........................................... 9 2.2 History .................................................................................................................................. 10 2.3 Share Price Performance ...................................................................................................... 12 2.4 Products and Services ........................................................................................................... 14 2.5 Toll Roads ............................................................................................................................ 15 2.5.1 CityLink ......................................................................................................................... 15 2.5.2 M2 Hills ......................................................................................................................... 15 2.5.3 Lane Cove Tunnel .......................................................................................................... 15 2.5.4 M1 Eastern Distributor .................................................................................................. 15 2.5.5 M7 Westlink .................................................................................................................. 16 2.5.6 M5 Motorway ................................................................................................................ 16 2.5.7 Pocahontas 895...
Words: 12462 - Pages: 50
...| | | NET PROFIT | | | III. INTENSITY OF DAMAGE DUE TO INSECTS- Pest | Autumn-Winter(Y/N) | Intensity Of Damage(Low/Med/High) | Spring-Summer | Intensity Of Damage(Low/Med/High | P1 | | | | | P2 | | | | | P3 | | | | | P4 | | | | | OTHERS | | | | | NOTE- 1. P1-FSB, P2- Whitefly, P3-Jassid, P4-Mite 2. Low- 0-10%, Med- 10-40%,High >40% IV. DO YOU USE INSECTICIDE- YES/NO V. INSECTICIDE USAGE PATTERN- Insect | Order of importance | General period Occurrence | Molecule used | Brand | PriceRs./acre | Doseper acre | Time of appl. | Control duration | Criterias considered | Application behaviorN/H | Satisfaction(Y/N) | P1 | | | M1 | | | | | | | | | | | | M2...
Words: 640 - Pages: 3
...On Tuesday, June 13, Blythe City Council approved the recommendation set forth by Chief Jeffrey Wade of the Blythe Police Department, for the acquisition of a 2000 Dodge Peacekeeper armored rescue truck, from the Glendale California Police Department. Through the 1033 program, a federal government policy regulated by the Secretary of Defense, underfunded law enforcement agencies that are unable to obtain supplies and equipment to fulfill their duties are inclined to receive a transfer of excess military equipage at no cost to the agency. Valued at $65,100, staff report made available at the council meeting said, due to budget concerns, purchasing a new Peacekeeper was fiscally impossible. Having already received issued patrol rifles through this program, Chief Wade said, Sgt. Joshua Coe of Blythe PD, worked tirelessly to make sure the City was able to receive at a time where the nation is persistently seeing an uprise in violence. Orating this report at last week’s City Council meeting, Wade said, “According to the FBI, violent crime and “active shooter” situations are on the rise all across the United States. The question is not “if,”we will have an active shooter situation in Blythe, but rather “when?” Wade said the vehicle will be used to rescue injured citizens and officers when an active threat is present, which will also provide officers with a safe cover. Before procuring this vehicle, the City never had an armored rescue truck, although, Coe said, Blythe, and the...
Words: 620 - Pages: 3
...LEADERS BOOK INDEX CHAPTER 1. PERSONNEL DATA 2. BATTLE FOCUS 3. EQUIPMENT DATA 4. TRAINING MANAGEMENT 5. SCHEDULED EVENTS 6. PHONE LISTINGS 7. REFERENCES CHAPTER 1 PERSONNEL DATA 1. DAILY PERSONNEL STATUS 2. PERSONNEL ASSET INVENTORY STATUS 3. PERSONNEL DATA DAILY PERSONNEL STATUS DATE: ___________ AUTHORIZED: OFF: ______ NCO: ______ ENL:______ TOTAL: ______ ASSIGNED: OFF: ______ NCO: ______ ENL:______ TOTAL: ______ PRESENT FOR DUTY: OFF: ______ NCO: ______ ENL:______ TOTAL: ______ TDY:_____ STATE SIDE LEAVE: ______ PASS: ______ IN CITY LV: _______ OFF CQ/SDN CO: ______ ON CQ/SDNCO: _____ IN PROCESSING: ______ OUT PROCESSING: ______ PROFILE: _______ HOSPITAL: ______ APT: ______ CON LEAVE: _______ KIA: ______ WIA: ______ MIA: ______ AWOL: ______ DAILY PERSONNEL STATUS DATE: ______ RANK NAME STATUS ______ ________________________________ ________ ______ ________________________________ ________ ______ ________________________________ ________ ______ ________________________________ ________ ______ ________________________________ ________ ______ ________________________________ ________ ______ ________________________________ ________ ______ ________________________________ ________ ______ ________________________________ ________ ______ ________________________________ ________ ______ ________________________________...
Words: 1327 - Pages: 6
...Leader’s Book NAME INSERT YOUR NAME UNIT INSERT YOUR UNIT PHONE # INSERT YOUR NUMBER Creed of the Noncommissioned Officer Creed of the Noncommissioned Officer No one is more professional than I. I am a Noncommissioned Officer, a leader of soldiers. As a Noncommissioned Officer, I realize that I am a member of a time honored Corps, which is known as “The Backbone of the Army.” I am proud of the Corps of Noncommissioned officers and will at all times conduct myself so as to bring credit upon the Corps, the Military Service and my country regardless of the situation in which I find myself. I will not use my grade or position to attain pleasure, profit or personal safety. Competence is my watch-word. My two basic responsibilities will always be uppermost in my mindaccomplishment of my mission and the welfare of my soldiers. I will strive to remain tactically and technically proficient. I am aware of my role as a Noncommissioned Officer. I will fulfill my responsibilities inherent in that role. All soldiers are entitled to outstanding leadership; I will provide that leadership. I know my soldiers and I will always place their needs above my own. I will communicate with my soldiers and never leave them uninformed. I will be fair and impartial when recommending both punishment and rewards. Officers in my unit will have maximum time to accomplish their duties; they will not have to accomplish mine. I will earn their respect and confidence as well as those of...
