Premium Essay

Production Systems

In:

Submitted By emblem0204
Words 2454
Pages 10
Production Systems

Assumptions: * available set of machine technology is fixed (short term production control decisions) * organization of production has been determined

Production system * collection of material, labour, capital, and knowledge that goes into manufacture of a product * how the collection of components is put together in a specific situation defines a particular system

Taxonomy of Production Systems * by different criteria and meaningful analysis applied * by production flow characteristics

Production processes can be either continuous or discrete (or one at a time fashion).

Three Major Building Blocks in a Production System 1. Machine Technology Base (or the Tools for Production) * Sets boundaries on the processes that can be employed in converting inputs to finished products * Long term planning decisions * Major component of productivity improvement 2. Organization * Product layout * Organizes people and machines that is satisfactory for the production of a single product * Sequential operations * Flow line organization of a production * Process layout * According to the manufacturing process involved in the production of products * Machinery is grouped based on common purposes * When there are a large number of different products using the same machinery but not necessarily in the same order * Job shop * A plant manufacturing a variety of items with different machinery requirements and routings using a process layout * Group technology * The intermediate between flow line and job shop production configurations

Information Base * Describes the product and its manufacturing process in terms of machine requirements and the flow of the product within the production

Similar Documents

Free Essay

Toyota Production System

...Executive summary This system which is comprised of several of the company’s core value concepts which is aim towards the Toyotas customer oriented and quality driven operations and production process has grown in reputation over the years. This presentation intends to analyze this system alongside other aspects of the company’s business operations in regards of its Facilities in North America Toyota production system This presentation is aimed to illustrate a four exercise approach in analyzing the Toyota Manufacturing Corporations and the TPS it adopts. We analyzed Toyota production system based on our understanding of what it represents in terms of its Concepts. We also define TPS as an entity, furthermore we discuss its purpose in Toyota Manufacturing Corporation as well as its production in North America. To better illustrate its value to the company we also describe the advantages and limitations of the system. Weighted Scoring Model Using a the weighted scoring model we would critically assessing the potential Lexus RX 330 North American Plant location decision between TMMC or any of Toyota Manufacturing Corporation U.S factory plants. In doing so we would identifying the factors the company would need to consider. Decision Tree We would be applying the decision tree tool to adequately recommend a production capacity for TMMC to utilize in the production of the new Lexus RX 350 line in order to achieve optimal quality and maximize profit. First we explain the...

Words: 381 - Pages: 2

Premium Essay

Toyota Production System

...Toyota Production System How does a company simultaneously meet its customers’ demands on time while maintaining the best quality levels at the lowest cost? Sounds like conflicting business goals? Where huge companies with deep pockets failed, one company stood out and faced the challenge of trying to meet these goals. This company was Toyota. The post-WW2 period was trying for the Japanese economy. The country was ravaged by the atomic bombings and the drain on resources from the war time activities, forced companies like Toyota to develop innovative and cost efficient manufacturing processes. The Toyota Production System (TPS) arose out of necessity in response to the circumstances surrounding the company. Many of the foundational concepts are old and unique to Toyota while others have their roots in more traditional sources. The oldest part of the production system is the concept of Jidoka which was created in 1902 by Toyoda founder Sakichi Toyoda. This concept pertains to notion of building in quality at the production process as well as enabling separation of man and machine for multi-process handling. The most famous element of the TPS is no doubt the Just-in-Time pillar of the production system. The phrase Just-in-Time was coined by Kiichiro Toyota in 1937 after the start of Toyota Motor Corporation. The company was quite poor and could not afford to waste money on excess equipment or materials in production. Everything was expected to be procured just in time and not...

