Submitted By pushpozaman3
Words 1773
Pages 8
Date: 4th September, 2009
Junaid khan
Course Instructor,
School of Business,
North South University
Subject: Submission of the Intern report.
Dear Sir,
I am very pleased to submit this report, which has been prepared for the requirement of the course of BUS-498. I tried my level best to complete this report properly and to write an efficient term paper within all the constraints.
In spite of the various difficulties faced in preparing this project, I tried to be as thorough as possible. I therefore request you to accept this report as per the requirement of the course.
Sincerely,

Importance of planning in country less developed and developing countries
The meaning of economic planning differ from country to country and person to person. Keeping in view the various definitions we can say that aim of all the plans is to utilize the available resources more effectively achieving the well defined objectives during given period of time.

Importance or Objectives or Advantages of Planning

1. In crease in National Income :-
The objective of planning is to utilize the resources of the country in such a manner that it should increase the size of national income. In the developing countries planning is very useful for increasing the production of the country.

2. Superior Decisions :-
The decision of planning authority are more superior as compared to the individuals. Planning authority keeps in view the interest of the whole nation. It prepares the plan keeping in view the economic condition of the country.

3. Achievement of Full Employment :-
In the less developed countries and in the advanced countries the objectives of planning is to achieve the full employment.The main objectives of the planning to create jobs for the people of the country.

4. Equal Distribution Of Wealth :-
In the capitalistic countries the gap between rich and poor is increasing. It creates social evils. Through planning we can reduce the inequalities in income.

5. Elimination or Regional Disparity :-
Through planning the regional economic disparities can be removed. In the plan special fund can be allocated for the development of backward areas. It is the one of main objective of planning that there will be reduction in the regional disparity.

6. Improvement in The Balance Of Payment :-
The balance of payment of developing countries remains deficit. It adversely affects the rate of economic growth. Through planning government can reduce the imports and can increase the exports.

7. Balanced Economy :-
If one sector of the economy is developed the country will not achieve maximum rate of development. Through planning resources of the country can be allocated in such a manner that it provides balance to the economy.

8. Control of Economic Crises :-
Due to economic crises, economy faces many problems. Through planning depression can be controlled and production can be increased.

9. Solution of Over Population :-
When the size of population is greater than the size of natural resources it can be adjusted through effective planning.

10. Self Sufficiency In Food :-
Each country wants to become self sufficient in food. So this objective is also achieved through planning. In the each development the target was proposed for the agriculture sector.

11. Industrial Development :-
Today without industrialization no any country can improve its economic condition. For the establishment of new industries, planning is very effective.

12. Increase In welfare Program :-
The provision of social services is main aim of the planning. For example some developing countries plan various facilities like housing, schooling, transport and water provided to the people.

13. Increase In Capital Formation :-
Without increasing the rate of capital formation, we can not increase the rate of development. In the less developed countries rate of saving is very low and due to this rate of investment is low. Through effective planning we can increase the rate of savings in the country.

14. Elimination of Poverty :-
Through planning we can increase the rate of economic development in the country. National income and per capita income will rise and poverty will remove.

