...Promotion In Nursing Practice To equate and distinguish, the author had to search literatures from the GCU library and Google. The author noted that there was a lot to learn about health promotion in the three articles. Today’s health promotion is not just restricted to preventing disease, restoring health, containing illness, concentrating health pedagogy, lifestyle and behavioral alterations, but has attempted a new paradigm, authorizing the patients by taking governmental and societal action to encourage health improving environment (Irvine, 2007). This paper focuses on the intention of the health promotion in nursing practice, roles and responsibilities of nursing evolving health promotion, implementing methods that encompasses all the domains of nursing, and compares the three phases of health promotion prevention of diabetes. There are various definitions given by authors and organizations regarding the health promotion but the definition of the World Health Organization (WHO, 1986), Ottawa charter is the popular one, which reads “Health promotion is the process of enabling people to increase control over, and to improve, their health. To reach a state of complete physical, mental and social well-being, an individual or group must be able to identify and to realize aspirations, to satisfy needs, and to change or cope with the environment.” This definition emphasizes on responsibility of patient health and also expands its role in healthy lifestyle changes for betterment...
Words: 1231 - Pages: 5
...------------------------------------------------- WESTERN GOVERNORS UNIVERSITY ------------------------------------------------- Submittal Cover Sheet ------------------------------------------------- ------------------------------------------------- Date: 7-21-2015 ------------------------------------------------- Student Name: ------------------------------------------------- Student ID Number: ------------------------------------------------- Student Degree Program: BS-IT ------------------------------------------------- Student Email: tryyg@wgu.edu ------------------------------------------------- Four Digit Assessment/Project Code: ENT1 ------------------------------------------------- Mentor Name: Tiffany Trissel-Griffey ------------------------------------------------- For Revisions Only Indicate Previous Grader: ------------------------------------------------- ------------------------------------------------- ------------------------------------------------- Submit to: ------------------------------------------------- Western Governors University ------------------------------------------------- Attn.: Assessment Delivery Department ------------------------------------------------- 4001 South 700 East, Suite 700 ------------------------------------------------- Salt Lake City, Utah 84107-2533 ------------------------------------------------- ------------------------------------------------- wgusubmittals@wgu.edu ...
Words: 9838 - Pages: 40
...Solectron Supply Chain Management Best Practice Background Solectron was founded in 1977 as the as the “Solar Energy Company”, and originally produced solar energy products. Today it is a worldwide provider of electronics manufacturing services to original equipment manufacturers (OEM’s). The company provides customized, integrated manufacturing services that span all three stages of the product life cycle, including pre-manufacturing, manufacturing, and post-manufacturing (see Table 1). These servies are now integrated to the point where Solectron is now responsible for all supply chain processes associated with sourcing parts, building, and distribution of electronics and systems for almost every major OEM customer in the industry. A list of primary OEM customers is shown in Table 2, which spans the telecommunication, networking, computer systems, peripherals, semiconductors, consumer electronics, industrial equipment, medical electronics, avionics, and automotive electronics industries. These industries are in different stages of maturity, with network manufacturers fairly new, and computer systems fairly mature. The diversity of major customers in this list is testimony to their success. In 1991, Solectron won the Malcolm Baldrige National Quality Award, reflecting the high level of performance achieved within this company. The company has also been honored with more than 100 recognition awards, 25 of which were received this year (see Table 3). The...
Words: 3634 - Pages: 15
...Solectron Supply Chain Management Best Practice Background Solectron was founded in 1977 as the as the “Solar Energy Company”, and originally produced solar energy products. Today it is a worldwide provider of electronics manufacturing services to original equipment manufacturers (OEM’s). The company provides customized, integrated manufacturing services that span all three stages of the product life cycle, including pre-manufacturing, manufacturing, and post-manufacturing (see Table 1). These servies are now integrated to the point where Solectron is now responsible for all supply chain processes associated with sourcing parts, building, and distribution of electronics and systems for almost every major OEM customer in the industry. A list of primary OEM customers is shown in Table 2, which spans the telecommunication, networking, computer systems, peripherals, semiconductors, consumer electronics, industrial equipment, medical electronics, avionics, and automotive electronics industries. These industries are in different stages of maturity, with network manufacturers fairly new, and computer systems fairly mature. The diversity of major customers in this list is testimony to their success. In 1991, Solectron won the Malcolm Baldrige National Quality Award, reflecting the high level of performance achieved within this company. The company has also been honored with more than 100 recognition awards, 25 of which were received this year (see Table 3). The...