Words: 1301 - Pages: 6

Premium Essay

Toytota Production System

...DNA of the Toyota Production System by Steven Spear and H. Kent Bowen long been hailed as the source of Toyota's outstanding performance as a manufacturer. The system's distinctive practices -its kanhan cards and quahty circles, for instance - have been widely introduced elsewhere. Indeed, following their own internal efforts to henchmark the world's best manufacturing companies, GM, Ford, and Chrysler have independently created major initiatives to develop Toyota-like production systems. Companies that have tried to adopt the system can be found in fields as diverse as aerospace, consumer products, metals processing, and industrial products. What's curious is that few manufacturers have managed to imitate Toyota successfully-even though the company has been extraordinarily open about its practices. Hundreds of thousands of executives from thousands of businesses have toured Toyota's plants in Japan and the United States. Frustrated by their inability to replicate Toyota's performance, many visitors assume that the secret of Toyota's success must lie in its cultural roots. But that's just not the case. Other Japanese companies, such as Nissan and Honda, have fallen short of Toyota's standards, and Toyota has successfully introduced its production system all around the world, including in North America, where the company is this year building over a million cars, minivans, and light trucks. So why has it been so difficult to decode the Toyota Production System? The answer, we...

Words: 7586 - Pages: 31

Premium Essay

Toyota Production System

...Toyota Production System (Adapted from Slack, et al. 2006) Seen as the leading practitioner and the main originator of the lean approach, the Toyota Motor Company has progressively synchronised all its processes simultaneously to give high quality, fast throughput and exceptional productivity. It has done this by developing a set of practices that has largely shaped what we now call ‘lean’ or ‘just-in-time’ but which Toyota calls the Toyota Production System (TPS). The TPS has two themes, ‘just-in-time’ and ‘jidoka’.’Just-in-time’ is defined as the rapid and coordinated movement of parts throughout the production system and supply network to meet customer demand. It is operationalised by means of heijunka (levelling and smoothing the flow of items), kanban (signalling to the preceding process that more parts are needed), and nagare (laying out processes to achieve smoother flow of parts throughout the production process). Jidoka is described as ‘humanizing the interface between operator and machine’. Toyota’s philosophy is that the machine is there to serve the operator’s purpose. The operator should be left free to exercise his or her judgement. Jidoka is operationalised by means of fail-safe (or machine jidoka), line-stop authority (or human jidoka), and visual control (at-a-glance status of production processes and visibility of process standards). Toyota believes that both just-in-time and jidoka should be applied ruthlessly to the elimination of waste, where...

Words: 836 - Pages: 4

Premium Essay

Toyato Production System

...How is Toyotas cars produced? stockless production The Mind of the Strategist Just in time production is the essence of economies of scale. It is subject to the law of diminishing return. You must have large enough demand for your finished products to receive free shipping on a particular day. The closer the manufacturer is to its supplier the less likely the manufacturer will have a supplier issue. Financially sustainable The company receives the order then orders inventory to build the products. Maintain high quality is maintained by having the right employee in the right job. The employee is consistently doing the same job. Inventory buildup requires a lot of cash that could be used to reinvest into the company’s growth; research and development, lowers short term debt requirements. Inventory buildup increases storage cost which lowers your ROI. Requires team work Lean production requires the integration of tasks, identification and removal of defects, kaizen production. Integrated tasks is Requires discipline You must wait for orders to come in before you start manufacturing. This means that you need to have faith in your sales team. Regular improvements to the design of the manufacturing system. Look at Amazons system robots As soon as the product is manufactured it is already sold. Slow is smooth, smooth is fast http://www.economist.com/node/13976392 http://www.economist.com/node/13941150 Problems with Just in time Just in time manufacturing...

