Free Essay

Pcr Project

In:

Submitted By dejdej
Words 4025
Pages 17
4110065A.qxp

9/25/2007

2:39 PM

Page 1



Quick Start Bradford
Protein Assay
Instruction Manual

For technical service call your local Bio-Rad office, or in the US,
1-800-4BIORAD (1-800-424-6723)

4110065A.qxp

9/25/2007

2:39 PM

Page 5

Table of Contents
Section 1

Introduction

1

1.1 Principle

1

1.2 Selecting a Protein Standard

5

1.3 Product Description
Section 2

Instructions

9
11

2.1 Standard Assay Protocol

11

2.2 Microassay Protocol

14

Section 3

Data Analysis

18

Section 4

FAQs and Troubleshooting

22

Section 5

Ordering Information

26

Section 6

References

28

Section 7

Appendix

30

4110065A.qxp

9/25/2007

2:39 PM

Page 7

Section 1
Introduction
The Quick Start Bradford protein assay is a simple and accurate procedure for determining the concentration of protein in solution. It provides ready-to-use convenience by supplying the dye reagent at 1x concentration and two protein assay standards at seven prediluted concentrations. The prediluted standards are conveniently packaged in
2 ml screwcap vials, eliminating wasteful and sharp ampoules, and ensuring protein stability over the shelf life of the product.
1.1 Principle
The Bradford assay is a protein determination method that involves the binding of Coomassie
1

4110065A.qxp

9/25/2007

2:39 PM

Page 8

Brilliant Blue G-250 dye to proteins (Bradford
1976). The dye exists in three forms: cationic
(red), neutral (green), and anionic (blue) (Compton and Jones 1985). Under acidic conditions, the dye is predominantly in the doubly protonated red cationic form (Amax = 470 nm). However, when the dye binds to protein, it is converted to a stable unprotonated blue form (Amax = 595 nm) (Reisner et al. 1975, Fazekes de St. Groth et al. 1963,
Sedmack and Grossberg 1977). It is this blue protein-dye form that is detected at 595 nm in the assay using a spectrophotometer or microplate reader. +

H
Cation
«
470 nm (red)

+

H
Neutral form
« Anion
650 nm (green) 595 nm (blue)
2

4110065A.qxp

9/25/2007

2:39 PM

Page 9

Work with synthetic polyamino acids indicates that Coomassie Brilliant Blue G-250 dye binds primarily to basic (especially arginine) and aromatic amino acid residues (Compton and
Jones 1985). Spector (1978) found that the extinction coefficient of a dye-albumin complex solution was constant over a 10-fold concentration range. Thus, Beer's law may be applied for accurate quantitation of protein by selecting an appropriate ratio of dye volume to sample concentration. Certain chemical-protein and chemical-dye interactions interfere with the assay. Interference from non-protein compounds is due to their ability to shift the equilibrium levels of the dye among the three colored species. Known sources of interference,
3

4110065A.qxp

9/25/2007

2:39 PM

Page 10

such as some detergents, flavonoids, and basic protein buffers, stabilize the green neutral dye species by direct binding or by shifting the pH
(Compton and Jones 1985, Fanger 1987).
Nevertheless, many chemical reagents do not directly affect the development of dye color when used in the standard protocol and the more common reagents are listed in Table 1. The microassay is compatible with lower concentrations of reagents 1/25 than listed in Table 1 due to the larger sample volume-to-dye ratio. Since every protein-chemical reagent combination has not been assayed, it is possible that some of the listed reagents interfere in combination with certain proteins. However, with respect to proteins such as bovine serum albumin (BSA) and bovine
4

4110065A.qxp

9/25/2007

2:39 PM

Page 11

gamma-globulin, the listed reagents show little or no interference.
1.2 Selecting a Protein Standard
In any protein assay, the ideal protein to use as a standard is a purified preparation of the protein being assayed. In the absence of such an absolute reference protein, another protein must be selected as a relative standard. The best relative standard to use is one that gives a color yield similar to that of the protein being assayed.
Selecting such a protein standard is generally done empirically. Alternatively, if only relative protein values are desired, any purified protein may be selected as a standard. The two most common protein standards used for protein assays are BSA and gamma-globulin.
5

4110065A.qxp

9/25/2007

2:39 PM

Page 12

With the Quick Start Bradford protein assay, dye color development is significantly greater with
BSA than with most other proteins, including gamma-globulin. Therefore, the BSA standard would be an appropriate standard if the sample contains primarily albumin, or if the protein being assayed gives similar response to the dye. For a color response that is typical of many proteins, the gamma-globulin standard is appropriate.

6

4110065A.qxp

9/25/2007

2:39 PM

Page 13

Table 1. Reagents compatible with the
Quick Start Bradford protein assay when using the standard procedure.*
Acetone, 10%
Acetonitrile, 10%
Ammonium sulfate, 1 M
Ampholytes, 3–10, 0.5%
ASB-14, 0.025%
Ascorbic acid, 50 mM
Bis-Tris, pH 6.5, 0.2 M b-mercaptoethanol, 1 M
Calcium chloride, 40 mM
CHAPS, 10%
CHAPSO, 10%
Deoxycholic acid, 0.2%
DMSO, 5%
Dithioerythritol (DTE), 10 mM
Dithiothreitol (DTT), 10 mM
Eagle's MEM
Earle's salt solution
EDTA, 0.2 M
EGTA, 0.2 M

