...In-Plant Training Report 2nd Semester (BCCT) Brandix College in clothing Technology and Management(dip 16) K.A. Vidun S. Piyasumana 2 INTRODUCTION I’m a student of Brandix College who is studying College Diploma in Textile Technology & Management where my name is K.A.Vidun S. Piyasumana. This is the Report of my second semester of my In-Plant Training program. This In-Plant training will let the diploma batch students to join to different Factories and study the whole process. Since the students are beginners to the field, BCCT provided us a guide line to adjust to this environment and continue that studying with the aid of a Guide Line. As I requested some Factories and as the College appointed me, I had to start my InPlant Training in Brandix Green Plant Seeduwa. Commencing on 14th February 2013 I started the Industrial Training for the College Diploma in Clothing Technology & Management Course under the influence and Coordination by Mr. Dinesh Sampath (HR Assistant of Brandix Casualwear Seeduwa) with so many supports & advisers. Initially after walking throughout the factory, I was introduced and guided to each section to study their process, and collect information under the influence of the department chief or Incharge and also from the Minor Staff. Most of the time I had to subject myself for self study, grab the knowledge by walking to the machine Operators and the staff and also be practical in some operations to get the real idea. So therefore...
Words: 14690 - Pages: 59
...CORDEIRO APVD DATE 26 JAN 2015 SHEET 1 OF 6 REVISION 03 QP-010011-10 TRACE CODE 1 DOC SAMPLE CAMERON Y/N SIZE INSPECTION (2) (4) - QUALITY PLAN DESCRIPTION: RISER, TELESCOPING JOINT, RISER ADAPTER, RISER RUNNING TOOL ASSEMBLIES AND SUBASSEMBLIES, AND SPIDERS AND GIMBALS, API 16F INSPECTION / TEST ACTIVITY SURVEILLANCE DEFINITIONS STANDARD (1) PROCEDURE AND/OR ACCEPTANCE CRITERIA HOLD CAMERON REQUIREMENT ACTIVITY THAT REQUIRES ONE WORKING DAY ADVANCE NOTIFICATION. WORK SHALL NOT PROCEED BEYOND THIS POINT WITHOUT WRITTEN CONFIRMATION OF WAIVER. WITNESS ACTIVITY THAT REQUIRES ONE WORKING DAY ADVANCE NOTIFICATION. WORK MAY PROCEED ON SCHEDULE SHOULD THE REPRESENTATIVES FAIL TO SHOW FOR THE ACTIVITY. WAIVER OF NOTIFICATION REQUIREMENTS SHALL BE IN WRITING. MONITOR ACCESS SHALL BE PROVIDED TO ALLOW SURVEILLANCE ON SITE AND AT SUB-SUPPLIERS. MONITORING ACTIVITIES ARE NOT RESTRICTED TO SPECIFICALLY IDENTIFIED MONITOR POINTS AND WILL NOT BE SUBJECT TO ANY FORMAL NOTIFICATION, THOUGH MANUFACTURING PERSONNEL ARE EXPECTED TO SHARE PLANNING AND SCHEDULING INFORMATION. REVIEW APPROPRIATE RECORDS OF THE ACTIVITY SHALL BE PROVIDED FOR REVIEW. WHERE PRACTICAL, REVIEW OF RECORDS SHALL TAKE PLACE PROGRESSIVELY THROUGHOUT THE MANUFACTURE AND TEST PROCESS. CAMERON SOURCE INSPECTION ACTIVITY THAT REQUIRES PROVIDING ONE WORKING DAY ADVANCE NOTIFICATION FOR INSPECTION OR WITNESS OF INSPECTION BY CAMERON REPRESENTATIVE. ACTIVITIES WAIVED BY CAMERON SHALL BE IN WRITING. PREMANUFACTURING...
Words: 2005 - Pages: 9
...Based on soil investigation a soil report is prepared for the purpose of designing the building foundation. When an engineer designs building foundation he/she must carefully read the report and design the foundation based on the data provided in the report. Soil investigation is required for the following purposes - To know the allowable bearing capacity of foundation for proposed building. To know the depth and type of foundation for the proposed building. To know the allowable passive resistance for the foundation of proposed building. To know the type, grading and nature of soil. To know the ground water level. Typical steps of soil investigation Soil investigation involves following steps – Details planning for the sequence of operations. Collecting the samples of soil from the plot. Determining the soil characteristics by conducting field tests. Study the condition of ground water level. Collecting ground water sample for chemical analysis. Soil exploration. Testing all collected samples in the laboratory. Preparation of drawings and charts Analysis the test results. Preparing report Depending on the load type, soil investigation can be limited to Penetrometer teats only for relatively good soil and light loads. For heavier soil, a combination of both Penetrometer tests and borehole tests are required. Methods of Soil Investigations The normal methods of soil investigations are: • Inspection • Test pits...
