NP2000 Introduction
The NP2000 is variable-pitch aircraft propeller designed for a variety of medium to heavy duty cargo and passenger aircraft. The propeller is equipped with state-of-the-art electronic control, all composite blades, and individual line-replaceable blades. Compatible with most Allison and Rolls Royce engine installations.

NP2000 Maintenance Concept
The NP2000 propeller system maintenance concept is based on phase inspections according to the number of flight hours. The interval of these inspections is 500, 1,000, 1,500 flight hours. Because of planning purposes, these phase inspections contain periodic maintenance tasks, which would be otherwise performed according to calendar time. Exceptions are inspections such as Pre-flight inspection, Post-flight, conditional, and turn around inspections that are performed at the (O) level.

NP2000 Main Features
Main features are introduced below: * Compatible with Allison and Rolls Royce engine installations. * Electronic control. * Individual line replaceable blades. * Reduced maintenance costs. * Fewer mechanical parts. * Higher reliability. * Reduced noise. * Lower vibration. * Reduced feather drag. * Tighter speed governing.

NP2000 Basic Data * Diameter 13 ft 5 in * 5100 SHP rating, 5610 SHP growth * 1106 RPM

Maintenance Levels
A traditional three-level maintenance concept, consisting of Organizational level (O), Intermediate level (I) and Depot level (D) maintenance was adopted for the NP2000.

Organizational Level Maintenance
The “O” level maintenance is performed by operational units performing the following maintenance actions: * Pre-flight inspection, Post-flight inspection. * Propeller Servicing. * Electronic control system diagnostics. * Propeller balancing. * Removal and replacement of individual blades. * Removal and replacement of propeller assembly. * Removal and replacement of propeller dome assembly. * Removal and replacement of propeller pump housing assembly. * Removal and replacement of forward and aft spinner assemblies. * Removal and replacement of propeller variable pitch actuator. * Removal and replacement of propeller brush block assembly. * Removal and replacement of propeller electronic control unit (PECU). * Removal and replacement of propeller deice slip ring assembly.

Intermediate Level Maintenance
The (I) level maintenance is performed by the aircraft intermediate maintenance department personnel and consists of work on the propeller installed on the aircraft as well as on individual disassembled components. At the (I) level, selected (O) level line replaceable units (LRU’s) are tested and inspected in order to identify and repair the cause for failure. Repairs are carried out on those LRU’s that are prescribed as (I) level repair. If the failure cannot be identified or repaired, the unit/component is delivered to a repair facility or the manufacturer (Depot level).

Depot Level Maintenance
Depot level maintenance will be through a performance based contract with the manufacturer. The LRU’s requiring maintenance at the Depot Level are repaired by the propeller manufacturer or by the unit/component supplier/manufacturer.

NP-2000 Depot Level Inspection Requirements
After 1,000 flight hours (which is half of the propeller service life), visual inspections of the main propeller structure and main suspension points with eddy currents, with consequent disassembly if any anomalies are discovered.

Technical Publications
Publications new and updated will be in a phased approach in five phases with deliveries from 3/31/13 through 5/31/13. Phases will be determined by priority and determined by availability of source data. Phases one and two will satisfy requirements for validation of installation. Phases three through five will satisfy maintenance and operation requirements.

Training
Initial training will be provided by manufacturer. This training is included on initial acquisition contract and will be performed at the three sites utilizing NP2000 system. Follow on training and technical support is to be provided on a performance based contract by contract support teams. Contract requires technical support teams to be located in the three sites utilizing system and provide 24/7 support with the capability to travel to support deployed units.

Support Equipment
No unique support equipment requirements are anticipated.
Facilities
No new requirements for NP2000 integration.
Manpower and personnel
No new requirements for NP2000 integration.
Supply Support
No new requirements for NP2000 integration.

Similar Documents

Premium Essay

Sasasas

.... Chapter Failure prevention and recovery 19 Eurotunnel response team during one of their regular patrols in the tunnel Source: Eurotunnel Introduction One obvious way of improving operations performance is by preventing failure. Failure is rarely unimportant, but in some operations it is vital that processes do not fail. Failure in aircraft in flight, for example, or electricity supplies to hospitals, or car seat belts, or the emergency services can be literally fatal. For these operations dependability is not just desirable, it is essential. Even in less critical situations, having dependable processes can give a competitive advantage. But no process is perfect and failures will occur. So it is important that we learn from all failures and have plans in place which help them recover and minimize their effects. Figure 19.1 shows how this chapter fits into the operation’s improvement activities. Operations strategy Failure prevention and recovery Operations process improvement makes processes better Design Operations management Improvement Total quality management organizes process improvement Planning and control Failure prevention and recovery stops processes becoming worse Topic covered in this chapter Figure 19.1 This chapter covers failure prevention and recovery . 618 Part Four Improvement Key questions I I I I I ??? Why do operations fail? How is failure measured? How can failure and potential failure be...