Ethanol, 10%
Glucose, 20%
Glycerol, 5%
Glycine, 0.1 M
Guanidine-HCl, 2 M
Hank's salt solution
HCl, 0.1 M
HEPES, 0.1 M
Imidazole, 0.2 M
Magnesium chloride, 1 M
MES, 0.1 M
Methanol, 10%
Modified Dulbecco's PBS
MOPS, 0.1 M
NAD, 2 mM
Nonidet P-40, 0.25%
Octyl b-glucoside, 0.5%
Octyl b-thioglucopyranoside, 1%
PBS
7

4110065A.qxp

9/25/2007

Phenol Red, 0.5 mg/ml
PIPES, 0.2 M
PMSF, 2 mM
Potassium chloride, 2 M
Potassium phosphate, 0.5 M
SB 3–10, 0.1%
SDS, 0.025%
Sodium acetate, pH 4.8, 0.2 M
Sodium azide, 0.5%
Sodium bicarbonate, 0.2 M
Sodium carbonate, 0.1 M
Sodium chloride, 2.5 M
Sodium citrate, pH 4.8 or
6.4, 0.2 M
Sodium hydroxide, 0.1 M
Sodium phosphate, 0.5 M
Sucrose, 10%

2:39 PM

Page 14

TBP, 5 mM
TBS (25 mM Tris, 0.15 M NaCl, pH 7.6), 0.5x
TCEP, 20 mM
Thio-urea, 1 M
Tricine, pH 8, 50 mM
Triethanolamine, pH 7.8, 50 mM
Tris, 1 M
Tris-glycine (25 mM Tris, 192 mM glycine) Tris-glycine-SDS, (25 mM Tris,
192 mM glycine, 0.1% SDS),
0.5x
Triton X-100, 0.05%
Tween 20, 0.01%
Urea, 4 M

Coomassie is a trademark of Imperial Chemical Industries. Triton is a trademark of Union Carbide Corp. Tween is a trademark of ICI Americas, Inc.
*The concentration limits for compatibility with the microassay are 1/25 of the values in Table 1.

8

4110065A.qxp

9/25/2007

2:39 PM

Page 15

1.3 Product Description
All kit components have a 1 year shelf life at 4°C.
Standards are provided in a 0.9% NaCl, 0.05%
NaN3 solution.
1x Dye Reagent: 1 L of dye solution containing methanol and phosphoric acid. One bottle of dye reagent is sufficient for 200 assays using the standard 5 ml procedure or 4,000 assays using the microplate procedure.
BSA Standard, 2 mg/ml: Provided in 2 ml tubes. Bovine Gamma-Globulin Standard, 2 mg/ml:
Provided in 2 ml tubes.
9

4110065A.qxp

9/25/2007

2:39 PM

Page 16

Bovine Serum Albumin Standard Set:
Set of 7 concentrations of BSA (2, 1.5, 1, 0.75,
0.5, 0.25, 0.125 mg/ml) in 2 ml tubes.
Bovine Gamma-Globulin Standard Set:
Set of 7 concentrations of gamma-globulin (2,
1.5, 1, 0.75, 0.5, 0.25, 0.125 mg/ml) in 2 ml tubes. 10

4110065A.qxp

9/25/2007

2:39 PM

Page 17

Section 2
Instructions
2.1 Standard Protocol
1. The standard protocol can be performed in three different formats, 5 ml and a 1 ml cuvette assay, and a 250 µl microplate assay.
The linear range of these assays for BSA is
125–1,000 µg/ml, whereas with gammaglobulin the linear range is 125–1,500 µg/ml.
2.

Remove the 1x dye reagent from 4°C storage and let it warm to ambient temperature. Invert the 1x dye reagent a few times before use.

3.

If 2 mg/ml BSA or 2 mg/ml gamma-globulin standard is used, refer to the tables in the
11

4110065A.qxp

9/25/2007

2:39 PM

Page 18

appendix as a guide for diluting the protein standard. (The dilutions in the tables are enough for performing triplicate measurements of the standards.) For the diluent, use the same buffer as in the samples (refer to
Troubleshooting section for more information). Protein solutions are normally assayed in duplicate or triplicate. For convenience, the BSA or gamma-globulin standard sets can be used, but blank samples (0 µg/ml) should be made using water and dye reagent. 4.

Pipet each standard and unknown sample solution into separate clean test tubes or microplate wells (the 1 ml assay may be performed in disposable cuvettes). Add the
12

4110065A.qxp

9/25/2007

2:39 PM

Page 19

1x dye reagent to each tube (or cuvette) and vortex (or invert). For microplates, mix the samples using a microplate mixer. Alternatively, use a multichannel pipet to dispense the 1x dye reagent. Depress the plunger repeatedly to mix the sample and reagent in the wells. Replace with clean tips and add reagent to the next set of wells.
Assay

Volume of
1x Dye Reagent

5 ml
1 ml
Microplate

5.

Volume of
Standard and Sample
100 µl
20 µl
5 µl

5 ml
1 ml
250 µl

Incubate at room temperature for at least
5 min. Samples should not be incubated longer than 1 hr at room temperature.
13

4110065A.qxp

6.

