Free Essay

Gs1145 Project

In:

Submitted By wayne17
Words 897
Pages 4
Business Name: NOMNOMNOM
Kitchen Location: Washington

Operating Permit- $603
Food Handlers Permits- $10 Each $60 Total

Our plan is to provide local marijuana dispensaries with medicated cupcakes! We will be offering three varieties which offer different strength levels. We will utilize a community kitchen until we are able to locate and budget a store front. The community kitchen is located in Kirkland, and is currently operating with proper zoning permits. The price is $500 per month which includes; water, electricity, maintaining permits, full use of commercial kitchen, dish wash station, multiple hand washing stations, dry storage, walk in refrigerator, and separate prep areas.
Menu:
White Luxury- Vanilla cupcake with white chocolate buttercream, and real gold dust! Strongest potency $15 retail. Wholesale 36 for $450, 12 for $140, 6 for $60, can make other packages, check for specials.
Tooty Fruity- Strawberry cupcake filled with fresh strawberry cream, topped with mixed berry buttercream, and garnished with sliced strawberry! Middle of the road potency $8 retail. Wholesale 36 for $195, 12 for $65, 6 for $30, can make other packages, check for specials.
Decadent Chocolate- Chocolate cupcake filled with chocolate mousse, topped with chocolate buttercream, and garnished with fudge drizzle. Lowest potency $5 retail. Wholesale 36 for $100, 12 for $45, 6 for $20, can make other packages, check for specials.

Food Supplies Needed: Plan is to only have to shop on our own for the first ninety days of business, that way we establish customers. Then we will shop food service contractors for best price, product, and availability.
Flour 25LBS= $12.5
Granulated Sugar 25LBS= $10
Powdered Sugar 50LBS= $45
Baking Soda 10LBS= $12.5
Baking Powder 10LBS= $5
Salt 25LBS= $5
Vanilla Extract 1GAL= $15
Vanilla Beans 1/4 LBS =$5
White Chocolate 20LBS= $100
Gold Dust 1LB= $200
Milk Chocolate 25LBS= $45
Cocoa Powder 50LBS= $30
Brown Sugar 40LBS= $25
Strawberries 45 LBS=$ 80
Raspberries 25LBS= $20
Eggs 15DOZ= $35
Sour Cream 10LBs= $20
Buttermilk 3GAL= $ 10
Butter 150LBS= $50
Heavy Cream 5GAL= $30