Words: 25060 - Pages: 101

Premium Essay

Finnish Project Management Championships 2010

...system deliveries for large engineering industry clients. Its three strategic customers have increasingly requested maintenance services after the actual equipment and system deliveries, and these services have so far been carried out by the side of other duties by the technical staff. OleanTek’s leaders have noticed that maintenance could be implemented also in the form of more strategic service business that could complement the company’s offering and generate important benefits to other customers, too. OleanTek has decided to invest in a new service business launch project to plan and test four basic service concepts concurrently: corrective maintenance, preventive maintenance, spare parts service, and modernization. The project starts with delimiting the service offering and ends with planning the broader service launch process; the actual marketing and broader launch of new services are excluded from the project. Paul Lander, the maintenance manager, has been selected as project manager for the project. He is well acquainted with OleanTek and its clientele already. Paul has noticed that it is very difficult to plan the project with detail as most of the tasks include a lot of uncertainty due to their ambiguous content and novelty and the chosen mode of operating. The project is intended to employ cross-functional cooperation that involves expertise from maintenance, marketing, and technical planning. The required persons can spend a maximum of 30% of their time to the tasks in...

Words: 1075 - Pages: 5

Free Essay

Total Productivity Mainteneance

...(1)http://www.leanexpertise.com/TPMONLINE/articles_on_total_productive_maintenance/tpm/tpmroberts.htm TPM TOTAL PRODUCTIVE MAINTENANCE History and Basic Implementation Process by Jack Roberts, Ph.D. Jack_Roberts@TAMU-Commerce.edu Department of Industrial and Engineering Technology Texas A&M University-Commerce Abstract: Total Productive Maintenance (TPM) is a maintenance program which involves a newly defined concept for maintaining plants and equipment. The goal of the TPM program is to markedly increase production while, at the same time, increasing employee morale and job satisfaction. The TPM program closely resembles the popular Total Quality Management (TQM) program. Many of the same tools such as employee empowerment, benchmarking, documentation, etc. are used to implement and optimize TPM. This paper will define TPM in some detail, evaluate its strengths and weaknesses as a maintenance philosophy, and discuss implementation procedures. Examples of successfully implemented programs will be presented. I. What is Total Productive Maintenance? Total Productive Maintenance (TPM) is a maintenance program concept. Philosophically, TPM resembles Total Quality Management (TQM) in several aspects, such as (1)total commitment to the program by upper level management is required, (2) employees must be empowered to initiate corrective action, and (3) a long range outlook must be accepted as TPM may take a year or more to implement and is an on-going...

Words: 1849 - Pages: 8

Free Essay

Asset Performance Management

...MARKET SCOPE Asset performance management Addressing the root cause A properly and adequately designed asset performance management framework can bring a cohesive approach to manage assets, monitor equipment health, and ensure the compliance of critical operational & business processes. Such a framework has to leverage the established asset management capabilities provided by the best-in-class systems. Courtesy: PCM Ltd n the 1980s, the world was awakened by two major disasters that signified the vitality of engineering assets and the importance to manage their performance. The first event was a lethal methyl isocyanate (MIC) leak in Bhopal on December 2, 1984, and the second the catastrophic Chernobyl nuclear disaster on April 26, 1986. Over 20,000 were killed, and half a million victims maimed, disabled or otherwise affected in the Bhopal gas tragedy. Criminal cases were filed against the then corporate Chairman. In the Chernobyl reactor, the accident happened because of a combination of basic engineering deficiencies in the reactor and faulty actions of the operators (as per UN Chernobyl Forum report, the safety systems had been switched off, and the reactor was being operated under improper, unstable conditions, a situation which allowed an uncontrollable power surge to occur). More than 20 years have passed since the tragedy occurred, and it is difficult to tell precisely the number of deaths – past and future – attributable to the Chernobyl accident. Since the...

