Q. What distinguishes system thinking from analytical thinking? Is systems thinking something new or is it just another perspective? Explain.
Analytical thinking says about the parts or elements of the situation, but in system thinking is about the how those parts and elements are work together, and it is a combination of both the analytical thinking and the synthetical thinking, in analytical thinking we always prefer to eliminate the unsatisfactory elements and we pick the best option after removing the elements, that means we try to reduce the risk factor by eliminating the unnecessary elements, but in systems thinking we consider all the elements and make them into groups and those groups are subjected to the central or main theme of the concept. We need both the system thinking and innovation or analytical thinking to solve the complex problems
System thinking is opposite of analytical thinking because in the system thinking the whole or system is primary and the parts or individuals are secondary, but in analytical writing parts are primary and system or whole is secondary. System thinking is the closed loop thinking it is quite difficult to understand In systematic thinking mainly there are three steps included, list out the systematic elements, group them into sub themes, and finally find the central or main theme of the project.
System thinking: “System thinking is a universal approach to understanding that focuses on the way that a system’s constituent parts interrelate and how systems work over time and within the conditions of larger systems” system thinking is nothing but the way of approach to solve the problem, by viewing problems as part of an overall system rather than reacting to specific part of outcomes or events it is necessary to understand system first, in order to understand system thinking. For example if we take a car it is made up of engine wheels battery and so on.., and these parts are put together to organize in a specific way, so it makes a function is a vehicle transport.
Analytical thinking: Analytical thinking is a critical component of the visual thinking that which shows the ability of the fast and effective thinking

Q. Describe the following concepts and explain how they fit into systems thinking: objectives, elements, subsystems, attributes, environment, boundary, structure, inputs, outputs, process and constraints.
A system is defined as coordination of set of parts to achieve the common objective or goal. It should mainly defined first and foremost by its objectives and then by environment, attributes and elements and subsystems etc..
Objectives and goals: in order to finish any project we have to set some objectives and goals, because they are very helpful to guide the correct way, we have chance to focus on important things and we will take good decisions to finish the task very efficiently. So setting of goals and objectives are very important in every system or project, similarly those are very helpful in system thinking process. so for every man made systems it is necessary to set the goals and objectives.
Elements and Subsystems: The smallest part in the system is called an element and subsystem is nothing but it is an integrating part of the main system and acts as a component of the large or main system and subsystem can also defined as arranging of elements into smaller groups to create an environment to cooperate with each other and assign the work to them for getting good result “A subsystem is a system that functions as a component of a large system” for example in online marketing the retailer have a distribution system but within that some subsystems may be exist like delivery, order fulfillment etc.. so for any system the elements play a key role in the success of the system, if a system having a good and strong elements then the subsystem and as well as system becomes very strong, so elements are like roots for subsystem and subsystems are act as roots for system thinking.
Attributes: Attribute is nothing but the property or characteristics of the objects. For example the color of leaf, here color is characteristic of the leaf. similarly components, elements, system, have their unique characteristics. And it describes the quantitative and qualitative terms of the elements, system and the subsystems.
Environment and boundary: Environment is nothing but the surroundings, it may effects the system, and the boundary separates the system from the environment and protects. The system is somewhat obscure and it is difficult to separate system from the environment
Inputs, process, Outputs:
In any successful system, the output of the any task should be based on the input raw material and the process of the system, for example in making of tea milk, sugar, and tea powder are the elements or raw materials and the vessel is a source to process, pour them into vessel then if we subject them to heat then we get the output, here the output or the product quality depends on the process and the raw materials, so the coordination of these elements are very important in the system.
Q. Describe the features and properties that distinguish human organizations from other systems.
Organizations is a special class of open system that which having their own properties, and it shares the common features with all other systems. Open systems also contributes the characteristics of the negative entropy, feedback, homeostasis, differentiation and coordination. System is defined as group of elements interact with each other and to fulfill their common purpose or goal. Systems can be commonly classified into two types according to the interaction with the environment, open system and closed system. In open system the elements, subsystems and system interact with each other and with other system and with the environment. As we know that most of the human organizations are open systems, in these organizations people, information, capital, and material is used as input, goods waste products are outputs. many organizations consume the raw material for production and emit the finished goods along with the pollution and some waste. For open system there is no particular boundaries so these organizations are interacts with the environment. But where as in closed system, system have relatively less interaction with the environment.
Q. What is the environmental fallacy?
Environmental fallacy is error of ignoring or fail to understand the effects of the environment of system. According to the Charles west churchman every problem is totally linked to the environment and attempts to solve one problem will cause others. Mainly the ecological fallacies are confusion between the ecological correlation and individual correlation, higher average and higher likelihood, total and group average.

