Pm592 Project One

In:

Submitted By arianamiles
Words 2467
Pages 10
Introduction
Oil is an essential part of our everyday living. Historically, the oil and natural gas industry have accounted for approximately 10 percent to 25 percent of the state’s GSP, a trend that roughly tracks the price of oil. drilling rig bores a hole into the earth through which steel pipes are inserted. Pipes or casings like cement would then be put in between for strength as well as for separating different pressure zones- if they exist. The well is then drilled further, and more casings are added. At times, 2-3 layers of casings would be built depending on the geological composition of the zone. The rotator table then passes the drill string onto the hole. The drill string rotating by 'top drive' or 'power swivel' mechanism extends the drill bit. This extension is done with the help of the derrick (the structure holding the drill string). The drill bit then cuts the rock into pieces.
Drilling fluid, also called mud-mixture of fluids, chemicals, abrasives and solids - is then pumped down the drill string. This fluid clears the cut rock bits onto the surface. Compressed air is substituted for the fluid, at times. In turbo-drilling, a turbine is placed in the drill string. Mud flows through this turbine causing the drill bit to rotate.
This hydrocarbon-rich mixture of crude oil and gases runs our factories, our cars, heats some homes and has provided Americans with an unprecedented standard of living since its discovery in America in 1859. Petroleum is an extremely versatile substance; refining it creates everything from asphalt and gasoline to lighter fluids and natural gas, along with a variety of essential elements such as sulphur and nitrogen. Petroleum products are also vital ingredients (“feedstocks”) in the manufacture of medicines, chemicals and plastics.
Because of its chemical structure, long hydrocarbon molecules that can be “cracked” or

Similar Documents

Premium Essay

Gmoney

...PM592 Week One You Decide TO:   Kara Rose, Marketing Director and Jessie Megana, R&D Director VisionTec, 38 Washington Street, Newburyport, MA 01950 SUBJECT: New Vision System Camera for the Pharmaceutical Market       In an effort to increase sales in the lucrative Pharmaceutical Market, Vision Tec is investigating a way to create a high-resolution camera system to inspect drug labels ensuring they contain the proper information to meet the ever evolving governmental standards. The Work Breakdown Structure (WBS) is graphical representations of tasks which need to be completed in order complete the project.   The New Vision System project will be broken down into three sub-activities (phases).   Each phase will be assigned to an organizational working group and broken down in to work packages which may be decomposed further as the project proceeds. New Vision System Project     1.0 Market Feasibility                                 1.1 Interview Customers           1.2 Determine market trends       1.3 Test Market             1.4 Identify Target Market                       2.0 Concept Feasibility 2.1 Study System 2.3 Define User Requirements 2.4 Prepare Report 3.0 System Development 3.1 Software 3.1.1 Packaging 3.1.2 Customize Software 3.2 Hardware 3.3 Network 3.4 Prepare Report Vision Tec Project       Vision Tec is an advanced technology company who develops high tech products for...

Words: 496 - Pages: 2

Premium Essay

Pm 592

...Project Proposal for Opening a Speciality Coffee Shop CP1 – Project Proposal PM592 – Project Cost and Schedule Control Table of Contents Executive Summary 3 Project Description 3 Work Breakdown Structure 4 Cost Estimates 5 Usage of Advanced Cost Estimating Techniques 7 Cost Assumptions 8 Financial Analysis including NPV 9 Project Schedule 9 Project Gantt chart 12 Executive Summary – This project proposal describes and presents task and cost details of a very exciting and profitable business opportunity, which is the opening of a new speciality coffee shop in a busy, commercial location of the town. There are many businesses already that are based on selling coffees and beverages, however this business aims to provide more than just a beverage and tries to create an ambience and experience based on the best even flavors and quality of coffee, in a small business and high personal relationship type of setting, to create a base of loyal customers that would make for a stable and steady business opportunity. In terms of project details, the concept is to create a speciality coffee shop, which delivers very high quality and friendly service in a highly populated and high traffic commercial area. The costs involved in starting out the project are $100,000 including set up costs of $75,000 and operating costs of $25,000. This business is expected to produce a profit of $5000 per month, and gives a NPV of $54,620 over three years. Assuming a project start date of...