Words: 1405 - Pages: 6

Free Essay

Operations

...MAINTENANCE MANAGEMENT Prof. O.P. Gandhi ITMMEC, IIT Delhi The term ‘maintenance’ means to keep the equipment in operational condition or repair it to its operational mode. Main objective of the maintenance is to have increased availability of production systems, with increased safety and optimized cost. Maintenance management involves managing the functions of maintenance. Maintaining equipment in the field has been a challenging task since the beginning of industrial revolution. Since then, a significant of progress has been made to maintain equipment effectively in the field. As the engineering equipment becomes sophisticated and expensive to produce and maintain, maintenance management has to face even more challenging situations to maintain effectively such equipments in industrial environment. This brief lecture on maintenance management includes maintenance strategies, functions of maintenance department, maintenance organization and elements of maintenance management. MAINTENANCE STRATEGIES OR OPTIONS A maintenance strategy or option means a scheme for maintenance, i.e. an elaborate and systematic plan of maintenance action. Following are the maintenance strategies [1] that are commonly applied in the plants. • Breakdown Maintenance or Operate to Failure or Unplanned Maintenance • Preventive or Scheduled Maintenance • Predictive or Condition Based Maintenance • Opportunity Maintenance • Design out Maintenance The equipment...

Words: 1201 - Pages: 5

Free Essay

Management

...MAINTENANCE MANAGEMENT The term ‘maintenance’ means to keep the equipment in operational condition or repair it to its operational mode. Main objective of the maintenance is to have increased availability of production systems, with increased safety and optimized cost. Maintenance management involves managing the functions of maintenance. Maintaining equipment in the field has been a challenging task since the beginning of industrial revolution. Since then, a significant of progress has been made to maintain equipment effectively in the field. As the engineering equipment becomes sophisticated and expensive to produce and maintain, maintenance management has to face even more challenging situations to maintain effectively such equipments in industrial environment. This brief lecture on maintenance management includes maintenance strategies, functions of maintenance department, maintenance organization and elements of maintenance management. MAINTENANCE STRATEGIES OR OPTIONS A maintenance strategy or option means a scheme for maintenance, i.e. an elaborate and systematic plan of maintenance action. Following are the maintenance strategies [1] that are commonly applied in the plants. • Breakdown Maintenance or Operate to Failure or Unplanned Maintenance • Preventive or Scheduled Maintenance • Predictive or Condition Based Maintenance • Opportunity Maintenance • Design out Maintenance The equipment under breakdown maintenance...

Words: 1194 - Pages: 5

Free Essay

Benefits

...cost of the maintenance programmes but to improve the functional performance of the plant equipment. Enhanced reliability and efficiency will in turn contribute to improved economic and safety performance of the plant equipment. 245.2. Cost Benefits Cost reduction benefits are not the primary goal of the RCM process however, EdF estimate that the application of RCM to their maintenance programmes will produce a maintenance cost reduction of 7 Million Euros over a period of 2004-2007 when applied to a large standardised fleet. Conversely, the experience in the Czech Republic where RCM was applied to a small number of systems at the Dukovany NPP the experience proved to be maintenance cost neutral. The experience of cost savings through the application of RCM in France, Spain, UK and Czech Republic are detailed in the Attachments to this TECDOC. Many are quoted in the form of task and man-hour reductions. 5.3. Contribution to Long Term Operation RCM is a systematic approach to the identification and execution of maintenance activities designed to support plant performance. The associated condition monitoring programmes and analytical techniques ensure excellent knowledge of plant condition and can provide early warning of plant aging and obsolescence issues which are vital for asset management. The data collected and the maintenance practices developed are conducive to long term asset management strategies. 5.4. Soft 5.4.1. Operations and Maintenance interaction...

Words: 597 - Pages: 3

Premium Essay

Strategic Choices and Evaluations

...excellences, product leadership, and customer intimacy (Business Dictionary website, n.d.). Coca-Cola has recently rolled out the Operational Excellent (OE) Site Lead within all of the facilities. This new position is in place to drive the OE culture, built OE capability, and to deliver the OE vision across the facility. The OE site lead is responsible to provide expertise, training and leadership on Lean Principles and Structured Problem Solving to all employees. Other programs that OE has led to are Total Productive Maintenance (TPM) and Total Quality Management (TQM) Recently Coca-Cola has been rolling out a new program called Total Productive Maintenance. This Total Productive Maintenance is a maintenance program that involves a newly defined concept for maintaining facility and equipment. The goal of the Total Productive Maintenance program is to noticeably increase production while at the same time, increasing employee morale and job satisfaction. Total Productive Maintenance was introduced to help the company to avoid waste, reduce cost and that the product sent to the customer had no defects. This program is set up at Coca-Cola to help the plant reduce unscheduled downtime on the machinery that...

