Free Essay

Final Project

In:

Submitted By Dwayne
Words 1306
Pages 6
Business Solutions.com Richman Investments Rel 1, Ver.0 8/11/2012 Richman Investments Business Continuity Plan By

Emergency notification contacts Name | Address | Home | Mobile phone | | | | | | | | | | | | | | | | | | | | | | | | | | | | |

Date | Summary of changes made | Changes made by (Name) | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
Revisions control page

Purpose

The purpose of this business continuity plan is to prepare Richman Investments in the event of extended service outage caused by factors beyond our control (natural disasters, man-made events), and to restore services to the company in a minimum time frame. All Richman Investments sites are expected to implement preventive measures whenever possible to minimize operational disruptions and to recover as rapidly as possible when an accident occurs.

The plan identifies vulnerabilities and recommends necessary measures to prevent extended communication service outages. It is a plan that encompasses all Richman Investments system sites and operations facilities.

Scope
The scope of this plan is limited to disaster recovery. This is a business continuity plan, not a daily problem resolution procedures document.

Plan objectives * Serves as a guide line for Richman Investments recovery teams. * References and points to the location of critical data. * Provides procedures and resources needed to assist in recovery. * Identifies vendors and customers that must be notified in the event of a disaster. * Assists in avoiding confusion experienced during a crisis by documenting, testing and reviewing recovery procedures. * Identifies alternate sources for supplies, resources and locations. * Documents storage, safeguarding and retrieval procedures for vital records.

Assumptions * Key people (team leaders or alternates) will be available following a disaster. * This document and all vital records are stored in a secure off-site location and not only survive the disaster but accessible immediately following the disaster. * Each support organization will have its own plan consisting of unique recovery procedures, critical resource information and procedures.

Disaster definition

Any loss of utility service (power, water), connectivity (system site), or catastrophic event weather, natural disaster, vandalism) that causes an interruption in the service provided by Richman Investments operations. The plan identifies vulnerabilities and recommends measures to prevent extended service outages.

Recovery teams * Team Leader * Information Security Members * Network Administrators * Physical Security Personnel * Legal Personnel * Human Resources (HR)

Team member responsibilities * Each team member will designate an alternate * All of the members should keep an updated calling list of their work team members’ work, home, and cell phone numbers both at home and at work. * All team members should keep this plan for reference at home in case the disaster happens after normal work hours. All team members should familiarize themselves with the contents of this plan. * Instructions for using the business continuity plan This plan becomes effective when a disaster occurs. Normal problem management procedures will initiate the plan, and remain in effect until operations are resumed at the original location or a replacement location and control is returned to the appropriate functional management.

Disaster declaration

The senior management team, with input from the EMT, DRT and IT, is responsible for declaring a disaster and activating the various recovery teams as outlined in this plan. In a major disaster situation affecting multiple business units, the decision to declare a disaster will be determined by Richman Investments senior management. The EMT and DRT will respond based on the directives specified by senior management. Notification

Regardless of the disaster circumstances, or the identity of the person(s) first made aware of the disaster, the EMT and DRT must be activated immediately in the following cases: * Two or more systems and/or sites are down concurrently for three or more hours * Five or more systems and/or sites are down concurrently for three or more hours

External communications

Corporate public relations personnel are designated as the principal contacts with the media (radio, television, and print), regulatory agency, government agencies, and other external organizations following a formal disaster declaration. Emergency management standards

Data backup policy
Full and incremental backups preserve corporate information assets and should be performed on a regular basis for audit logs and files that are irreplaceable, have a high replacement cost, or are considered critical. Backup media should be stored in a secure, geographically separate location from the original and isolated from environmental hazards.

Department-specific data and document retention policies specify what records must be retained and for how long. All organizations are accountable for carrying out the provisions of the instruction for records in their organization.

IT follows these standards for its data backup and archiving:
Backup Policy
Backup media is stored at locations that are secure, isolated from environmental hazards, and geographically separate from the location housing the system.

0 Backups greater than three years old are destroyed every six months. 1 Backups less than three years old must be stored locally off-site. 2 The system supervisor is responsible for the transition cycle of tapes.