Non-food Items:
Cupcake Pans 300= $150
Paper Liners 2000= $30
Packaging Boxes 500= $150
Mixing Bowls 200= $80
Spoons 200= $70
Knives 200= $80
Scoops 50= $40
Piping Bags 1000= $5
Oven Mitts 100= $60
Storage Containers 400= $120
Ziploc Bags 1000= $15
VANILLA CUPCAKES * 1 and 2/3 cup all-purpose flour * 1/2 teaspoon baking powder * 1/4 teaspoon baking soda * 1/2 teaspoon salt * 1 cup granulated sugar * 1/2 cup (1 stick) unsalted butter, melted * 2 egg whites * 1/4 cup vanilla greek yogurt (or plain; or regular yogurt; or even sour cream) * 3/4 cup vanilla almond milk (or cow's milk; or soy milk; or plain almond milk) * 2 teaspoons vanilla extract * seeds scraped from 1/2 split vanilla bean
VANILLA BEAN FROSTING * 1 cup (2 sticks) unsalted butter, softened to room temperature * 4-5 cups powdered (confectioners') sugar * 1/4 cup heavy cream* * 1 teaspoon vanilla extract * seeds scraped from 1/2 split vanilla bean * salt, to taste
Directions:
1. Preheat oven to 350F degrees. Line muffin tin with 12 cupcake liners. Set aside. 2. In a medium bowl, mix together flour, baking powder, baking soda, and salt. Set aside. In a large microwave-safe bowl, melt butter in the microwave. Whisk in sugar - mixture will be gritty. Whisk in egg whites, yogurt, milk, and vanilla extract until combined. Split 1 vanilla bean down the middle lengthwise. Scrape seeds from half of the vanilla bean into batter. Reserve other half. 3. Slowly mix dry ingredients into the wet ingredients until no lumps remain. Batter will be thick. 4. Divide batter among 12 cupcake liners (or 24 mini) and bake for 20 minutes or until a toothpick inserted in the center comes out clean. Bake for 8-9 minutes if making mini cupcakes. Allow to cool. 5. To make the frosting, beat softened butter on medium speed with an electric or stand mixer. Beat for about 3 minutes until smooth and creamy. Add powdered sugar, cream, vanilla extract, and vanilla bean seeds with the mixer running. Increase to high speed and beat for 3 minutes. Add more powdered sugar if frosting is too thin or more cream if mixture is too thick. Add salt if frosting is too sweet (1/4 teaspoon). Frost cooled cupcakes (I used Wilton 1M piping tip). There may be leftover frosting depending how much you use on each cupcake. 6. Store cupcakes in an airtight container at room temperature for up to 3 days and in the refrigerator up to 7.
*Strongly urged to use heavy cream. You may use milk or half-and-half, but heavy cream will give the frosting a thicker texture. I recommend it.
Do you want to make a vanilla cake out of this? You can! Simply bake in a 9-inch cake pan (I urge you to use a spring form pan because this will be a taller cake) and bake for 30-34 minutes.
Do you want to make a double layer vanilla cake out of this? You can! Double this cupcake recipe and bake it in two separate 9-inch cake pans. Fill the pans only 1/2 way full and use any extra batter to make cupcakes (because there is a little *too much* batter). The bake time is around 22-24 minutes, give or take. Use a toothpick to determine doneness.

Similar Documents

Premium Essay

Gs1145 Nsa Project

...GS1145 NSA Project If you’re ready for one of the highest paying jobs in the Internet Technology field, Information Security Officer is the job for you. ISO (Information Security Officer) is also one of the most challenging and demanding career fields that IT has to offer, usually consisting of more senior IT personal. I will be discussing the necessary education, experience and day to day duties to perform this highly in demand job. The first thing I’m going to talk about is the required education, experience and qualifications necessary to become an Information Security Officer. To be a ISO you must possess at a minimum a Bachelor’s in Information Security or equivalent years of work experience, Master’s is preferred. You must also have a minimum of eight years of progressively responsible experience in information security, risk management and implementing a comprehensive disaster recovery program. You should also possess a minimum of six years supervising professionals in an IT environment. Lastly there is essential certification you must possess; Certified Information System Security Professional (CISSP) is usually at the top of required certifications. Some other certifications that are helpful are: CCNA (Cisco Certified Network Associate); CCIE (Cisco Certified Internetwork Expert); A+ certification; Network plus and Security plus. Knowledge of all of these certifications, education and experience would make you highly desirable with any company to be there Information...

Words: 483 - Pages: 2

Free Essay

Tim and Funding

...Few memories as a failure on a major project from half a decade ago still vividly remains in memories. As a Research Assistant to Tim, it was my first paid job. Tim, an Engineer, worked in silos and had driver social style to his heart beat. He only communicated the expectations without delving in the details that he had in his mind. Even though the Office space was a closed knit space for 16 students, Tim seldom hung out with people to build personal relationships. He only interacted with others when there was a need. His lack of explanation on why the project was needed had left me wondering regarding purpose and design aspects of the new programming project. I struggled on how to effectively design the project and often sought help from other people, who recommended me that the project needed investment in new programming platform as old platform was incapable of achieving the project objectives. After making almost no progress on the project and wasting time in attempts to make old platform workable, I received a vehement email from Tim, stating that XYZ Inc. was deciding to scale back on funding, as no progress reports were submitted. I was shocked to learn that I was even expected to submit progress reports at the end of quarter on the undertaken project in which I had neither any clue nor communication. As an amiable person, I was too quick to reach an agreement with Tim on project deliverables. I had thought that I would be receiving friendly advice and guidance from...