9/25/2007

2:39 PM

Page 20

Set the spectrophotometer to 595 nm. Zero the instrument with the blank sample (not required for microplate readers). Measure the absorbance of the standards and unknown samples. Refer to Section 3 for data analysis.
Note: If the spectrophotometer has a reference and sample holder, the instrument can be zeroed with two blank samples. If the effect of buffer on absorbance is required, zero the instrument with a cuvette filled with water and dye reagent in the reference holder. 2.2 Microassay Protocol
1. The microassay protocol can be performed in two different formats, a 2 ml cuvette assay
14

4110065A.qxp

9/25/2007

2:39 PM

Page 21

and a 300 µl microplate assay. The linear range of these assays for BSA is 1.25–10 µg/ml, whereas with gamma-globulin the linear range is 1.25–20 µg/ml.
2.

Remove the 1x dye reagent from the 4°C storage and let it warm to ambient temperature. Invert the 1x dye reagent a few times before use.

3.

Depending on the type of standard used, refer to the tables in the appendix as a guide for diluting the protein standard. For the diluent, use the same buffer as in the samples.
Protein solutions are normally assayed in duplicate or triplicate. The dilutions in the tables provide enough volume to run triplicates.
15

4110065A.qxp

4.

9/25/2007

2:39 PM

Page 22

Pipet each standard and unknown sample solution into separate clean test tubes, disposable cuvettes, or microplate wells. Add
1x dye reagent to each tube or cuvette and vortex: for microplates, mix the samples using a microplate mixer. Alternatively, use a multichannel pipet to dispense the 1x dye reagent. Depress and release the plunger repeatedly to mix the sample and reagent in the wells. Replace with clean tips and add reagent to the next set of wells.
Assay

Volume of
Standard and Sample

Volume of
1x Dye Reagent

2 ml
Microplate

1 ml
150 µl

1 ml
150 µl

16

4110065A.qxp

9/25/2007

2:39 PM

Page 23

5.

Incubate at room temperature for at least
5 min. Samples should not be incubated longer than 1 hr at room temperature.

6.

Set the spectrophotometer to 595 nm. Zero the instrument with the blank sample (not required for microplate readers). Measure the absorbance of the standards, blanks, and unknown samples. Refer to Section 3 for data analysis.
Note: If the spectrophotometer has a reference and sample holder, the instrument can be zeroed with the blank samples. If the effect of buffer on absorbance is required, zero the instrument with a cuvette filled with water and dye reagent in the reference holder. 17

4110065A.qxp

9/25/2007

2:39 PM

Page 24

Section 3
Data Analysis
1.

If the spectrophotometer or microplate reader was not zeroed with the blank, then average the blank values and subtract the average blank value from the standard and unknown sample values.

2.

Create a standard curve by plotting the
595 nm values (y-axis) versus their concentration in µg/ml (x-axis). Determine the unknown sample concentration using the standard curve. If the samples were diluted, adjust the final concentration of the unknown samples by multiplying by the dilution factor used.
18

4110065A.qxp

9/25/2007

2:39 PM

Page 25

3.

The microplate procedure may yield lower values than the standard and microassay procedures due to a shorter light path used in the microplate reader. This may decrease the level of detection of the assay.

4.

Standard curve examples for the standard
5 ml procedure and the microassay procedure are listed in Figures 1 and 2, respectively. 19

4110065A.qxp

9/25/2007

2:39 PM

Page 26

Fig 1. Typical standard curves using the standard 5 ml procedure with BSA and gamma-globulin standards.

20

4110065A.qxp

9/25/2007

2:39 PM

Page 27

Fig 2. Typical standard curves using the microassay procedure with BSA and gamma-globulin standards.

21

4110065A.qxp

9/25/2007

2:39 PM

Page 28

Section 4
FAQs and Troubleshooting
Questions

Recommendations

1 The buffer that I normally use is not in the list of compatible reagents. How will I know if it interferes with the Quick Start
Bradford assay?

It is best to run two standard curves, one with protein in the same buffer as your sample and one with protein in water, and then plot a graph of protein concentration versus absorbance. If the buffer does not interfere, the two standard curves will have identical slopes. Adding the buffer or interfering component to the standards used to construct the standard curve for the actual protein assay can compensate for partial interference. 22

4110065A.qxp

9/25/2007

2:39 PM

Page 29

2 My sample contains a
If the protein concentration is high detergent concentration that is enough, a sample with detergent can incompatible with the Quick be diluted so that the concentration of
Start Bradford assay. How can I detergent is reduced to 0.1% or less. assay for protein?
Alternatively, the Bio-Rad DC™ (detergent compatible) protein assay can be used (catalog #500-0111). The DC protein assay is a modified Lowry assay, which works in the presence of 1% ionic or nonionic detergent. 3 Is any sample preparation required? In general, no. However, the protein must be solubilized. The sample cannot be a suspension or an unfiltered homogenate.

23

4110065A.qxp

9/25/2007

4 Does the binding of the blue dye to cuvettes skew results?

2:39 PM

Page 30

Bio-Rad's disposable polystyrene cuvettes (catalog #223-9950) are recommended for the protein assay.
When using quartz cuvettes, the amount of dye that binds to them is negligible (Bradford 1976). Therefore, removal of the residual blue color between each sample reading is unnecessary. However, since the cuvettes may be used for subsequent procedures, there are several recommended treatments for dye removal:





24

Rinse the cuvette with methanol, or Rinse the cuvette with glassware detergent, followed by ddi water, or Soak the cuvette in 0.1 N HCl for a few hours, then wash with ddi water. 4110065A.qxp

9/25/2007

2:39 PM

Page 31

5 May I use a wavelength other than 595 nm?

Yes. Absorbance can be measured at
580–610 nm.

