...Axia College Material Appendix D Floor Plan Site Survey Data Sheet The following tables will help you gather the data necessary for analyzing each of the five floor plans in the Floor Plan Site Survey exercise. As you go through the exercise, complete the information in each table. The information gathered in this assignment will assist you in your final project. Conference Center |Explain the major features of this floor plan. For example, are there large open spaces, large walls, cubes, or offices?| |Within this plan there are a lot of walls. This plan also has a lot of offices. | |Identify areas of this floor plan that may present issues when designing your network. Why will these areas present | |issues? For each area identified, what can you do to overcome the issue? | |The areas what I see that may present a problem would be the back hall way because it does not have any signal strength.| |I believe this happened because of all of the walls in between the access point and the back offices. One thing that | |can be done for this is to install another access point on the other end of the building or move the access point that | |already exists. | |Based on your site survey, do you think that placing the wireless access point in the data center is an ideal location...
Words: 1232 - Pages: 5
...Cwp to be on site night of install to assist with qst cable management due to bandit barriers along teller row pic CWP- To be onsite night of install to assist with horizontal shelf install due to bandit barriers pic CWP- There are Vertical QST’s requiring a Horizontal Stand and Shelf (TWQHS) - pic. Be on site NOI to assist with QST relocation. Will be required to install the shelf and may include new cable hole drilling. Remove vertical stand and mask any damage on the teller wall. pics CWP widen QST cable holes to 1 inch or larger on front and/or back of backsplash to accommodate QST, ferrite bead prior to the QST cable management pic Carl - fyi There is an empty power cord plugged into the server UPS pics Cwp to be on site night of install to assist with qst cable management due to bandit barriers along teller row pic(s) 20,24,11. FYII QST cables are at 1 inch. Cwp to be on site night of install to assist with false walls pic(s) SV3 tech drill QST cable holes to 1 inch or larger on front and/or back of backsplash to accommodate QST, ferrite bead prior to QST cable management pic(s) 9,10. Mount QST on customer right on horizontal shelf. SV3 Tech existing vertical QST will move to the new horizontal stand pic This will be the new TAR to change the vertical qst to a horizontal shelf. Include picture references. CWP to be onsite in support of QST installation. Work may include, but is not limited to, false wall removal, drilling, cable routing...
Words: 3539 - Pages: 15
...Cisco BTS 10200 Softswitch Building Environment and Power Site Survey Document Brief The Building Environment and Power Site Survey provides essential information about the customer site for the Cisco BTS 10200 Softswitch. The Cisco BTS 10200 Softswitch is a software-based class-independent telephony switch that utilizes MGCP as the control protocol for voice. Modification History |Ver. |Date |Comment | |R332a |06/30/2002 |Initial draft for Rls.Release 3.3.2 | |R33b |10/29/2002 |Page 1 – Added electrical requirements warning. | | | |Sec. 3 – Changed upper temperature limit to 104°F (40°C) | | | |Sec. 4.1 – Clarified requirements for redundant “A” and “B” feeds. | | | |Sec. 4.2 – Clarified requirements for redundant “A” and “B” feeds. | | | |Sec. 9 – Clarified requirement for modem numbering. | |R33c |01/22/2003 |Updated headers and footers. No content changes. ...
Words: 3441 - Pages: 14
...Summary This report summarizes a plan to conduct a wireless site survey, also called a radio frequency (RF) survey, at Orchard Street Art Center. This survey will generate recommendations for maximizing network security, coverage, and capacity. Expert Advice Earlier this year, the board of directors of Orchard Street Art Center asked me to propose a plan to improve wireless coverage throughout the center’s public areas, offices, classrooms, music studios and indoor and outdoor theaters. To make sure I proposed the most effective plan possible, I decided to seek the advice of experts. Fortunately, one of the area’s top experts in wireless networking, Jamie Brookstone, president of Brookstone Network Consulting, offered the services of his staff pro bono. Thanks to his offer, I was able to meet several times with the following consultants: Lyn Luzerne Our conversations focused on ways to improve network connections for the center’s staff and patrons. I also studied information obtained from leading hardware manufacturers and software distributors. This research suggests that our first step is to conduct a site survey of our entire facility. Final Recommendation A high availability, secure wireless network is crucial to our mission at Orchard Street Art Center. Lighting and sound systems in our two theaters increasingly rely on wireless signaling, as do our classroom facilities. Furthermore, patrons and instructors now consider a secure wireless network essential for a variety...
