Turkmenistan-AfghanistanPakistan-India Gas Pipeline:
South Asia’s Key Project
The biggest pipeline issue in South Asia currently is the proposed
Trans-Afghanistan Pipeline or TAPI, as it is known. This report gives a breakdown of the history of the project as well as the pertinent issues.

T

he Trans-Afghanistan Pipeline (TAP or TAPI) is a proposed natural gas pipeline being developed by the Asian Development Bank. The pipeline will transport Caspian Sea natural gas from Turkmenistan through Afghanistan into Pakistan and then to India. The abbreviation comes from the first letters of those countries.
Proponents of the project see it as a modern continuation of the Silk Road. The Afghan government is expected to receive 8% of the project’s revenue.
The original project started in March 1995 when an inaugural memorandum of understanding between the governments of Turkmenistan and Pakistan for a pipeline project was signed. In August 1996, the Central Asia Gas
Pipeline, Ltd. (CentGas) consortium for construction of a pipeline, led by U.S. oil company Unocal, was formed. On
27 October 1997, CentGas was incorporated in formal signing ceremonies in Ashgabat, Turkmenistan by several international oil companies along with the Government of
Turkmenistan. In January 1998, the Taliban, selecting
CentGas over Argentinian competitor Bridas Corporation, signed an agreement that allowed the proposed project to proceed. In June 1998, Russian Gazprom relinquished its
10% stake in the project. Unocal withdrew from the consortium on 8 December 1998.
The new deal on the pipeline was signed on 27 December 2002 by the leaders of Turkmenistan, Afghanistan and
Pakistan. In 2005, the Asian Development Bank submitted the final version of a feasibility study designed by British company Penspen. ‘Since the US-led offensive that ousted the Taliban from power,’ reported Forbes in 2005, “the

6

APR-JUN 2011

project has been revived and drawn strong
US support” as it would allow the Central Asian republics to export energy to Western markets “without relying on Russian routes”.
Then-US Ambassador to Turkmenistan Ann
Jacobsen noted that:
“We are seriously looking at the project, and it is quite possible that
American companies will join it”. Due to increasing instability, the project has essentially stalled; construction of the Turkmen part was supposed to start in 2006, but the overall feasibility is questionable since the southern part of the Afghan section runs through territory which continues to be under d e facto
Taliban control.

Visit our websites at www.safan.com

A Gas Pipeline Framework Agreement, signed by representatives of the four participating nations on April 25,
2008 in Islamabad, envisaged construction to start in 2010, supplying gas by 2015. The announced 1,000-mile route would follow the ancient trading route from Central to
South Asia, extending from the Dauletabad gas field in
Turkmenistan along the highway through Herat, Helmand and Kandahar in Afghanistan, to Quetta and Multan in
Pakistan, and on to Fazilka in India. Participating countries have held numerous high-level planning meetings during the past eight years, with Asian Development Bank (ADB) sponsorship and multilateral support.
The 1,680 kilometres (1,040 mi) pipeline will run from the Dauletabad gas field to Afghanistan. From there TAPI will be constructed alongside the highway running from
Herat to Kandahar, and then via Quetta and Multan in
Pakistan. The final destination of the pipeline will be the
Indian town of Fazilka, near the border between Pakistan and India. The pipeline will be 1,420 millimetres (56 in) in diameter with a working pressure of 100 standard atmospheres (10,000 kPa). The initial capacity will be 27 billion cubic meters (bcm) of natural gas per year of which 2 bcm will be provided to Afghanistan and 12.5 bcm to each
Pakistan and India. Later the capacity will increase to

TAPI is expected to boost the economies of all four countries. In 2008, Pakistan’s Prime Minister described the pipeline as a vital project for the development and progress of the region. Further, pipelines are potentially good for peace. As President Berdimuhamedov of Turkmenistan said: “The pipeline between Turkmenistan, Afghanistan, Pakistan and India will be a weighty contribution to the positive cooperation on this continent.”

33 bcm. Six compressor stations would be constructed along the pipeline.[9] The pipeline was expected to be operational by 2014.
The cost of the pipeline is estimated cost at
US$7.6 billion.[8] The project is to be financed by the Asian
Development Bank.
In December 2010, setting aside concerns about Islamic militants, the presidents of Turkmenistan, Afghanistan, Pakistan, along with India ’ s petroleum minister, Murli Deora, have signed an inter-governmental agreement pledging to construct a 1,735-kilometer natural gas pipeline connecting all four states. On
December 12, a day after the agreement was inked in
Ashgabat, Afghanistan ’ s
Mines and Industry minister said pipeline security would be a top priority.
The TurkmenistanAfghanistan-Pakistan-India
(TAPI) pipeline would supply 33 billion cubic meters of Turkmen gas a year from the Dauletabad gas fields to Pakistan and India via Afghanistan ’ s volatile southern provinces, according to the semi-official
Turkmenistan.ru website.
In doing so, Kabul could
Figure 1. Proposed TAPI Gas Pipeline reap billions of dollars in
Source: Canadian Centre for Policy
Alternatives.
transit fees.

