Developing savory rosti-crsps (cast study 6)

Most people see the snack market as dynamic and innovative, but actually it is surprisingly conservative. Most of what passes for product innovation is in fact tinkering with our marketing approach, things like special offers, promotion tie-ins and so on. We occasionally put new packs round our existing products and even more occasionally we introduce new flavors in existing product ranges. Rarely though does anyone in their industry introduce something radically different. That is why project Orlando is both exciting and scary Monica Allen, Technical Vice-President of PJT’s snack division, was commenting on a new product to be marketed under PJT’s best-known brand ‘Dreddo Dan’s Surfer Snacks’. The Dreddo Dan’s brand made use of surfing and outdoor ‘action-oriented youth’ imagery, but in fact was aimed at slightly older generation who, although aspiring to such a lifestyle, had more discretionary spend for the premium snacks in which the brand specialized. Current products marketed under the brand included both fried and baked snacks in a range of exotic flavors. The project, internally known as Project Orlando, was a baked product that had been in ‘development ‘ for almost three years but had hitherto been seen very much as a long-term development, with no guarantee of ever making it through to market launch. PJT had several of these long-term projects running at any one time. They were allocated a development budget, but usually no dedicated resources were a associated with the project. Less than half of these long-term projects ever even reached the stage o being test marketed. Around 20 percent never got past the concept stage, and less than 20percent ever went into production. However, the company viewed the development effort put into these ‘failed’ products as being worthwhile because it often led to ‘spin-off’ developments and ideas that could be used elsewhere. Up till this point ‘Orlando’ changed dramatically.
‘Orlando’ was a concept for a range of snack foods, described within the company as savory potato cookies essentially they were one-and-a-half-inch discs of crisp, fried potato with a soft dairy cheese-like filling. The idea of incorporating dairy fillings in snacks had been discussed within the industry for some time but the problems of manufacturing such a product were formidable. Keeping the product crisp on the outside yet soft in the middle, while at the same time ensuring microbiological safety, would not be easy. Moreover such as a product would have to be capable of being stored at ambient temperatures, maintain its physical robustness and have a shelf life of at least three months.
Bringing Orlando products to market involved overcoming three types of technical problem. First, the formulation and ingredient mix for the product had to maintain the required texture yet be capable of being baked on the company’s existing baking lines. The risk of developing an entirely new production technology for the product was considered too great. Second, extruding the mixture into baking molds while maintaining microbiological integrity (dairy product are difficult to handle) would require new extrusion technology. Third, the product would need to be packaged in material that both reflected its brand image but also kept the product fresh through its shelf life. The first of these problems had, more or less, been solved in PJT’s development laboratories. The second and third problems now seemed less formidable because of a number of recent technological breakthroughs made by equipment suppliers and packaging manufacturers. This had convinced the company the Orlando was worth significant investment and it had been giving priority development forward. She decided to put together a dedicated project team to oversee the development. “It is important to have representatives from all relevant part of company. Although the team will carry out much of the worked themselves, they will still need the corporation and the resources of their own departments. So, as well as being part of the team, they are also gateways to expertise around the company. ‘The team consisted of representative of marketing, the development kitchens (laboratories), PJT’s technology Centre (a development facility that served the whole group, not just the snack division), packaging engineers, and representatives from the division’s two manufacturing plants. All but the Manufacturing representatives were allocated to the project team on a fulltime basis. Unfortunately, Manufacturing had no –one who had sufficient process knowledge and who could be spared from their day-to-day activities.