Words: 806 - Pages: 4
...Wireless Site Survey Recommendation Wireless Site Survey Recommendation Orchard Street Art Center Orchard Street Art Center Summary This report summarizes a plan to conduct a wireless site survey, also called a radio frequency (RF) survey, at Orchard Street Art Center. This survey will generate recommendations for maximizing network security, coverage, and capacity. Expert Advice Earlier this year, the board of directors of Orchard Street Art Center asked me to propose a plan to improve wireless coverage throughout the center’s public areas, offices, classrooms, music studios and indoor and outdoor theaters. To make sure I proposed the most effective plan possible, I decided to seek the advice of experts. Fortunately, one of the area’s top experts in wireless networking, Jamie Brookstone, president of Brookstone Network Consulting, offered the services of his staff pro bono. Thanks to his offer, I was able to meet several times with the following consultants: Lyn Luzerne Associate Engineer Dean Armstrong Senior Engineer Suzanne j. Sheffield-Harper Project Manager Our conversations focused on ways to improve network connections for the center’s staff and patrons. I also studied information obtained from leading hardware manufacturers and software distributors. This research suggests that our first step is to conduct a site survey of our entire facility. What Is a Wireless Site Survey? A wireless site survey is an analysis of a facility’s wireless networking...
Words: 896 - Pages: 4
...Aruba Migration Guide 802.11AC MIGRATION GUIDE 802.11ac Aruba Migration Guide Table of Contents Introduction 802.11AC basics Why 802.11ac? 802.11ac technology overview Backward compatibility RF spectrum Multistation MAC throughput > 1 Gbps 256 QAM Wider channels More spatial streams Downlink multi-user MIMO Pros of 802.11ac Cons of 802.11ac Strategy and planning for 802.11ac migration Site planning basics Planning process Minimum requirements and actions to implement 802.11ac Aruba recommendations for 802.11ac migration General Capacity RF planning Installation Wireless RF coverage considerations and questionnaire Summary 3 3 3 4 4 4 5 5 5 5 6 6 6 6 6 6 7 8 8 8 8 8 9 10 Aruba Networks, Inc. 2 802.11ac Aruba Migration Guide Introduction Wi-Fi has become such an amazingly successful technology because it has continuously advanced while remaining backwards compatible. The current state-of-the-art Wi-Fi is known as Wi-Fi CERTIFIED n or 802.11n. 802.11n has become popular because it improves performance. As 802.11n has become a standard interface on PCs, tablets and smartphones, the applications used by these devices have continued to progress. Mobile technology has encountered the next frontier – video. Whether delivering YouTube to smartphones or moving HDTV signals around the office or home, video has become a significant driver of network traffic, chiefly because it requires one or two orders of magnitude more bandwidth than other IP services. Now...
Words: 3787 - Pages: 16
...Style. Robert Sewall contracted the main section of the house in 1799 however, the type of brick used on the section of the house facing Second Street NE, on the west side of the structure indicates that this area was built much earlier, anywhere from 1680-1750. This area of the house is now the kitchen of the Sewall Belmont House. The way the house stands today is a rectangular, two and one half stores high set on a raised basement. The house is joined at the northeast corner with attachments at the kitchen and the stable. The main façade is three bays across with a central doorway. The front door features sidelights on both sides and a keystone molded archway. A double staircase leads to the central entrance. The Georgian style floor plan is based around a center...
Words: 1746 - Pages: 7
...Designs with a plan that outlines how you intend to design their wireless network. The plan must be based on the recommended steps for designing a WLAN, outlined in the following bulleted list. In addition to the design of the network, Apex Designs has asked that you provide a basic wireless security policy. To that end, your plan must consist of the following elements: • Deployment scenario • IEEE wireless network type • Access point management • Location of wireless devices • Wireless security policy Final Project Timeline Budget your time wisely and work on your project throughout the course. Some of the discussion questions, CheckPoints, and assignments in the course will assist you in creating your final project. If you complete your course activities and use the feedback provided by the instructor, you will be on the right track to complete your project successfully. □ Suggested in Week One: Read the Final Project Overview and Timeline in Appendix A. Review Appendix I and Appendix J. □ Suggested in Week Three: Begin to identify the hardware components that your network may use based on the list of components compiled in the Wireless Network Components assignment. You will not be able to finalize this list until you select the floor plan on which your network will be based. Research the cost of each component from the Wireless Network Components assignment or another approved resource. □ Suggested in Week Five: Select the floor plan from Appendix...