APR-JUN 2011

7

Afghan President Hamid Karzai stressed the economic benefits of the pipeline and said Afghanistan would work to “expedite” the project’s completion. Kabul could earn upwards of $1.4 billion in transit fees annually.

History

cruing to Afghanistan would be in the order of US$ 300 million per year, equivalent to one-third of the annual budget for development projects, in addition to providing for domestic job creation. This would also enhance possibilities for the development of domestic gas resources in
Afghanistan for local use. Earlier estimated to cost only US$
3.3 billion when it was a trilateral Turkmenistan-Afghanistan-Pakistan, the current cost figure including India is US$
7.6 billion. It was at first thought that the gas would come from Turkmenistan’s Daulatebad field, but Ashgabat has now clarified that it will come from the newly discovered
South Yolotan-Osman field. A 1,045-mile route going south from Turkmenistan and then east through Herat and
Kandahar was chosen over a northern route through Kabul because of terrain considerations. Mountains in the north rendered that route too difficult, and the southern route has roads that facilitate the transport of construction materials.

After a pipeline from Turkmenistan to Pakistan through
Afghanistan was first proposed in the mid-1990s, a Unocalled consortium signed a construction agreement in early
1998 with the new Taliban government in Kabul. It was never built after Unocal withdrew from the consortium in late 1998 because of international publicity of the human rights abuses, and in particular the treatment of women, under the Taliban regime. After the end of the Taliban regime, the idea was revived. At the end of 2002, the three countries signed a new agreement. The Asian Development Bank (ADB) conducted a feasibility study, executed by the British firm Penspen, which rendered a favorable verdict in 2005. In 2006, the Indian federal cabinet apAlternatives
For several years, India and Pakistan have been negotiproved India’s joining the project, although New Delhi had not yet been invited; India was formally incorporated into ating with Iran for another pipeline project to bring Iranian gas to their countries. With an estimated capital cost of $7.5 the project in 2008.
The project received increased impetus from billion, the pipeline would be similar in cost to the TAPI
Turkmenistan following President Saparmurat Niyazov’s project. Petroleum ministers of India and Pakistan met in death and his succession by Gurbanguly Berdimuhamedov Islamabad in April 2008 (just after the TAPI meeting) to at the end of 2006. Another key factor was Russia’s resolve a pricing issue and clear the way for signing treatment of Turkmenistan in the wake of the April 2009 agreements; and President Ahmadinejad of Iran visited pipeline explosion in the latter country, which Turkmenistan Islamabad and New Delhi the following week for talks on accused Russia of instigating, and which led to the suspen- the pipeline. Since then, India has oscillated on the project sion of gas exports to Russia for the rest of that calendar year, with reduced quantities flowing in 2010 as well. The present design of the project provides for export of 33 billion cubic meters per year (bcm/
y) from Turkmenistan, of which India and Pakistan would each receive 14 bcm/y while Afghanistan gets 5 bcm/y.
Indian demand for natural gas would justify laying a parallel pipeline later to double the quantity, and this is not out of the question if the initial implementation is successful. The present schedule foresees the end of construction in
2014 with the pipeline entering into service in 2015.
It is thought that transit revenues ac- Figure 2. Proposed Iran-Pakistan-India Pipeline

8

APR-JUN 2011

Visit our websites at www.safan.com

and has stayed largely on the sidelines following a period of tense India-Pakistan relations. However, in December
2009, India’s petroleum minister, Murli Deora, said his country was discussing important issues relating to the pipeline with other participating countries.
In May 2009, Iran and Pakistan went ahead and signed an initial agreement, without India. Russia’s Gazprom expressed willingness to help build the line, most recently in January 2010. The same month, US Special Envoy
Richard Holbrooke met with Pakistan’s petroleum minister
Syed Naveed Qamar, and, according to a Pakistani newspaper, he offered incentives to Pakistan to abandon the
Iranian project. Subsequently, the petroleum minister told journalists that Pakistan and Iran would sign a technical agreement soon; he had met with the US ambassador and officials of US Overseas Private Investment Corporation who had expressed no objection to the project.

Complications
The planned TAPI pipeline offers benefits to all four participating countries and would promote cooperation. For Turkmenistan, it would provide revenue and diversification of export routes. For Pakistan and India, it would address energy deficits. In Afghanistan, it would provide revenue for development and gas for industrial enterprises. The potential for export to other countries through the Pakistani port of Gwadar is a further advantage. TAPI is consistent with the US declared policy of linking Central and South Asia and diversifying export routes for Turkmen gas. For a number of countries, TAPI could provide business opportunities in construction and operation of the pipeline.
Understanding the significance of the TAPI pipeline requires shining the spotlight on Turkmenistan, the source of the gas. Turkmenistan is one of five Central Asian states that became independent in 1991 when the Soviet
Union broke up.
Disagreement exists on how much gas the country actually holds. According to the BP Statistical Review
2009, Turkmenistan has the world’s fourth largest reserves of natural gas, 7.94 trillion cubic meters (TCM), exceeded only by Russia, Iran and Qatar. Turkmenistan’s 2009 ranking represents a sharp upgrade from 2008 (2.43 TCM).
The new estimate follows the 2008 audit of the huge South
Yolotan-Osman field in western Turkmenistan, conducted by the UK auditing firm Gaffney, Cline & Associates. The