System Images * A copy of the most current image files must be made at least once per week. * This backup must be stored offsite. 3 The system supervisor is responsible for this activity.

Off-site storage procedures * Backups and disks, and other suitable media are stored in environmentally secure facilities. * Backups or disk rotation occurs on a regular schedule coordinated with the storage vendor. * Access to backup databases and other data is tested annually.

Emergency management procedures The following procedures are to be followed by system operations personnel and other designated Richman Investments personnel in the event of an emergency. Where uncertainty exists, the more reactive action should be followed to provide maximum protection and personnel safety. Note: Anyone not recognized by the IT staff as normally having business in the area must be challenged by the staff who should then notify security personnel. These procedures are furnished to Richman Investments management personnel to take home for reference. Several pages have been included to supply emergency contacts. In the event of any situation where access to a building housing a system is denied, personnel should report to alternate locations. Primary and secondary locations are listed below.

Alternate locations Workplace: Richman Investments * Attempt to contact your immediate supervisor or management via telephone. Home and cell phone numbers are included in this document Workplace: Richman Investments * Attempt to contact your immediate supervisor or management via telephone. Home and cell phone numbers are included in this document Workplace:Richman Investments * Attempt to contact your immediate supervisor or management via telephone. Home and cell phone numbers are included in this document

In the event of a natural disaster In the event of a major catastrophe affecting Richman Investments facility, will immediately notify the Emergency Management Team. Procedure | STEP | ACTION | | 1 | Assess the situation and determine if outside assistance is needed; if this is the case, dial 9-1-1 immediately. | | 2 | Immediately notify all other personnel in the facility of the situation and be prepared to cease voice operations accordingly. | | 3 | Immediately notify all other personnel in the facility of the situation and be prepared to cease operations accordingly. | | 4 | Water detected below the raised floor may have different causes: * If water is slowly dripping from an air conditioning unit and not endangering equipment, contact repair personnel immediately. * If water is of a major quantity and flooding beneath the floor (water main break), immediately implement power-down procedures. While power-down procedures are in progress, evacuate the area and follow management’s instructions. |

Plan review and maintenance

This plan must be reviewed semiannually and exercised on an annual basis. The test may be in the form of a walk-through, mock disaster, or component testing. Additionally, with the dynamic environment present within Richman Investments, it is important to review the listing of personnel and phone numbers contained within the plan regularly.

The hard-copy version of the plan will be stored in a common location where it can be viewed by site personnel and the EMT and DRT. Electronic versions will be available via Richman Investments.

Similar Documents

Premium Essay

Final Project

...IT 510 Final Project Guidelines and Rubric Overview The final project for this course is the creation of a System Proposal Document. In any modern enterprise, it is crucial that all of the different stakeholders, users, inputs, and outputs that relate to the business’s IT systems coalesce in a logical and cohesive way for the systems to be effective. As a member of an IT team, your overarching goal is to ensure that the IT systems ultimately do what the business needs them to do. In this course, you have learned about the key principles and practices underlying the analysis, design, implementation, and management of IT systems. In this final project, you will apply this knowledge by creating a systems proposal document. The project is divided into four milestones, which will be submitted at various points throughout the course to scaffold learning and ensure quality final submissions. These milestones will be submitted in Module Two, Module Four, Module Six, and Module Eight. The final submission will occur in Module Nine. In this assignment, you will demonstrate your mastery of the following course outcomes:     Assess the relationship of systems analysis, design, implementation, and development processes as they relate to the management of information technology systems Communicate the paradigms, processes, and activities of systems development to diverse audiences Apply structure and object oriented analysis modeling techniques to analyze, design, and...

