Free Essay

Proj598

In:

Submitted By jozinnah123
Words 902
Pages 4
TABLE OF CONTENTS

1. INSTRUCTIONS TO BIDDERS 4
1.1. General Description of Work 4
1.2. What Must Be Included with Bid 4
1.3. Schedule of Bid Period Activities 4
1.4. Location of Work 5
1.5. Pre-Bid Meeting 5
1.6. Owner Contact for Questions 5
1.7. Pre-Award Surveys 5
1.8. Sealed Bid Requirements 5
1.9. Basis for Bid Evaluation 6
1.10. Ethical Standards 6
1.11. Responsibility for Surety Bonds 6
1.12. Proposal Format 6
1.13. List of Bidders 6
1.14. Letter of Acknowledgment 6
2. DESCRIPTION OF WORK 7
2.1. Engineering Contracts 7
2.2. Construction Contracts 8
3. PROPOSAL 8
3.1. Breakdown of Bid Price 9
3.2. Revisions and Extra Work 9
3.3. Escalation Formulas 9
3.4. Scheduled Completion Dates 9
3.5. List of Subcontractors 9
3.6. Key Supplier or Contractor Personnel 9
3.7. Length of Time Bid Is Valid 9
3.8. List of Bid Document Addenda Reviewed by Bidder 9
3.9. Notice of Conflicts or Errors in Bid Documents 9
3.10. Clarifications of Bids 10
3.11. Bidder Signature 10
4. SPECIFICATIONS AND DRAWINGS 10
5. SPECIAL CONDITIONS 10
6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 11
Appendix A 12
Appendix B 13
Supplier/Bidder List 13

http://www.rfpdb.com/ http://www.imcconstruction.com/general_contractor_landing/construction_manager.php?gclid=CMaD753QurICFUJx4AodulgAkghttp://www.state.nj.us/treasury/purchase/bid/summary/13x22704.shtml 1. INSTRUCTIONS TO BIDDERS
Enterprise is seeking proposals from small businesses and large businesses from commercial construction contracting organizations that have the capability to design and construct a baseball practice field, clubhouse and parking area.
.
1.1. General Description of Work
The semipro baseball project will include but not limited to the demolition of few dilapidated barns, clearing of the land for construction, the construction of small clubhouse, and a parking area that holds about 50 cars.
1.2. What Must Be Included with Bid
Bids for the semipro baseball project must include a $150m insurance bond, proof of reading technical blue prints, a team of construction engineers, skilled supervisors, builders(professional carpenters, electricians, plumbers, flooring experts and general construction workers), the proper earth moving equipment, and plan of moving such project to succession. And all bids should include total cost and schedule breakdowns per the project’ plan, and must be signed.
1.3. Schedule of Bid Period Activities
Enterprise will accept proposals submitted in response to this RFP until 2:30 p.m., Central Standard Time on _Augest____ _13_, 2012_ (the “Submittal Deadline.”) at the following location. Proposals must be received by Enterprise on or before the Submittal Deadline and shall be delivered to:

Purchasing and Distribution Services Department
One UTSA Circle
Pennsylvania, PA 19111
1.4. Location of Work 22 Lenox Park Easton, Pa 19111
22 Lenox
1.5. Pre-Bid Meeting
Pre-bid meeting to be held on August 15, 2013 at One UTSA circle, Pennsylvania, PA 19111 to abreast the bidders about specific requirements of the project. There will be a period of questions and answers, at which time bidders and host can address any issues pertinent to the contract.
1.6. Owner Contact for Questions
Any questions from the bidders should be forwarded to Rionel Crusoe.
1.7. Pre-Award Surveys
There will be pre-award surveys by bidders to glean their technical and management capabilities in respect to the contract execution.
1.8. Sealed Bid Requirements
Bid must be sealed as a security measure.
1.9. Basis for Bid Evaluation
All Bidders must have technological and managerial capabilities to perform such contract.
1.10. Ethical Standards
Bidders are required not to share information with other bidders. Honesty in every proposal is expected by the owner.
1.11. Responsibility for Surety Bonds
All bidders are required to submit proof of surety bond in the amount of $200m as monetary compensation for failure to perform specified acts referenced in the project.
1.12. List of Bidders
Day and Zimmermann General Contractors, Philadelphia
PJ Dick-Trumbull-Linda Paving, Pittsburgh PA
American Infrastructure, Worcester PA
Kinsley Construction INC, York PA
Weston Solutions INC, Westchester PA
Quandel Enterprises INC, Harrisburg PA
Miscaro Construction Company, Pittsburg PA

1.13. Letter of Acknowledgment
We will highly appreciate letter of acknowledgement from bidders to the procurement groups indicating the intent to bid.