10

APR-JUN 2011

audit estimated the reserves of this field alone to be between 4 and 14 TCM of gas, making it the world’s fourth or fifth largest field.
Other fields remain to be audited, and Turkmen officials predicted in 2008 that the final results would be much higher. Since then, two publications have cast doubt on the audit results, relying on information obtained from unnamed Russian and Turkmen sources who suggest that
Turkmen officials may have provided false data to exaggerate the size of the reserves. Gaffney, Cline & Associates refutes these allegations. Meanwhile, President
Berdymukhamedov has dismissed various top energy officials. Whatever the truth of the matter, Turkmenistan’s gas reserves are huge and there is a titanic struggle underway.
The geopolitical stakes are high.
Doubts persist over the sustainability of gas supplies from
Turkmenistan. Given that Turkmenistan has signed agreements with both Iran and China to increase existing supplies to these markets, and is also the largest supplier of natural gas to Russia’s Gazprom, questions have arisen over whether it will be able to meet its commitments for
TAPI. Though Turkmenistan claims that its gas export potential has increased following the discovery of the giant
South Yolotan field, which holds 212 trillion cubic feet of recoverable gas (equal to about 90 percent of US proven reserves), its TAPI partners have demanded third party certification of its claimed reserves. As per the agreement, Turkmenistan will supply 90 mmcmd of gas for
TAPI, with 38 mmcmd each going to Pakistan and India, and the rest to Afghanistan.
In addition, Turkmenistan’s gas sector suffers from several constraints, including lack of financial resources and the technical capability to develop new projects.
The country also lacks adequate pipeline network infrastructure to deliver gas to its markets, and continues to be dependent on Russia’s network for exports to the
West. As a result, according to some experts, it’s unlikely that it will be able to increase its export volumes substantially over the next 10 years.
Since the TAPI route passes through areas with major insurgencies, security is clearly an issue. In both Afghanistan and the tribal area of Pakistan, people along the route have long histories of independence from central and foreign powers. Unless their cooperation is sought and the benefits to them are clear, pipeline security will be an expensive nightmare for years to come.

Visit our websites at www.safan.com

Peace is essential. Pipeline construction cannot begin until the killing stops and all stakeholders, including the
Pashtun, participate in the project. Both Afghanistan and
Pakistan are complex countries. Their mix of ethnic groups, long-standing tribal traditions, and history of minimal governance create major challenges. Such challenges require political, not military solutions. The strategy of national reconciliation offered at the London conference on
Afghanistan in January 2010 is a beginning. TAPI is geopolitically significant, but encumbered with many difficulties that will challenge all participants in the years ahead.
As with the IPI project, the pipeline route remains controversial. The nearly 1,700-kilometre pipeline will originate from Turkmenistan’s Daulatabad gas field, and transit some 730 kilometres through Herat, Helmand and Kandahar in Afghanistan, to Quetta and Multan in Pakistan, and on to Fazilka in India. Given the ongoing insurgency in
Afghanistan, concerns over the security of the pipeline through that country remain. While the presence of NATO troops in Afghanistan may succeed in securing the route, how long can they be expected to remain in Afghanistan, and what will happen once they do withdraw?
Meanwhile, the 800-kilometre section of the pipeline in
Pakistan also isn’t secure. Part of the pipeline will pass through Balochistan, where the insurgency has intensified. The fact that domestic pipelines through Balochistan

Figure 3. Proposed Central Asian Gas Pipelines
Source: Canadian Centre for Policy Alternatives.

are being targeted virtually every other day, affecting supplies throughout the province, suggest it’s unlikely that an international project would be spared by the insurgents. Moreover, international sponsors and financiers would be unwilling to finance a project whose security is questionable.
Finally, differences over the pricing of the gas as well as transit fees have arisen between India and Turkmenistan.
The recent inter-ministerial meeting apparently ended in a stalemate, with India expressing its unwillingness to pay the price proposed by Turkmenistan, as it would be higher than the price of liquefied natural gas (LNG).
All this means that if the pipeline is ultimately constructed, it will be largely down to uncompromising US support for the project. While Washington’s raison d’etre is that it will help stabilise Afghanistan as well as assist the country in its development, not least by allowing it to earn around $300 million per annum in transit fees, it would also allow Central Asian countries to find an alternate market in the east and thereby lessen their dependence on Russia as well as feeding energy-starved
South Asian nations.