Words: 1233 - Pages: 5
...____ Res. Engr.____ Off Engr. ____ Inspt. ____ NYSDOT RLPL (or representative) Present During Review? YES NO ____________________________________ Local Sponsor Official Present During Review? YES NO ____________________________________ Construction Monitoring and Staffing: Was a pre-construction meeting held for this project? YES NO Date of meeting:_____________________ Has a Construction Monitoring Plan (CMP) been prepared for this project? YES NO Is the CMP available for review? YES NO (Please make a copy and attach to report) Does the plan specify a required level of on-site project staffing? YES NO If YES, what is the specified project staffing:______ EIC/RE/PM _______ Office Engineer ________ On-site Inspectors Is the project staffing requirement being met? YES NO N/A If NO, why? _________________________________________________________________________________________ ACTUAL on-site construction inspection staff: Local Forces Consultant:__________________________________________ ____ EIC/RE ____ Office Engineer ____ Inspectors Are Inspectors NICET Certified: YES NO Does the project rely on off-site project personnel? YES NO Role:______________________________________ Review the project visitation logs to verify the frequency of visits from the following individuals: - Designated off-site project personnel such as EIC/Project Manager:...
Words: 961 - Pages: 4
...mining, alumina refining, and aluminum smelting. Five years ago, Alumina was found to be in violation during a routine Environmental Protection Agency (EPA) compliance evaluation inspection when discharges of polycyclic aromatic hydrocarbons (PAH) were above the prescribed limits in test samples. This is also a violation of the Clean Water Act. In 1948, the Federal Water Pollution Control Act (FWPCA) was enacted to regulate water pollution by establishing water quality standards that define which bodies of water can be used for public drinking, recreation, propagation of fish and wildlife, and agricultural and industrial uses. Under the FWPCA, dischargers of pollutants are required to maintain monitoring equipment, keep samples, and keep records. This act is also referred to as the Clean Water Act. Alumina was in compliance, in part, by having the required monitoring equipment, keeping test samples, and recording the results of test samples. However, they were lax in the amount of PAH they allowed to pollute Lake Dira. The EPA issued an order to clean up and Alumina did. A prevention of this violation is to perform in-house inspections more routinely to make sure PAH discharge levels are kept under the prescribed limits. If the EPA does routine inspections once a year, in-house inspections should be done every three months. This gives Alumina the opportunity to correct any violations...
Words: 1359 - Pages: 6
...capacity factor & efficiency or other parameters. * Monitor & plan Sewing production to meet the shipment requirement of the Company. * To follow up production target of the line wise production plan. * Make Time & Action Plan to have hard look on daily progress report & co-ordinate accordingly. * Monitoring the Daily production Reports with updated figure to know the production at a glance. * Prepare daily problem report & action plan against the problem, take proper step to solve them. * Any other task assigned by management Fakir Fashion Ltd. Sr. Manager (IPE) Job Description / Responsibility * Responsible for planning, developing and implementing allover IE & WS activities in all departments. * Setting IE team and ensuring that the targets are achieved. * Review the current policies and improve plans to improve upon the existing standards. * Setting up and maintaining controls and documentation procedures. * Prepare operation bulletin machine / line layout. * Do method / Motion / Time study in line for each style. * Capacity study of line for setting standards targets and line balancing. * Monitor the productivity and efficiency report. * Train the concern responsible to increase productivity. * Ensure various system implementations to minimize the cost and increase efficiency of factory. Park (Bangladesh) Company Limited. Manager - Work Study Job Description / Responsibility Park (Bangladesh) Company Limited...
Words: 1007 - Pages: 5
...Statistical Tables Answer THREE questions. Each question is worth 20 marks Question 1 A finance company is concerned about the time that employees spend surfing the WWW. The company has taken a random sample of 40 employees and has automatically recorded the time each employee has spent surfing on the last Friday in March. The times (recorded in minutes) are summarised in the table below. |23 |11 |54 |35 |21 |15 |33 |13 | |17 |56 |12 |90 |5 |32 |15 |67 | |17 |12 |120 |34 |128 |5 |76 |34 | |130 |45 |67 |106 |19 |69 |37 |94 | |10 |25 |31 |57 |28 |100 |32 |80 | Table: surfing duration (minutes) on the last Friday in March for a random sample of 40 employees. (i) Calculate the five-number summary for the data; (5 marks) (ii) Draw a boxplot; (5 marks) (iii) Classify the data into a frequency table, using intervals 0 to 9, 10 to 19 etc; (5 marks) (iv) Write a report on your findings and indicate any additional information you would require. (5 marks) (Total 20 marks) Question 2 Overleaf/.....