Words: 2901 - Pages: 12

Free Essay

Ece 313 Week 5 Final Project

...ECE 313 WEEK 5 FINAL PROJECT To purchase this visit here: http://www.activitymode.com/product/ece-313-week-5-final-project/ Contact us at: SUPPORT@ACTIVITYMODE.COM ECE 313 WEEK 5 FINAL PROJECT The Final Project will illustrate how family-centered programs, theories, and concepts support the early childhood classroom and the child’s family. The family-centered approach asserts that family involvement is important for a young child’s cognitive and social development. The Final Project, which will be presented via PowerPoint, will address the following scenario: You are the director of a preschool program that serves children ages three to five. You are giving a presentation to teachers and parents to encourage partnerships in the education of the whole child. The objective of your presentation is to encourage adaptive skills and to facilitate strategies in which to maximize these abilities that can be taught in the classroom and extended at home. Address the following points: 1. Self-help skills. 2. Pro-social skills. 3. Self-regulation skills. For each of the three skill-sets: 1. Explain the desired skills and how they relate to the classroom and home. 2. Identify and discuss two to three strategies for teaching the skill-set to children in the classroom. 3. Explain how you will help parents to utilize the strategies to reinforce the desired ability at home. 4. Identify and describe a resource (either community or web-based) for the parents to use to continue...

Words: 1497 - Pages: 6

Free Essay

Ece 313 Week 5 Final Project

...A++PAPER;http://www.homeworkproviders.com/shop/ece-313-week-5-final-project/ ECE 313 WEEK 5 FINAL PROJECT The Final Project will illustrate how family-centered programs, theories, and concepts support the early childhood classroom and the child’s family. The family-centered approach asserts that family involvement is important for a young child’s cognitive and social development. The Final Project, which will be presented via PowerPoint, will address the following scenario: You are the director of a preschool program that serves children ages three to five. You are giving a presentation to teachers and parents to encourage partnerships in the education of the whole child. The objective of your presentation is to encourage adaptive skills and to facilitate strategies in which to maximize these abilities that can be taught in the classroom and extended at home. Address the following points: Self-help skills. Pro-social skills. Self-regulation skills. For each of the three skill-sets: Explain the desired skills and how they relate to the classroom and home. Identify and discuss two to three strategies for teaching the skill-set to children in the classroom. Explain how you will help parents to utilize the strategies to reinforce the desired ability at home. Identify and describe a resource (either community or web-based) for the parents to use to continue their learningat home. The PowerPoint presentation must be 18 to 20 slides in length, not including...

Words: 353 - Pages: 2

Premium Essay

Nt1310 Unit 8 Final Project

...Final Design Project The final design was a combination of a month’s worth of creativity, ingenuity, hard work and most importantly, team work. Although the preliminary design was determined to be mostly unusable, we did gain a vast amount of knowledge which was critical to the final design of our project. The first portion of the project was tasked with catching all of the marbles as they were going to be dropped all at once. Our goal was to create a mechanism which would all for the balls to be sent through the project one by one as we believed that this would allow for more efficient and more accurate sorting. Thankfully, we were able to use the same design for the ball delivery system as in the preliminary design as the entire team was very pleased with how well it worked. The final design for the mechanism was built on a cardboard shoe box which was flipped...

Words: 1616 - Pages: 7

Premium Essay

Capstone Final Project

...Capstone Greenway Bank Project Presented by: CISSA Amed Aplicano, Ivan Armendariz, Chris Christopher, Steven Smedley, Samuel Holman Table of Content 1. Table of content…………………………………………………………………………..……1 2. Project Charter………………………………………………………………………………....2-11 3. Change Management Plan…………………………………………………………………12-15 4. Change Management Procedure……………………………………………………….16 5. Project Schedule and Gantt Chart………………………………………………………17 6. Network Activity Diagram………………………………………………………………….18-20 7. Work Breakdown Structure……………………………………………………………….21 8. WBS Dictionary………………………………………………………………………………….22-24 9. Network Logical Diagram………………………………………………………………......25-26 10. Network Physical Diagram………………………………………………………………….27 11. Server Configuration…………………………………………………………………………..28-30 12. Active Directory Schema…………………………………………………………………….31 13. Client Configuration……………………………………………………………………………32-33 14. Infrastructure Configuration……………………………………………………………….34 15. Budget/Bill of materials……………………………………………………………………….35-37 16. Quality Plan…………………………………………………………………………………………38-40 17. Risk Management Plan………………………………………………………………………..41-48 18. Meeting Minutes…………………………………………………………………………………49-66 19. Final presentation slides……………………………………………………………………..67-77 20. Progress report………………………………………………………………………………….78- 1 NT2799.U1.HO4 Greenway Bank: Project ______________________________________________________________________________ Greenway Bank Project NSA Capstone Project Charter __________...

