The Manhattan Project was an innovative work extend that delivered the main atomic weapons amid World War II. It was driven by the United States with the backing of the United Kingdom and Canada. From 1942 to 1946, the task was under the bearing of Major General Leslie Groves of the U.S. Armed force Corps of Engineers; physicist J. Robert Oppenheimer was the executive of the Los Alamos National Laboratory that planned the genuine bombs. The Army segment of the venture was assigned the Manhattan District; "Manhattan" bit by bit superseded the authority codename, Development of Substitute Materials, for the whole venture. Along the way, the venture assimilated its before British partner, Tube Alloys. The Manhattan Project started humbly in 1939, yet developed to utilize more than 130,000 individuals and cost almost US$2 billion . More than 90% of the expense was for building processing plants and creating the fissile materials, with under 10% for advancement and generation of the weapons. Exploration and generation occurred at more than 30 destinations over the United States, the United Kingdom and Canada.

Two sorts of nuclear bomb were produced amid the war; a generally straightforward firearm sort splitting weapon was made utilizing uranium while a more intricate plutonium implosion-sort weapon was planned simultaneously. For the Gun-Type weapon advancement uranium-235 was required. Synthetically indistinguishable to the most well-known isotope, uranium-238, and with practically the same mass, it demonstrated hard to discrete the two. Three strategies were utilized for uranium improvement: electromagnetic, vaporous and warm. The vast majority of this work was performed at Oak Ridge, Tennessee. In parallel with the work on uranium was a push to deliver plutonium. Reactors were built at Oak Ridge and Hanford, Washington, in which uranium was lighted and transmuted into plutonium. The plutonium was then artificially isolated from the uranium. The firearm sort outline demonstrated unfeasible to use with plutonium so the implosion-sort weapon was created in a purposeful configuration and development exertion at the venture's main research and plan lab in Los Alamos, New Mexico.

The venture was likewise accused of social affair knowledge on the German atomic weapon venture. Through Operation Alsos, Manhattan Project staff served in Europe, some of the time behind foe lines, where they assembled atomic materials and records, and gathered together German researchers. In spite of the Manhattan Project's tight security, Soviet nuclear spies still infiltrated the system.

The main atomic gadget ever exploded was an implosion-sort bomb at the Trinity test, directed at New Mexico's Alamogordo Bombing and Gunnery Range on 16 July 1945. Young man, a firearm sort weapon, and Fat Man, an implosion-sort weapon, were utilized as a part of the nuclear bombings of Hiroshima and Nagasaki, individually. In the prompt after war years, the Manhattan Project directed weapons testing at Bikini Atoll as a feature of Operation Crossroads, grew new weapons, advanced the improvement of the system of national labs, bolstered medicinal examination into radiology and established the frameworks for the atomic naval force. It kept up control over American nuclear weapons exploration and generation until the arrangement of the United States Atomic Energy Commission in January 1947.

Starting points

The revelation of atomic parting by German scientific experts Otto Hahn and Fritz Strassmann in 1938, and its hypothetical clarification by Lise Meitner and Otto Frisch, made the improvement of a nuclear bomb a hypothetical plausibility. There were fears that a German nuclear bomb task would create one in the first place, particularly among researchers who were exiles from Nazi Germany and other rightist nations. In August 1939, physicists Leó Szilárd and Eugene Wigner drafted the Einstein–Szilárd letter, which cautioned of the potential improvement of "greatly intense bombs of another sort". It asked the United States to find a way to get stockpiles of uranium metal and quicken the exploration of Enrico Fermi and others into atomic chain responses. They had it marked by Albert Einstein and conveyed to President Franklin D. Roosevelt. Roosevelt approached Lyman Briggs of the National Bureau of Standards to head the Advisory Committee on Uranium to examine the issues raised by the letter. Briggs held a meeting on 21 October 1939, which was gone to by Szilárd, Wigner and Edward Teller. The board of trustees reported back to Roosevelt in November that uranium "would give a conceivable wellspring of bombs with a danger boundlessly more prominent than anything now known."

Briggs suggested that the National Defense Research Committee burn through $167,000 on examination into uranium, especially the uranium-235 isotope, and the as of late found plutonium. with Vannevar Bush as its executive. The workplace was enabled to take part in substantial designing tasks notwithstanding inquire about. The NDRC Committee on Uranium turned into the S-1 Uranium Committee of the OSRD; "uranium" was soon dropped for security reasons.