Words: 813 - Pages: 4
...2408-14-1 (Uncorrected Fault Record Aircraft) (chap 2). DA Form 2408-14 (Uncorrected Fault Record) will no longer be used for aviation equipment. Incorporates Standard Army Maintenance System procedures (chap 3). Adds procedures for documentation of component repair at Aviation Intermediate Maintenance and depot levels of maintenance (chap 3). Adds phase maintenance and periodic inspection documentation procedures (chap 3). Adds information on migrating automated DA Form 2410 (Component Removal and Repair/Overhaul Record) data (chap 3). Changes DA Form 2410 and instructions. Therefore, the U.S. Army Aviation and Missile Command’s Guide/Workbook for the DA Form 2410, The Army Maintenance Management System Aviation (TAMMS-A), October 1992, is obsolete (chap 3). Adds instructions for DA Form 2408-16 (Aircraft Component Historical Record) and DA Form 2410 to track aircraft survivability equipment electronic countermeasures and avionics systems Line Replaceable Units that have software installed (chaps 3 and 4). Incorporates the forms and records instructions published in TB 1-2840-24820-2 (One Time Inspection and Conversion of Forms and Records for T700, 701, and 701C Series Gas Turbine Engines) (chaps 3 and 4). Incorporates the forms and records instructions...
Words: 138921 - Pages: 556
...framework for school inspection The framework for inspecting schools in England under section 5 of the Education Act 2005 (as amended). |This framework sets out the statutory basis for inspections conducted under section 5 of the Education Act 2005 (as amended) from | |September 2012. It summarises the main features of school inspections and describes how the general principles and processes of | |inspection are applied to maintained schools, academies and some other types of school in England. This version of the framework is | |effective from September 2014. | Age group: 0–19 Published: January 2015 Reference no: 120100 Contents Introduction 4 What is the purpose of school inspection? 4 How does inspection promote improvement? 4 Key features of the framework for school inspection 5 What are the legal requirements for the inspection of schools? 7 What determines the timing of a school’s inspection? 10 What are the principles of school inspection? 13 What is the relationship between school self-evaluation and inspection? 14 Who inspects schools? 15 Inspection grades used to make judgements 15 Schools judged to be causing concern 17 Part B. The process of inspection 18 What happens before the inspection? 18 What happens during the inspection? 19 What happens after the inspection? 22 Introduction ...
Words: 7537 - Pages: 31
... no person may operate an aircraft unless, within the preceding 12 calendar months, it has had— An annual inspection in accordance with part 43 of this chapter and has been approved for return to service by a person authorized by §43.7 of this chapter; or An inspection for the issuance of an airworthiness certificate in accordance with part 21 of this chapter. No inspection performed under paragraph (b) of this section may be substituted for any inspection required by this paragraph unless it is performed by a person authorized to perform annual inspections and is entered as an “annual” inspection in the required maintenance records.(b) Except as provided in paragraph (c) of this section, no person may operate an aircraft carrying any person (other than a crewmember) for hire, and no person may give flight instruction for hire in an aircraft which that person provides, unless within the preceding 100 hours of time in service the aircraft has received an annual or 100-hour inspection and been approved for return to service in accordance with part 43 of this chapter or has received an inspection for the issuance of an airworthiness certificate in accordance with part 21 of this chapter. The 100-hour limitation may be exceeded by not more than 10 hours while en route to reach a place where the inspection can be done. The excess time used to reach a place where the inspection can be done must be included in computing the next 100 hours of time in service.(c) Paragraphs (a) and (b)...
Words: 1592 - Pages: 7
...generally use a sampling approach to evidence gathering? A. | Auditors are experts and do not need to look at much to know whether the financial statements are correct or not. | B. | Auditors must balance the cost of the audit with the need for precision. | C. | Auditors must limit their exposure to their auditee to maintain independence. | D. | The auditor's relationship with the auditee is generally adversarial, so the auditor will not have access to all of the financial information of the company. | | 9. | Which of the following statements best describes a relationship between sample size and other elements of auditing? A. | If materiality increases, so will the sample size. | B. | If the desired level of assurance increases, sample sizes can be smaller. | C. | If materiality decreases, sample size will need to increase. | D. | There is no relationship between sample size and materiality or the desired level of assurance. | | 10. | Which of the following statements about the study of auditing is NOT true? A. | The study of auditing...
