Premium Essay

Nt1330 Unit 1 Term Paper

Submitted By
Words 1247
Pages 5
Q1. Name some events in operating system which are responsible to allocate resources and to control user programs to prevent errors.
These resources include time, power, hardware, etc... that controls the operation of the application programs to prevent errors.
Q2.Consider a well-known reputed university having thousands of students enrolled, at the end of semester each student must have a semester end report generated by computer. Each report card needs same resources to execute. Being a student of operating system, you know operating system responsibility is to schedule the job. In your perspective, which environment will be suitable for given scenario to increase CPU utilization? Support your answers with 2-3 reasons.
Ans:
FCFS is used …show more content…
There are four events that may occur where the scheduler needs to step in and make this decision:
1) The current process goes from the running to the waiting state because it issues an I/O request or some operating system request that cannot be satisfied immediately.
2) The current process terminates.
3) A timer interrupt causes the scheduler to run and decide that a process has run for its allotted interval of time and it is time to move it from the running to the ready state.
4) An I/O operation is complete for a process that requested it and the process now moves from the waiting to the ready state. The scheduler may then decide to preempt the currently-running process and move this newly-ready process into the running state.
2) Process preemption Sol: A scheduler is a preemptive scheduler if it has the ability to get invoked by an interrupt and move a process out of a running state to let another process

Similar Documents

Premium Essay

Nt1330 Unit 3 Assignment 1 Term Paper

...employees (5 in the main office and 15 in the warehouse. Company is hiring 14 more warehouse workers, 2 more office clerks, and 3 field sales rep. A requisition for 16 desktops and 3 laptops are needed for new employees, the 3 laptops are for the sales rep. Migration of Windows XP to Windows 7 or 10 is also needed for this project. New printers will need to be purchased with copy/fax/scan capabilities. A refresh of the company’s switch from 8 port to a 32 port will also be needed. Routers to connect to the other warehouse to be rented will be needed to interconnect network. WAP’s will need to be installed on the warehouse for mobile devices. Current Solution Desktops (5), Laptop (1) Desktop (21), Laptop (4) Operating System – Windows XP Pro Windows 7 or 10 Printers – Dot Matrix (1), Laser (1) 5 new LaserJet Printers (Copy/FAX/Scan) 8-Port Switch 2 (32-Port) Switches and 2 Routers Cabling Update and replace Ethernet cables Speed Work with Service provider to increase bandwidth Applications – Access DB and Spreadsheets Purchase other SQL DB solutions Storage Invest on servers and Cloud Technology...

Words: 499 - Pages: 2

Premium Essay

Fsmo Role Ayer Nate Method

...have one domain controller (not recommended), there is nothing to do since all roles must be on this server, but if you have multiple servers you should move some of theese roles on to more servers. It is also important to be aware of what servers are Global Catalog servers, especially if you have more than one domain and even if only one domain, they will be prefered by applications like Exchange server. It is recommended to place the forest roles on one Domain Controller (DC) and the domain roles on another server. If not all Domain Controllers are Global Catalog servers, it is also important to place the infrastructure master on a server that is NOT a Global Catalog server. Recommended Best Practice setup of FSMO roles. Domain Controller #1 Place the two forest roles on this server. * Schema Master * Domain Master Domain Controller #2 Place the domain roles on this server. * RID Master * Infrastructure Master * PDC Emulator If more domains exist in the forest, place the domain roles on a server in theese domains like Domain Controller #2 Global Catalog configuration. In Windows 2008 Active Directory all Domain Controllers are by default Global Catalog servers, personally...

Words: 10360 - Pages: 42

Premium Essay

Nothing

...practices, various media and interconnection components), networking devices and their specifications and functions. Students will practice designing physical network solutions based on appropriate capacity planning and implementing various installation, testing and troubleshooting techniques for a computer network. Where Does This Course Belong? | | | NT2799 | | | | | | | | NSA Capstone | | | | | | | Project | | | | | NT2580 | | | NT2670 | NT2640 | | PT2520 | | Introduction to | | | | | | | | | | | Email and Web | | | | | Information | | | | IP Networking | | Database Concepts | | | | | Services | | | | | Security | | | | | | | | | | | | | | | | NT1330 | | | NT1230 | NT1430 | | PT1420 | | Client-Server | | | Client-Server | | | Introduction to |...

Words: 10839 - Pages: 44

Premium Essay

Unit

...ITT TECHNICAL INSTITUTE NT1310 Physical Networking GRADED ASSIGNMENTS ------------------------------------------------- Student Professional Experience Project NSA SPE Project 1 (to be completed by the end of NT1310): Install, Configure, Test, Maintain and/or Document the Worksite Local Area Network and Its Components Purpose The purpose of the Student Professional Experience (SPE) project is to provide you an opportunity for work experience in your field or in a related field to add to your résumé. You may have an opportunity to serve your community or work for a local employer for a project that will take between 20 and 30 hours. Project Logistics Career Services will identify an employer with needs in the following areas: Network related tasks (mostly confined to the LAN and Microsoft Windows Server 2008 environments) Students are expected to practice various skills discussed in all the technical courses in Quarters 1 through 3 of the NSA program at an employer’s site on network related tasks (more confined to the LAN and Microsoft Windows Networking with Server 2008 environments) that would involve installation, configuration, testing, maintenance and documentation of the worksite network and its components, and to properly document the technical information in all involved activities. Such documentation will be used as the source material for Items 2 and 3 defined in the Deliverables section of this document. Possible example projects could...

Words: 6762 - Pages: 28