Words: 446 - Pages: 2
...Evaluation of Security Programs SECURITY SITE SURVEY REPORT THE DEVRY CENTER 9210 HIGHER EDUCATION DRIVE NEW YORK, NY 11747 OVERVIEW A security survey is the official procedure utilized to review specific applications, areas, or Processes of residence or a business to document security, risk vulnerabilities, and authenticate the program in place (Broder & Tucker, 2011). One could perform a survey from all the risk perspectives such as facility security, physical security, or life safety. An expert conducts a involving a pre-determined constraint of checklist as well as an official reporting system. A security survey is a significant element of the general risk and security program (Craighead, 2009). When carrying out a security survey one must set clear goals. The goals would also be extensive from reviewing the fitness of the whole security program to more summarizing goals, such as the value and effectiveness of the physical security of the programs (Luis, 1994). SITE DESCRIPTION The Devry center building is located in downtown New York City on a four-acre piece of land. The building is a thirty story high containing 1,250 underground garage parking spaces and a rooftop garden. The building has a maximum capacity of 2000 tenants, and the tenants occupy the 27th and 30th floor of the building. SCOPE I conducted the security survey at Devry Center on December 1, 2013 to December 5, 2013. This report...
Words: 1939 - Pages: 8
...SEVERFIELD-REEVE STRUCTURES [pic] Developing Total Ownership A Strategy to Improve Health and Safety Developing a positive Health and Safety Culture Written by Dave Atkinson Contents Page: Section Title Page: 1 Contents Page Page: 2 1: Executive Summary Page: 3 2: Introduction 2a: Business organisation Page: 9 3: Assessment of existing culture 3a: Report of Indicators 3b: Report of methodology and conduct of survey 3c: Report of findings with interpretation 3d: Conclusion Page: 35 4: Strategy for Improving the Health and Safety Culture 4a: Aims and objectives 4b: Priorities for action 4c: Resources and constraints 4d: Implementation plan 4e: Methodology for monitoring success Page: 61 5: Business Case 5a: Requirements for resources 5b: Cost benefit analysis 5c: Reference to legislation 5d: Case Page: 72 6: Bibliography Page: 73 7: Appendices Section 1 Executive Summary Following an assessment of the current Health and Safety culture and climate within the business, areas of weakness have been identified that are holding back the progression towards the ultimate aim and objective in Health and Safety – Employee participation creating “Total Ownership". The assessment of the Health and Safety Culture covered such areas as an analysis of the 2009 employee Health and Safety questionnaire, a review of audits carried out, a check on the progress against 2009...
Words: 20466 - Pages: 82
...interested in what the merchandise represents. The other reason for the product decline consists of the younger customers out in the world seeking the motorcycle at a lesser cost; it is for the fact that they would not otherwise have high salaries as in the older age group. These young customers are not able to identify with the Lifestyle image of CruiserThorr for the reason of the bike and its features have matured a small amount according to the market standards. The sales down turn caused Thorr’s challengers to gain industry shares and a competitive market gain. The tasks used were to turn around sales rejections by generating a strategic marketing plan, producing a perceptual map, and assembling the choice of to upgrade the CruiserThorr or construct an upgraded side that fits in with recent more current trends in motorcycles. This plan should make certain Thorr’s place in the marketplace if the process is successful. In the beginning phase it is recognizing the parameters and how they could be necessary for the product and vital to the consumers. The Lifestyle image of the bike is important for the reason of the right of owning a manly bike. Lifestyle image supplies to a lot of sales in spite of the weather. Motorcycles are an image and it has always been, from the 1900s until today. Pricing strategies play a big role in the success of the product also. It is also important for the product to be priced accordingly; so it can target the market it is alluring towards. For example...