In Britain, Frisch and Rudolf Peierls at the University of Birmingham had made a leap forward researching the minimum amount of uranium-235 in June 1939. Their counts showed that it was inside a request of extent of, which was sufficiently little to be conveyed by an aircraft of the day. Their March 1940 Frisch–Peierls update started the British nuclear bomb venture and its Maud Committee, which collectively suggested seeking after the improvement of a nuclear bomb.

At a meeting between President Roosevelt, Vannevar Bush, and Vice President Henry A. Wallace on 9 October 1941, the President endorsed the nuclear project. To control it, he made a Top Policy Group comprising of himself—in spite of the fact that he never went to a meeting—Wallace, Bush, Conant, Secretary of War Henry L. Stimson, and the Chief of Staff of the Army, General George C. Marshall. Roosevelt picked the Army to run the venture as opposed to the Navy, as the Army had the most involvement with administration of vast scale development ventures. He additionally consented to facilitate the exertion with that of the British, and on 11 October he made an impression on Prime Minister Winston Churchill, recommending that they compare on nuclear matters.

Possibility

Recommendations

The S-1 Committee held its initially meeting on 18 December 1941 "invaded by a climate of excitement and direness" in the wake of the assault on Pearl Harbor and the consequent United States presentation of war upon Japan and afterward on Germany. Work was continuing on three distinct methods for isotope partition to particular uranium-235 from uranium-238. Lawrence and his group at the University of California, Berkeley, examined electromagnetic partition, while Eger Murphree and Jesse Wakefield Beams' group investigated vaporous dissemination at Columbia University, and Philip Abelson coordinated exploration into warm dispersion at the Carnegie Institution of Washington and later the Naval Research Laboratory.

In the mean time, there were two lines of exploration into atomic reactor innovation, with Harold Urey proceeding with examination into substantial water at Columbia, while Arthur Compton brought the researchers working under his watch from Columbia, California and Princeton University to join his group at the University of Chicago, where he composed the Metallurgical Laboratory in mid 1942 to study plutonium and reactors utilizing graphite as a neutron mediator. Briggs, Compton, Lawrence, Murphree, and Urey met on 23 May 1942 to conclude the S-1 Committee proposals, which required every one of the five innovations to be sought after. This was endorsed by Bush, Conant, and Brigadier General Wilhelm D. Styer, the head of staff of Major General Brehon B. Somervell's Services of Supply, who had been assigned the Army's illustrative on atomic matters.

Bomb outline ideas

Compton asked hypothetical physicist J. Robert Oppenheimer of the University of California, Berkeley, to assume control research into quick neutron counts—the way to figurings of minimum amount and weapon explosion—from Gregory Breit, who had stopped on 18 May 1942 in view of worries over careless operational security. John H. Manley, a physicist at the Metallurgical Laboratory, was relegated to help Oppenheimer by reaching and organizing test material science bunches scattered the nation over. Oppenheimer and Robert Serber of the University of Illinois analyzed the issues of neutron dispersion—how neutrons moved in an atomic chain response—and hydrodynamics—how the blast delivered by a chain response may carry on. To survey this work and the general hypothesis of parting responses, Oppenheimer and Fermi met gatherings at the University of Chicago in June and at the University of California, Berkeley, in July 1942 with hypothetical physicists Hans Bethe, John Van Vleck, Edward Teller, Emil Konopinski, Robert Serber, Stan Frankel, and Eldred C. Nelson, the last three previous understudies of Oppenheimer, and trial physicists Emilio Segrè, Felix Bloch, Franco Rasetti, John Henry Manley, and Edwin McMillan. They likely affirmed that a splitting bomb was hypothetically conceivable.

There were still numerous obscure elements. The properties of immaculate uranium-235 were generally obscure, just like those of plutonium, a component that had just been found in February 1941 by Glenn Seaborg and his group. The researchers at the Berkeley meeting imagined making plutonium in atomic reactors where uranium-238 iotas consumed neutrons that had been radiated from fissioning uranium-235 particles. Right now no reactor had been constructed, and just minor amounts of plutonium were accessible from cyclotrons. Indeed, even by December 1943, just two milligrams had been created. There were numerous methods for organizing the fissile material into a minimum amount. The least complex was shooting a "tube shaped fitting" into a circle of "dynamic material" with an "alter"— thick material that would center neutrons internal and keep the responding mass together