Advantages
1. Planning facilitates management by objectives.
a. Planning begins with determination of objectives.
b. It highlights the purposes for which various activities are to be undertaken.
c. In fact, it makes objectives more clear and specific.
d. Planning helps in focusing the attention of employees on the objectives or goals of enterprise.
e. Without planning an organization has no guide.
f. Planning compels manager to prepare a Blue-print of the courses of action to be followed for accomplishment of objectives.
g. Therefore, planning brings order and rationality into the organization.
2. Planning minimizes uncertainties.
a. Business is full of uncertainties.
b. There are risks of various types due to uncertainties.
c. Planning helps in reducing uncertainties of future as it involves anticipation of future events.
d. Although future cannot be predicted with cent percent accuracy but planning helps management to anticipate future and prepare for risks by necessary provisions to meet unexpected turn of events.
e. Therefore with the help of planning, uncertainties can be forecasted which helps in preparing standbys as a result, uncertainties are minimized to a great extent.
3. Planning facilitates co-ordination.
a. Planning revolves around organizational goals.
b. All activities are directed towards common goals.
c. There is an integrated effort throughout the enterprise in various departments and groups.
d. It avoids duplication of efforts. In other words, it leads to better co-ordination.
e. It helps in finding out problems of work performance and aims at rectifying the same.
4. Planning improves employee’s moral.
a. Planning creates an atmosphere of order and discipline in organization.
b. Employees know in advance what is expected of them and therefore conformity can be achieved easily.
c. This encourages employees to show their best and also earn reward for the same.
d. Planning creates a healthy attitude towards work environment which helps in boosting employees moral and efficiency.
5. Planning helps in achieving economies.
a. Effective planning secures economy since it leads to orderly allocation ofresources to various operations.
b. It also facilitates optimum utilization of resources which brings economy in operations.
c. It also avoids wastage of resources by selecting most appropriate use that will contribute to the objective of enterprise. For example, raw materials can be purchased in bulk and transportation cost can be minimized. At the same time it ensures regular supply for the production department, that is, overall efficiency.
6. Planning facilitates controlling.
a. Planning facilitates existence of certain planned goals and standard of performance.
b. It provides basis of controlling.
c. We cannot think of an effective system of controlling without existence of well thought out plans.
d. Planning provides pre-determined goals against which actual performance is compared.
e. In fact, planning and controlling are the two sides of a same coin. If planning is root, controlling is the fruit.
7. Planning provides competitive edge.
a. Planning provides competitive edge to the enterprise over the others which do not have effective planning. This is because of the fact that planning may involve changing in work methods, quality, quantity designs, extension of work, redefining of goals, etc.
b. With the help of forecasting not only the enterprise secures its future but at the same time it is able to estimate the future motives of it’s competitor which helps in facing future challenges.
c. Therefore, planning leads to best utilization of possible resources, improves quality of production and thus the competitive strength of the enterprise is improved.
8. Planning encourages innovations.
a. In the process of planning, managers have the opportunities of suggesting ways and means of improving performance.
b. Planning is basically a decision making function which involves creative thinking and imagination that ultimately leads to innovation of methods and operations for growth and prosperity of the enterprise.

Disadvantages

internal Limitations
There are several limitations of planning. Some of them are inherit in the process of planning like rigidity and other arise due to shortcoming of the techniques of planning and in the planners themselves.
1. Rigidity
a. Planning has tendency to make administration inflexible.
b. Planning implies prior determination of policies, procedures and programmes and a strict adherence to them in all circumstances.
c. There is no scope for individual freedom.
d. The development of employees is highly doubted because of which management might have faced lot of difficulties in future.
e. Planning therefore introduces inelasticity and discourages individual initiative and experimentation.
2. Misdirected Planning
a. Planning may be used to serve individual interests rather than the interest of the enterprise.
b. Attempts can be made to influence setting of objectives, formulation of plans and programmes to suit ones own requirement rather than that of whole organization.
c. Machinery of planning can never be freed of bias. Every planner has his own likes, dislikes, preferences, attitudes and interests which is reflected in planning.
3. Time consuming
a. Planning is a time consuming process because it involves collection of information, it’s analysis and interpretation thereof. This entire process takes a lot of time specially where there are a number of alternatives available.
b. Therefore planning is not suitable during emergency or crisis when quick decisions are required.
4. Probability in planning
a. Planning is based on forecasts which are mere estimates about future.
b. These estimates may prove to be inexact due to the uncertainty of future.
c. Any change in the anticipated situation may render plans ineffective.
d. Plans do not always reflect real situations inspite of the sophisticated techniques of forecasting because future is unpredictable.
e. Thus, excessive reliance on plans may prove to be fatal.
5. False sense of security
a. Elaborate planning may create a false sense of security to the effect that everything is taken for granted.
b. Managers assume that as long as they work as per plans, it is satisfactory.
c. Therefore they fail to take up timely actions and an opportunity is lost.
d. Employees are more concerned about fulfillment of plan performance rather than any kind of change.
6. Expensive
a. Collection, analysis and evaluation of different information, facts and alternatives involves a lot of expense in terms of time, effort and money
b. According to Koontz and O’Donell, ’ Expenses on planning should never exceed the estimated benefits from planning. ’
External Limitations of Planning
1. Political Climate- Change of government from Congress to some other political party, etc.
2. Labour Union- Strikes, lockouts, agitations.
3. Technological changes- Modern techniques and equipments, computerization.
4. Policies of competitors- Eg. Policies of Coca Cola and Pepsi.
5. Natural Calamities- Earthquakes and floods.
6. Changes in demand and prices- Change in fashion, change in tastes, change in income level, demand falls, price falls, etc.