Implications
The four-way decision to implement the TAPI project is the coup de grace against the long-discussed Iran-PakistanIndia gas pipeline project, which never progressed beyond the stage of Iran-Pakistan and IranIndia bilateral consultations. In the end, Pakistan signed an agreement with Iran in May 2009 for a reduced-volume bilateral pipeline after India withdrew from the project in 2008. In 2010, Iran stated that it had completed the internal segment on its own territory (or at least from the
Assalouyeh Energy Zone to
Iranshahr, 120 miles west of the
Pakistani border). The floods and political unrest in Pakistan (the pipeline enters in Baluchistan) have likely delayed its execution of its part of the project. The variant whereby the gas would

APR-JUN 2011

11

have gone to the Pakistani port of Gwadar (on a small peninsula in the country’s southwest at the entrance to the
Persian Gulf) for liquefaction and sea transport to China is no longer in play. In March 2010 China ceased providing its development assistance to Gwadar, a few months after pulling the plug on the Khalifa refinery project, also in
Pakistani Baluchistan.
The ADB intends to fund one-third of TAPI’s estimated cost. This declaration represents a geo-economic seal of approval that should help to unlock funding from the financial centers and the private sector, much as the
European Investment Bank and European Bank for Reconstruction and Development play similar roles for European pipelines from Russia and the South Caucasus. India had early on hinted that it would like its own companies to have a significant role in the pipeline’s construction, and
Berdimuhamedov has reportedly approved a leading role for India in the pipeline construction consortium. Chinese and American companies have also been reported to be expressing interest in the construction consortium. At the
December 2010 meeting in Ashgabat where the quadripartite agreement was inked among their leaders, the respective energy ministers also signed a complementary framework document. This document foresees, early in
2011, a series of three bilateral meetings between
Turkmenistan and each of the other participating states in order to agree supply conditions, including commodity price and transit tariffs. Then another four-way meeting should be held to agree and legitimize contractually all the sales and purchase agreements together.
The fact that Ashgabat has informed its partners that the gas will come from South Yoloton-Osman rather than from
Dauletabad strongly suggests that it is preparing an eventual decision to participate in constructing a Trans-Caspian
Gas Pipeline (TCGP) to Azerbaijan for gas to enter either the Nabucco pipeline and/or any of a number of other gas transmission projects to Europe as defined by the EU’s
Southern Corridor strategy. That is because Dauletabad is the source of gas for the so-called East-West Pipeline (EWP) inside the country that Turkmenistan decided in 2010 to reconstruct on its own rather than contracting with Gazprom or any of the other 70 international companies that had responded to its international tender. The western terminus of the EWP is not far from the country’s Caspian Sea coast, and its projected refurbished volume is 30 bcm/y. That happens to be the minimum volume necessary to make the

12

APR-JUN 2011

TCGP commercially viable and preferable to other methods (such as condensation or liquefaction) for transmitting the gas. At the December 2010 five-way Baku summit of
Caspian littoral states, Berdimuhamedov declared that any two countries should have the right to build a pipeline under the sea between them without having to ask permission from all the others.

Conclusions
It is intended that segments of the TAPI pipeline in
Afghanistan are buried in order to make them less susceptible to terrorist attacks. Local communities will be given incentives to participate in this defense, and the central government has bruited the deployment of
7,000 soldiers (to be trained by NATO) to safeguard the route. Successful implementation of the project would not only assist in the peaceful economic development of Afghanistan, diversify Turkmenistan ’ s gas exports, and provide resources to energy-hungry Pakistan and
India. It would also alter the geopolitical contours of the region, providing an artery for intensifying cooperation in the meta-region that lies east of the Caspian
Sea, south of Russia, and west of China. In particular, it would in the first instance integrate Afghanistan more into South Asia while giving India the opportunity that it has long sought to deepen its own geo-economic projection into Central Asia.
As was the case with the IPI, most experts are sceptical about TAPI becoming a reality given the myriad constraints and political problems that exist among the partners. While India continues to be wary about the security of the pipeline traversing through Pakistan, it will have a hard time selling gas from this project, particularly when it has access to more cost-effective alternatives, be it from the IPI project, LNG imports or from its own recent gas finds. If the project does see the light of day, it will be due to significant US support for the project, as well as its own larger political and strategic considerations.

References
• Wikipedia
• Robert M. Cutler (01/19/2011 issue of the CACI
Analyst)
• Deirdre Tynan (The Turkmenistan-AfghanistanPakistan-India (TAPI) pipeline Looks Set to go Ahead)
PP
• Journal of Energy Security

Visit our websites at www.safan.com

Similar Documents

Free Essay

Dddd

...In queueing theory, Kendall's notation (or sometimes Kendall notation) is the standard system used to describe and classify a queueing node. D. G. Kendall proposed describing queueing models using three factors written A/S/c in 1953[1] where A denotes the time between arrivals to the queue, S the size of jobs and c the number of servers at the node. It has since been extended to A/S/c/K/N/D where K and D the capacity of the queue and queueing discipline[2] and N the size of the population of jobs to be served.[3][4] When the final three parameters are not specified (e.g. M/M/1 queue), it is assumed K = ∞, N = ∞ and D = FIFO. In queueing theory, Kendall's notation (or sometimes Kendall notation) is the standard system used to describe and classify a queueing node. D. G. Kendall proposed describing queueing models using three factors written A/S/c in 1953[1] where A denotes the time between arrivals to the queue, S the size of jobs and c the number of servers at the node. It has since been extended to A/S/c/K/N/D where K and D the capacity of the queue and queueing discipline[2] and N the size of the population of jobs to be served.[3][4] When the final three parameters are not specified (e.g. M/M/1 queue), it is assumed K = ∞, N = ∞ and D = FIFO. In queueing theory, Kendall's notation (or sometimes Kendall notation) is the standard system used to describe and classify a queueing node. D. G. Kendall proposed describing queueing models using three factors written A/S/c in 1953[1]...