Words: 6288 - Pages: 26
...Ban hành kèm theo Thông tư số: 09/2007/TT-BTNMT ngày 02/8/2007 của Bộ Tài nguyên và Môi trường về việc hướng dẫn lập, chỉnh lý, quản lý hồ sơ địa chính |CỘNG HOÀ XÃ HỘI CHỦ NGHĨA VIỆT NAM Độc lập - Tự do - Hạnh phúc |Mẫu số: 01/ĐK | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | SỔ ĐỊA CHÍNH |TỈNH:.....................................................................................Mã: | | | ...
Words: 10454 - Pages: 42
..... 55 QOLP - Army Quality of Life Program ....................... 56 BOSS - Better Opportunities for Single Soldiers ................. 57 CHAMPUS / TRICARE ................................ 58 DEERS - Defense Enrollment Eligibility Reporting System .......... 59 NCODP - Noncommissioned Officer Development Program ......... 60 Weight Control ....................................... 62 Physical Training ...................................... 66 Weapons ............................................ 70 M136 AT4 - Rocket Launcher ............................ 120 M16/A2 - 5.56 mm Semiautomatic Rifle ..................... 123 M4 - 5.56 mm Semiautomatic Rifle ........................ 130 M18A1 - Antipersonnel (Claymore) Mine .................... 137 M2 - .50 Caliber Machine Gun ........................... 140 M203 - 40 mm Grenade Launcher ......................... 144 M240B - Machine Gun ................................ 147 M249 - Machine Gun ................................. 150 M60 - Machine Gun .................................. 154 Page 1 / 389 © Copyright 1999-2012 ArmyStudyGuide.com Version 5.3 M72 - Light Anti-Tank Weapon...
Words: 85951 - Pages: 344
...Desenvolvimento e operacionalização de um plano de negócios para uma atividade industrial Mariana Borges de Sousa Serras Pereira Dissertação de Mestrado Orientador na FEUP: Prof. Eduardo Gil da Costa Faculdade de Engenharia da Universida de do Porto Mestrado Integrado em Engenharia Industrial e Gestão 2014-01-27 Desenvolvimento e operacionalização de um plano de negócios para uma atividade industrial ii Desenvolvimento e operacionalização de um plano de negócios para uma atividade industrial Resumo Como consequência da atual recessão económica, a Movelpartes, empresa pertencente ao grupo Sonae Indústria, sofreu uma queda acentuada no seu volume de vendas. Esta queda teve como consequência a perda de rentabilidade da empresa, em particular na unidade industrial localizada em Vilela. Por outro lado, o método vigente de produção e expedição de produtos promocionais do grupo é pouco eficiente. Da conjugação destas duas proposições surgiu a ideia de industrializar, internalizar e centralizar a produção e expedição de produtos promocionais na unidade fabril de Vilela. Os principais objetivos deste projeto são o aumento da rentabilidade da unidade de Vilela, através da imputação de parte dos custos fixos aos produtos promocionais; a redução dos custos de produção e expedição dos produtos promocionais e permitir que funcionários da empresa, atualmente encarregues da produção de amostras, fiquem disponíveis para outras atividades de maior valor acrescentado...
Words: 17499 - Pages: 70
...ITT Technical Institute NT1310 Physical Networking Student Course Package Bring this document with you each week Students are required to complete each assignment and lab in this course package on time whether or not they are in class. Late penalties will be assessed for any assignments or labs handed in past the due date. The student is responsible for replacement of the package if lost. Table of Contents Syllabus 2 Student Professional Experience 19 Graded Assignments and Exercises 23 Labs 47 Documenting your Student Professional Experience 57 ITT Technical Institute NT1310 Physical Networking Onsite Course SYLLABUS Credit hours: 4.5 Contact/Instructional hours: 56 (34 Theory Hours, 22 Lab Hours) Prerequisite(s) and/or Corequisite(s): Prerequisites: NT1210 Introduction to Networking or equivalent Course Description: This course examines industry standards and practices involving the physical components of networking technologies (such as wiring standards and practices, various media and interconnection components), networking devices and their specifications and functions. Students will practice designing physical network solutions based on appropriate capacity planning and implementing various installation, testing and troubleshooting techniques for a computer network. Where Does This Course Belong? | | | NT2799 | | | | | | | | NSA Capstone | | | | | | | Project | | | | | NT2580...
Words: 10839 - Pages: 44
...AS 3600—2009 AS 3600—2009 Australian Standard® Concrete structures Accessed by NEWCREST MINING LIMITED on 14 Jul 2010 This Australian Standard® was prepared by Committee BD-002, Concrete Structures. It was approved on behalf of the Council of Standards Australia on 8 October 2009. This Standard was published on 23 December 2009. The following are represented on Committee BD-002: • • • • • • • • • • • • • • • • AUSTROADS Association of Consulting Engineers Australia Australian Building Codes Board Bureau of Steel Manufacturers of Australia Cement Concrete & Aggregates Australia—Cement Cement Concrete & Aggregates Australia—Concrete Concrete Institute of Australia Engineers Australia La Trobe University Master Builders Australia National Precast Concrete Association Australia Steel Reinforcement Institute of Australia University of Adelaide University of Melbourne University of New South Wales University of Western Sydney This Standard was issued in draft form for comment as DR 05252. Standards Australia wishes to acknowledge the participation of the expert individuals that contributed to the development of this Standard through their representation on the Committee and through the public comment period. Keeping Standards up-to-date Accessed by NEWCREST MINING LIMITED on 14 Jul 2010 Australian Standards® are living documents that reflect progress in science, technology and systems. To maintain their currency, all Standards are periodically reviewed, and...
Words: 70634 - Pages: 283