Similar Documents

Premium Essay

Projects

...Project Estimating Technique Paper By: Efrain Gonzalez Jr. CPMGT/303 October 6, 2014 Chanda Sanders This paper describes each of the project estimating techniques by explaining when each technique would be used, and how each technique is used. The information being explained provides sources of information that is needed to figure out the most appropriate technique for a project. When justifying an estimate there are certain tools you could use that will help one justify an estimate correctly, and the information being provide explains what tools will be used to justify estimates. Project estimating techniques and tools are important aspects needed to achieve the goal and objective of a project. An analogous estimation is a very common estimation technique used to estimate activities within a project through previous experiences with different projects and extrapolates onto the current project at hand. This technique is mainly used for projects that have the same type of work, and the same resources being used between projects. Parametric model estimation is another precise, easy, accurate technique that is used to estimate time, and resources needed within a project to perform activities. The use of this technique is created upon historical experiences, and lessons learned on different projects. The three point estimation techniques is used to clarify and understand levels of uncertainty within an estimation through the use of three sets of assumption that are all different...

Words: 793 - Pages: 4

Premium Essay

Project

...Chapter 3 Planning the Project This chapter begins by discussing the nine key elements of the project plan. The following two sections address the planning process in greater detail with considerable emphasis placed on the project launch meeting and the hierarchical planning process by which parts of the plan are sequentially broken down into finer levels of detail. This provides a natural transition to the creation of the Work Breakdown Structure. Finally, the chapter is concluded with a discussion of multidisciplinary teams including the topics of integration management and concurrent engineering. Cases and Readings Some cases appropriate to the subject of this chapter are: Harvard: 9-692-058 Taco Bell Corp. This 31-page best-selling case describes a project to implement a new strategic plan involving major changes in layout, staffing, quality, product design, and information systems. The coordination and integration of all these project activities is what makes the plan successful, and hard for competitors to imitate. Two teaching notes are available for this case: 5-692-091 (20 pages) and 5-196-073 (12 pages). Harvard: 9-694-059 Hardcard Project: Plus Development Corp. (A1); 9-694-060 Hardcard Project: Plus Development Corp. (A2) This 10-page (12-pages for A2) case allows the students to evaluate, using Microsoft Project software, the time line, resource allocations, and other aspects of a major project concerned with developing a hard disk drive...

Words: 3660 - Pages: 15

Premium Essay

Projects

...THE CONTRIBUTION OF PROJECT MANAGEMENT TO THE DEVELOPMENT OF GHANA INTRODUCTION Project management as a management discipline underpins much economic activity. In industries as diverse as pharmaceuticals, software and aerospace, projects drive business. And in the public sector, it is effective project management that translates politicians' promises of new roads, schools and hospitals into gleaming new constructions that improve everyday life. The development of Ghana Successive Ghanaian governments pursued various models of economic development throughout the 1960s, 70s and 80s. In the immediate post independent era of the early 1960s, Ghana’s economic development objectives were geared towards the ‘Big Push’ primary economic policies. These revolved around: a major investment effort; an industrialization drive; increased import substitution; processing of commodities and minerals previously exported in their raw form; and direct state participation in leading areas of the economy. The 1970s ushered in a policy of increased ‘Ghanaianisation’ or indigenisation with specified industrial activities reserved for state participation, Ghana-foreign ownership, and exclusive Ghana ownership, among others. The early 1980s saw the liberalization of the Ghanaian economy and the encouragement of foreign investments. All these approaches, however, fell far short of expectations and the failures were exacerbated by adverse terms of trade, falling commodity prices, and crippling debt by...