Words: 12136 - Pages: 49

Premium Essay

Project Management Final Paper

...1. Project Definition Form 1.1 Project Title Biaño’s Pizzaderia Inventory Management System 1.2 Project Context On March 27, 2007, the friends and neighbors of Alberto Biaño in Cebu City were treated to the first serving of Mr. Biaño's famous pizza.  This core group became his first loyal customers, as news spread far and wide of the pizza with the great homemade taste that everyone could afford.  Inspired by the resounding success of his initial offering, Alberto Biaño continued to develop his recipes to improve his pizzas' quality and taste until a perfect blend of crispy dough and aromatic sauce was achieved for everyone to enjoy. Another innovation was the concept of the “pizzaderia”, which  combined the words “pizza” and “carenderia”, to describe the little streetside eateries where Biaño’’s delicious but affordable pizzas were enjoyed by  people from all walks of life. Whether for birthdays, anniversaries, celebrations and get-togethers, everyone wanted to make a Biaño’s pizza part of their special treat. From that little pizzaderia in Mabolo, Mr. Biaño soon branched out to Capitol, Tabunok, USC Main, Mandaue and Mactan, making Biaño's pizza a truly well-loved snack in Cebu.  Realizing the potential for such great value in an affordable price, many franchisers from different places all over the country such as Cagayan de Oro, Oroquieta City, Butuan soon became part of the Biaño's Pizzaderia family 1.3 Statement of the Problem As of now, Biano’s Pizzaderia only...

Words: 3731 - Pages: 15

Premium Essay

Is535 Final Course Project

...Starting an E Commerce Online Business Keller Graduate School of Management Managerial Applications of Information Technology 11/12/2011 [Type the fax number] Jamie Lynch You want to start an E commerce business selling your products and services online but how to get started? Milestone 1 Problem: The business problem to be solved is how can an entrepreneur start and maintain a successful E commerce business online? Background: The first key to starting a successful online business is to first understand ecommerce and how it operates. Most people understand that ecommerce or electronic commerce refers to the buying and selling of products or services over electronic systems such as the Internet and other computer networks. However, it stretches beyond just the buying and selling of goods; it also includes an online process of developing, marketing, selling, delivering, servicing and paying for products and services.  “The use of commerce is conducted in this way, spurring and drawing on innovations in electronic funds transfer, supply chain management, internet marketing, online transaction processing, electronic data interchange (EDI), inventory management systems, and automated data collection systems. Modern electronic commerce typically uses the World Wide Web at least at one point in the transaction's life-cycle, although it may encompass a wider range of technologies such as e-mail, mobile devices and telephones as well”. (Electronic Commerce, modified...

Words: 3665 - Pages: 15

Premium Essay

Final Course Project Paper

...Tektronix Portfolio: Bringing Innovation and Satisfaction Week 7 Course Project Final Draft PROJ 587 Advanced Program Management Contents 1.0 Executive Summary 4 2.0 Organization’s Strategic Plan 5 3.0 Organization’s Strategic Capacity Plan 6 3.1 Defend the Core 6 3.2 Expansion of Sales and Products 6 3.3 Balance the Portfolio 6 4.0 Portfolio Management Process 7 4.1 Portfolio Strategic Plan 7 4.2 Portfolio Charter 7 4.3 Portfolio Management Plan 7 4.4 Portfolio Roadmap 8 4.5 Portfolio 9 5.0 Project Selection Criteria 9 5.1 Project Definition 9 5.1.1 Project Categorization 9 5.1.2 Project Prioritization 9 5.1.3 Weighted Scoring Method 10 5.2 Project Acceptance 11 5.2.1 Business Criteria 11 5.2.2 Logistical Criteria 11 6.0 Program Management Plan 11 6.1 Setup of Program Management Office (PMO) 11 6.1.1 Responsibilities: 11 6.2 Phase Gate Review Team 12 7.0 Plan to Identify/Resolve Triple Constraints Conflicts 12 8.0 Change Management Plan 14 8.1 Controlling Scope Change 14 8.2 Change Control Process 15 9.0 Resource Utilization Plan 16 9.1 Network Diagram 16 9.1.1 Utilization 16 9.1.2 Background Activities 16 9.1.3 Single-Tasking and Mulit-Tasking 16 9.1.4 Cross-Training 17 9.1.5 Identify Time-Critical Activities 17 9.1.6 Schedule Based on Deliverables 17 9.2 Requirements Plan 17 10.0 Works Cited 19 1.0 Executive Summary The primary purpose and goal of this report is to explain in detail the Portfolio Management...