Words: 444 - Pages: 2

Premium Essay

Student

...and answer document, uploaded to D2L dropbox. You will have to find an IT professional to interview on your own.  Description of this assignment 1. Each student needs to find a candidate for a Post-implementation Review (PIR) report describing an information systems development project. 2. Where can you find an information technology professional to interview? You will have to find an IT professional to interview on your own.    3. If you work for a business or government organization, you should consider interviewing the IT/MIS director for your organization.  If you work P/T or F/T in any reasonably sized organization, it is likely that there are some IT workers around (like help desk staff, programmers, analysts, network technicians or even IT managers). It can even be a friend, relative or acquaintance you know who works in such a job. 4. The following is a list of themes that you could address in the interview: Please do not write this paper in question and answer format. Use the questions below to help guide the interview. ▪ What type of job does he/she do? For whom? ▪ What projects is he/she currently working on for the organization? ▪ What projects has he/she recently completed? ▪ What IT applications has the firm recently implemented? ▪ Were the most recently applications developed in-house, were they outsourced development or were they application software packages that were customized and purchased? ...

Words: 563 - Pages: 3

Premium Essay

Poo on Women: Is This Bad?

...Kempen | C402/C405 | Extend Diploma Mechanical Engineering EDENGM22A/B | Peter Kempen | C402/C405 | | GCSE English | Katherine Davey | G4 | GCSE English | Katherine Davey | G4 | | AS English Literature | Francesca Thomas | A58 | | | | | Archaeology: Unit 1 | Caroline Wilcox | B254 | Archaeology: Unit 2 | Caroline Wilcox | B254 | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49 | | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | Spring Term Revision Schedule 2013-14 Week 1 | Tuesday 8th April | | Morning session 10.00-12.00 | Afternoon Session 1.00-3.00 | | Subject/course | Teacher | Room | Subject/course | Teacher | Room | | A2 Business (China Research Theme) | Nessa | A25 | AS Business | Nessa | A25 | | A2 Economics | Charles | G5 | AS Economics | Charles | | | AS Business | Sarah (11.00-12.30) | A39 | A2 Business (Higher level exam technique) | Sarah | A39 | | AS Law | Amina | A26 | | | | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49...

Words: 883 - Pages: 4

Premium Essay

Microsoft Excel

...For ""Anticipated Project Size"" use your internal metrics as guidance. For example, if you use lines of code, then mentally assign ball park values to Small, Medium and Large as part of determining whether to give this criteria a high or low score. Follow a similar process ""Anticipated Duration"". Since project duration depends on project complexity, mentally categorize earlier projects as short, average or long duration to help put the current project in context. 2. After assigning a score for each criteria, view the Feasibility Study Suitability Indicator to discover the best method to use for determining project viability. 3. Omitted criteria will give an inaccurate result, so ensure all criteria are scored before checking the indicator." Criteria "Score (1=high, 3=low)" Guidelines Business Risk "1 = Significant, high-risk projects 2 = Low-to-modertate risk projects 3 = Small, low risk projects" Technology Risk "1 = Significant, high risk technological risks 2 = Low-to-moderate technological risks 3 = Small, low technological risks" Anticipated Project Size "1 = Large 2 = Medium sized 3 = Small" Anticipated Project Duration "1 = Long 2 = Medium duration 3 = Short" Project Dependencies "1 = Substantial and intricate project dependencies 2 = Minimal or manageable project dependencies 3 = No project dependencies" ...

Words: 451 - Pages: 2

Free Essay

Enterprenure

...(EPIEC) . From there he gained a lot of working experience and knowledge which made him to success in his business later . Business Motivation and starting One of the motivating factors was his father’s dream of his establishment in the society and another factor was after the independence of Bangladesh Aminul Islam realized that a new country has been born, therefore, a lot of construction will be needed for the development of the country and that is when he came up with the idea of Project Builders Limited. He proposed the idea to three other recent BUET graduates and they agreed to start with this new business. After the death of one of the partner and other two sold their share currently Aminul Islam is the only Managing Director and Chairman of Project Builders Limited. Vision The vision of Project Builders limited is to make quality constructions and make a strong infrastructure development of the country. Mission Construction of important structure and projects and to become the number one construction builder in Bangladesh. Initial Finance The company was initially started with four partners along...