Words: 3634 - Pages: 15
...(Prepared from website Radio-Electronics.com with thanks http://www.radio-electronics.com/) 3G LTE Tutorial - 3GPP Long Term Evolution - developed by 3GPP, LTE, Long Term Evolution is the successor to 3G UMTS and HSPA providing much higher data download speeds and setting the foundations for 4G LTE Advanced.. LTE, Long Term Evolution, the successor to UMTS and HSPA is now being deployed and is the way forwards for high speed cellular services. In its first forms it is a 3G or as some would call it a 3.99G technology, but with further additions the technology can be migrated to a full 4G standard and here it is known as LTE Advanced. There has been a rapid increase in the use of data carried by cellular services, and this increase will only become larger in what has been termed the "data explosion". To cater for this and the increased demands for increased data transmission speeds and lower latency, further development of cellular technology have been required. The UMTS cellular technology upgrade has been dubbed LTE - Long Term Evolution. The idea is that 3G LTE will enable much higher speeds to be achieved along with much lower packet latency (a growing requirement for many services these days), and that 3GPP LTE will enable cellular communications services to move forward to meet the needs for cellular technology to 2017 and well beyond. Many operators have not yet upgraded their basic 3G networks, and 3GPP LTE is seen as the next logical step for many operators...
Words: 18462 - Pages: 74
...this document is subject to change. PS Series Firmware Version 2.1 or later. ii Deploying VERITAS Backup Exec 10 and Auto-Snapshot Manager Table of Contents Technical Report and Software Revision Information......................................................... iv Introduction ............................................................................................................................1 Common Backup and Recovery Configurations ...................................................................2 Backup and Recovery Media .................................................................................................3 Backup to Disk and Restore from Disk Operations ...........................................................3 Backup to Tape and Restore from Tape Operations ..........................................................3 VSS Snapshots and Backup ...................................................................................................3 Exchange Backup Levels...
Words: 9581 - Pages: 39
...Gupta Miss. Subodh Choudhary (ACADEMIC CO-ORDINATOR PGDM) (SUPERVISOR) IAMR Ghaziabad DECLARATION I, Ashish Kumar Saini, hereby declare that the project work entitled “ANALYSIS OF PUREIT ON 4 P’S OF MARKETING AND CONSEMER BENHAVIOUR” is an authenticated work carried out by me at HINDUSTAN UNILIVER LIMITED under the guidance of Miss. Subodh Choudhary for the partial fulfillment of the award of the Diploma of PGDM and this work has not been submitted for similar purpose anywhere else except to IAMR, Ghaziabad, approved by AICTE. Date: Place: (ASHISH KUMAR SAINI) ACKNOWLEDGEMENT I take this opportunity to express my gratitude to the Management of HUL at Jaipur for providing me the opportunity to get an exposure of their esteemed unit. I am sincerely thankful to the HR department for coordinating my training and explicitly express my thanks to Mr. Shahnawaz Alam for their continued help and guidance during my stay there. Last but not the least, I express my deep gratitude to my mentor Miss. Subodh Choudhary for sending me to a large integrated water division of Pureit of HUL and giving me a chance to acquire experience of my lifetime. I also express my thanks to parents and all family members and friends who directly or indirectly provided me their moral support....
Words: 8274 - Pages: 34
...minimized. Stop-or-go sampling allows a test to be stopped as early as possible and is not appropriate for checking whether procedures have been followed. 2. The decisions and actions of an IS auditor are MOST likely to affect which of the following risks? A. Inherent B. Detection C. Control D. Business The correct answer is: B. Detection Explanation: Detection risks are directly affected by the auditor's selection of audit procedures and techniques. Inherent risks usually are not affected by the IS auditor. Control risks are controlled by the actions of the company's management. Business risks are not affected by the IS auditor. 3. Senior management has requested that an IS auditor assist the departmental management in the implementation of necessary controls. The IS auditor should: A. refuse the assignment since it is not the role of the IS auditor. B. inform management of his/her inability to conduct future audits. C. perform the assignment and future audits...
Words: 97238 - Pages: 389