6 Precipitation occurs in the tubes. The samples contain a detergent in the buffer. Dilute the sample to reduce the detergent level or dialyze the samples. 7 Absorbance of protein standard The 1x dye reagent may be cold from and samples is very low.
4°C storage. Warm the dye reagent to ambient temperature. The 1x dye reagent may be old. If it is over 1 year old, replace the dye reagent.
8 Absorbance of standard is acceptable, but absorbance of samples is very low.

The samples may contain a substance that interferes with the reaction, such as detergent or basic solutions. Check the compatibility guide (Table 1). Dilute the sample.
Ensure the standards are diluted in the same buffer as the samples.
The molecular weight of the sample protein may be low. The lower limit of detection for this method is approximately 3,000–5,000 daltons.

25

4110065A.qxp

9/25/2007

2:39 PM

Page 32

Section 5
Ordering Information
Catalog # Description
500-0201 Quick Start Bradford Protein Assay Kit 1, includes
1 L 1x dye reagent and 5 x 2 ml bovine serum albumin standard at 2 mg/ml
500-0202 Quick Start Bradford Protein Assay Kit 2, includes
1x dye reagent (1 L), bovine serum albumin standard set (2 sets of 7 standards, 0.125–2.0 mg/ml, 2 ml)
500-0203 Quick Start Bradford Protein Assay Kit 3, includes
1x dye reagent (1 L), bovine g-globulin standard
(5 x 2 mg/ml)
500-0204 Quick Start Bradford Protein Assay Kit 4, includes
1 L 1x dye reagent and bovine gamma globulin standard set with 2 x 2 ml each concentration
500-0205 Quick Start Bradford 1 x Dye Reagent, 1L
500-0206 Quick Start Bovine Serum Albumin Standard,
2 mg/ml, 5 x 2 ml tubes
26

4110065A.qxp

9/25/2007

2:39 PM

Page 33

Catalog # Description
500-0207 Quick Start Bovine Serum Albumin Standard Set,
2 x 2 ml each concentration, (2, 1.5, 1, 0.75, 0.5,
0.25, and 0.125 mg/ml)
500-0208 Quick Start Bovine Gamma Globulin Standard,
2 mg/ml, 5 x 2 ml tubes
500-0209 Quick Start Bovine Gamma Globulin Standard Set,
2 x 2 ml each concentration (2, 1.5, 1, 0.75, 0.5,
0.25, and 0.125 mg/ml)
223-9950 Disposable Polystyrene Cuvettes, 3.5 ml, box of 100
223-9955 Disposable Polystyrene Cuvettes, 1.5 ml, box of 100
224-0096 Costar 96-well Flat-Bottom EIA Plate, polystyrene,
5 per package, box of 100

27

4110065A.qxp

9/25/2007

2:39 PM

Page 34

Section 6
References
Bradford MM, A rapid and sensitive method for the quantitation of microgram quantities of protein utilizing the principle of protein-dye binding, Anal Biochem, 72, 248–254 (1976)
Compton SJ and Jones CG, Mechanism of dye response and interference in the Bradford protein assay, Anal Biochem 151,
369–374 (1985)
Fanger B, Adaptation of the Bradford protein assay to membrane-bound proteins by solubilizing in glucopyranoside detergents, Anal Biochem 162, 11–17 (1987)
Fazekas de St. Groth S et al., Two new staining procedures for quantitative estimation of proteins on electrophoretic strips,
Biochim Biophys Acta 71, 377–391 (1963)
Reisner AH et al., The use of Coomassie Brilliant Blue G-250 perchloric acid solution for staining in electrophoresis and isoelectric focusing on polyacrylamide gels, Anal Biochem 64, 509–516 (1975)
28

4110065A.qxp

9/25/2007

2:39 PM

Page 35

Sedmak JJ and Grossberg SE, A rapid, sensitive and versatile assay for protein using Coomassie Brilliant Blue G-250, Anal
Biochem 79, 544–552 (1977)
Spector T, Refinement of the Coomassie blue method of protein quantitation. A simple and linear spectrophotometric assay for less than or equal to 0.5 to 50 micrograms of protein, Anal
Biochem 86, 142–146 (1978)

29

4110065A.qxp

9/25/2007

2:39 PM

Page 36

Section 7
Appendix
5 ml Standard Assay
Tube #
1
2
3
4
5
6
7
8 (blank)

Standard
Volume (µl)
300
375
325
175
325
325
325


Source of
Standard
2 mg/ml stock
2 mg/ml stock
2 mg/ml stock
Tube 2
Tube 3
Tube 5
Tube 6


Diluent
Final
Volume (µl) [Protein] (µg/ml)
0
2,000
125
1,500
325
1,000
175
750
325
500
325
250
325
125
325
0

1 ml Standard Assay
Tube #
1
2
3
4
5
6
7
8 (blank)

Standard
Volume (µl)
70
75
70
35
70
70
70


Source of
Standard
2 mg/ml stock
2 mg/ml stock
2 mg/ml stock
Tube 2
Tube 3
Tube 5
Tube 6


30

Diluent
Final
Volume (µl) [Protein] (µg/ml)
0
2,000
25
1,500
70
1,000
35
750
70
500
70
250
70
125
70
0

4110065A.qxp

9/25/2007

2:39 PM

Page 37

Microplate Standard Assay
Tube #
1
2
3
4
5
6
7
8 (blank)