Similar Documents

Free Essay

Manhatten Project

...The Manhattan Project The Manhattan Project was a significant turning point for the United States in World War II. The rumors of the creation of an atomic bomb put the Allies on edge; each wanting to be the first to create such a destructive technology. The reason behind why the US chose to execute this project, the processes and events that took place, and the subsequent effects of the project depict the importance of this major US event. To fully understand the importance of the Manhattan Project, it is first imperative to understand the reasoning behind why the United States chose to pursue the project. In 1939, Allied scientists had fears that Nazi Germany might develop nuclear weapons (The Manhattan Project). At this point in the War, Hitler was at his most powerful. He had one of the largest followings in history and his reign was producing devastating outcomes for the Jewish population (The Manhattan Project). Once the scientific community discovered that German physicists could split a uranium atom, action needed to be taken (The Manhattan Project). Albert Einstein, who fled Nazi Germany to live in the US, felt as though President Roosevelt should be made aware of the dangers of atomic technology being in the hands of Hitler (Ushistory). A letter written by Einstein was received by Roosevelt, yet the President found no reason to immediately respond to such a situation (Ushistory). However, 1941 began the American effort to construct an atomic bomb (The Manhattan...

Words: 2298 - Pages: 10

Premium Essay

Manhattan Project History

...The Manhattan project was the first atomic bomb that was used during WWII. It was led by United states with help from the UK and Canada. It was used during 1942-1946 and commanded by Major General Leslie Groves. It costed about 2 million dollars to fund and make. The resarch took about 30 different states to make the bomb. During the war two types of bombs were being created a nuclear fission weapon using urianium and a implosion type weapon. With the fission weapon it only took .7 amout of natural uranium to create. Almost all of the buliding took place in Oak Ridge Tennesse.For the implosion type weapon it needed Plutonium it was seperated chemically from the uranium and later used to make the implosion type weapon.. Another use for the bombs was for gathering information on the germans nuclear project. Sometimes The Manhattan Project was used behind enemy lines in Europe. Even though the project was super secret soviet atomic speis were able to get through to the prgram....

Words: 526 - Pages: 3

Free Essay

Tim and Funding

...Few memories as a failure on a major project from half a decade ago still vividly remains in memories. As a Research Assistant to Tim, it was my first paid job. Tim, an Engineer, worked in silos and had driver social style to his heart beat. He only communicated the expectations without delving in the details that he had in his mind. Even though the Office space was a closed knit space for 16 students, Tim seldom hung out with people to build personal relationships. He only interacted with others when there was a need. His lack of explanation on why the project was needed had left me wondering regarding purpose and design aspects of the new programming project. I struggled on how to effectively design the project and often sought help from other people, who recommended me that the project needed investment in new programming platform as old platform was incapable of achieving the project objectives. After making almost no progress on the project and wasting time in attempts to make old platform workable, I received a vehement email from Tim, stating that XYZ Inc. was deciding to scale back on funding, as no progress reports were submitted. I was shocked to learn that I was even expected to submit progress reports at the end of quarter on the undertaken project in which I had neither any clue nor communication. As an amiable person, I was too quick to reach an agreement with Tim on project deliverables. I had thought that I would be receiving friendly advice and guidance from...

Words: 444 - Pages: 2

Premium Essay

Student

...and answer document, uploaded to D2L dropbox. You will have to find an IT professional to interview on your own.  Description of this assignment 1. Each student needs to find a candidate for a Post-implementation Review (PIR) report describing an information systems development project. 2. Where can you find an information technology professional to interview? You will have to find an IT professional to interview on your own.    3. If you work for a business or government organization, you should consider interviewing the IT/MIS director for your organization.  If you work P/T or F/T in any reasonably sized organization, it is likely that there are some IT workers around (like help desk staff, programmers, analysts, network technicians or even IT managers). It can even be a friend, relative or acquaintance you know who works in such a job. 4. The following is a list of themes that you could address in the interview: Please do not write this paper in question and answer format. Use the questions below to help guide the interview. ▪ What type of job does he/she do? For whom? ▪ What projects is he/she currently working on for the organization? ▪ What projects has he/she recently completed? ▪ What IT applications has the firm recently implemented? ▪ Were the most recently applications developed in-house, were they outsourced development or were they application software packages that were customized and purchased? ...

Words: 563 - Pages: 3

Premium Essay

Poo on Women: Is This Bad?