Development Objectives
Monica had tried to set the objectives for the project in her opening remarks to the project team when they had first come together: ‘we have a real chance here to develop a product that not only will have major market impact, but will also give use a sustainable competitive advantage. We need to make this project work in such a way that competitors will find it difficult to copy what we do. The product formulation is a real success for our development people, and as long as we get the hand of using the new extrusion method and packaging material, we should be difficult to beat. The success of Orlando in the marketplace will depend on our ability to operationalize and integrate the various technical solutions that we now have access to. The main problem with this type of product is that it will be expensive to develop and yet, once our competitors realize what we are doing, they will come in fast to try and out-innovate us. Whatever else we do we must ensure that there is sufficient flexibility in the project to allow us to respond quickly when competitors follow us into the market with their own ‘me-too’ products. We are not racing against the clock to get this to market, but once we do make a decision to launch we will have to move fast and hit the launch date reliably. Perhaps most important, we must ensure that the product is 200percent safe. We have no experience in dealing with the microbiological testing which dairy- based food manufacture requires. Other divisions of PJT do have this experience and I guess we will be relying heavily on them.’
Monica, who had been tasked with managing the now much expanded development process, had already drawn up a list of key decisions she would have to take. * How to resource the development project. The division had a small development staff, some of whom had been working on Project Orlando, but a project of this size would require extra staff amounting to about twice the current number of people dedicated to product development. * Whether to invest in a pilot plant. The process technology required for the new project would be unlike any of the division’s current technology. Similar technology was used by some companies in the frozen food industry and one option would be to carry out trials at these (non-competitor) companies’ sites. Alternatively, the Orlando team could build their own pilot plant which would enable them to experiment in-house. As well as the significant expense involve, this would raise the problem of whether any process innovations would work when scaled up to full size/ however, it would be far more convenient for the project team and allow them to make their mistakes’ In private. * How much development to outsource. Because of the size of the project, Monica had considered outsourcing some of the development activities. Other divisions within the company may be able to undertake some of the development work and there were also specialist consultancies that operated in the food processing industries. The division had never used any of these consultancies before but other divisions had occasionally done so. * How to organize the development. Currently the small development function had have been organized around loose functional specialisms. Monica wondered whether this project warranted the creation of separate department independent of the current structure. This might signal the importance of this project to the whole division.
Fixing the budget
The budget to develop project Orlando through to launch had been set at $30 million. This made provision to increase the size of the existing development team by 70percent over a 20-month period (for launch two years from now). It also includes enough funding to build a pilot plant that would allow the team the flexibility to develop response to potential competitor reaction after the launch. So, of the $30m around $12m was for extra staff and contracted-out product development, 5$m for the pilot plant and $3m for one-off costs (such as the purchase of test equipment, etc.)Monica was unsure whether the budget would be big enough. ‘I know everyone in my position want more money, but it is important not to underfund a project like this. Increasing our development staff by 70% is not really enough. In my opinion we need an increase of at least 90% to make sure that we can launch when we want. This would need another $5m, spread over the next 20 months. We could get this by not building the pilot plants, I suppose, but I am reluctant to give that up. It would means begging for test capacity on other companies’ plants, which is never satisfactory from a knowledge-building viewpoint. Also it would compromise security. Knowledge of what we were doing could easily leak to competitors. Alternatively we could subcontract more of the research, which, may be less expensive, especially in the long run, but I doubt if it would save the full $m we need. More important, I am not sure that we should subcontract anything which would compromise safety, and increasing the amount of work we send out may do that. No, it’s got to be the extra cash or project could overrun. The profit projection for the Orlando products looks great. But delay or our inability to respond to competitor pressures would depress those figures significantly. Our competitors could get into the market only a little after us. Word has it that marketing’s calculations indicate a delay of only six months.

Table6.2
Preliminary ‘profit stream’ projections for the project Orlando range of products, assuming launch in 24months’ time Time period* 1 2 3 4 5 6 7 | Profit flow 10 20 50 90 120 130 135 | ($ million) *Six-months periods. | Could not only delay the profit stream by the six months but also cut it by up to 30%. Monica was keen to explain two issue to the management committee when it met to consider her request for extra funding. First, that there was a coherent and well though-out strategy for the development of Project Orlando over the next two years. Second, that saving $5m on he development budget would be a false economy.