Words: 1230 - Pages: 5

Premium Essay

Project

...State University of New York Empire State College, MBA Program Course 651644: Tools and Processes in Project Management Summer 2013 term Instructor: Dr. Adams Assignment #1: X-philes Data Management Corporation: RFP Matters By Jose M Collazo What is the basis for the problem? There are two primary problems with how X-philes Data Management Corporation handled the request for proposal. The first one was the lack of communication by the managers who selected the same vendor for two different projects. This problem led to the creation of the second problem which is proper resource allocation. When dealing with multiple projects with the same vendor, the company runs the risk of creating multiple interdependencies. Any resource allocation decisions made in one project by the vendor are likely to have ramifications in the other projects. According to Pinto, Some of the better known problems include inefficient use of resources, resource bottlenecks, ripple effects, and the heightened pressure on personnel to multitask (Pinto 2013). The personnel issue in particular, was a main cause of schedule slippage as employees quit at the contractor and they were unable to maintain sufficient staffing levels to keep the projects on track. While bottleneck’s restricts a vendor's ability to make money, they realize that the best way to maximize income is to fully exploit the bottleneck resource (Chakravorty & Atwater§, 2006)...

Words: 1044 - Pages: 5

Premium Essay

Project

...with any project team is a lack of good communication.This type issue could arrise where team members are scareterd all over the world without face to face communication.The communication through the internet, skype or some of the other communication technologies that are now available are sometimes not reliable and could cause miscommunication. what about one of the team members performing one of the tasks without informing the other team members about it. Overdetermining - project managers sometimes overstates their capabilities of comleting a project on time. That is when a project will take say two months to accomplish they use presure or lack of experience or presure to perform even the other factors that ignores reality for something that is not imporsimble to accomples in the time given. When everyone is not available at the same time to work as a team on the project this could cause a delay to finish and deliver the project on time. The trade offs that is to make a clear policy of communication from the begining of the project that nobody goes off course and that everyone have to work as a team and must be on the sameline with everyone on the team. The project head must make him or herself available at all time to make sure that all the policys are met by everyone in the group. Handster inc. 1. Which projects would you recommend Handstar pursue based on the NPV approach? The spreadsheet bellow summarizes the NPV calculations for the six projects assuming...

Words: 518 - Pages: 3

Premium Essay

Projects

...Project Kick-Off Meeting Dwayne A. Blanchette BUS 611: Project Planning and Management Dr.: Donald McKay April 25, 2016 Recently the project charter for transitioning the Quick Drop 100 (QD100) from New York to Florida received final authorization. I was awarded the project and assigned as project manager (PM) to lead a team of qualified individuals and complete the task of relocating the QD100 program to the state of Florida. The next step in the preparation phase is to hold a project kickoff meeting. This meeting will be used to acclimate team members, clients, and other attendants to ensure everyone understands the key players and their respective roles. As the PM I plan to generate enthusiasm, motivation, and excitement while maintaining a guided discussion regarding the content, schedule, and duration of the project from start to finish. To prepare for the meeting I will accomplish several preliminary tasks. The most important areas to consider during preparation include identifying stakeholders, communication methods, team building, accountability and code of conduct. Once the tone has been set and key points discussed the meeting will conclude by first reiterating member expectations and responsibilities followed by a summary of all pertinent information. The bottom line is this kickoff meeting will be presented as such to ensure all relevant attendants and stakeholders are provided a transparent achievable list of goals. Stakeholders A significant...