Q. What is modularization? What are its benefits in system design and operation.
Modularization is nothing but the breaking or splitting the main large program into multiple modules. Modularization of system design and operation can be approach in two ways 1. Theoretical approach of modularization 2. Practical approach of modularization
Modularization will be beneficial to a company or organization or a system, including market demand, focus of component, time to market, module decoupling according to interface and mixing and matching. Benefits of modularization are: * Provides abstraction * Ignoring non essential details and focuses on important properties. * Multiple programs are allowed to work simultaneously * It helpful to understand the structure easily, and makes structure easier. * Allows code reuse
The subsystem or loop is replaced by the simplified elements, and make the complicated structure into simple structure.

Case study 2-1:
Q. What is the system? What are its key elements and subsystems? What are boundaries and how are they determined? What is the environment?
Purification of the water in Gulf is the main system and the key elements are waste from the garbage, raw sewage during the heavy rainfall, subsystems are purification of waste before dumping into the Gulf. The main goal of the system is to recover the gulf from current situation, that which is effected by waste, so I think every surroundings that which may helpful to get back the normal stage of Gulf from the waste by proper maintaining the purification system.
Q. Who are the decision makers?
GCSD and the people are plays key role in the system, people thoughts regarding the population growth, and waste minimization will definitely influence and decides the future of the Gulf water pollution.
Q. What is the problem? carefully formulate it.
The main problem is in flood conditions it would be a little bit difficult to the proper filteration before the dump into Gulf. And one more thing is population growth and industry growth. Due to increasing those things, a lot of problems that faced.
Q. Define the overall objective of the water waste management program, because the program is wide ranging in scope you should break this down into several sub objectives.
The main objective of the water management program is to reduce the effect of waste which is subjected to the environment because gulf facing a lot of problem with the population growth and as well as the industry growth.
Q. What are the resources and constraints. There are so many resources like restaurants, resorts, hotels, beaches, fishing nearby beach etc.. The main resource for the water treatment or waste management is filtration plants that which are filter the waste before release into the environment.

Q. Elaborate on the kinds of alternatives and range of solutions to solving the problem.
The main aim of the system is to reduce the waste and process the waste, so it should be fulfill with the creating awareness about the problems that which are raised due to the population growth, and make a strict rule for industries, it is necessary to process the waste before relive into the surroundings.
Q. Discus some techniques that could be used to help evaluate which alternatives are better.
The main thing that we have to do is creating awareness about the problems due to the population growth, and give clear instructions to the industries, and make a rule to the industries, purifying the waste before release into outside.
Case study 2-2
Q. In this case history, what is system and what are the elements, what is environment and what are elements of the environment.
In this case study the main theme is explanation about the two entities of the british aerospace project, the main system is the process of the aircraft manufacturing and designing features , the elements are funding, design, cost and delivery dates etc..
Q. Describe the interaction between the system and its environment.
System has interaction with the environment in open system but where as in closed system the interaction between the system and environment should be very less almost negligible, the main reason for this situation is formation of barrier between the system and the environment.
Q. Do you feel that important decision made in this project system thinking? Explain.
System thinking is one of the main phenomenon while handling a project. It concentrates on systems not in subsystems the contractor or head of project will follow the system thinking. System think will handle the systems and employees below them will handle sub systems.
Q. Comment on the concept of integration in the project. How were aspects of the project integrated or not integrated?
Integration means checking all the elements of project are properly working or not. Integration gives an idea about project how it is going daily.
Not integration process generally takes place in building normal house.
Q. What are the main factors that contributed to cancelation of the project? Which of these factors would you characterize as project management?
There may be a lot of reasons to cancel the project like failure to fulfill the legal issues, cost of the project, material quality, lack of proper scheduling, fail to meet the conditions in the contract document. Every factor influence the project management.