Words: 512 - Pages: 3

Premium Essay

Toyota Production System

...Idea behind the theory Muda is the Japanese term for waste and is a key concept in the Toyota Production System. The definition of waste is basically anything that does not add value. “Value and waste are opposites. "Value" is what the customer is actually willing to pay for the product or service. Economists define value as the ratio of the usefulness of a product or service to its costs. This includes the product's functions and features and it relates to the whole product, service or both. Costs include the price paid and also the cost in time and hassle in obtaining and using the product or service” (Sowards, 2005). “It is common to find that in a factory less that 5 per cent of activities actually add value, 35 per cent are necessary non-value-adding activities and 60 per cent add no value at all” (Jones, Hines, & Rich, 2006, pg. 154). To truly be able to eliminate waste from a process you need to know what wastes you are looking for. There are seven wastes that were identified by Toyota’s Chief Engineer, Taiichi Ohno as part of the Toyota Production System. 1. Overproduction. Producing items for which there are no orders, which generates such wastes as overstaffing and storage and transportation costs because of excess inventory. Ohno considered this to be the fundamental waste, since it causes most of the other wastes. 2. Waiting (time on hand). Workers merely serving to watch an automated machine or having to stand around waiting for the next processing step, tool, supply...

Words: 1901 - Pages: 8

Premium Essay

Toyota Production System

...Toyota production system Toyota Production System is an essential part of what makes Toyota different and makes Toyota’s products a profitable investment for its customers’ businesses. Toyota’s customers know what to expect when they buy from Toyota – a business partner with the strength and flexibility to meet the needs of a changing market. TPS has been successfully practiced by lots of firm in order to improve the quality. According to the article “origin of the Toyota production system in China”, Japanese-style production method on the dynamic evolutionary process of production systems in China, with a view to adding the Chinese experience to the discussion on the evolution of manufacturing systems that has become so prevalent in recent years on an international scale. The first introduction of the Toyota production system into China and the process of technology transfer is the case of First Automotive Works, the representative Chinese automobile manufacturer. By 1992 the just-in-time system had been introduced into the whole production line at FAW's transmission plant. The average workload rate per operator had risen from the old 27.7% plant average to 65%, machine stoppage time had become 80% shorter, and a total of 468 production personnel had been retrenched. Labor productivity rose from 129,000 yuan per person in 1991 to 303,000 yuan per person in 1994, and the number of transmissions produced per worker rose from 27.7 units in 1991 to 68.5 units in 1994--in...

Words: 476 - Pages: 2

Free Essay

Toyota Production System

...Toyota Production System Da Wikipedia, l'enciclopedia libera. IMPIANTI INDUSTRIALI Il Toyota Production System, detto anche, in alcune pubblicazioni accademiche, Toyotismo, è un metodo di organizzazione della produzione derivato da una filosofia diversa e per alcuni aspetti alternativa alla produzione di massa, ovvero alla produzione in serie e spesso su larga scala basata sulla catena di montaggio di Henry Ford. Produzione industriale Progettazione di prodotto Design - DFX CAD - CAE Progettazione di processo Processo di produzione industriale Meccatronica - CNC - Robot industriale CAM - PLC - CAPP Il nome deriva dal fatto che essa è stata inventata negli anni 1940-1950 presso la Toyota, da Sakichi Toyoda, Kiichiro Toyoda, ed in particolare dal Progettazione di sistema giovane ingegnere Taiichi Ohno. Alla base del TPS si trova l'idea di 'fare di più con meno', cioè Sistema di produzione - GT di utilizzare le (poche) risorse disponibili nel modo Taylorismo - Fordismo - Catena di montaggio - UTE più produttivo possibile con l'obiettivo di JIT - Toyotismo - Produzione snella incrementare drasticamente la produttività della Automazione - Fabbrica automatica - FMS fabbrica. La Toyota, nell'immediato dopo-guerra, CIM - MRP - ERP - TQM si trovava in condizioni gravissime di mancanza di risorse, come peraltro gran parte dell'industria del Giappone, uscito sconfitto e stremato da una guerra devastante. Esso si basa su 5 principi puntando su un concetto apparentemente semplice:...

Words: 1091 - Pages: 5

Premium Essay

Toyota Production System

...Toyota is renowned not only as one of the World's greatest manufacturers and for its Toyota Production System (TPS), but also as the company that inspired Lean Production (Lean). However, there is a common assumption that Lean Production and the Toyota Production System are identical. In this research paper we will compare TPS and Lean and will try to answer the question: Are there any differences between TPS and Lean and, if yes, what are they? 