Words: 2081 - Pages: 9

Free Essay

Kanpur

...knowledge to serve my best to the organization as well as my professional growth. Academics Relevant Courses: • Completed six weeks course and training in JAVA from SLR Infotech Pvt. Ltd, CHANDIGARH. • Pursuing 6 Months course and training in JAVA from DUCAT,NOIDA. • Completed six weeks course in C++ From ICT, KAITHAL B. Tech Projects: S.No Name Of the Project Description Team Members Roles and Responsibilities 1. CHANDIGARH TOURISM (B.Tech Summer Training Project) It was a software project based on core JAVA. It includes all the places to visit , map of chandigarh , hotel room booking , slides . Backend was based on MS-ACCESS . 2 Coding of Some pages, database manipulation & connectivity and preparing Crystal Reports. 2. DELHI TOURISM (B.Tech Minor Project ) It was a software project based on core JAVA. It includes all the places to visit , map of delhi , hotel room booking , slides . Backend was based on MS-ACCESS . 2 Coding of Some pages, database manipulation & connectivity and preparing Crystal Reports. 3. CRIME FILE MANAGEMENT (B.Tech Major Project ) It was a website describing various departments in crime department. It includes 3 modules WRITER , INSPECTOR , ADMIN. Writer writes complaints , Inspector investigates by watching the record using id’s and admin has all the controls. Platform used was ECLIPSE and backend was ORACLE database. 2 Overall designing of pages & coding of Admin Panel. Extra...

Words: 375 - Pages: 2

Premium Essay

Sharon Construction

...The following case represents a realistic situation facing construction firm that has just won a competitive contract. The realistic conditions complicating the project are described in detail, as are the alternatives offered by the staff for dealing with these complexities. Case The Sharon Construction Corporation The Sharon Construction Corporation has been awarded a contract for the construction of a 20,000-seat stadium. The construction must start by February 15 and be completed within one year. A penalty clause of $15,000 per week of delay beyond February 15 of next year is written into the contract. Jim Brown, the president of the company, called a planning meeting. In the meeting he expressed great satisfaction at obtaining the contract and revealed that the company could net as much as $300,000 on the project. He was confident that the project could be completed on time with an allowance made for the usual delays anticipated in such a large project. Bonnie Green, the director of personnel, agreed that in a normal year only slight delays might develop due to a shortage of labor. However, she reminded the president that for such a large project, the company would have to use unionized employees and that the construction industry labor agreements were to expire on November 30. Past experience indicated a fifty-fifty chance of a strike. Jim Brown agreed that a strike might cause a problem. Unfortunately, there was no way to change the contract. He inquired about...