Words: 8583 - Pages: 35
...| | | | | | | |INSPECTION / |STANDARD (1) |PROCEDURE AND/OR ACCEPTANCE CRITERIA |DOC |SAMPLE |CUSTOMER | |TEST ACTIVITY | | |Y/N(2) |SIZE |INSPECTION | |OPERATION ACTIVITY: 0010 |IN PROCESS | | | |VERIFY PART(S) HAVE RAW MATERIAL TRACEABILITY IS AVAILABLE BEFORE USE | | | | |DRSV010 |CAMERON STANDARD |METHOD- QUALIFIED PERSONNEL TO VERIFY APPLICABLE MATERIAL IS CORRECT BEFORE USE |YES |100% |- | |RAW MATERIAL | |STANDARD- CAMERON STANDARD | | ...
Words: 475 - Pages: 2
...Fall 15 Fall 15 Case II report Shasha Chen Professor: Dr. Maureen Mascha Date: 11/09/2014 Case II report Shasha Chen Professor: Dr. Maureen Mascha Date: 11/09/2014 08 Fall 08 Fall 1. Auditors should always evaluate the design and test the operating effectiveness of a company’s internal control. The key procedures of the evaluation of design are fulfilled by inquires, observations, and inspections. The same procedures can be used to test the operating effectiveness as well. Re-performance of controls is another method to test the operating effectiveness depending on different situations. Some of the key considerations related to the evaluation of design and the testing of operating effectiveness are summarized as follows: Information technology considerations Auditors should understand a company’s information technology (IT), including the system-generated data and reports, which are required by PCAOB. When assessing a company’s risk of material misstatement, auditors should pay great attention towards both manual and automated controls equipped by the company. Auditors should identify the control activities from the internal IT system performed by management. Just like the case stated, when testing the risk #1 and #2...
Words: 1930 - Pages: 8
...RESUME BALJEET SINGH PH: 09953469069. Email: - baljeet.170483@gmail.com Rz-B-5/1, street no. 23, Sadh Nagar-2, Palam colony, New Delhi-110045. Career Overview A quality professional with Six year’s experience in Garments in the export and buying sector. Have proven track record of improving business by implementing systematic Quality control, production planning, working procedure and providing, higher levels of customer service. While currently working as senior QA, my career goal is to move into senior management , therefore I am seeking for a new professional challenge. • Handled Business worth US 10 million across Europe and Auatralia in last financial year . Managing supplier base across Delhi ( NCR), Jaipur, and Nepal • Managing the entire quality control activities, production planning and order processing.. • Comfortable interacting with multiple levels of organisation, management and staff . • Interfacing between buyers/ buying agents and manufacturers for facilitating smooth order execution to achieve shipment date deadline from sampling / fits / sealers to shipping of goods. • Work in tandem with the merchandising and production team to acess technicalities in patterns and production area. • Implementing New Systems in quality department for better work efficiency 1 Career Interest Production planning, Quality Control & Technical compliance. Professional Work Experience: 2 ...
Words: 783 - Pages: 4
...finishing, and inspection. Each table requires 3 hours of assembly, 2 hours of finishing, and 1 hour of inspection. Each chair requires 2 hours of assembly, 2 hours of finishing, and 1 hour of inspection. The profit per table is $120 while the profit per chair is $80. Currently, each week there are 200 hours of assembly time available, 180 hours of finishing time, and 40 hours of inspection time. Linear programming is to be used to develop a production schedule. 1) In a Word document, describe the components of this linear programming model. (10 points) Manufacturers produce tons of goods every day, all of which impact consumers indirectly or directly. Similar to any industry, the manufacturing industry has specific objectives and corresponding strategies that are designed to improve a company's bottom line. These relate to quality, safety, vendor Hickory selection, problem identification and resolution, and efficiency and costs. When manufacturers do not produce a high-quality product, customers can begin to lose faith in the product and stop buying. Even if a company does an excellent job of sorting poor products from good ones, poor products mean a loss to the company, as the company cannot sell those items. For these reasons, one objective of manufacturing is reducing flaws and maintaining high product standards. Strategies might include weekly product sample reviews, while tactics might include physical tests of the product or visual inspections. $80 per chair ...
Words: 661 - Pages: 3