Similar Documents

Premium Essay

Project Management

...MAN620/ADM720 Project Management Lecture Session 1 : 26th January 2010       An introduction into project management with some history of project management and some contextual information. How project management has permeated almost all aspects of working life. The evolution of the project management context. Why and under what circumstances project management is used. What characterizes projects and differentiates them from other forms of management. Examples of projects – large medium and small. Chapter 1 - An Introduction to Project Management The Project Management Book of Knowledge (PMBoK) defines Projecy Management as “the application of knowledge, skills, tools and techniques to project activities to meet project requirements”. In the course outline we make the following statements with regard to what this course promises you engineering students. In the engineering environment, Project Management can be practiced either a stand-alone professional discipline or as an integral part of the delivery mechanism for engineering services. Either way, all engineers need a thorough understanding of Project Management theory, principles, practices, tools and techniques. This course has been structured to stimulate the interest of student engineers in the discipline of Project Management and to equip them with sufficient knowledge of the discipline to meaningfully participate in project work at an early stage. Many organisations do not employ full time Project Managers and...

Words: 5880 - Pages: 24

Premium Essay

Project Management

...Project Management 1. Introduction As a discipline and professional subject, project management has gained unprecedented prevalence throughout the world as a consequence of its role in assisting the organization to efficiently utilize limited resources, resolving sophisticated technology and enhancing its survive in the increasingly competitive market. Specifically, implementing project management techniques assists the organization in curtailing the overheads costs, satisfying project deadlines and customizing the project workplace and so forth. Some 4500 years ago, projects had been undertaken with the pyramids construction by the ancient Egyptians, but it is universally accepted that the period of 1950s is an indication of the arrival of modern management era and the commencement of utilizing formal project management tools and techniques (Awan, 2010). Economic pressures of the industrialized world, competition between rival companies and greater regard for the value, well-being and hence the employment costs of working people have all contributed to the development of new project management ideas and techniques. The purpose of this essay is to identify the major developments in the domain of project management over the past five decades and to explain how these historical developments influence the understanding of modern project management. 2. Crucial Developments in the Field of PM and Repercussions on Understanding Modern Project Management Prior to 1950s...

Words: 2234 - Pages: 9

Premium Essay

Project Management

...MBP1133 | Project Management Framework Prepared by Dr Khairul Anuar L1 – The Project Environment www.notes638.wordpress.com 1 Lecture Topics 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. Introduction Understanding Project Management Overview of Project Management Project Management according to PMBOK® Guide What is a Successful Project Management Benefits of Project Management Obstacles in Project Management Project Deliverables Project Stakeholders Defining Project Success Defining the Project Manager’s Role Project Scope and Product Scope Project Management Success Factors Project Management Failure Project Life Cycle Integrated Processes of Project Management Integrated Processes of Project Management 2 1. Introduction • PM started about 40 years ago in the US in the Department of Defense contractors and construction companies. • Today, the concept behind project management is being applied in such diverse industries and organizations as  defense, construction, pharmaceuticals, chemicals, banking, hospitals, accounting, advertising, law, state and local governments, and the United Nations and  even transitional planning for a new US president (Romney Readiness Project, in 2012), and  NGOs/disaster relief organisation 3 4 2. Understanding Project Management • A project can be considered to be any series of activities and tasks that:  Have a specific objective to be completed within certain specifications  Have defined start and end dates  Have funding...

Words: 1391 - Pages: 6

Premium Essay

Project Management

...2 3.0 PROJECT MANAGEMENT 2 4.0 PROJECT MANAGEMENT PROCESS 3 5.0 PROJECT LIFE CYCLE 3 6.0 FIRST PROJECT MANAGEMENT PROCESS- PROJECT INITIATION 5 6.1 BENEFIT AND LIMITATION IN PROJECT INITIATION PROCESS 7 7.0 SECOND PROJECT MANAGEMENT PROCESS- PROJECT PLANNING 11 7.1 BENEFIT AND LIMITATION IN PROJECT PLANNING PROCESS 13 8.0 THIRD PROJECT MANAGEMENT PROCESS- PROJECT EXECUTION 14 8.1 BENEFIT AND LIMITATION IN PROJECT EXECUTION PROCESS 16 9.0 FOURTH PROJECT MANAGEMENT PROCESS- CONTROLLING/MONITORING 18 9.1 BENEFIT AND LIMITATION IN PROJECT CONTROLLING/ 20 10.0 FINAL PROJECT MANAGEMENT PROCESS – CLOSING PROCESS 22 10.1 BENEFIT AND LIMITATION IN PROJECT CLOSING PROCESS 23 11.0 BIBLIOGRAPHY 25 12.0 APPENDICES 27 1.0 INTRODUCTION To know the benefit and limitation of using single process for managing projects, firstly we need to know what is project, project management and what is the process to manage projects. 2.0 PROJECT Project is viewed as a conversion or transformation of some form of input into an output. The inputs are some form of want or need which is satisfied through the process. (Harvey Maylor, 1996) 3.0 PROJECT MANAGEMENT According to Project Management Methodology guidebook, project Management is the process of achieving project objectives (schedule, budget and performance) through a set of activities that start and end at certain points in time and produce quantifiable and qualifiable deliverables. Project management...

