Request for Proposal

New Practice Field – Spokane Indians
Spokane Indians
602 North Havana Street, Spokane, WA 99202
(509) 535-2922 PROJ598 – Nov. 2012

TABLE OF CONTENTS

1. INSTRUCTIONS TO BIDDERS 3 1.1. General Description of Work 3 1.2. What Must Be Included with Bid 3 1.3. Schedule of Bid Period Activities 3 1.4. Location of Work 4 1.5. Pre-Bid Meeting 4 1.6. Owner Contact for Questions 4 1.7. Pre-Award Surveys 4 1.8. Sealed Bid Requirements 4 1.9. Basis for Bid Evaluation 4 1.10. Ethical Standards 4 1.11. Responsibility for Surety Bonds 4 1.12. Proposal Format 4 1.13. List of Bidders 4 1.14. Letter of Acknowledgment 4
2. DESCRIPTION OF WORK 5 2.1. Engineering Contracts 5 2.2. Construction Contracts 5
3. PROPOSAL 5 3.1. Breakdown of Bid Price 5 3.2. Revisions and Extra Work 5 3.3. Escalation Formulas 5 3.4. Scheduled Completion Dates 5 3.5. List of Subcontractors 5 3.6. Key Supplier or Contractor Personnel 5 3.7. Length of Time Bid Is Valid 5 3.8. List of Bid Document Addenda Reviewed by Bidder 5 3.9. Notice of Conflicts or Errors in Bid Documents 5 3.10. Clarifications of Bids 5 3.11. Bidder Signature 5
4. SPECIFICATIONS AND DRAWINGS 5
5. SPECIAL CONDITIONS 5
6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 5
Appendix A 6
Appendix B 8
Supplier/Bidder List 8

1. INSTRUCTIONS TO BIDDERS
1.1. General Description of Work
This proposal is intended to provide an insight to bidders regarding the physical development and blueprints of the new “Spokane Indians Practice Field.” Spokane Indians wishes to have a 20 acre site designed for a medium size baseball practice field. The new practice ball park will be located next to the existing softball stadium on Havana Street. The site is to be accessible to the existing park via one vehicular street with side walk for pedestrian

Similar Documents

Premium Essay

Pm 598

... | | The course project for PM598 consists of three parts, which provide familiarization to processes associated with Contract and Procurement Management.  • Part 1 (PP1) of the course project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP Template document in the Doc Sharing area to develop information to support section one of the RFP.  • Part 1 (PP2) of the course project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor.  • Part 3 (PP3) of the course project entails selecting one of the three case studies from the PP3 - Course Project Case Study document in the Doc Sharing area and answering questions that demonstrate an understanding of the Garrett text. The deliverable for PP3 is a seven-page document that addresses each of the questions specified for the case study selected. This three-part project provides an overview of the processes and material that is used to develop a RFP as well as address relevant questions that could result from Contract and Procurement management.  The points assigned to each part of the course project are listed below: |Course Project Assignment |  Due |Points | |    Course Project Part 1 (PP1) |Week 2 |40 | |    Course Project Part 2 (PP2) ...

Words: 2420 - Pages: 10

Premium Essay

Essay1

...bThe course project for PM598 consists of three parts, which provide familiarization to processes associated with contract and procurement management. • Part 1 (PP1) of the Course Project focuses on the first section of the RFP and entails selecting one of the three RFP procurement cases listed under the PP1 section and using the PP1&2 - Course Project RFP template document in the Doc Sharing area to develop information to support section one of the RFP. • Part 1 (PP2) of the Course Project entails completing the remaining sections of the RFP by developing a comprehensive document that could be submitted to a vendor. • Part 3 (PP3) covers all of the TCOs but touches mainly upon textbook Chapters 9 through 12. You will be required to identify an opportunity through https://www.Fbo.gov and follow the instructions, which are located in the Doc Sharing section. This three-part project provides an overview of the processes and material that are used to develop a RFP as well as address relevant questions that could result from contract and procurement management. The points assigned to each part of the Course Project are listed below: |Course Project Assignment |Due |Points | |Part I (PP1) - RFP Section 1 |Week 2 |40 | |Part II (PP2) - Complete RFP |Week 4 |125 | |Part III (PP3) - Formal Proposal Submission |Week 6 |125 | |Total | ...

Words: 1270 - Pages: 6