Words: 1318 - Pages: 6

Premium Essay

Queuing

...Spring 2010 School of Engineering Maintenance impact on Production Profitability - A Case Study Växjö, 2010 Thesis no:TEK 028/2010 Obamwonyi Martyn Enofe Gregory Aimienrovbiye Department of Terotechnology (Total Quality Maintenance) Linnaeus University School of Engineering Department of Terotechnology (Total Quality Maintenance) 4SE31E Degree Project Master Thesis Författare/ Authors Obamwonyi Martyn Enofe Gregory Aimienrovbiye Linnaeus University Institutionen / Institution School of Engineering Department of Terotechnology (Systemekonomi) Dokumenttyp/Type of document Examensarbete (Degree Project) Handledare/Tutors Matias Taye Examinator/ Examiner Basim Al-Najjar Title och undertitel/ Title and subtitle Maintenance impact on Production Profitability - A Case Study Sammanfattning/Abstract Maintenance has had a tremendous impact on company’s proficiency to optimize its production system in order to meet its long term objectives. Generally, a production system in which maintenance is not given attention may easily lead to the system producing defective product as a result of machine defect. The purpose of this thesis is to utilized tools and methods to analyze the impact of maintenance implementation in a production system. The analytical Hierarchy process was utilized to filter the defining factors and sub-factors considered to be related to the life length and performance of production equipment in the research which was carried out at SCA...

Words: 17171 - Pages: 69

Free Essay

Facility Report

...the current and future maintenance requirements of the valet department of The Four Seasons Sydney hotel. Under the authorisation of Four Seasons’ General Manager, Mr. Vincent Hoogewijs, this report was carried out on the 2nd of July 2012. The process of conducting the report involved designing a FCA form using academic and industry literature as guidance to match the functions of the chosen area of the property. The FCA form found the valet department is in ‘1-excellent condition’ although some aspects of valet housekeeping (mechanical and structural) were ranked lower at ‘2- minor damage/cosmetic’. Recommendations have been provided for both facility/engineering and general management to assist respectively in taking corrective measure to minimise and where possible eliminate the present issues that require maintenance.   Table of Contents Letter of Transmittal............................................................................................................ 2 Executive Summary............................................................................................................ 3 Table of Contents................................................................................................................ 4 1.0. Introduction of Facilities Case.................................................................................. 1.1. Facilities Overview 1.2. Current Operations & Equipment 1.3. Past & Present Maintenance........................

Words: 1373 - Pages: 6

Free Essay

Oprah

...River Arch User Fee 451000 - Interest & Dividend Inc 470000 - Rental Income 496000 - Boat Ramp Income 499000 - Miscellaneous Income Total Other Income Total River Walk Income General & Administrative 504000 - Accounting/Audit 506500 - Committees 506600 - Swim Team 508000 - Corporate Fees 511000 - Dues/Subscriptions 524000 - Insurance 528000 - Legal 532000 - Postage/Distribution 534000 - Printing 542000 - Uncollectable Accounts 549900 - Administrative/Salaries Total General & Administrative Common Utilities 551000 - Electricity 552000 - Gas 555000 - Telephone 557000 - Water Total Common Utilities Service & Contracts 566000 - Grounds Maintenance 568000 - Management 570000 - Pool Management 573000 - Security 576000 - Trash Removal Total Service & Contracts Building Maintenance Exp 587000 - General Bldg Maint & Rep 589000 - Lights Total Building Maintenance Exp Page 1 of 2 2012 Budget 371,640.00 371,640.00 2,000.00 3,864.00 6,426.00 4,750.00 5,000.00 11,000.00 100.00 300.00 33,440.00 405,080.00 4,000.00 2,000.00 3,200.00 250.00 279.00 12,000.00 2,000.00 4,700.00 12,000.00 1,000.00 11,000.00 52,429.00 22,000.00 3,000.00 1,950.00 6,000.00 32,950.00 83,000.00 49,279.00 52,000.00 11,000.00 5,000.00 200,279.00 24,000.00 8,000.00 32,000.00 2012 Monthly Budget 30,970.00 30,970.00 166.67 322.00 535.50 395.83 416.67 916.67 8.33 25.00 2,786.67 33,756.67 333.33 166.67 266.67 20.83 23.25 1,000.00 166.67 391.67 1,000.00 83.33 916.67 4,369.09 1,833.33 250.00 162.50 500.00 2,745.83 6,916.67...