Words: 6687 - Pages: 27

Premium Essay

Project Management

...11/17/07 The Project Management Life Cycle By Jason Westland (A book review by R. Max Wideman) Introduction Editor's Note: We liked so much of this book that we asked for the author's permission to quote extensively from the whole of Jason Westland's Chapter 1. This is because it succinctly describes what follows in detail in the remainder of the book. However, in pursuing our regular book review structure, we placed his text under corresponding headings. Since the quotations are so extensive, we have not followed our normal practice of indenting quoted paragraphs. However, the references are identified in the footnotes. As Jason says: "Welcome to The Project Management Life Cycle. This book describes the Methodl23® Project Management Methodology (MPMM)1 and provides a practical approach to managing projects. Every phase, activity and task in the project life cycle is described here in detail to help you manage staff, customers and suppliers efficiently. By reading this book, you will gain the knowledge and confidence required to properly initiate a project, create detailed project plans, build high quality deliverables, monitor and control delivery and close projects effectively. "Not only will you learn how to successfully complete projects from end to end, but you will also be armed with a suite of tools and templates to allow you to create project deliverables quickly and easily. More than 150 charts, tables and diagrams are included in this book to help explain the steps...

Words: 4494 - Pages: 18

Premium Essay

Project Management

...Project Management Jo Anne Bishop Ashford University Project Planning and Management BUS611 Dr. Caroline Howard October 14, 2012 Project Management Effective project management is crucial to the success of any project regardless of the size or complexity. Project management experts Karen Tate and Paula Martin said, “Trying to manage a project without project management is like trying to play football without a game plan” (Martin & Tate, 2001, pg 9). Project managers have a difficult job. Their jobs are often times made more difficult by the dynamic environment in which they must work. Project managers must take a project through the entire project management life-cycle, from an idea to a fully developed deliverable. While the job is difficult, there are many tools and processes that have been developed to assist in project management. While they are responsible for the leadership of the project, they have many, such as the project sponsor and project team members, who are there to assist them in ensuring the job gets done. In addition to the personnel who will help him, there are many different project management tools as well. Project scope, work breakdown structures, contingency plans and project management software are all tools that, if used properly, can ensure that a project can be completed within time and budget. Project management is not an easy job but if a project manager understands his project and his roles and responsibilities along with the...

Words: 3003 - Pages: 13

Premium Essay

Project Management

...related to project management? The video illustrate the introduction of the project management institute. The video shows the project management training programs from registered education provider. In the video, it provided basic information of project management standards. The website source shows the project management maintaining connections with the business world, successful project management programs are learning to adapt to address the changing needs of business. However, the video shows several main points of project management training. Frist one, project management education is growing globally. Second, organizations want project managers with the right skills. 2) How is this specifically related to the textbook information? (Be specific!) The video mentions the important reason why choose from the project management institute and how the project management training development. Project management provides people with a powerful set of tools that improves their ability to plan, implement, and manage activities to accomplish specific organizational objectives. Exciting opportunities await people skilled in project management. (Larson and Gray 2-3). The YouTube video does relate to the textbook information.   Because this video is a good commercial introduction to the Project Management Institute. In the textbook, chapter one is all about the modern project management, the importance of project management, and an integrative approach of today’s project management. The project...

