B2: Features and Characteristics of SUSE Linux Enterprise Server 12 (3.12)

1. System Rollback
System malfunctioning and failures due to misconfiguration of system parameters and accidentally removal of critical system components such as applications can cause imaginable consequences. Therefore, recovery capability is one of the most concerned aspect. The system rollback feature in SUSE Linux Enterprise Server 12 (3.12) give organization’s servers better resiliency and availability by taking snapshot of system when it is running under healthy condition. When system failure occurs and require recovery action, system administrator can easily reboot the system from the snapshot which has been integrated into system bootloader.

2. Live Patching Capability …show more content…
Most system requires rebooting after installation of new patches. Therefore pausing the operations of the system to apply new patches will bring certain productivity impacts as web servers running 24/7 and 365 days of the year to provide services for all parties that rely on it. To address this issue, SUSE introduced live patching technology which allowing systems to update security patches without needing any rebooting or termination of system operations. As a result, it will dramatically assuring the availability of mission-critical processes of organization web servers.

3. Powerful Deployment Options
SUSE Linux Enterprise Server 12 can supports and be installed on any physical, virtual and even cloud-based environments. It can perfectly compatible with different hardware and can be deployed on hardware architectures including Intel 64, IBM System z and so forth.There has been plenty of leading hardware vendors support SUSE Linux Enterprise Server, therefore the organizations will have less worries and considerations to undergo renewal and upgrade of system hardwires.

4.

Similar Documents

Premium Essay

Nothing

...responsible for replacement of the package if lost. Table of Contents Syllabus 2 Student Professional Experience 19 Graded Assignments and Exercises 23 Labs 47 Documenting your Student Professional Experience 57 ITT Technical Institute NT1310 Physical Networking Onsite Course SYLLABUS Credit hours: 4.5 Contact/Instructional hours: 56 (34 Theory Hours, 22 Lab Hours) Prerequisite(s) and/or Corequisite(s): Prerequisites: NT1210 Introduction to Networking or equivalent Course Description: This course examines industry standards and practices involving the physical components of networking technologies (such as wiring standards and practices, various media and interconnection components), networking devices and their specifications and functions. Students will practice designing physical network solutions based on appropriate capacity planning and implementing various installation, testing and troubleshooting techniques for a computer network. Where Does This Course Belong? | | | NT2799 | | | | | | | | NSA Capstone | | | | | | | Project | | | | | NT2580 | | | NT2670 | NT2640 | | PT2520 | | Introduction to | | | | | | | | | | | Email and Web | | | | | Information | | | | IP Networking | | Database Concepts | | | | | Services | | | | | Security | | | | | | | | | | | | | | | | NT1330 | | | NT1230 | NT1430 | | PT1420 | | Client-Server | | | Client-Server...

Words: 10839 - Pages: 44

Premium Essay

Unit

...hours. Project Logistics Career Services will identify an employer with needs in the following areas: Network related tasks (mostly confined to the LAN and Microsoft Windows Server 2008 environments) Students are expected to practice various skills discussed in all the technical courses in Quarters 1 through 3 of the NSA program at an employer’s site on network related tasks (more confined to the LAN and Microsoft Windows Networking with Server 2008 environments) that would involve installation, configuration, testing, maintenance and documentation of the worksite network and its components, and to properly document the technical information in all involved activities. Such documentation will be used as the source material for Items 2 and 3 defined in the Deliverables section of this document. Possible example projects could be (but are not limited to): Install/maintain/upgrade site LAN cabling/wiring Survey, inventory and document networking layout and assets Install, configure and/or support Windows 7 desktop as network clients Install, configure and/or support Windows Server 2008 for a network Install, configure and/or support a site LAN (local area network, wired or wireless) General network user...

Words: 6762 - Pages: 28