelines of the project and the added use of the work break down structure gave me a better view of how important it is to meet deadlines. Prioritizing the work packages and understanding the possibility that not all objectives would be completed helped minimize the stress associated with the project process. The activity shows how to diligently work together and communicate effectively in order to ensure a successful project outcome. Conducting...

Words: 297 - Pages: 2

Premium Essay

Week 4 Assignment 2

...Assignment 2: Scope and Time Management By: Joshua Roberts CIS 517: IT Project Management Dr. Reddy Urimindi February 2, 2014 Scope and Time Management Summarize how this activity improves the chances of your future IT project being a success. Given that the IT project in scope, i.e. installation of 10 wireless access points in the company is a complex undertaking that would impact a lot of stakeholders and also incur a lot of company resources, it is very essential that it is done in an effective and efficient manner. Also, given that the scope of this project spans across different departments, and would go on for about three months, there needs to be very high degree of coordinated efforts, aided by regular and effective communication that would ensure that the project is a success (Project Management Certification, n.d). The creation of a WBS allows the company both these points above, by bringing in structure to project planning and execution and providing very good visibility on what is to be performed and achieved in order to execute the project effectively. This essentially translates into the project teams and sponsors having a good view on the schedule estimates, and also to effectively manage the schedule to ensure that the project gets completed on time. The activity of creating a project plans ensures that the project team has given enough though to all the key areas, and is well prepared to execute the project, thus enabling complex tasks to be broken down...

Words: 340 - Pages: 2

Premium Essay

Case Study 3

...Case Study 3: Green Computing Research Project – Part 5 Tamyra Sampson Strayer University Dr. Hart CIS 517 August 31, 2014 INTRODUCTION Quality is an important part to any project. Quality is defined as “the totality of characteristics of an entity that bar on its ability to satisfy stated or implied needs” (ISO8042:1994) or “the degree to which a set of inherent characteristics fulfills requirements” (ISO9000:2000) (Schwalbe, 294). The purpose of project quality management is to ensure that the project deliverables are met without detriment to the project. There are three main processes to project quality management: planning quality, performing quality assurance, and performing quality control. Planning quality is anticipating challenges and situations that will require actions that ensure the intended outcome. Performing quality assurance centers on the quality of standards for the project. Performing quality control improves quality; however, the main outcomes are acceptance decisions, rework and process adjustments. Quality control has seven basic tools and techniques that can be applied to information technology projects. Those seven tools are: * Cause-and-effect diagrams * Control Charts * Run Chart * Scatter Diagram * Histogram * Pareto Chart * Flowcharts HISTOGRAM Of the Seven Basic Tools of Quality, the histogram is a bar graph of a distribution of variables (Schwalbe, 304). Each problem or situation is graphed, depicting the frequency...

Words: 507 - Pages: 3

Premium Essay

Case Study 1: Green Computing Research Project – Part 1

...Case Study 1: Green Computing Research Project – Part 1 CIS 517 - IT Project Management Student: Robert Lawson Instructor: Dr. Stephen Huber Project Title: Green Computing Research Project Date of Authorization: October 1 Project Start Date: October 1 Projected End Date: April 1 Project Manager: Ito, 999-9999, ito@wearebig.com ------------------------------------------------- Budget Summary: The firm has allocated $500,000 for this project. It will be used in efforts to assist in achieving the goals that have been set forth in the project objectives. This includes purchasing systems and software to support recommended changes, development life cycle of software, and funding changes related to power optimization within the datacenter (i.e., managed PDUs, etc.). Furthermore, funds will also be used to assist and support telecommuting team members to access resources involved in the project. ------------------------------------------------- Project Objectives: The project objectives are as follows: * Assist in following the company goal of helping improve the environment while increasing revenues and reducing costs. * Research possible applications of green computing. * Provide an extensive report, including financial analysis and recommendations on what green computing technologies to implement. * Discover ways to save power and compute resources. * Minimize the company’s overall carbon footprint, while cleaning, maintaining, and...

Words: 434 - Pages: 2