Words: 277 - Pages: 2

Premium Essay

Project Management

...Managing Projects Table of Contents Task 1 3 1.1. Network diagram 3 1.2. Total float 3 1.3. Critical path. 4 1.4 Timetable 4 1.5. Adjusted timetable 5 1.6. Limitations of the network diagrams 6 i. Time 6 ii. Costs 6 iii. Ambiguity 7 iv. Complexity 7 v. Reliability 7 vi. External factors 7 Task 2 7 2.0. Executive summary 7 2.1. Introduction 8 2.1.1. Project management 8 2.1.2. The roles and the scope of the project manager in a company 9 2.2. Project management techniques 10 2.3. Methodology 10 2.4. Project development stages and process 11 Initiation stage 12 Planning and designing stage 13 Execution of the project 13 Monitoring and controlling stage 14 Closing stage 14 2.5. Risks and control problems 14 2.6. Recommendations 16 2.7. Conclusion 16 Reference lists 18 Task 1 1. Network diagram [pic] 2. From the below snapshot derived from a programming software, the total float days is equal to 76 days [pic] 3. From the below diagram, the critical path is determined by the longest duration between the tasks that the project may take to complete. The red arrows denote the path. This time does not include the floats between the tasks but instead the period between the parallel tasks (Nigel 1995). [pic] 4. |ID |Task Name |Duration (Days) |Start ...

Words: 3680 - Pages: 15

Premium Essay

Project Management

...Project Management-C101 Section A Part One: 1. C) Project 2. C) Lower cost of capital 3. D) Projects involve little uncertainty 4. C) Meeting communications goals 5. A) Proposal 6. A) Project Management 7. A) Strategic, tactical 8. B) Program 9. D) Technical skills 10. B) Process Part Two: Q1. Project management is a one-time carefully planned and organized effort to achieve a specific goal. Project management includes: Developing a project plan, which includes defining project goals and objectives, specifying tasks or how goals will be achieved, what resources are need, and associating budgets and timelines for completion Implementing the project plan, carefully to make sure the plan is being managed according to plan. The different phases of a project lifecycle are as below: Project Lifecycle 1. Project Initiation Project Initiation in simple terms is: starting up the project. We initiate a project by defining its reason, business goals, and scope. The reason for initiating it, and the propose solution to be implemented. We will also put together a project team, define early milestones, and early budget proposal. With the above information we can move on and perform an end of Phase study in order to get a GO No GO decision. 2. Project Planning Once we define the project and assemble the project team, we are ready to enter the in depth Project Planning phase. This involves creating the "PMP", Project Management Plan, in...

Words: 5015 - Pages: 21

Premium Essay

Project Management

...letters.” Chapter 1 1) The association designed to bring together project management professionals and systematically capture project management knowledge is called: 1) _______ A) Project Management Institute. B) Project Management Professionals Association. C) PM Knowledge Organization. D) The Knowledge Association. 2) A planned undertaking of related activities to reach an objective that has a beginning and an end is called: 2) _______ A) a system. B) a campaign. C) a project. D) an undertaking. 3) Projects are: 3) _______ A) to be avoided. B) indefinite. C) temporary. D) never successful. 4) A ________ is a person who has an interest in a new or existing project. 4) _______ A) professional B) projector C) stakeholder D) federal investigator 5) A ________ provides high level support for a project. 5) _______ A) stakeholder B) project manager C) project sponsor D) projector 6) A project failure can be: 6) _______ A) a project that finishes but exceeds it budget. B) a project that does not finish on time. C) a project that finishes on time and budget but does not deliver a system that meets expectations. D) all of the above. 7) Which factor is among the primary reasons for project failure? 7) _______ A) Failed communication among parties B) Poor quality control C) Lack of planning D) All of the above 8) Failure can take place ________ of a project. 8) _______ A) during the initiation process B) during any process C) during...

Words: 4357 - Pages: 18

Premium Essay

Project Management

............................................................................. 4 Main Body .............................................................................................................................................. 5 1.0 Project Charter ......................................................................................................................... 5 Project Vision .................................................................................................................................. 6 Project Objectives/Deliverables ....................................................................................................... 6 Assumptions .................................................................................................................................... 7 Risks and Dependencies................................................................................................................... 7 Actor Catalog .................................................................................................................................. 9 Business Process Flow ................................................................................................................... 10 Project Organization Chart ............................................................................................................. 11 Roles and Responsibility ......................................................................................