Words: 4607 - Pages: 19

Premium Essay

Final Course Project(Rebuilding the Neighborhood Playground Project

...Rebuilding the Neighborhood Playground Project Lawanna Martin MGMT404 Course Project Professor Herbig 06/20/2012 Rebuilding the Playground Project Executive Summary: For several years now the Fifth Street neighborhood has been complaining that there playground is in need of being rebuilt or remodeled. They have found that their playground in the neighborhood is not meeting safety standards required by playground new guidelines. The official in the neighborhood has done some fundraising to have the playground rebuilt to meet these standards. They would like for the playground to be safer with much more activities for the entire family to enjoy by removing the old playground and replace it with new playground equipment. They would like for the kids in the neighborhood to enjoy more outdoor play and closer to their homes. Scope Statement: Goal Definition This project will include a 2,500 square-feet area, with structural plastic playground that includes climbing wall, slides, jungle gym which is attached to each other instead of the general wood finishing, as the old playground was. It will also contain monkey bars at a fixed height so that kids will not get hurt when jumping down. There will be three swing sets (belt swing, infant/toddler swing, and tire swing), so that parents have the choice of which is safer for their kids. A concrete side walk will be included, so that kids can ride their bikes and other things. Benches will be placed closely...

Words: 843 - Pages: 4

Premium Essay

Proj 587 Project Final

...Course Project Epsilon: Portfolio Management Plan Instructor: Stanley Mefford Oct 24, 2012 Table of Contents Introduction 3 Epsilon’s Strategic Plan 3 Strategic Capacity Plan 4 Portfolio Management Process 6 Project Selection Criteria 7 Program Management Plan 8 Quality 9 Scope 10 Internal Teams 10 External Teams 11 Scheduling 11 Conflict Resolution Plan 12 Change Management Plan 13 Resource Utilization 15 Conclusion 16 Resources 17 Introduction Deploying over 40 billion emails annually, Epsilon is ranked as the top database marketing services provider and is the world’s leading multi-channel marketing and technology organization (Palmer, 2012). Epsilon works with over 2,000 global clients that represent industries across many markets including financial services, customer packaged goods, retail, travel and pharmaceutical markets. Some of Epsilon’s service offerings include: database technology, email services, and reporting/analytics. As a leader in the market, an impressive 26 of the Fortune 100 companies trust them to provide marketing services (Epsilon, 2012). Since 2009, Epsilon had been experiencing unprecedented growth. In 2011, Direct Marketing News reported that Epsilon’s 2010 global revenues increased 19% as compared to the previous year and was expected to double its revenues (Gordon & Washkuck, 2011). From the outside, forecasts couldn’t be brighter for the company. Internally, however, it was a different story...

Words: 4958 - Pages: 20

Premium Essay

Bscs Final Project Proposal-Template

...BSCS FINAL PROJECT PROPOSAL Title of the Project Term of Registration: Fall 2014 Presented by: Registration No: | Name: | L1F01BSCS0001 | ABC XYZ | L1F01BSCS0002 | ABC XYZ | L1F01BSCS0003 | ABC XYZ | Faculty of Information Technology | University of Central Punjab Project Title Write down the brief project topic in four to five words only. However, the topic should not be ambiguous or very general. Project Advisor The Name of your advisor will come here. Particulars of the students: S.No | Registration# eg.L1F00BSCS0101 | Name in Full Use Block Letters | CGPA | Signatures | 1 | | | | | 2 | | | | | 3 | | | | | Advisor’s Consent I Prof./Dr./Mr./Ms. ________________________________________________ am willing to guide these students in all phases of above-mentioned project as advisor. I have carefully seen the Title and description of the project and believe that it is of an appropriate difficulty level for the number of students named above. Note:Advisor can’t be changed without prior permission of the Manager Projects and the duration for completion of the Project is 2 regular semesters (approx.) from the date of Registration of Research Project. | Signatures and Date | Advisor | EVALUATOR/REFEREE 1 I have carefully read the project proposal and feel that the proposed project is a useful one and of a sufficient difficulty level to justify 2 regular semesters workload for above mentioned students. I have made recommendations...