Standard
Volume (µl)
20
30
20
20
20
20
20


Source of
Standard
2 mg/ml stock
2 mg/ml stock
2 mg/ml stock
Tube 2
Tube 3
Tube 5
Tube 6


Diluent
Final
Volume (µl) [Protein] (µg/ml)
0
2,000
10
1,500
20
1,000
20
750
20
500
20
250
20
125
20
0

2 ml Microassay Cuvette Standard Dilutions
Tube #
1
2
3
4
5
6
7
8 (blank)

Standard
Volume (µl)
40
65
30
3,250
3,250
3,250
3,000


Source of
Standard
2 mg/ml stock
2 mg/ml stock
2 mg/ml stock
Tube 2
Tube 4
Tube 5
Tube 6


31

Diluent
Final
Volume (µl) [Protein] (µg/ml)
3,160
25
6,435
20
3,970
15
3,250
10
3,250
5
3,250
2.5
3,000
1.25
3,200
0

4110065A.qxp

9/25/2007

2:39 PM

Page 38

2 ml Microassay Cuvette Dilutions for BSA or
Gamma-Gobulin Standard Sets
Tube #
1
2
3
4
5
6
7
8 (blank)

Standard
Volume (µl)
40
35
35
35
35
35
35


Source of
Standard
2 mg/ml
2 mg/ml
1.5 mg/ml
1 mg/ml
0.5 mg/ml
0.25 mg/ml
0.125 mg/ml


Diluent
Final
Volume (µl) [Protein] (µg/ml)
3,160
25
3,465
20
3,465
15
3,465
10
3,465
5
3,465
2.5
3,465
1.25
3,200
0

Microplate Microassay Dilutions for
2 mg/ml BSA or Gamma-Globulin
Tube #
1
2
3
4
5
6
7
8 (blank)

Standard
Volume (µl)
10
10
6
500
500
500
500


Source of
Standard
2 mg/ml stock
2 mg/ml stock
2 mg/ml stock
Tube 2
Tube 4
Tube 5
Tube 6


32

Diluent
Final
Volume (µl) [Protein] (µg/ml)
790
25
990
20
794
15
500
10
500
5
500
2.5
500
1.25
500
0

4110065A.qxp

9/25/2007

2:39 PM

Page 39

Microplate Microassay Dilutions for BSA or
Gamma-Globulin Standard Sets
Tube #
1
2
3
4
5
6
7
8 (blank)

Standard
Volume (µl)
10
5
5
5
5
5
5


Source of
Standard
2 mg/ml
2 mg/ml
1.5 mg/ml
1 mg/ml
0.5 mg/ml
0.25 mg/ml
0.125 mg/ml


33

Diluent
Final
Volume (µl) [Protein] (µg/ml)
790
25
495
20
495
15
495
10
495
5
495
2.5
495
1.25
500
0

4110065A.qxp

9/25/2007

2:39 PM

Page 2

Bio-Rad Laboratories, Inc.
2000 Alfred Nobel Dr.
Hercules, CA 94547 USA
(510) 741-1000
1-800-424-6723 US only

4110065 Rev A

Similar Documents

Premium Essay

Wild Woods Apartment

...Wild Woods Apartments 418 Wildwood Lane San Francisco, CA 98564 | | Statement of Work Statement of Work SOW 201 for Agreement for a Database for Wild Oaks Apartments (a division of Wild Woods) 3/22/14 | | | January 1, 2015 | Wild Woods Apartments 418 Wildwood Lane San Francisco, CA 98564 | | Wild Oaks is a part of the larger corporation of Wild Woods, there is a need for a more in depth system so that Wild Oaks is able to keep track of their clients rentals, this includes the collection of rent, maintenance Issues that arise that must address, Wild Oaks also has to send in a report for all total expenses at Wild Oaks Apartments. This Statement of Work (SOW) is issued pursuant to the Consultant Services Master Agreement between Wild Oaks (“Client”) and Wild Woods Apartments (“Contractor”), effective March 23, 2014 (the “Agreement”). This SOW is subject to the terms and conditions contained in the Agreement between the parties and is made a part thereof. Any term not otherwise defined herein shall have the meaning specified in the Agreement. In the event of any conflict or inconsistency between the terms of this SOW and the terms of this Agreement, the terms of this SOW shall govern and prevail. This SOW # 201 (hereinafter called the “SOW”), effective as of January 1, 2015, is entered into by and between Contractor and Client, and is subject to the terms and conditions specified below. The Exhibit(s) to this SOW, if any, shall be deemed to be a part...

Words: 1512 - Pages: 7

Free Essay

Tim and Funding

...Few memories as a failure on a major project from half a decade ago still vividly remains in memories. As a Research Assistant to Tim, it was my first paid job. Tim, an Engineer, worked in silos and had driver social style to his heart beat. He only communicated the expectations without delving in the details that he had in his mind. Even though the Office space was a closed knit space for 16 students, Tim seldom hung out with people to build personal relationships. He only interacted with others when there was a need. His lack of explanation on why the project was needed had left me wondering regarding purpose and design aspects of the new programming project. I struggled on how to effectively design the project and often sought help from other people, who recommended me that the project needed investment in new programming platform as old platform was incapable of achieving the project objectives. After making almost no progress on the project and wasting time in attempts to make old platform workable, I received a vehement email from Tim, stating that XYZ Inc. was deciding to scale back on funding, as no progress reports were submitted. I was shocked to learn that I was even expected to submit progress reports at the end of quarter on the undertaken project in which I had neither any clue nor communication. As an amiable person, I was too quick to reach an agreement with Tim on project deliverables. I had thought that I would be receiving friendly advice and guidance from...