Words: 8273 - Pages: 34

Premium Essay

It Project Management

...Bronson Prof. Brian Kraus Project Management – CIS 517 July 14, 2013 In the Denver suburb of approximately 309,000, Aurora faced a severe drought that lasted for several years. By 2003 the water supply in the city was at an all-time low. The decline in the water supply and a constant drought forced the water authority to enforce water restrictions and other incentives to encourage residence to conserve water. There was only enough water for the community for 9 months when there was a need for a 3 - 5 year supply. The Aurora city government and the Aurora water authority desperately needed a solution to the issue of dwindling water supply, after analyzing several possible resolutions to the problem; the Aurora city council approved the Prairie Water Project in 2010. The city sought a project to increase the city’s water supply by adding 10,000 acres of renewable water within a 5 year timeframe with a budget of $854 million. The Meridian Colorado project management team of CH2MHill was chosen to complete the plan. CH2MHill is a worldwide organization that is a leader in providing their clients who needed engineering or consulting resolutions. They also provided their clients with solutions by being technologically sound, creative, and inventiveness. They are known for delivering a quality product and sharing the benefits. The Prairie Water Project was a plan to provide the Aurora, Colorado community with a sustainable water source. The project would draw water from...

Words: 1232 - Pages: 5

Premium Essay

Project Management

...Fundamentals of Project Management Third Edition This page intentionally left blank Fundamentals of Project Management Third Edition JAMES P. LEWIS American Management Association New York • Atlanta • Brussels • Chicago • Mexico City • San Francisco Shanghai • Tokyo • Toronto • Washington, D.C. Special discounts on bulk quantities of AMACOM books are available to corporations, professional associations, and other organizations. For details, contact Special Sales Department, AMACOM, a division of American Management Association, 1601 Broadway, New York, NY 10019. Tel.: 212-903-8316. Fax: 212-903-8083. Web site: www.amacombooks.org This publication is designed to provide accurate and authoritative information in regard to the subject matter covered. It is sold with the understanding that the publisher is not engaged in rendering legal, accounting, or other professional service. If legal advice or other expert assistance is required, the services of a competent professional person should be sought. Lewis, James P., 1941– Fundamentals of project management / James P. Lewis.—3rd ed. p. cm. Includes bibliographical references and index. ISBN-10: 0-8144-0879-6 ISBN-13: 978-0-8144-0879-7 1. Project management. I. Title. HD69.P75L488 2007 658.4'04—dc22 2006019308 “PMI” and the PMI logo are service and trademarks of the Project Management Institute, Inc. which are registered in the United States of America and other nations; “PMP” and the PMP logo are certification...

Words: 45558 - Pages: 183

Premium Essay

Project Management

...Project Management By Present Project management techniques can be used to improve the ampletion of project by planning and scheduling a project to develop the work break down structure. This involves identifying the activities that must be performed in the project. An activity is a job or task that is a part of a project. There may be varying levels of detail, and each activity may be broken into its most basic components. The time cost resource requirement predecessors and persons responsible are identified for each activity. When this has been done a schedule for the project can be developed. For example the most realistic project that organizations like Microsoft, General Motors, or the U.S. Defense Depart undertake are large and complex. A builder putting up an office building for example must complete thousand of activities costing millions of dollars. NASA must inspect countless components before it launches a rocket. Almost every industry worries about how to manage similar large scale, complicated projects effectively. In addition to managing the time and cost involved in a project, a manager must also be concerned with resources used in a project. These resources might be equipment for people. In planning a project and often as part of the work break down structure, a manager must identify which resources are needed with each activity. For example, in a construction project there may be several activities requiring the use of heavy equipment such as...

Words: 445 - Pages: 2

Premium Essay

Project Management

...01 1.1 Introduction of Project Management Although project management history starts further back in latter 19th century modern project management began in the early 1960s. The need of the project management increased with the development of business around projects and to communicate and co-ordinate work across departments and people. According to the PMBOK (2008) project defines as "temporary endeavour undertaken to create a unique product or service.Temparary means that every project has a definite end. Unique means that the product or service is different in some distinguishing way from all similar product or service." PMBOK (2004) analyse project management as “the application of knowledge, skills, tools and techniques to project activities in order to meet stakeholder’s needs and expectations from a project." Where, Grham (1985) identified project management as "a set of people and other resources temporarily assembled to reach a specified objective, normally with a fixed budget and with a fixed time period. Projects are generally associated with products or procedures that are being done for the time or with known procedures that are being altered." These two definitions clearly show the difference of identifying the project management in time to time. Success or failure of the project can influence by project manager. He integrates and co-ordinates and guides them to successfully complete the project. Below are some desirable project manager attributes (Burke...

Words: 1834 - Pages: 8