RACI CHART:

Responsibility Project Mgr. Project Coordinator Plan engineer Business manager Operations mgr
General Description of Work A/R I A/R
What Must Be Included with Bid A R/I I
Schedule of Bid Period Activities R A/R I I I
Pre-Bid Meeting R A/R C
Owner Contact for Questions R I I
Pre-Award Surveys R A/R
Sealed Bid Requirements R A/R
List of Bidders A/R I I
Letter of Acknowledgment I I A/R
Basis for Bid Evaluation A/R R I
Ethical Standards A/R R C
Responsibility for Surety Bonds C R/A I

List of potential suppliers:

Building - large
Derek Royal
Royal Construction

DENVER, PA (Northern Lancaster County)
73 Kurtz Road, Denver, PA 17517
NEW HOLLAND, PA (Eastern Lancaster County)
828 East Earl Road, New Holland, PA 17557

RELIABLE EQUIPMENT
92 Steamwhistle Drive, Ivyland, PA 18974
Phone: (215) 357-3500 • Fax: (215) 357-9193
Email:info@reliable-equip.com

The selection of the potential suppliers was due to back ground investigation made by the procurement department

Similar Documents

Premium Essay

Proj598 Rfp 3

...Hotel Rooms for FESAC Meeting for U.S. Census Bureau A proposal by DC Hotel and Suites Solicitation #: CENSUS_VLT-13-HOTEL Contract Award Date: April 18, 2013 April 14, 2013 DC Hotel & Suites 1291 Alabama Avenue SE Washington, District of Columbia 20233 +1 301 555 5555 Prepared by: Jennifer Mitchell jennifer.mitchell@dchotel.com DC Hotel & Suites 1291 Alabama Avenue SE Washington, District of Columbia 20233 April 14, 2013 Victor Levi Thomas Contract Specialist U.S. Census Bureau 4600 Silver Hill Road Suitland, Maryland 20746 Dear Mr. Thomas: Attached is our bid for the Hotel Rooms for FESAC Meeting, Solicitation Number: CENSUS_VLT-13-HOTEL. This bid assumes that if granted all necessary arrangements will be made no later than 30 days prior to the FESAC meeting. This bid is also based on information provided at this time. Any revisions required at a later date will be subject to price review at that time. If there is anything you have questions about please contact me any time. Thank you for giving us this opportunity. We look forward to hearing from you. Sincerely, Jennifer Mitchell Hotel Manager Enclosure Contents Technical Approach 4 Introduction 4 General Description 4 Capacity 4 Goals 4 Description 4 Cost 5 Other Amenities 5 Personnel Qualifications 6 References 7 Team Partners 8 Capabilities and Partner Capabilities 8 Works Cited 10 Technical Approach Introduction DC Hotel & Suites is the...

Words: 1306 - Pages: 6

Premium Essay

Proj598-Week-3-Quiz1

...1. | Question : | (TCO B) All of the below would be considered good selection criteria for a buyer to use to select a seller, except | |   | Student Answer: | |  proprietary rights of buyer, overall cost, and warrantee offered by seller. |   | | |  past work done by seller, intellectual property rights, and risk associated with a given seller. |   | | |  technical capability of seller, understanding of work by seller, and business type of seller. |   | | |  managerial approach of seller, capacity of seller to do the work, and ability of seller to make a reasonable make-or-buy decision. |   | Instructor Explanation: | PMBOK® Guide, Chapter 12 | | |   | Points Received: | 10 of 10 |   | Comments: | | | | Question 2. | Question : | (TCO A) In industry, there are four processes one follows in the procurement area of project management. Describe and explain these four processes in the procurement management process for the buyer. | |   | Student Answer: |   | There are four processes in procurement management; plan, conduct, administer, and close procurement. Plan Procurement Process of documenting project purchasing decision, specifying the approach and identifying potential sellers. The first out of four procurement-related project management processes is in the Planning Process group, and is the process which creates the guidelines for all of the procurement activities on the project. It helps document the project procurement decisions...