Words: 444 - Pages: 2

Premium Essay

Student

...and answer document, uploaded to D2L dropbox. You will have to find an IT professional to interview on your own.  Description of this assignment 1. Each student needs to find a candidate for a Post-implementation Review (PIR) report describing an information systems development project. 2. Where can you find an information technology professional to interview? You will have to find an IT professional to interview on your own.    3. If you work for a business or government organization, you should consider interviewing the IT/MIS director for your organization.  If you work P/T or F/T in any reasonably sized organization, it is likely that there are some IT workers around (like help desk staff, programmers, analysts, network technicians or even IT managers). It can even be a friend, relative or acquaintance you know who works in such a job. 4. The following is a list of themes that you could address in the interview: Please do not write this paper in question and answer format. Use the questions below to help guide the interview. ▪ What type of job does he/she do? For whom? ▪ What projects is he/she currently working on for the organization? ▪ What projects has he/she recently completed? ▪ What IT applications has the firm recently implemented? ▪ Were the most recently applications developed in-house, were they outsourced development or were they application software packages that were customized and purchased? ...

Words: 563 - Pages: 3

Premium Essay

Poo on Women: Is This Bad?

...Kempen | C402/C405 | Extend Diploma Mechanical Engineering EDENGM22A/B | Peter Kempen | C402/C405 | | GCSE English | Katherine Davey | G4 | GCSE English | Katherine Davey | G4 | | AS English Literature | Francesca Thomas | A58 | | | | | Archaeology: Unit 1 | Caroline Wilcox | B254 | Archaeology: Unit 2 | Caroline Wilcox | B254 | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49 | | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | Spring Term Revision Schedule 2013-14 Week 1 | Tuesday 8th April | | Morning session 10.00-12.00 | Afternoon Session 1.00-3.00 | | Subject/course | Teacher | Room | Subject/course | Teacher | Room | | A2 Business (China Research Theme) | Nessa | A25 | AS Business | Nessa | A25 | | A2 Economics | Charles | G5 | AS Economics | Charles | | | AS Business | Sarah (11.00-12.30) | A39 | A2 Business (Higher level exam technique) | Sarah | A39 | | AS Law | Amina | A26 | | | | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49...

Words: 883 - Pages: 4

Premium Essay

Microsoft Excel

...For ""Anticipated Project Size"" use your internal metrics as guidance. For example, if you use lines of code, then mentally assign ball park values to Small, Medium and Large as part of determining whether to give this criteria a high or low score. Follow a similar process ""Anticipated Duration"". Since project duration depends on project complexity, mentally categorize earlier projects as short, average or long duration to help put the current project in context. 2. After assigning a score for each criteria, view the Feasibility Study Suitability Indicator to discover the best method to use for determining project viability. 3. Omitted criteria will give an inaccurate result, so ensure all criteria are scored before checking the indicator." Criteria "Score (1=high, 3=low)" Guidelines Business Risk "1 = Significant, high-risk projects 2 = Low-to-modertate risk projects 3 = Small, low risk projects" Technology Risk "1 = Significant, high risk technological risks 2 = Low-to-moderate technological risks 3 = Small, low technological risks" Anticipated Project Size "1 = Large 2 = Medium sized 3 = Small" Anticipated Project Duration "1 = Long 2 = Medium duration 3 = Short" Project Dependencies "1 = Substantial and intricate project dependencies 2 = Minimal or manageable project dependencies 3 = No project dependencies" ...

Words: 451 - Pages: 2

Free Essay

Enterprenure

...(EPIEC) . From there he gained a lot of working experience and knowledge which made him to success in his business later . Business Motivation and starting One of the motivating factors was his father’s dream of his establishment in the society and another factor was after the independence of Bangladesh Aminul Islam realized that a new country has been born, therefore, a lot of construction will be needed for the development of the country and that is when he came up with the idea of Project Builders Limited. He proposed the idea to three other recent BUET graduates and they agreed to start with this new business. After the death of one of the partner and other two sold their share currently Aminul Islam is the only Managing Director and Chairman of Project Builders Limited. Vision The vision of Project Builders limited is to make quality constructions and make a strong infrastructure development of the country. Mission Construction of important structure and projects and to become the number one construction builder in Bangladesh. Initial Finance The company was initially started with four partners along...

Words: 2081 - Pages: 9

Free Essay

Kanpur

...knowledge to serve my best to the organization as well as my professional growth. Academics Relevant Courses: • Completed six weeks course and training in JAVA from SLR Infotech Pvt. Ltd, CHANDIGARH. • Pursuing 6 Months course and training in JAVA from DUCAT,NOIDA. • Completed six weeks course in C++ From ICT, KAITHAL B. Tech Projects: S.No Name Of the Project Description Team Members Roles and Responsibilities 1. CHANDIGARH TOURISM (B.Tech Summer Training Project) It was a software project based on core JAVA. It includes all the places to visit , map of chandigarh , hotel room booking , slides . Backend was based on MS-ACCESS . 2 Coding of Some pages, database manipulation & connectivity and preparing Crystal Reports. 2. DELHI TOURISM (B.Tech Minor Project ) It was a software project based on core JAVA. It includes all the places to visit , map of delhi , hotel room booking , slides . Backend was based on MS-ACCESS . 2 Coding of Some pages, database manipulation & connectivity and preparing Crystal Reports. 3. CRIME FILE MANAGEMENT (B.Tech Major Project ) It was a website describing various departments in crime department. It includes 3 modules WRITER , INSPECTOR , ADMIN. Writer writes complaints , Inspector investigates by watching the record using id’s and admin has all the controls. Platform used was ECLIPSE and backend was ORACLE database. 2 Overall designing of pages & coding of Admin Panel. Extra...