Words: 645 - Pages: 3

Free Essay

Should Pacific Jet Outsourse the Inspection

...completed much faster by technicians that perform it regularly and have all of the special equipment necessary. Taking everything into consideration I recommend that we outsource the inspection. Should Pacific Jet outsource the 72 month inspection? This is the first 72 month inspection that our 135 charter company (Pacific Jet) has coming due. Since we are a small operation with only 3 aircraft and 4 maintenance technicians performing a 72 month inspection in-house will be a huge undertaking. The main items to consider are costs, aircraft downtime, and quality control issues. We have to decide if we want to perform this inspection in-house our outsource it. The airlines have been outsourcing maintenance for decades and have accelerated this outsourcing rapidly since 2001. In 2005, some airlines outsourced as much as 62 percent of their maintenance and that number continues to grow. While they have increased their outsourcing of maintenance their accident rates have declined, statistically proving that outsourced maintenance is safe (Armstrong, 2007). There are many companies that could perform this inspection for us if we decide to outsource...

Words: 1523 - Pages: 7

Free Essay

Maintenance Scheduling

...performance. Resources include manpower, materials, tools and special equipment. Access refers to when the equipment will be prepared and accessible so that it can be worked on in safe (locked out/tagged out) condition, with necessary precautions taken, permits obtained, and any specialized documentation, drawings, or information in hand. Proper time relates to job start, duration of execution, and completion within the time frame agreed upon with the internal customer during the weekly coordination meeting. The Weekly Expectation Scheduling is the locus from which all maintenance activity is executed. Scheduling should be viewed as the “point” function and “marketing arm” of the system because it yields the earliest tangible results (often within weeks of start up). All individuals and groups perform better and accomplish more with clearly established, communicated and published expectations. When the maintenance function is managed without a weekly schedule, there are no specific expectations as to what is to be accomplished with the resources for which payroll checks will be drawn. Instead, whatever reactive demands are made is what will be done. The fundamental requirement target (the schedule) against which to control, followed by action (execution of the schedule) to achieve the target. The results, measured against the original intention (called schedule compliance), provide feedback for correcting deviations (improving future schedule compliance). Managers...

Words: 2773 - Pages: 12

Free Essay

Condition Monitoring

...MOM350 CONDITION MONITORING AND MANAGEMENT PROJECT 2 – SPRING 2013 LINN WETTELAND STUD.NR 204592 “USING FAULT TREES TO DETERMINE THE ROOT CAUSE OF ROTATING EQUIPMENT FAILURES” (Robert X. Perez) In the paper “Using fault trees to determine the root cause of rotating equipment failures”, the author, Robert X Perez, explains through his own experience as a senior reliability engineer at Citgo Petroleum Corporation, and through examples of various events in different systems the importance of finding the root cause(s) of failures in rotating equipment. The author explains these “major failures causing significant undesired events are the result of a series of events, and compares it to the reaction of a domino line being tipped over by a single domino chip. And studying chain of event, or probable scenarios is at the heart of RFCA’s” (Perez) The author focuses on FTA (Fault tree analysis) as a tool to determine such root causes. And gives examples of cases where use of these tools could have OR have prevented multiple damages due to one component failure causing failure in surrounding components. RCFA – Root Cause Failure analysis “Root Cause Failure analysis is a structured process to identify any physical, human and latent causes of undesirable event(s).And how such a process can be used in achieving continuous plant reliability improvements by targeting mechanical and organizational deficiencies in a process facility” (Perez). A tool for “Identification and correction...

Words: 1529 - Pages: 7

Free Essay

Group Study

...our spirit all aided us to surmount difficulties during doing the research and show our ability confidently as well. We are also indebted to HUCFL Second - year English students for their cooperation to complete our questionnaires and their active contributions to suggest feasible solutions for our research topic. Last but not least, we can’t help mentioning the remarkable efforts of our group members. They conducted the research to the best of their ability and worked very hard to perfect the research as well as possible. Their merits are thankworthy. ABSTRACT Our research was carried out to investigate the attitude of HUCFL Second- year English students toward the school facility protection and some solutions for school facility maintenance. Due to the important of school facilities in the cause of HUCFL’s education- training and its status quo, we carried out the small- scale research to examine main causes of HUCFL’s facility damage. We delivered 20 questionnaires randomly to the Second – year English students and we thereafter analyzed the data collected from those questionnaires. Based on the research findings, we had the clear understanding about the concerned reality of HUCFL’s school facilities and the close relationship between the lack of students’ awareness and the degraded quality of the facilities. What is more, we realized that the students’ responsibility for protecting the school facilities is the main...

Words: 3960 - Pages: 16