Words: 918 - Pages: 4

Premium Essay

My Paper

...FOR PROJECT A Cash Flows DCF (13%) PV 350,000 0.8850 309,750 350,000 0.7831 274,085 350,000 0.6931 242,585 826,420 NPV = 826,420 – 735,000 NPV = 91,420 FOR PROJECT B Cash Flows DCF (13%) PV 300,000 0.8850 265,500 300,000 0.7831 234,930 300,000 0.6931 207,930 708,360 NPV = 708,360 – 690,000 NPV = 18,360 FOR PROJECT C Cash Flows DCF (13%) PV 200,000 0.8850 177,000 200,000 0.7831 156,620 200,000 0.6931 138,620 472,240 NPV = 472,240 – 600,000 NPV = (127,760) Assuming the cost of capital increase to 15%, the new NPV will be as follows FOR PROJECT A Cash Flows DCF (15%) PV 350,000 0.8696 304,360 350,000 0.7561 264,635 350,000 0.6575 230,125 799,120 NPV = 799,120 – 735,000 NPV = 64,120 FOR PROJECT B Cash Flows DCF (15%) PV 300,000 0.8696 260,880 300,000 0.7561 226,830 300,000 0.6575 197,250 684,960 NPV = 684,960 – 690,000 NPV = (5,040) FOR PROJECT C Cash Flows DCF (15%) PV 200,000 0.8696 173,920 200,000 0.7561 151,220 200,000 0.6575 131,500 456,640 NPV = 456,640 – 600,000 NPV = (143,360) At this point it is necessary for one to determine the sensitivity of the change in NPV of the three projects due to the increase in cost of capital. SUMMARY OF NPVS’ CALCULATIONS PROJECT | NPV @ 13% | NPV @ 15% | % CHANGE IN NPV | A | 91,420 | 64,120 | * 29.86% | B | 18,360 | (5,040) | * 127.45% | C | (127,760) | (143,360) | * 12.2% | From the table above it is clear that all three projects had...

Words: 350 - Pages: 2

Free Essay

Business

...selected a company in which they wanted to go with. Before the project began there are several things in which both the client and the consultant should cover before making an agreement to enter into a contract. The client and the consultant both should understand the risks of a project, the cost, rewards, and deadlines. There are three reasons for success or failure that could happen with the new project. One is the importance of the consultant competency and fit with the company needs. The consultant should be able to understand the company and what it does and its needs. It’s important In this case the consultant should ask themselves if this is something they are able to do. The second reason is the interpersonal fit between the consultant and the clients. The consultant should be able to speak with the client and feel they are going to be able to talk to them in regards to the business needs. Finally the last reason is if the consultant is able to establish ground rules for the consulting process. Being able to identify the rules before and making sure it’s something they can commit to will help both parties. Fullerton, Johanna; West, Michael View Profile The client and the consultant should both agree on the scope of the project, the project time line, what both parties are hoping to achieve , the client role vs. the consultant role, and finally how the client measure to the success of the project. www.partnercomm.net. When a client brings in a consultant...

Words: 1060 - Pages: 5

Premium Essay

Half Term Revision Dates

...Kempen | C402/C405 | Extend Diploma Mechanical Engineering EDENGM22A/B | Peter Kempen | C402/C405 | | GCSE English | Katherine Davey | G4 | GCSE English | Katherine Davey | G4 | | AS English Literature | Francesca Thomas | A58 | | | | | Archaeology: Unit 1 | Caroline Wilcox | B254 | Archaeology: Unit 2 | Caroline Wilcox | B254 | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49 | | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | Spring Term Revision Schedule 2013-14 Week 1 | Tuesday 8th April | | Morning session 10.00-12.00 | Afternoon Session 1.00-3.00 | | Subject/course | Teacher | Room | Subject/course | Teacher | Room | | A2 Business (China Research Theme) | Nessa | A25 | AS Business | Nessa | A25 | | A2 Economics | Charles | G5 | AS Economics | Charles | | | AS Business | Sarah (11.00-12.30) | A39 | A2 Business (Higher level exam technique) | Sarah | A39 | | AS Law | Amina | A26 | | | | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49...

Words: 883 - Pages: 4

Free Essay

Individual or Small Group Student Projects

...Individual or Small Group Student Projects Contacting Community Partners When contacting an outside organization about a service-learning project, you want to make sure to maintain a professional attitude. So how do you make the first call? Below follows a possible introduction to use when calling and making that first contact with an agency of your choice. Hello, my name is _______________________. I am presently enrolled in a ___________course at [name of campus]. My [instructor or Student Success Lead] gave me your name and number. I am very interested in doing a service-learning project for your agency. I want to apply the _________skills I am learning in my _________class to the volunteer position. When can I meet with you to discuss this further? If you have to leave a message, don’t be discouraged. Because many nonprofit and community agencies are understaffed, they might not return your call right away. Persistence is important in regards to making contacts and starting your service experience. More Communication Tips: When speaking to the site supervisor… * Ask about the organization’s volunteer policies and training guidelines. It is possible that you need to fill out additional paperwork with their agency as well as the GU/MSB/UCC paperwork. * Explain the course objectives (provided in your course syllabus) and tell them that you have __ service-learning hours to fulfill for your course. * Tell them your availability. What times are best...