Words: 375 - Pages: 2

Premium Essay

Sharon Construction

...The following case represents a realistic situation facing construction firm that has just won a competitive contract. The realistic conditions complicating the project are described in detail, as are the alternatives offered by the staff for dealing with these complexities. Case The Sharon Construction Corporation The Sharon Construction Corporation has been awarded a contract for the construction of a 20,000-seat stadium. The construction must start by February 15 and be completed within one year. A penalty clause of $15,000 per week of delay beyond February 15 of next year is written into the contract. Jim Brown, the president of the company, called a planning meeting. In the meeting he expressed great satisfaction at obtaining the contract and revealed that the company could net as much as $300,000 on the project. He was confident that the project could be completed on time with an allowance made for the usual delays anticipated in such a large project. Bonnie Green, the director of personnel, agreed that in a normal year only slight delays might develop due to a shortage of labor. However, she reminded the president that for such a large project, the company would have to use unionized employees and that the construction industry labor agreements were to expire on November 30. Past experience indicated a fifty-fifty chance of a strike. Jim Brown agreed that a strike might cause a problem. Unfortunately, there was no way to change the contract. He inquired about...

Words: 918 - Pages: 4

Premium Essay

My Paper

...FOR PROJECT A Cash Flows DCF (13%) PV 350,000 0.8850 309,750 350,000 0.7831 274,085 350,000 0.6931 242,585 826,420 NPV = 826,420 – 735,000 NPV = 91,420 FOR PROJECT B Cash Flows DCF (13%) PV 300,000 0.8850 265,500 300,000 0.7831 234,930 300,000 0.6931 207,930 708,360 NPV = 708,360 – 690,000 NPV = 18,360 FOR PROJECT C Cash Flows DCF (13%) PV 200,000 0.8850 177,000 200,000 0.7831 156,620 200,000 0.6931 138,620 472,240 NPV = 472,240 – 600,000 NPV = (127,760) Assuming the cost of capital increase to 15%, the new NPV will be as follows FOR PROJECT A Cash Flows DCF (15%) PV 350,000 0.8696 304,360 350,000 0.7561 264,635 350,000 0.6575 230,125 799,120 NPV = 799,120 – 735,000 NPV = 64,120 FOR PROJECT B Cash Flows DCF (15%) PV 300,000 0.8696 260,880 300,000 0.7561 226,830 300,000 0.6575 197,250 684,960 NPV = 684,960 – 690,000 NPV = (5,040) FOR PROJECT C Cash Flows DCF (15%) PV 200,000 0.8696 173,920 200,000 0.7561 151,220 200,000 0.6575 131,500 456,640 NPV = 456,640 – 600,000 NPV = (143,360) At this point it is necessary for one to determine the sensitivity of the change in NPV of the three projects due to the increase in cost of capital. SUMMARY OF NPVS’ CALCULATIONS PROJECT | NPV @ 13% | NPV @ 15% | % CHANGE IN NPV | A | 91,420 | 64,120 | * 29.86% | B | 18,360 | (5,040) | * 127.45% | C | (127,760) | (143,360) | * 12.2% | From the table above it is clear that all three projects had...

Words: 350 - Pages: 2

Free Essay

Business

...selected a company in which they wanted to go with. Before the project began there are several things in which both the client and the consultant should cover before making an agreement to enter into a contract. The client and the consultant both should understand the risks of a project, the cost, rewards, and deadlines. There are three reasons for success or failure that could happen with the new project. One is the importance of the consultant competency and fit with the company needs. The consultant should be able to understand the company and what it does and its needs. It’s important In this case the consultant should ask themselves if this is something they are able to do. The second reason is the interpersonal fit between the consultant and the clients. The consultant should be able to speak with the client and feel they are going to be able to talk to them in regards to the business needs. Finally the last reason is if the consultant is able to establish ground rules for the consulting process. Being able to identify the rules before and making sure it’s something they can commit to will help both parties. Fullerton, Johanna; West, Michael View Profile The client and the consultant should both agree on the scope of the project, the project time line, what both parties are hoping to achieve , the client role vs. the consultant role, and finally how the client measure to the success of the project. www.partnercomm.net. When a client brings in a consultant...

Words: 1060 - Pages: 5

Premium Essay

Half Term Revision Dates

...Kempen | C402/C405 | Extend Diploma Mechanical Engineering EDENGM22A/B | Peter Kempen | C402/C405 | | GCSE English | Katherine Davey | G4 | GCSE English | Katherine Davey | G4 | | AS English Literature | Francesca Thomas | A58 | | | | | Archaeology: Unit 1 | Caroline Wilcox | B254 | Archaeology: Unit 2 | Caroline Wilcox | B254 | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49 | | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | Vocational Sport and Travel Tourism assignment completion | Danny Chilvers | A50 | | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | AS /A2 GraphicsExtend Diploma Year 2 Final Major Project | Mark Pearson | Art Rooms | Spring Term Revision Schedule 2013-14 Week 1 | Tuesday 8th April | | Morning session 10.00-12.00 | Afternoon Session 1.00-3.00 | | Subject/course | Teacher | Room | Subject/course | Teacher | Room | | A2 Business (China Research Theme) | Nessa | A25 | AS Business | Nessa | A25 | | A2 Economics | Charles | G5 | AS Economics | Charles | | | AS Business | Sarah (11.00-12.30) | A39 | A2 Business (Higher level exam technique) | Sarah | A39 | | AS Law | Amina | A26 | | | | | Vocational Business assignment completion | Kemi Osoba | A49 | Vocational Business assignment completion | Bekoe Newman | A49...