...Kempen | C402/C405 | Extend Diploma Mechanical Engineering EDENGM22A/B | Peter Kempen | C402/C405 | | GCSE English | Katherine Davey | G4 | GCSE English | Katherine Davey | G4 | | AS English Literature | Francesca Thomas | A58 | | | | | Archaeology: Unit 1 | Caroline Wilcox | B254 | Archaeology: Unit 2 | Caroline Wilcox | B254 | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49 | | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | Spring Term Revision Schedule 2013-14 Week 1 | Tuesday 8th April | | Morning session 10.00-12.00 | Afternoon Session 1.00-3.00 | | Subject/course | Teacher | Room | Subject/course | Teacher | Room | | A2 Business (China Research Theme) | Nessa | A25 | AS Business | Nessa | A25 | | A2 Economics | Charles | G5 | AS Economics | Charles | | | AS Business | Sarah (11.00-12.30) | A39 | A2 Business (Higher level exam technique) | Sarah | A39 | | AS Law | Amina | A26 | | | | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49...

Words: 883 - Pages: 4

Premium Essay

Microsoft Excel

...For ""Anticipated Project Size"" use your internal metrics as guidance. For example, if you use lines of code, then mentally assign ball park values to Small, Medium and Large as part of determining whether to give this criteria a high or low score. Follow a similar process ""Anticipated Duration"". Since project duration depends on project complexity, mentally categorize earlier projects as short, average or long duration to help put the current project in context. 2. After assigning a score for each criteria, view the Feasibility Study Suitability Indicator to discover the best method to use for determining project viability. 3. Omitted criteria will give an inaccurate result, so ensure all criteria are scored before checking the indicator." Criteria "Score (1=high, 3=low)" Guidelines Business Risk "1 = Significant, high-risk projects 2 = Low-to-modertate risk projects 3 = Small, low risk projects" Technology Risk "1 = Significant, high risk technological risks 2 = Low-to-moderate technological risks 3 = Small, low technological risks" Anticipated Project Size "1 = Large 2 = Medium sized 3 = Small" Anticipated Project Duration "1 = Long 2 = Medium duration 3 = Short" Project Dependencies "1 = Substantial and intricate project dependencies 2 = Minimal or manageable project dependencies 3 = No project dependencies" ...

Words: 451 - Pages: 2

Free Essay

Enterprenure

...(EPIEC) . From there he gained a lot of working experience and knowledge which made him to success in his business later . Business Motivation and starting One of the motivating factors was his father’s dream of his establishment in the society and another factor was after the independence of Bangladesh Aminul Islam realized that a new country has been born, therefore, a lot of construction will be needed for the development of the country and that is when he came up with the idea of Project Builders Limited. He proposed the idea to three other recent BUET graduates and they agreed to start with this new business. After the death of one of the partner and other two sold their share currently Aminul Islam is the only Managing Director and Chairman of Project Builders Limited. Vision The vision of Project Builders limited is to make quality constructions and make a strong infrastructure development of the country. Mission Construction of important structure and projects and to become the number one construction builder in Bangladesh. Initial Finance The company was initially started with four partners along...

Words: 2081 - Pages: 9

Free Essay

Kanpur

...knowledge to serve my best to the organization as well as my professional growth. Academics Relevant Courses: • Completed six weeks course and training in JAVA from SLR Infotech Pvt. Ltd, CHANDIGARH. • Pursuing 6 Months course and training in JAVA from DUCAT,NOIDA. • Completed six weeks course in C++ From ICT, KAITHAL B. Tech Projects: S.No Name Of the Project Description Team Members Roles and Responsibilities 1. CHANDIGARH TOURISM (B.Tech Summer Training Project) It was a software project based on core JAVA. It includes all the places to visit , map of chandigarh , hotel room booking , slides . Backend was based on MS-ACCESS . 2 Coding of Some pages, database manipulation & connectivity and preparing Crystal Reports. 2. DELHI TOURISM (B.Tech Minor Project ) It was a software project based on core JAVA. It includes all the places to visit , map of delhi , hotel room booking , slides . Backend was based on MS-ACCESS . 2 Coding of Some pages, database manipulation & connectivity and preparing Crystal Reports. 3. CRIME FILE MANAGEMENT (B.Tech Major Project ) It was a website describing various departments in crime department. It includes 3 modules WRITER , INSPECTOR , ADMIN. Writer writes complaints , Inspector investigates by watching the record using id’s and admin has all the controls. Platform used was ECLIPSE and backend was ORACLE database. 2 Overall designing of pages & coding of Admin Panel. Extra...