Words: 739 - Pages: 3

Premium Essay

Dddd

...For the exclusive use of S. AL OBAIDLI 9-405-009 REV: SEPTEMBER 22, 2005 DAVID THOMAS BORIS GROYSBERG CATE REAVIS Sonoco Products Company (A): Building a WorldClass HR Organization Your business is only going to be as good as the people you’ve got. You can have the best strategy in the world, but if you don’t have effective execution by people, it’s going to fail. — Harris DeLoach, Sonoco CEO In order to make progress, we had to somehow decide what things were going to be the same across the company and what things could be or needed to be different to support the businesses. There was a balance that we needed to figure out. — Cindy Hartley, Senior VP, Human Resources It was late August 2000. Cindy Hartley, senior vice president of human resources (HR) at Sonoco, a 100-year-old global provider of industrial and consumer packaging and related services, was meeting with five members of her reorganization task force comprising the heads of employee relations and organizational development, the company’s chief labor attorney, and two key divisional HR directors. Looking to cut costs across the company, the company’s newly appointed CEO had asked Hartley to come up with at least two potential new HR structures that would reduce the function’s costs by 20%, or $2.8 million. But there were other equally pressing reasons for the reorganization. Number one was to ensure top-level accountability for talent management and upgrading. The second reason was to provide...

Words: 10040 - Pages: 41

Free Essay

Dddd

...1. | Which of the following statements about starch is false? | | A. | Starch may be partially branched. | B. | Starch is a polymer of glucose. | C. | Starch is formed by the condensation of monomers. | D. | The properties of starch are very similar to those of cellulose. | E. | Starch may be digested by people. | | Incorrect See Concept 2.3: Carbohydrates Consist of Sugar Molecules | Points Earned: | 0/1 | Correct Answer: | D | Your Response: | E | 2. | Which of the following biological molecules are linked by covalent bonds formed by the removal of the elements of water from the reactants (a kind of condensation reaction)? | | A. | Oils | B. | Fats | C. | Proteins | D. | Starch | E. | All of the above | | Correct See Concept 2.2: Atoms Interact and Form Molecules | Points Earned: | 1/1 | Correct Answer: | E | Your Response: | E | 3. | Table salt, NaCl, is neutral. When dissolved in water, NaCl | | A. | does not separates, but interacts with water molecules. | B. | separates to form Na– and Cl+ molecules. | C. | separates to form Na+ and Cl– ions that interact with water molecules. | D. | separates to form Na+ and Cl– ions that do not interact with water molecules. | E. | remains as NaCl (does not dissociate). | | Correct See Concept 2.2: Atoms Interact and Form Molecules | Points Earned: | 1/1 | Correct Answer: | C | Your Response: | C | 4. | A reaction that has a negative ΔG | | A. | is always paired...

Words: 1128 - Pages: 5

Premium Essay

Dddđ

...* . * deals with intentions and motives * Consequentialist theories don't pay direct attention to whether an act is carried out with good or bad intentions; most people think these are highly relevant to moral judgements. * Duty-based ethics can include intention in at least 2 ways... * If a person didn't intend to do a particular wrong act - it was an accident perhaps - then from a deontological point of view we might think that they hadn't done anything deserving of criticism. This seems to fit with ordinary thinking about ethical issues. * Ethical rules can be framed narrowly so as to include intention. Bad points of duty-based ethics * absolutist * Duty-based ethics sets absolute rules. The only way of dealing with cases that don't seem to fit is to build a list of exceptions to the rule. * allows acts that make the world a less good place * Because duty-based ethics is not interested in the results it can lead to courses of action that produce a reduction in the overall happiness of the world. * Most people would find this didn't fit with their overall idea of ethics: ...it is hard to believe that it could ever be a duty deliberately to produce less good when we could produce more... A C Ewing, The Definition of Good, 1947 * hard to reconcile conflicting duties * Duty-based ethics doesn't deal well with the cases where duties are in conflict. Top Kant taught (rather optimistically) that every rational...