Our approach to comparing TPS and Lean will be based on the 14 Management principles described in Jeffrey Liker's book The Toyota Way. We will briefly describe each TPS principle and then search the Lean literature: books, journal articles, and web-sites to find evidence of whether or not the same principle is present in Lean Production and whether there are any differences in the interpretation of the principle, its scope and depth. It is worth noting that this research paper will focus on one way comparison between TPS and Lean; we will not try to outline topics present in the Lean literature and then identify whether or not they are covered in the TPS literature. 

This research paper is based on the usage of three types of resources: books, articles and organizational web-sites. The books listed in the references section can be generally sub-divided into three groups: the origination of Lean and its connection to Toyota ([1] and [3]), books describing the Lean tools and providing limited guidance on the implementation of Lean ([2]...

Words: 404 - Pages: 2

Premium Essay

Toyota Production System Case

...to alleviate this problem. A short term solution might including placing additional Vendor Managed Inventory “golden” seats on-site at the TMS facility to replace defective parts to ensure that there are fewer parts taken off line. There must also be a close examination of the two TMS areas. The first take would be to explore the reason for the difference in defect rates between the shifts. If there is a training problem, this should be addressed immediately. Additional emphasis needs to be focused on the reason for the delays in obtaining replacement parts from KFS once the source of the problem is identified in the Clinic or Overflow area. 3. The Toyota Production System principle is based on the assumption that true need will deviate from production planning and that problems will crop up. The Toyota Production System relies on two practices to address problems and drive additional quality and productivity: Jidoka and Kaizen. Jidoka was...

Words: 611 - Pages: 3

Premium Essay

Decoding the Dna of the Toyota Production System

...DNA of the Toyota Production System by Steven Spear and H. Kent Bowen long been hailed as the source of Toyota's outstanding performance as a manufacturer. The system's distinctive practices -its kanhan cards and quahty circles, for instance - have been widely introduced elsewhere. Indeed, following their own internal efforts to henchmark the world's best manufacturing companies, GM, Ford, and Chrysler have independently created major initiatives to develop Toyota-like production systems. Companies that have tried to adopt the system can be found in fields as diverse as aerospace, consumer products, metals processing, and industrial products. What's curious is that few manufacturers have managed to imitate Toyota successfully-even though the company has been extraordinarily open about its practices. Hundreds of thousands of executives from thousands of businesses have toured Toyota's plants in Japan and the United States. Frustrated by their inability to replicate Toyota's performance, many visitors assume that the secret of Toyota's success must lie in its cultural roots. But that's just not the case. Other Japanese companies, such as Nissan and Honda, have fallen short of Toyota's standards, and Toyota has successfully introduced its production system all around the world, including in North America, where the company is this year building over a million cars, minivans, and light trucks. So why has it been so difficult to decode the Toyota Production System? The answer, we...

Words: 7627 - Pages: 31

Premium Essay

In What Ways Can the Toyota Production System Be Seen as Rare and Difficult to Imitate?

...2.2. In what ways can the Toyota Production system be seen as rare and difficult to imitate? Toyota Production system is a system that was developed initially to account for the specific issues facing one company. The revolutionary ideas and concepts pioneered at Toyota have been used in many other organizations and industries throughout the world. TPS has evolved to help companies maximize value. In this system all activities relating to the manufacturing process. Toyota Production system is an integrated socio-technical system that comprises its management philosophy and practices. It is developed by Toyota. The Toyota Production system organizes manufacturing and logistics for the automobile manufacturer, including interaction with suppliers and customers. The system is a major precursor of the more generic “learn manufacturing” Shigeo Shingo and Eiji Toyoda developed the system between 1948 and 1975. [1]. What the goals of Toyota Production System? The goal of companies using TPS is to provide the exact quantity, with the exact quality, exactly when the customer wants it. Toyota production system provide world class quality and service to the customer, and develop each employee’s potential, based on mutual respect, trust and cooperation. It will reduce cost through the elimination of waste and maximize profit. The most important goals is about developing flexible production standards based on market demand. Rare is about they are rare when possessed by few, if...

