Premium Essay

Nt1310 Unit 5 Tasks Of Project Managers

Submitted By
Words 539
Pages 3
Project Manager  As a leader of a specific project.
 The one who making plan, budget, oversea and document all aspects of the specific project you are working on.
 Measure the project performance using appropriate tools and technique.
 Ensure resources availability and allocation.
 Ensure that all project are delivered on time, within scope and within budget.
 Perform risks management to minimize project risk.

Administration

 Involved with the coordination and implementation of office procedures and frequently have responsibility for specific projects and tasks.
 Involved in written and oral communication, word processing, typing and requires relevant skills such as IT, organizational and presentation skill. …show more content…
 Not captured the commercial market.
 First using during Second World War for tracking enemy aircraft bar code technology.

Components of RFID

The RFID tags known as transponders or acts as transmitters as a receivers in systems.
 Basics components of RFID :
• Antenna
• Microchip or memory
• Encapsulating materials

Types of Tags
1. Read-only Tag
 Information written only once during the manufacturing process.
 Information along with the serial number on the read-only tag can never be altered.

2. Read-Write Tag
 Read-write only the serial number is written during the manufacturing process which cannot be altered.
 The blocks of information can be rewritten by the user.

3. Write Once Read Many
 The serial number is written only once and cannot be rewritten.
 It can be read multiple times.

RFID Reader
 Device used to transmit and receive information from the RFID tag. It also called as an ‘interrogator’.
 It includes sensors that are capable of reading the tags in the vicinity.

Application RFID
1. Personnel identification
2. Livestock identification and tracking
3. Electronic toll connection
4. Cargo and container

Similar Documents

Premium Essay

Project

...NT1310 : Project Page 1 PROJECT DESCRIPTION As the project manager for the Cable Planning team, you will manage the creation of the cable plan for the new building that will be built, with construction set to begin in six weeks. The deliverables for the entire Cable Plan will consist of an Executive Summary, a PowerPoint Presentation and an Excel Spreadsheet. You will develop different parts of each of these in three parts. The final organization should contain these elements: The Executive Summary: o Project Introduction o Standa rds and Codes  Cable Standards and Codes  Building Standards and Codes o Project Materials o Copper Cable, Tools, and Test Equipment o Fiber - Optic Cable, Tools, and Test Equipment o Fiber - Optic Design Considerations o Basement Server Complex Design o First Floor Design o Security and Safety o Component Cost, Picture, and source The Excel Spreadsheet: Component Names Component Descriptions Component Costs Total Project Costs The PowerPoint Presentation: Introductory Slide Component Slides with Component Name, Quantity Needed, Description, Price, Picture, and Reference (where to buy the component) Description of the Basement Telecommunications and Network Server Space Network Equipment Required for the Server Farm Cable Plant Design for the Basement NT1310 : Project Page 2 Standard Floor Desig n for Computers and Network Equipment Cable Plant for the Standard Floor Course Objectives Tested: ...

Words: 1510 - Pages: 7

Premium Essay

Nt1230 Syllabus

...principles for the client-server based networking systems. Students will examine processes and procedures involving the installation, configuration, maintanence, troublshooting and routine adminstrative tasks of popular desktop operating system(s) for standalone and network client computers, and related aspects of typical network server functions. Client-Server Networking I Syllabus Where Does This Course Belong? 1st QTR GS1140 NT1110 GS1145 Problem Solving Theory Computer Structure and Logic Strategies for the Technical Professional 2nd QTR NT1210 Introduction to Networking NT1230 Client-Server Networking I MA1210 College Mathematics I 3rd QTR NT1310 NT1330 MA1310 4th QTR PT1420 NT1430 EN1320 5th QTR PT2520 NT2580 EN1420 6th QTR NT2640 NT2670 CO2520 7th QTR NT2799 SP2750 Physical Networking Client-Server Networking II College Mathematics II Introduction to Programming Linux Networking Composition I Database Concepts Introduction to Information Security Composition II IP Networking Email and Web Services Communications Network Systems Administration Capstone Project Group Theory The follow diagram indicates how this course relates to other courses in the NSA program: 1 Date: 8/31/2012 Client-Server Networking I Syllabus NT2799 NSA Capstone Project NT2580 Introduction to Information Security NT2670 Email and Web Services NT2640 IP Networking PT2520 Database Concepts NT1330 Client-Server Networking II NT1230 Client-Server Networking...

Words: 1834 - Pages: 8

Premium Essay

Test

...the Windows environment. Windows Security Syllabus Where Does This Course Belong? This course is required for the Bachelor of Science in Information Systems Security program. This program covers the following core areas:    Foundational Courses Technical Courses BSISS Project The following diagram demonstrates how this course fits in the program:    IS4799 NT2799 IS4670 ISC Capstone Project Capstone ProjectCybercrime Forensics NSA    NT2580 NT2670  Introduction to  Information Security IS4680 IS4560 NT2580 NT2670 Email and Web Services Hacking and Introduction to  Security Auditing for Compliance Countermeasures Information Security Email and Web Services      NT1230 NT1330 Client-Server Client-Server  Networking I Networking II  IS3230 IS3350 NT1230 NT1330  Issues Client-Server Client-Server  SecurityContext in Legal Access Security Networking I Networking II   NT1110  NT1210 Structure and Introduction to  ComputerLogic Networking    IS3120 IS3110 NT1210 Network  Risk Management in Introduction to General Education / General Studies NT2580 NT2799 Communications Information Technology Introduction to Information Security NSANetworking Capstone Project IS4550 NT2640 Security Policies and Implementation IP NT2640 Networking IP Networking PT2520...

Words: 2305 - Pages: 10

Premium Essay

Fsmo Role Ayer Nate Method

...Sole's Blog SOLVE YOUR IT PROBLEMS FASTER, SAVE YOUR FEET AND GET MORE TIME ON YOUTUBE! * HOME * * ABOUT SOLE VIKTOR * * USEFULL LINKS « How to publish a website with both Anonymous and Forms Based Authentication in ISA 2006 How to configure ISA 2006 with FBA for OWA and NTLM for Outlook Anywhere and Autodiscover in Exchange 2007 » How to place FSMO and Global Catalog roles in Active Directory During installation of Active Directory on a Windows Server 2000/2003/2008 all FSMO roles will automatically be installed on the first server. But Best Practice dictates to move some of theese Flexible Single Master of Operation (FSMO) roles to seperate servers. If you only have one domain controller (not recommended), there is nothing to do since all roles must be on this server, but if you have multiple servers you should move some of theese roles on to more servers. It is also important to be aware of what servers are Global Catalog servers, especially if you have more than one domain and even if only one domain, they will be prefered by applications like Exchange server. It is recommended to place the forest roles on one Domain Controller (DC) and the domain roles on another server. If not all Domain Controllers are Global Catalog servers, it is also important to place the infrastructure master on a server that is NOT a Global Catalog server. Recommended Best Practice setup of FSMO roles. Domain Controller #1 Place the two forest roles on this server. * Schema Master...

Words: 10360 - Pages: 42