Words: 365 - Pages: 2

Free Essay

Strategies to Make a Team Work

...slipping they can reach out to that team member to offer assistance or re-assign the project so that team doesn’t fail and that person doesn’t feel picked on by the whole team. It also defines who should be asking questions and for nobody again to feel picked on or singled out by another peer. Assignment of projects and ownership is crucial to this being a team effort that everybody has a stake in the outcome of the project. Goals, both short and long term are effective for setting a timeline on when certain parts of the project need to be completed in order for the next piece to start and to ensure we meet our deadline for turning in the project on time. Setting a regular meeting schedule is a little harder with our team being spread out all over three time zones, jobs and family. Our team has discussed at least posting once a day what is going on and their status. Example I was out of pocket for two days and my team had no idea what had happened to me till I returned to explain that I had been to a funeral out of town. If I had posted ahead of time, the team would have known what to expect and when I would be back to contribute my part. I can already see within my team alone that they have asked questions or worded things in another way to enlighten some things that were not exactly clear to me, so I do see the benefits already of working in this team environment instead of tackling these projects all on as...

Words: 327 - Pages: 2

Free Essay

Media

...document is intended as a guide for students to follow when preparing their internship reports. Submit the report to the course instructor (J. Flores or D. Wallace) after completing the internship activity: 1) Title Page 2) Table of Contents • Include an entry each main section as identified below (Introduction, Responsibilities, Major Projects, etc. • Provide an entry for each appendix, i.e., Appendix 1: Internship Proposal, Appendix 2: Documentation of Work Hours, etc.) 3) Introduction • Provide background information on the Company (paragraph). 4) Responsibilities • This should be a generalized description of Internship responsibilities (a couple of paragraphs at most). • Include a statement of the number of hours worked, with supporting documents in the Appendix. 5) Major Projects • Write summary descriptions for each major project, report, employee communication, or training packages developed (about a paragraph summarizing each) • Heading Examples: o Cyanide air sampling project o MSDS Inventory o Lead abatement project o Respiratory Protection Training o Compressor House Noise Survey o Acid tank ventilation project o Ergo Hazard evaluations • Provide examples of your work in an appendix (see below) 6) Internship Summary • Include pros and cons of your experience 7) Appendices • Include documents supporting the report, such as: o Internship Proposal o Documentation of Work Hours  A copy of check stubs showing first check and last check is...

Words: 311 - Pages: 2

Free Essay

Flextronics: Deciding on a Shop-Floor System for Producing the Microsoft X-Box - Case Analysis

...1. 5 factors that make the decision difficult for McCusker: - Aggravation of both teams: If he decides to use either Datasweep or Virtual Factory, the other team may feel “lost”, which subsequently affect the harmony between two teams. - Time pressure of the project: There is not enough time for further analysis on the systems. - Unusual importance of the project: This is Flextronics’ first global project and its success or failure can affect the company’s reputation and ability to bid for future projects. It is closely observed by internal and external parties. In additional, the relationship with Microsoft is particularly important to Flextronics. - Pros and Cons of the choices: there is no single alternative that can solve all the problems. - Overstated infrastructure: during the bid process, Flextronics made Microsoft thought that a single system had existed in both facilities and raised it expectations very high while in fact the system was not already in place. 2. The criteria that McCusker should consider in his decisions: - Client’s satisfaction: This includes three sub-criteria: meet Microsoft’s tracking system requirements, deliver products on time and ensure product quality. - Employees’ satisfaction: Regardless which decision he make, McCusker have to ensure that employees at both factories are convinced with his decision and coordinate well with each other. - Cost-saving: The purpose of implementing the process at two different factories in two countries...

Words: 1283 - Pages: 6