Words: 1426 - Pages: 6

Premium Essay

Inventory Control System

...Request for Proposal An Inventory Control System Knox’s Catalog 0701 Knox Lane Crest Hill Il.60403 815 919-3300 Andie Knox godlorddivine@yahoo.com PROJ598 – September 2013 TABLE OF CONTENTS 1.5. Pre-Bid Meeting 7 1.6. Owner Contact for Questions 8 1.7. Pre-Award Surveys 1.8. Sealed Bid Requirements 10 1.9. Basis for Bid Evaluation 11 1.10. Ethical Standards 11 1.11. Responsibility for Surety Bonds 11 1.12. Proposal Format 11 1.13. List of Bidders 11 1.14. Letter of Acknowledgment 11 2. DESCRIPTION OF WORK 12 2.1. Engineering Contracts 12 2.2. Construction Contracts 13 3. PROPOSAL 13 3.1. Breakdown of Bid Price 14 3.2. Revisions and Extra Work 14 3.3. Escalation Formulas 14 3.4. Scheduled Completion Dates 14 3.5. List of Subcontractors 14 3.6. Key Supplier or Contractor Personnel 14 3.7. Length of Time Bid Is Valid 14 3.8. List of Bid Document Addenda Reviewed by Bidder 14 3.9. Notice of Conflicts or Errors in Bid Documents 14 3.10. Clarifications of Bids 15 3.11. Bidder Signature 15 4. SPECIFICATIONS AND DRAWINGS 15 5. SPECIAL CONDITIONS 15 6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 16 Appendix A 17 Appendix B 18 1.5 Pre – Bid Meeting The Bidder’s Conference will take place on 29 August, 2013, beginning at 9:00am at the Holiday Inn Hotel in Joliet IL. Please be in place at 08:30am in the main hotel conference room prior to 9:00am for prompt conference start. Pre-bid conferences will be good an opportunity to ensure proper understanding of the...

Words: 579 - Pages: 3

Free Essay

Copier Confused

...PROJ598 – Contract and Procurement Management Copier Confusion The Business Company, Inc., badly needed new copying machines. The company had 20 machines, but they were old and copy quality was poor. They broke down frequently. And to change paper size from 8.5 x 11 in. to legal-size, the user had to remove one paper tray containing 8.5 x 11 in. paper and replace it with a tray containing legal-size paper. Newer machines had two trays, one for each paper size, that permitted changing paper size at the push of a button without changing paper trays. John Richards, the company’s purchasing agent, thought this would be a labor-saving feature and decided to include it in a specification for purchase of new machines. The copying machine industry called this feature, “dual-cassette” design. The Business Company issued an invitation for bids for purchase and maintenance of 20 replacement machines. The solicitation included a specification that called for a machine that would permit “copying both 8.5 x 11 in. and legal-size paper without manually changing the paper trays.” The term dual cassette did not appear in the specification. John received bids from several companies, including Copies Incorporated, a reputable manufacturer. Copiers had greeted the invitation for bids with great pleasure. Their inventory included 30 of their Model 125 copying machines, which they were phasing out. The Model 125 had only one tray, which held 8.5 x 11 in. and legal-size paper, but legal-size paper...

Words: 971 - Pages: 4

Premium Essay

Pm598 Pp1

...Request for Proposal New Practice Field – Spokane Indians Spokane Indians 602 North Havana Street, Spokane, WA 99202 (509) 535-2922 PROJ598 – Nov. 2012 TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS 3 1.1. General Description of Work 3 1.2. What Must Be Included with Bid 3 1.3. Schedule of Bid Period Activities 3 1.4. Location of Work 4 1.5. Pre-Bid Meeting 4 1.6. Owner Contact for Questions 4 1.7. Pre-Award Surveys 4 1.8. Sealed Bid Requirements 4 1.9. Basis for Bid Evaluation 4 1.10. Ethical Standards 4 1.11. Responsibility for Surety Bonds 4 1.12. Proposal Format 4 1.13. List of Bidders 4 1.14. Letter of Acknowledgment 4 2. DESCRIPTION OF WORK 5 2.1. Engineering Contracts 5 2.2. Construction Contracts 5 3. PROPOSAL 5 3.1. Breakdown of Bid Price 5 3.2. Revisions and Extra Work 5 3.3. Escalation Formulas 5 3.4. Scheduled Completion Dates 5 3.5. List of Subcontractors 5 3.6. Key Supplier or Contractor Personnel 5 3.7. Length of Time Bid Is Valid 5 3.8. List of Bid Document Addenda Reviewed by Bidder 5 3.9. Notice of Conflicts or Errors in Bid Documents 5 3.10. Clarifications of Bids 5 3.11. Bidder Signature 5 4. SPECIFICATIONS AND DRAWINGS 5 5. SPECIAL CONDITIONS 5 6. GENERAL CONDITIONS AND CONTRACT AGREEMENTS 5 Appendix A 6 Appendix B 8 Supplier/Bidder List 8 1. INSTRUCTIONS TO BIDDERS 1.1. General Description of Work This proposal is intended to provide an insight to bidders regarding...