Words: 612 - Pages: 3

Free Essay

Dddd

...Méthodologie de l’action marketing * Synthèse des informations : Sous la forme de tableau (SWOT) mettant en lumière les forces et les faiblesses dégagées par l’analyse interne ainsi que les opportunités et menaces dégagées par l’analyse externe. * Diagnostic La problématique : Elle doit sous forme de question, identifier le problème majeure auquel est confronté l’entreprise Exemple : Comment permettre à Dop de rajeunir son image de marque et de profiter de la forte croissance des après shampoing. * Les objectifs Ils ont pour mission d’exprimer les buts au l’entreprise doit atteindre Objectif qualitatif (renforce l’image de la marque) ou quantitatif (augmentation des ventes/CA) * La stratégie A ne pas confondre avec les moyens. A ne pas confondre avec les moyens : * La cible (consommateurs visés) * Le positionnement (différenciation avec la concurrence), personnalité du produit par rapport à d’autres marques concernant des produits de même nature * Les sources de volume (ou trouver des parts de marchés) * Le mix marketing : Ensemble d’outils à utiliser pour atteindre les objectifs fixés. Le produit, le prix, la distribution, la communication. Analyse et diagnostic On ne peut prendre aucune décision efficace sans une analyse complète : * de l’entreprise * du marché * de la concurrence * de l’environnement L’analyse SWOT : C’est l’outil d’analyse le plus employé, il repose sur quatre variables : * En interne, les...

Words: 356 - Pages: 2

Free Essay

Dddd

...|[pic] | |Year Applying For _________ |Planned Length of Stay | Birth Date |Gender |Office Use Only | |Semester Applied For: | | | | | |( Fall ( Spring |__________________________ |/ / |( Male | | |( Winter ( Summer | |Month Day Year |( Female | | |Family Name First Name | | | |_____ ________ ____ | |Permanent Mailing Address Telephone: (_____) - _______ - __________ Fax: (_____) - ______ - __________ | | ...

Words: 594 - Pages: 3

Free Essay

Dddd

...1 Boys' 16 Singles - 1-32 Round of 32 Round of 16 Round of 64 Robert Krill (1) Elm Grove, WI Quarterfinals Semifinals R. Krill(1) 2 Bye 3 Felipe M. Campos Madison, WI Sun 6/14 8:00 AM HHS F. Campos 4 Bye 5 Lucas Ebel Pewaukee, WI Sun 6/14 11:00 AM HHS L. Ebel 6 Bye 7 Benjamin J. Sinense Elm Grove, WI Sun 6/14 8:00 AM HHS B. Sinense 8 Bye 9 John D. Massart (5) Elm Grove, WI Mon 6/15 11:00 AM HHS J. Massart(5) 10 Bye 11 Samuel R. Keller Wauwatosa, WI Sun 6/14 8:00 AM HHS S. Keller 12 Bye 13 Colt Tegtmeier Madison, WI Sun 6/14 11:00 AM HHS C. Tegtmeier 14 Bye 15 James Paradisin Waunakee, WI Sun 6/14 8:00 AM HHS J. Paradisin 16 Bye 17 Casey Johnson (3) Mon 6/15 2:00 PM HHS Kohler, WI C. Johnson(3) 18 Bye 19 Anish K. Singhal Brookfield, WI Sun 6/14 8:00 AM HHS A. Singhal 20 Bye Sun 6/14 11:00 AM HHS 21 Jonathan D. Peck Stevens Point, WI J. Peck 22 Bye 23 Haiwen Dai Middleton, WI Sun 6/14 8:00 AM HHS H. Dai 24 Bye 25 Cecil J. Lingard (7) Mon 6/15 11:00 AM HHS Madison, WI C. Lingard(7) 26 Bye 27 Robbie May Mequon, WI Sun 6/14 8:00 AM HHS R. May 28 Bye 29 Ethan G. Mardanus-Budiono Sun 6/14 11:00 AM HHS Sussex, WI E. Mardanus-Budiono 30 Bye 31 Harry Rosmann 32 Robby Baranko Bayside, WI Sat 6/13 3:30 PM HHS Mequon, WI Sun 6/14 8:00 AM HHS...

Words: 296 - Pages: 2

Premium Essay

Dddd

...Curriculum Vitae Personal information Name : Jack Assai Emrazian Date / place of birth : 22 / 11 / 1995 , Kuwait Nationality : Armenian / Syrian Mobile number : 51591005 Gender : Male Academic Records * Attended and graduated from the(Armenian school of Kuwait )in 2013 * Attending ( the arab open university ) & studying business administration as a stage 2. Duties & experiences * 1 years selling experience in galleries * 2 years experience as a receptionist and costumer service department in advertisement designing company (neon center). * Interacting with costumers regularly to gain feedback on a quality and service effectiveness * Maintaining strong and cordial relationships with corporate sales level * Responsible for account, calls , sales budgets * Google knowledge of Microsoft office software including word , excel and outlook * Can communicate information and ideas to others in an understandable manner * Responsible for selling minerals and different type of materials * Ability to find out a client advertising needs and then match a solution to them Sales skills * A confident telephone manner * Can demonstrate effective sales presentations on a face to face level * Can meet a client to build close relationships with them * Knowledge of doing a consultative sell by listening to a costumers requirements and discussing a product benefits * Able to communicate effectively...