Words: 804 - Pages: 4

Premium Essay

The Seven Deadly Wastes of Logistics: Applying Toyota Production System Principles to Create Logistics Value

...2007   The Seven Deadly Wastes of Logistics: Applying Toyota Production System Principles to Create Logistics Value Joel Sutherland Managing Director Center for Value Chain Research Lehigh University, 621 Taylor Street, Bethlehem, PA 18015 E-mail: jos206@lehigh.edu Bob Bennett President Lean Consulting Associates, LLC, and Group Vice President (retired) Toyota Motor Sales USA, Inc. 16 Deerhill Drive Rolling Hills Estates, CA 90274 E-mail: bobben1@cox.net CVCR White Paper #0701 Abstract A business value chain is an end-to-end set of activities that can be applied to a product or service making it ready for the next activity. Most resources used in an activity add value—some do not. The resources consumed (such as people, time or equipment) that do not add value add cost and should be eliminated. This is the essence of the Toyota Production System, or Lean (the term used in the U.S. for what was originally known as the "Toyota Production System"). This article reviews the evolution of Lean principles from the beginning of Henry Ford’s revolutionary assembly line process for his Model T automobile in the early 1900’s, through Taiichi Ohno’s creation of the famous Toyota Production System in the mid-20th century, to adoption of these principles in addressing today’s logistics and transportation challenges. This paper presents real examples from executives who worked within the Toyota Production System and were effective in expanding these principles beyond the traditional...

Words: 5016 - Pages: 21

Free Essay

Why Is It so Hard to Implement a Tps-Like Production System Even If Toyota Has Unveiled All the Details?

...TPS-like Production System because of confusion between the tools and practices they may see on the plant, and the system itself. There is a paradox that all the activities, links and production flows in a Toyota factory are rigidly regulated, and at the same time the system is very flexible and adaptable, which is difficult to unravel for the outsiders. They do not often understand that it is this rigidly regulated system itself that makes all the operational flexibility and improvement possible, and stimulates the creation of the community of scientists (factory workers) who actually use scientific methods to make the workflow to be more efficient and straightforward. That means the activities and processes are constantly being challenged in order to improve the performance and increase the efficiency. Another problem for successful imitation is that this system and its methods are not actually written anywhere, neither were they officially imposed or consciously chosen. That’s why Toyota workers can hardly explain it in a systematic way, and the outsiders have difficulty grasping it, especially considering that the organizational changes are often made at a very low level. The system developed gradually over the company’s more than 6 decades in operation, and Toyota has become a learning organization that stimulates experimenting, which very much distinguishes it from other companies. According to the article, there are 4 rules that create the DNA of Toyota Production System...

Words: 276 - Pages: 2

Premium Essay

Standard Production System

... |Last Review: | | Purpose This document describes the ITS Standard Production Support Plan. Service-specific details are defined in the appendix. Changes to this plan are not permitted unless negotiated and approved by signers referenced at the end of this document. Support Overview Scope This plan defines roles and expectations for operation of all ITS provided services. Production support needs that extend beyond the levels described here must be negotiated, approved, and detailed as exceptions in the provided template and attached to the plan. This document is not intended to define internal team procedures. Support Overview/Key Points ● All ITS services are supported using the tiered service model where tier 1 and 2 reside at the Service Center and tier 3 are the subject matter experts. ● Support groups are configured in ITSM which is the ITS support tool of choice. ● Incident, Problem, Change, Availability, Capacity, Release, and Knowledge Management processes will be utilized by all support teams and are defined at the organizational level. ● Monitoring events will follow established ITS processes and procedures to ensure integrations with production support activities. ● The Significant Incident process will be utilized by all services covered under this plan. ● Service releases and/or changes will utilize the ITS Release...

Words: 1084 - Pages: 5