Words: 1295 - Pages: 6

Free Essay

Proj 598 - Part 2

...RFQ: FHWA Website Project Antoine Stephenson Contract and Procurement Management DeVry University, Keller Graduate School of Management Solicitation Number: PR031014_290 Notice Type: Combined Synopsis/Solicitation PROJ598 August 17, 2014 Professor: Gloria Durham Outline Cover Letter: Technical Approach: Problem/Request: The Federal Highway Administration (FHWA) has a requirement to conduct an analysis of the website, Federal-aid Essentials for Local Public Agencies (www.fhwa.dot.gov/federal-aidessentials), and to provide an updated design of the website to enrich the initial layout, usability, and functionality of the website. Solution: As a company Twanworks Inc., is different from other design companies. We don’t look to just deliver a product but to deliver an overall experience that will turn into a long lasting relationship/contract. Our understanding of current technical requirements that go into the process of planning designing, and implementing a website, is extensive and growing. We provide a whole solution to the problem at hand not just a product. Task 1 – Kick Off Meeting As with each and every project our company will send over some of our staff to visit your company/department to better understand the full needs and goals of each project. We will be sending a Project Manager (myself) and two of our senior staff. The purpose of which is to establish a working process that works within your...

Words: 2345 - Pages: 10

Premium Essay

Rfp Response to a Proposal

...Response to Expression of Interest To provide office space in Atlanta Metro Area PROJ598 – 22 April 2013 Submitted to: William B. Jones, Leasing Specialist Solicitation Number: 3GA0233 Submitted by: William B. Jones 11330 Lakefield Drive Building Two, Suite 200 Atlanta, GA 30097 Telephone: (770) 814-4466 Fax: (866) 251-892 Email: joneswil@oriis.com Table of Contents 1. SUMMARY OF PROPOSAL 3 1.1. Company Safety Program 3 1.2 Company background and relevant experience with Government Real Estate Acquisition 4 1.3. Report capabilities 4 1.4. References 4 1.5. Financial Information 4 2. Response to scope 4 3. Proposed Pricing 5 4. Other 6 4.1. Building requirement 6 4.2. Building location 6 4.3. Lease 6 4.4. Flood plain 6 4.5. Remaining issues 6 Attachments: Building location 7 Lease 16 1. Summary of proposal Office, Retail, Industrial & Investment Sales, LLC, is pleased to offer our bid to provide office space to the General Service Administration (GSA) in the Atlanta Metro area, Solicitation number: 3GA0233.. William Jones is Co-Owner and Principal Office, Retail, Industrial & Investment Sales, LLC, and has been involved in the commercial real estate industry since...

Words: 2413 - Pages: 10

Free Essay

A New Practice Field

...PROJ598—Contract and Procurement Management TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDERS Jones Sports Incorporated will start the process of accepting bids from contractors starting November 23, 2014 to build a new baseball field located at 5424 Rolling Meadows Drive, Fort Worth, Texas 76124.Jones Sports will accept proposals for the construction of a practice baseball field, a small parking lot and a clubhouse. 6 1.1. General Description of Work Jones Sports has purchased 20 acres of land for their semi pro baseball team to conduct practice. On this land Jones Sports has plans to build a practice field, a 50 space parking lot and a small clubhouse. These facilities will be designed for the use of the team and coaches only and does not require seating for spectators. The outcome of the project would have the construction of a practice field with artificial turf, a 4,000 square foot clubhouse that will consist of a locker room with restrooms and showers, a meeting room with a projector screen and projector, a lounge, a small room for storage and a 50 car parking lot where each space will hold a mid-size vehicle. The project will also consist of lighting for the baseball field and parking lot as well.as utilities. There will be no seating for spectators as part of this project. The layout of the practice field, clubhouse and parking lot will created by the winning contractor with the plans being approved before construction begins. A study has been done and it has shown...

Words: 3898 - Pages: 16