Words: 1380 - Pages: 6

Premium Essay

Indoor Theme Park Project

...Troy Paine PM592, Professor: Chrystal Foster 6/07/2012 Course Project 2 Indoor Theme Park Project Executive Summary As we continue our project we need to look at where we are in order to determine where we are going. Currently our total project costs are $4,644,920.00 which is above our original baseline cost of $4,449,920.00 due to unforeseen increases in material costs. This $195,000 dollar increase in fixed costs has not placed a significant setback in our projects bottom line. We are currently half way through our project with 40% of our goals completed. Even though we are currently behind schedule by ($565,266.07) we will be able to make up the time and still finish our project by the date of 12/19/2008. We have our new estimate at completion of $5,039,790.43 and with the proper adjustments to our schedule we will be able to pull our completion date back into line. We should be able to keep the costs in line if not improve upon them by keeping a tighter day to day track of our progress and adding additional resources to tasks and shorten their duration. Overall this project is still within a margin of acceptance and will be operational and complete for its grand opening. Task Name | Fixed Cost | Fixed Cost Accrual | Total Cost | Baseline | Variance | Actual | Remaining | Theme Park Project | $0.00 | Prorated | $4,644,920.00 | $4,449,920.00 | $195,000.00 | $1,230,683.00 | $3,414,237.00 | Task Name | % Complete | Planned Value - PV (BCWS) | Earned...

Words: 2997 - Pages: 12

Premium Essay

Pm 592 Study Guide

...PM592 On-line – Study Guide for Final Examination The final is an open book/open notes examination. The final includes nine questions, and is worth a total of 300 points. The sample problems here represent the types of problems that may appear on the final. There are solutions to the problems at the end. There will also be discussion problems. I have provided a list of the topics from which the discussion questions will be taken. On problems, please show all calculations when you complete the final. Problems: (TCO B) Three-point estimate: Problem (TCO B) Contingency Pricing: Problem (TCO G) Crashing: Problem (TCO C) WBS: Problem (TCO E) Resource Allocation/Leveling: Problem (TCO F, G) Earned Value/PMIS: Problem (TCO C) General Budget development, sensitivity: Problem Discussion topics: (TCO D) Accounting, PMIS, and Project Control (TCO A) Budgeting processes and techniques (TCO E) Resource Allocation Matrix (TCO F) Project Control Process (TCO F, G) EVM and EAC: Discussion: Terminal Course Objectives A Given the WBS and work packages develop an understanding of budgeting processes using top-down and bottom-up techniques. B Given the WBS and work packages, analyze the various cost estimating processes and investigate approaches used to justify and allocate contingency funds. C Given the project plan, develop budget estimates in appropriate categories including but not limited to labor, non-labor, overhead...

Words: 2741 - Pages: 11

Premium Essay

Pm592 Cp-2

...CP-2 Theme Park PM592 Project Cost and Schedule Control Oct 21, 2012 Introduction The construction of the new theme park project is laid out for 180 days of construction to finish. This project has a start Date of Monday April 4, 2008. The preliminary cost is $4,449,920.00 and with a completion date of December 19, 2008. The theme park will include a Ferris wheel, Rope course, Climbing walls, Carousel, Bowling, Go carts, and a Mini golf. The desired walk through date is December 18, 2008 with a grand opening on December 19, 2008. Executive Summary It has been 6 months since the start of the project and we now have 40% of the tasks complete. The actual cost so far to date is $1,230,683.00. There are many of the scheduled tasks behind in this schedule. The entire project thus far is behind schedule with a work performance index of .66 and 12% behind schedule. There are corrective actions that can get this project beck on schedule at minimal cost. This project should not be abandoned and should continue forward with the support of the investors. Schedule 1 This data is being supplied from MS Project. The WBS includes all work that has to be done to complete the project from start to finish. The current WBS includes all the data and baseline, review date and the current date is set to October, 1, 2008. The project start date is April, 14, 2008. Nearly 6 months into the project it is set at 40% complete. This shows the project is behind schedule. The...

Words: 3824 - Pages: 16