Words: 360 - Pages: 2

Premium Essay

Dddd

...CHAPTER 2a ENERGY TRANSFER BY HEAT, WORK & MASS CONTENTS Forms of Energy Energy Transfer by Heat Energy Transfer by Work Mechanical Forms of Work The First Law of Thermodynamics Energy Balance for close system Energy Conversion Efficiencies FORMS OF ENERGY • Energy can exist in numerous forms such as thermal, mechanical, kinetic, potential, electric, magnetic, chemical, and nuclear, and their sum constitutes the total energy, E of a system. Thermodynamics deals only with the change of the total energy. Macroscopic forms of energy: Those a system possesses as a whole with respect to some outside reference frame, such as kinetic and potential energies. Microscopic forms of energy: Those related to the molecular structure of a system and the degree of the molecular activity. Internal energy, U: The sum of all the microscopic forms of energy. Kinetic energy, KE: The energy that a system possesses as a result of its motion relative to some reference frame. Potential energy, PE: The energy that a system possesses as a result of its elevation in a gravitational field. The macroscopic energy of an object changes with velocity and elevation. • • • • • • ENERGY EQUESIONS Kinetic energy Kinetic energy per unit mass Potential energy Most of the closed system remains stationary, so for that system; KE = PE = 0 Potential energy per unit mass Total energy of a system Energy of a system per unit mass Total energy per unit mass PROBLEM Determined the mass...

Words: 2035 - Pages: 9

Premium Essay

Dddd

...Chapter 21 Structured Financing Techniques in Oil and Gas Project Fina.nce Future-Flow Securitizations, Prepaids, Volumetric Production Payments, and Project Finance Collateralized Debt Obligations Christopher L. Culp and J. Paul Forrester* I. INTRODUCTION Project finance is the extension of credit to finance an economic unit where the future cash flows of that unit serve as collateral for the loan. By facilitating the separation of project assets from the sponsor and enabling the financing of those assets on the basis of the cash flows they are expected to generate, project finance can allow a sponsor to undertake a project with more risk than the sponsor is otherwise willing to underwrite independently. Project finance can also help sponsors avoid incurring leverage beyond tolerable levels, thereby helping them preserve their debt capacity, credit ratings, and cash flows for alternative capital investment activities. Large-scale oil and gas projects have been popular subjects for project financing since the inception of the market. Indeed, modem project finance is thought to have begun in the 1930s when a Dallas bank extended a nonrecourse loan to finance an oil and gas project. I Project finance "came of age" in the 1970s and 1980s with the Please address correspondence to christopher.culp@chicagobooth.edu or jforrester@ mayerbrown.com. The usual disclaimer applies, and the opinions expressed herein do not necessarily reflect those of any...

Words: 11103 - Pages: 45

Premium Essay

Dddd

...The international trade activities are grown day by day. This trend is attributable to the increased globalization of the world economies and the availability of trade payment and finance from the international banking community. Although banks also finance domestic trade, their role in financing international trade and payment system is more critical due to the additional complications involved. First, the exporter might question the importer’s ability to make payment. Second, even if the importer is creditworthy, the government might impose exchange controls that prevent payment to the exporter. Third, the importer might not trust the exporter to ship the goods ordered. Fourth, even if the exporter does ship the goods, trade barriers or time lags in international transportation might delay arrival time. Financial managers must recognize methods that they can use to make payment and finance international trade so that they can conduct exporting or importing in a manner that maximizes the value of a business. In any international trade transaction, credit is provided by the exporter, the importer, one or more financing institutions, or any combination of these. The supplier may have sufficient cash flow to finance the entire trade cycle, beginning with the production of the product until payment is eventually made by the buyer. In some cases, the exporter may require bank financing to augment its cash flow. On the other hand, the supplier may not desire to provide financing...

Words: 303 - Pages: 2

Free Essay

Dddd

...Lignelsen om den barmhjertige samaritaner v25    Da   rejste   en   lovkyndig   sig   og   ville   sætte   Jesus   på   prøve   og   spurgte   ham:   »Mester,  hvad  skal  jeg  gøre  for  at  arve  evigt  liv?«  v26    Han  sagde  til  ham:  »Hvad   står   der   i   loven?   Hvad   læser   du   dér?«  v27    Manden   svarede:   »Du   skal   elske   Herren   din   Gud   af   hele   dit   hjerte   og   af   hele   din   sjæl   og   af   hele   din   styrke   og   af   hele  dit  sind,  og  din  næste  som  dig  selv.«  v28    Jesus  sagde:  »Du  har  svaret  rigtigt.   Gør   det,   så   skal   du   leve.«  v29    Men   han   ville   retfærdiggøre   sig   selv   og   spurgte   Jesus:   »Hvem   er   så   min   næste?«  v30    Jesus   svarede   og   sagde:   »En   mand   var   på   vej  fra  Jerusalem  ned  til  Jeriko  og  faldt  i  hænderne  på  røvere.  De  trak  tøjet  af  ham   og  slog  ham,  så  gik  de  og  lod  ham  ligge  halvdød.  v31    Tilfældigvis  kom  en  præst   den   samme   vej;   han   så   manden,   men...