Words: 883 - Pages: 4

Free Essay

Individual or Small Group Student Projects

...Individual or Small Group Student Projects Contacting Community Partners When contacting an outside organization about a service-learning project, you want to make sure to maintain a professional attitude. So how do you make the first call? Below follows a possible introduction to use when calling and making that first contact with an agency of your choice. Hello, my name is _______________________. I am presently enrolled in a ___________course at [name of campus]. My [instructor or Student Success Lead] gave me your name and number. I am very interested in doing a service-learning project for your agency. I want to apply the _________skills I am learning in my _________class to the volunteer position. When can I meet with you to discuss this further? If you have to leave a message, don’t be discouraged. Because many nonprofit and community agencies are understaffed, they might not return your call right away. Persistence is important in regards to making contacts and starting your service experience. More Communication Tips: When speaking to the site supervisor… * Ask about the organization’s volunteer policies and training guidelines. It is possible that you need to fill out additional paperwork with their agency as well as the GU/MSB/UCC paperwork. * Explain the course objectives (provided in your course syllabus) and tell them that you have __ service-learning hours to fulfill for your course. * Tell them your availability. What times are best...

Words: 365 - Pages: 2

Free Essay

Strategies to Make a Team Work

...slipping they can reach out to that team member to offer assistance or re-assign the project so that team doesn’t fail and that person doesn’t feel picked on by the whole team. It also defines who should be asking questions and for nobody again to feel picked on or singled out by another peer. Assignment of projects and ownership is crucial to this being a team effort that everybody has a stake in the outcome of the project. Goals, both short and long term are effective for setting a timeline on when certain parts of the project need to be completed in order for the next piece to start and to ensure we meet our deadline for turning in the project on time. Setting a regular meeting schedule is a little harder with our team being spread out all over three time zones, jobs and family. Our team has discussed at least posting once a day what is going on and their status. Example I was out of pocket for two days and my team had no idea what had happened to me till I returned to explain that I had been to a funeral out of town. If I had posted ahead of time, the team would have known what to expect and when I would be back to contribute my part. I can already see within my team alone that they have asked questions or worded things in another way to enlighten some things that were not exactly clear to me, so I do see the benefits already of working in this team environment instead of tackling these projects all on as...

Words: 327 - Pages: 2

Free Essay

Media

...document is intended as a guide for students to follow when preparing their internship reports. Submit the report to the course instructor (J. Flores or D. Wallace) after completing the internship activity: 1) Title Page 2) Table of Contents • Include an entry each main section as identified below (Introduction, Responsibilities, Major Projects, etc. • Provide an entry for each appendix, i.e., Appendix 1: Internship Proposal, Appendix 2: Documentation of Work Hours, etc.) 3) Introduction • Provide background information on the Company (paragraph). 4) Responsibilities • This should be a generalized description of Internship responsibilities (a couple of paragraphs at most). • Include a statement of the number of hours worked, with supporting documents in the Appendix. 5) Major Projects • Write summary descriptions for each major project, report, employee communication, or training packages developed (about a paragraph summarizing each) • Heading Examples: o Cyanide air sampling project o MSDS Inventory o Lead abatement project o Respiratory Protection Training o Compressor House Noise Survey o Acid tank ventilation project o Ergo Hazard evaluations • Provide examples of your work in an appendix (see below) 6) Internship Summary • Include pros and cons of your experience 7) Appendices • Include documents supporting the report, such as: o Internship Proposal o Documentation of Work Hours  A copy of check stubs showing first check and last check is...

Words: 311 - Pages: 2

Free Essay

Flextronics: Deciding on a Shop-Floor System for Producing the Microsoft X-Box - Case Analysis

...1. 5 factors that make the decision difficult for McCusker: - Aggravation of both teams: If he decides to use either Datasweep or Virtual Factory, the other team may feel “lost”, which subsequently affect the harmony between two teams. - Time pressure of the project: There is not enough time for further analysis on the systems. - Unusual importance of the project: This is Flextronics’ first global project and its success or failure can affect the company’s reputation and ability to bid for future projects. It is closely observed by internal and external parties. In additional, the relationship with Microsoft is particularly important to Flextronics. - Pros and Cons of the choices: there is no single alternative that can solve all the problems. - Overstated infrastructure: during the bid process, Flextronics made Microsoft thought that a single system had existed in both facilities and raised it expectations very high while in fact the system was not already in place. 2. The criteria that McCusker should consider in his decisions: - Client’s satisfaction: This includes three sub-criteria: meet Microsoft’s tracking system requirements, deliver products on time and ensure product quality. - Employees’ satisfaction: Regardless which decision he make, McCusker have to ensure that employees at both factories are convinced with his decision and coordinate well with each other. - Cost-saving: The purpose of implementing the process at two different factories in two countries...

Words: 1283 - Pages: 6