Words: 1146 - Pages: 5

Premium Essay

Final Project- Strategic Plan and Presentation

...Strategic Plan and Presentation STR/581 Strategic Plan and Presentation Contents Company Overview 2 Background 2 Company Structure 3 Environmental Scan 5 External Factors 5 Internal Factors 6 Strategies 7 Generic Strategies 7 Implementation 8 Company Overview Background KnowledgeNet Enterprises LLC is a business-to-business company that is currently based in Tempe, AZ. The company was formed in 2005 in Aberdeen, Washington in a small two bedroom home in hopes of providing businesses with affordable and high-end training for the Information Technology staff (D. Rottner, personal communication, 2014).Today, KnowledgeNet Enterprises LLC now serves over 6,000 companies world-wide. The company’s focus is to offer quality training that is backed by a customer service team that provides outstanding support to all of the company’s customers (KnowledgeNet, 2013). There are many different options of training available to the company’s customers that provide flexibility for the customers that have limited time to focus on training. The company offers instructor-led training live over the web so that customers get the classroom feel and interaction without having to be in the classroom. There are also recorded versions of all the live classes to provide flexibility for customers that cannot make it to the live class. KnowledgeNet Enterprises LLC also provides practice labs, exams, and full library of online books to assist with the training (KnowledgeNet,...

Words: 3172 - Pages: 13

Premium Essay

Nt1330 Unit 9 Final Project

...the progress of tasks/activities in a project. Also, another useful tool is a Work Breakdown Structure¹, which decomposes the project into smaller tasks to show relationships between the tasks. By combining project scheduling, project time estimation and risks analysis, there will be a higher chance of finishing the project successfully without delays. 2.3.3 Cost Overruns Cost overruns are closely related to project delays, but that is not always the case. Other cases could be changing the project direction from what was planned, or stakeholders...

Words: 605 - Pages: 3

Free Essay

Netw 202 Week 8 Final Project Latest

...NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican.us/product/netw-202-week-8-final-project-latest/ Contact us at: SUPPORT@WISEAMERICAN.US NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded NETW 202 WEEK 8 FINAL PROJECT LATEST To Purchase this tutorial visit following link http://wiseamerican...

Words: 495 - Pages: 2

Free Essay

Netw 202 Week 8 Final Project Latest

...NETW 202 WEEK 8 FINAL PROJECT LATEST To purchase this visit following link: https://coursehomework.com/product/netw/ Contact us at: HELP@APEXSEEKERS.COM NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded Course Home Work aims to provide quality study notes and tutorials to the students of NETW 202 Week 8 Final Project Latest in order to ace their studies. NETW 202 WEEK 8 FINAL PROJECT LATEST To purchase this visit following link: https://coursehomework.com/product/netw/ Contact us at: HELP@APEXSEEKERS.COM NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded Course Home Work aims to provide quality study notes and tutorials to the students of NETW 202 Week 8 Final Project Latest in order to ace their studies. NETW 202 WEEK 8 FINAL PROJECT LATEST To purchase this visit following link: https://coursehomework.com/product/netw/ Contact us at: HELP@APEXSEEKERS.COM NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded Course Home Work aims to provide quality study notes and tutorials to the students of NETW 202 Week 8 Final Project Latest in order to ace their studies. NETW 202 WEEK 8 FINAL PROJECT LATEST To purchase this visit following link: https://coursehomework.com/product/netw/ Contact us at: HELP@APEXSEEKERS.COM NETW 202 WEEK 8 FINAL PROJECT LATEST Networking 202 Week 8 Final Project Graded Course Home Work aims to provide quality study notes and tutorials to...

Words: 859 - Pages: 4