Words: 293 - Pages: 2

Premium Essay

Dddd

...BUS 530(NSU) SPRING, 2013, Synopsis:6 MBA Prog. Sec. 1 and 2 (1). Investment is addition to capital stock. Capital is the plant, equipment, buildings, and inventories of raw materials and semi-finished goods that are used to produce other goods and services. - Two flows change stock of capital: investment and depreciation (wear and tear and obsolescence). Depreciation is also called “capital consumption”. - Total amount spent on new capital and on replacing depreciated capital is “gross investment”. Gross investment minus depreciation is “net investment”. (2). Three types of investment: Business fixed(equipment structures), Residential Investment, Inventory Investment(goods that businesses put aside in storage, including materials and supplies, work in progress and finished gods). - The major determinant of investment is real rate of interest (rr). [pic] Fig 1: Downward Sloping Inv. Function Fig 2: A shift in Inv. Function ( in MP of capital) (3). Sources of Investment fund: I is financed by national saving and borrowing from the rest of the world. GDP = C + I + G + (X-M) Also GDP = C + S + T Combining two I + G + (X-M) = S + T Or I = S + (T-G) - (X-M) Saving, govt. saving, borrowing from ROW Or I = Pr. S + Govt. S Govt. saving may be positive or negative depending on budget surplus or deficit. The condition of stability (equality of S and I) ...

Words: 401 - Pages: 2

Premium Essay

Dddd

...Chandler's development of the theme danger The extract I've decided to choose for this particular task has a range of different forms of danger. These forms of danger are presented to us, as readers to make us react to certain scenarios differently. In this extract; Marlowe is with Bill Chess, an isolated man, both physically and mentally. Marlowe only meets Bill Chess a few pages prior to this scene in which Marlowe and Bill Chess witness the disturbing appearance of a body emerge from out of the water. From pages 50-53 ( The end of the chapter) there isn't much dialogue between the two characters as Chandler's focusing predominately on the environment they're in, and uses this to create a vivid image inside the reader's head which helps in the development of the sense of danger throughout this scene. Towards the ending of page 50 and the beginning of page 51, Marlowe enters into a deep thought whilst looking at the lake. There's a lexical field of 'peace' and the short paragraph in which Marlowe describes the atmosphere, he makes every detail seem sensitive and fragile: "It lay in the water almost without motion..." and "The air was peaceful and calm". He contrasts this with an environment he's more used to, the city. "a quiet you don't get in cities" this informs us of his lack of experience in these environments, the isolated cabin in the woods. The isolation of the cabin could reflect the current feelings Marlowe's experiencing as he makes himself seem 'new' to the...

Words: 558 - Pages: 3

Free Essay

Dddd

...大作文: 概况介绍:任务介绍、评分标准(包括右下角的字数不够等等)、写作时间安排,其他(最简化写作P5) 话题词汇(最P28-39) 句型语法(最p40-45) 分段方式 模板:开头段的写法,结尾段的写法,中间段的topic sentence 论证方式 高分技能:具体化、词汇多样性、准确性、不常用词(意义深刻)、句型多样性(70从句)、指代的使用、名词的重要性、书面文体的问题、程度控制、topic sentence、thesis statement、连贯衔接、评分标准checklist(加上字数、字迹等等/范文分析)、思路头脑风暴角度,学写提纲、特殊开头词、平行结构、分词、非谓语动词、定语的多样性、否定的多样性、押头韵、论证方式、观点难想题目分析 四种题型范文各一篇 十天突破展开 准确表达 具体化+such as +介词短语 句式变化:被动,从句,倒装,etc 小作文 常用句型单词 按重要性,要写做什么 内容顺序安排 连贯衔接 分段方法 模板:开头段,中间,结尾 句型多样性 词汇多样性 加上一点定性的描述 常见错误(不要加主观观点) 时态 流程图地图的特殊性 教学方法: 让学生自己在电视报纸上寻找使用了我所说的论证方式的地方,最好是英文 Individuality:随时加上那些学生新的知识点缺失,补充新的知识点 错误可能变成一个新的知识点,也可以一笔带过,make your best judgement If you don't know, you are not supposed to know. Put a pin on it and move on.Experiment Specify the measurement of mastery 要不要顺便教些难的:教:可能学多点,扩展;不教:少即是多,太多distract/lack focus-->可以放那里,看学生反应决定要不要教,怎么教。(一个知识点是否值得讲) 没讲过的给出:降低难度、增强信心 不给出:引发思考和学习 加强跟之前知识的联系,但是也不是每个出现过的知识点都要复习,有时一笔带过也行 观点的掌握和语言点的掌握,考察重点不同。观点的掌握,重在理解,记住,用上,迁移。语言点的掌握,重在准确 将学生真正薄弱的急需的(他们意识到他们薄弱、令学生意识到他们薄弱) 有些错误不必改,学正确的就行 有些点不用专门学,顺带提到就行 知识点--》神经连接 小作文:翻译--》看图自己写 知识点细化 学生表达跟范文表达的区别 选用常用单词写段落 such as……横线填空 短句技术拓展 句子连接在一起,明确逻辑关系 一定要用到某种句型和单词来写 variety of activities: what situation can you think of that you will use this word? the fact that ___________________________________ makes me happy/sad... the message that ______________________________makes me satisfied... students should engage in more recreational activities such as__________________________________ ...

Words: 387 - Pages: 2