Words: 1318 - Pages: 6
...1/19/2015 1/19/2015 One Giant Leap for Apex Design Wireless Network Plan One Giant Leap for Apex Design Wireless Network Plan Team B Team B Apex Design has found the need to incorporate a wireless network to collaborate with their existing wired network. Team B found this opportunity to display to Apex what they can do to bring their company to enjoy the modern conveniences of a wireless network. This deployment plan will cover Team B’s recommendations based off of the site survey provided by Apex. We will discuss our recommended wireless network type. The access point layout and how these points will be managed. We will go over the foreseen obstacles and what our plan is to overcome these obstacles. Finally, we will go over the security policy that should be implemented to keep Apex as secure with our wireless network as they are with their current wired network. IEEE Network Type Apex Designs has asked our company to design a wireless network for their business. This network will consist of several different pieces of hardware that all will work together to meet Apex’s needs. To ensure that the new network is operational, special considerations must be made as to which IEEE network standard to be used. Since Apex Designs is a business that has a preexisting network installed, the new network must be compatible with the legacy systems already in use. Failure to meet this requirement would cause major interruptions in work flow, thus hindering...
Words: 1940 - Pages: 8
...CHAPTOR 12 In the early 1930s, a mathematician developed a formula that could be used to make accurate weather forecasts, something that was unheard of at that time. However, because there were no computers or calculators at that time, it took almost three months of hand calculations to come up with the next day’s forecast. This obviously was far from useful, and many individuals scoffed at such a preposterous solution to weather forecasting. However, with the introduction of computers by the late 1940s, the amount of time needed for the calculations was dramatically decreased. Suddenly, this model became very popular, and today it forms the basis for all weather forecasting. The point here is that it sometimes requires vision to see how an idea or technology could be used. This vision also applies to new technologies like wireless communications. Some users question why we should consider wireless technology when the existing wired system seems to work just fine. In this chapter, you will learn what it takes to convert the potential of wireless technology into a successful business reality. We’ll look at the steps needed to incorporate wireless technology into a business, and at the advantages and challenges that face business users who consider adopting this new technology. Advantages of Wireless Technology The advantages of incorporating wireless technology into a business are far-reaching and can positively impact an organization in many ways. In addition to the...
Words: 8259 - Pages: 34
...Appraisal Appreciation & Conservation Assignment 2 Conservation Plan & Feasibility Study ------------------------------------------------- Module Title: BUILDING Appraisal Appreciation & Conservation Assignment 2 Conservation Plan & Feasibility Study Ian Scott Student ID 471727 Module Code: 6104 BEUG Module Leader: P.Kenny & S.Buxbaum Submission Date: 16/04/12 Ian Scott Student ID 471727 Module Code: 6104 BEUG Module Leader: P.Kenny & S.Buxbaum Submission Date: 16/04/12 Liverpool John Moores University School of the Built Environment Conservation Plan & Feasibility Study Of The Wellington Rooms (Known locally as the Irish Centre) The Wellington Rooms 2011 http://flickr.com/photos Report prepared by Mr Ian Scott: Student ID: 471727 Report Contents 1. Executive Summary 3 2. Introduction 3 3. Site Location & Description 3 4. Listing Extract 4 5. Statutory Controls 5 6. Evaluation of Development 5-6 7. Development Options 6-7 8. Appraisal of Repairs 7-9 9. Adaption Works 9-10 10. Conclusion 10 11. References & Bibliography 11 12. Photographs & Illustrations 12-16 ------------------------------------------------- 1.0 Executive Summary This executive summary provides a conservation plan and feasibility study considering the options for the proposed development...
Words: 3390 - Pages: 14
...ITNT 1700 | Site Survey Project | CWNA | | Name | 12/13/2010 | | Requirements Summary Business Requirements * Wireless Connection * The organization would like to provide GHSIA in the hotel and conference center * The business requires a high level of mobility for Wireless VOIP throughout hotel and conference center * Our equipment will be compatible with the existing equipment * Wireless Coverage * Covering the Hilton Hotel customers in their rooms, bedside and at their writing stations * Covering the Hilton management team in their offices with a dedicated wired connection and support for a wireless connection * Coverage in all meeting rooms, lounge area, pavilion, and pool side * Coverage in University Conference room for approximately 100 client stations * Optional coverage for kitchens, break rooms, and rest rooms User Requirements * Hilton hotel guests to receive unlimited guest access upon checking in and will expire upon checkout * Hilton guests to connect via Wi-Fi connection in meeting rooms, lounge area, pavilion and pool side * Hilton 12 managers to connect wireless with laptop and have a dedicated wired connection in offices Functional Requirements * Wireless PoS Access * Provide Hilton Hotel with 6 PoS stations to have WPA 2 with AES encryption * Shall be isolated to the PoS VLAN and separate from the GHSIA * Shall be PCI compliant * Shall...
Words: 952 - Pages: 4