Words: 375 - Pages: 2

Premium Essay

Sharon Construction

...The following case represents a realistic situation facing construction firm that has just won a competitive contract. The realistic conditions complicating the project are described in detail, as are the alternatives offered by the staff for dealing with these complexities. Case The Sharon Construction Corporation The Sharon Construction Corporation has been awarded a contract for the construction of a 20,000-seat stadium. The construction must start by February 15 and be completed within one year. A penalty clause of $15,000 per week of delay beyond February 15 of next year is written into the contract. Jim Brown, the president of the company, called a planning meeting. In the meeting he expressed great satisfaction at obtaining the contract and revealed that the company could net as much as $300,000 on the project. He was confident that the project could be completed on time with an allowance made for the usual delays anticipated in such a large project. Bonnie Green, the director of personnel, agreed that in a normal year only slight delays might develop due to a shortage of labor. However, she reminded the president that for such a large project, the company would have to use unionized employees and that the construction industry labor agreements were to expire on November 30. Past experience indicated a fifty-fifty chance of a strike. Jim Brown agreed that a strike might cause a problem. Unfortunately, there was no way to change the contract. He inquired about...

Words: 918 - Pages: 4

Premium Essay

My Paper

...FOR PROJECT A Cash Flows DCF (13%) PV 350,000 0.8850 309,750 350,000 0.7831 274,085 350,000 0.6931 242,585 826,420 NPV = 826,420 – 735,000 NPV = 91,420 FOR PROJECT B Cash Flows DCF (13%) PV 300,000 0.8850 265,500 300,000 0.7831 234,930 300,000 0.6931 207,930 708,360 NPV = 708,360 – 690,000 NPV = 18,360 FOR PROJECT C Cash Flows DCF (13%) PV 200,000 0.8850 177,000 200,000 0.7831 156,620 200,000 0.6931 138,620 472,240 NPV = 472,240 – 600,000 NPV = (127,760) Assuming the cost of capital increase to 15%, the new NPV will be as follows FOR PROJECT A Cash Flows DCF (15%) PV 350,000 0.8696 304,360 350,000 0.7561 264,635 350,000 0.6575 230,125 799,120 NPV = 799,120 – 735,000 NPV = 64,120 FOR PROJECT B Cash Flows DCF (15%) PV 300,000 0.8696 260,880 300,000 0.7561 226,830 300,000 0.6575 197,250 684,960 NPV = 684,960 – 690,000 NPV = (5,040) FOR PROJECT C Cash Flows DCF (15%) PV 200,000 0.8696 173,920 200,000 0.7561 151,220 200,000 0.6575 131,500 456,640 NPV = 456,640 – 600,000 NPV = (143,360) At this point it is necessary for one to determine the sensitivity of the change in NPV of the three projects due to the increase in cost of capital. SUMMARY OF NPVS’ CALCULATIONS PROJECT | NPV @ 13% | NPV @ 15% | % CHANGE IN NPV | A | 91,420 | 64,120 | * 29.86% | B | 18,360 | (5,040) | * 127.45% | C | (127,760) | (143,360) | * 12.2% | From the table above it is clear that all three projects had...

Words: 350 - Pages: 2

Free Essay

Business

...selected a company in which they wanted to go with. Before the project began there are several things in which both the client and the consultant should cover before making an agreement to enter into a contract. The client and the consultant both should understand the risks of a project, the cost, rewards, and deadlines. There are three reasons for success or failure that could happen with the new project. One is the importance of the consultant competency and fit with the company needs. The consultant should be able to understand the company and what it does and its needs. It’s important In this case the consultant should ask themselves if this is something they are able to do. The second reason is the interpersonal fit between the consultant and the clients. The consultant should be able to speak with the client and feel they are going to be able to talk to them in regards to the business needs. Finally the last reason is if the consultant is able to establish ground rules for the consulting process. Being able to identify the rules before and making sure it’s something they can commit to will help both parties. Fullerton, Johanna; West, Michael View Profile The client and the consultant should both agree on the scope of the project, the project time line, what both parties are hoping to achieve , the client role vs. the consultant role, and finally how the client measure to the success of the project. www.partnercomm.net. When a client brings in a consultant...

Words: 1060 - Pages: 5

Premium Essay

Half Term Revision Dates

...Kempen | C402/C405 | Extend Diploma Mechanical Engineering EDENGM22A/B | Peter Kempen | C402/C405 | | GCSE English | Katherine Davey | G4 | GCSE English | Katherine Davey | G4 | | AS English Literature | Francesca Thomas | A58 | | | | | Archaeology: Unit 1 | Caroline Wilcox | B254 | Archaeology: Unit 2 | Caroline Wilcox | B254 | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49 | | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | Spring Term Revision Schedule 2013-14 Week 1 | Tuesday 8th April | | Morning session 10.00-12.00 | Afternoon Session 1.00-3.00 | | Subject/course | Teacher | Room | Subject/course | Teacher | Room | | A2 Business (China Research Theme) | Nessa | A25 | AS Business | Nessa | A25 | | A2 Economics | Charles | G5 | AS Economics | Charles | | | AS Business | Sarah (11.00-12.30) | A39 | A2 Business (Higher level exam technique) | Sarah | A39 | | AS Law | Amina | A26 | | | | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49...

Words: 883 - Pages: 4

Free Essay

Individual or Small Group Student Projects

...Individual or Small Group Student Projects Contacting Community Partners When contacting an outside organization about a service-learning project, you want to make sure to maintain a professional attitude. So how do you make the first call? Below follows a possible introduction to use when calling and making that first contact with an agency of your choice. Hello, my name is _______________________. I am presently enrolled in a ___________course at [name of campus]. My [instructor or Student Success Lead] gave me your name and number. I am very interested in doing a service-learning project for your agency. I want to apply the _________skills I am learning in my _________class to the volunteer position. When can I meet with you to discuss this further? If you have to leave a message, don’t be discouraged. Because many nonprofit and community agencies are understaffed, they might not return your call right away. Persistence is important in regards to making contacts and starting your service experience. More Communication Tips: When speaking to the site supervisor… * Ask about the organization’s volunteer policies and training guidelines. It is possible that you need to fill out additional paperwork with their agency as well as the GU/MSB/UCC paperwork. * Explain the course objectives (provided in your course syllabus) and tell them that you have __ service-learning hours to fulfill for your course. * Tell them your availability. What times are best...

Words: 365 - Pages: 2

Free Essay

Strategies to Make a Team Work

...slipping they can reach out to that team member to offer assistance or re-assign the project so that team doesn’t fail and that person doesn’t feel picked on by the whole team. It also defines who should be asking questions and for nobody again to feel picked on or singled out by another peer. Assignment of projects and ownership is crucial to this being a team effort that everybody has a stake in the outcome of the project. Goals, both short and long term are effective for setting a timeline on when certain parts of the project need to be completed in order for the next piece to start and to ensure we meet our deadline for turning in the project on time. Setting a regular meeting schedule is a little harder with our team being spread out all over three time zones, jobs and family. Our team has discussed at least posting once a day what is going on and their status. Example I was out of pocket for two days and my team had no idea what had happened to me till I returned to explain that I had been to a funeral out of town. If I had posted ahead of time, the team would have known what to expect and when I would be back to contribute my part. I can already see within my team alone that they have asked questions or worded things in another way to enlighten some things that were not exactly clear to me, so I do see the benefits already of working in this team environment instead of tackling these projects all on as...

Words: 327 - Pages: 2

Free Essay

Media

...document is intended as a guide for students to follow when preparing their internship reports. Submit the report to the course instructor (J. Flores or D. Wallace) after completing the internship activity: 1) Title Page 2) Table of Contents • Include an entry each main section as identified below (Introduction, Responsibilities, Major Projects, etc. • Provide an entry for each appendix, i.e., Appendix 1: Internship Proposal, Appendix 2: Documentation of Work Hours, etc.) 3) Introduction • Provide background information on the Company (paragraph). 4) Responsibilities • This should be a generalized description of Internship responsibilities (a couple of paragraphs at most). • Include a statement of the number of hours worked, with supporting documents in the Appendix. 5) Major Projects • Write summary descriptions for each major project, report, employee communication, or training packages developed (about a paragraph summarizing each) • Heading Examples: o Cyanide air sampling project o MSDS Inventory o Lead abatement project o Respiratory Protection Training o Compressor House Noise Survey o Acid tank ventilation project o Ergo Hazard evaluations • Provide examples of your work in an appendix (see below) 6) Internship Summary • Include pros and cons of your experience 7) Appendices • Include documents supporting the report, such as: o Internship Proposal o Documentation of Work Hours  A copy of check stubs showing first check and last check is...

Words: 311 - Pages: 2