Words: 1862 - Pages: 8

Premium Essay

Project

...PROJECT MANAGEMENT COURSE ASSESSMENT 1 The final date for submission of this assessment without penalty is 24th March 2014 Assessment will be accepted for marking 14 days prior to the due date Late Penalty System Please refer to the Student/Programme Handbook This module is being delivered through the Manchester Blackboard virtual learning environment. All assessments must be submitted through Blackboard at: http://online.manchester.ac.uk/ If you have any technical difficulties using blackboard, please visit our support pages at: http://www.studentnet.manchester.ac.uk/blackboard Submitting your Assignment 1. Assignments should be typed, 10 or 11 point font size (Times Roman or similar if possible) double spaced with a 4 cm margin on the right side of the page with the page size specified as UK A4. All pages must be numbered. 2. Assignments should be submitted in either Microsoft Office and/or PDF format (.doc, .docx, .pdf etc.). File names should be kept simple and only contain alphanumeric characters (a-z0-9), spaces and underscores (e.g. Valid_filename_1.doc). Files with other characters such as apostrophes, brackets or commas may not be accessible by markers. 3. Assignments may be uploaded only once; substitutions are not permitted and students should therefore ensure that the version uploaded is their final submission. 4. Please ensure you include your student number and the assignment reference (PM/Student Number/Jan14/1) in all submitted assignments and that assignments...

Words: 740 - Pages: 3

Premium Essay

Project

...decision to earn a project management certification is a big one, so make sure you choose one that best fits your current expertise and your future career plans. You can apply for any certification that matches your qualifications, and no certification serves as a prerequisite for another. * Certified Associate in Project Management (CAPM)® * Project Management Professional (PMP)® * Program Management Professional (PgMP)® * PMI Agile Certified Practitioner (PMI-ACP)SM * PMI Risk Management Professional (PMI-RMP)® * PMI Scheduling Professional (PMI-SP)® Already have a PMI certificate PMI Educational Foundation Mission and Vision Join PMI Educational Foundation in Building Better Futures through project Management. PMI Educational Foundation (PMIEF), the philanthropic arm of PMI, announces the Building Better Futures capital campaign to expand its mission to champion project management knowledge and skill for educational and social good globally. Donations to the campaign support sustainable programs that further the very project management principles and practices that project management practitioners, employers and suppliers believe in by developing: * A Better Prepared Project Management Workforce for the Future * A Better Prepared Society for Future Success   * A Better Prepared Response in Future Times of Need Donations to the Building Better Futures campaign demonstrate a clear commitment to bringing the benefits of project management to...

Words: 554 - Pages: 3

Premium Essay

Project

...The Project manager will put together a human resources team that will be responsible for building a cross-cultural team that will work closely together. Individuals who are bilingual and have worked on a global scale will be given priority. Employees will be selected through a thorough interview process that includes background checks and drug testing. We will only hire qualified individual because they will represent the Acme Company in Mexico and will help us establish a relationship with the community we will be serving An approach is to work with a reputable local employment agency, another one is to hire translators to assist management and local staff. The human resources team will implement current company policies and procedures A marketing and communication team will be responsible for: * promoting Acme products * Supporting project management in achieving the aims and objectives of the project. * Implementation and evolution of the brand guidelines. * Instilling and communicating good marketing and communications practice across Acme * Marketing analysis and environmental scanning (the team will ensure that Acme offers competitive prices than local competitors. * Helping the company communicate with the public. * Creating advertisements, campaigning, offering coupons In order to have an effective marketing strategy, we will work with local marketing companies because they have better understanding on how to market Acme’s products...

Words: 319 - Pages: 2

Premium Essay

Project

...Research Project Management Key Concepts Dr Robin Henderson robin@myconsultants.net Research Project Management - Key Concepts © My Consultants Ltd 2010 Introduction The successful management of a research project depends upon the researchers ability to plan, coordinate and perform the research. Many researchers do not formally manage their research and whilst this does not necessarily mean that the research will not be completed successfully this approach has impacts on the staff whom are involved in the project. For example an unplanned approach can often lead to stress in members of the research team, crises management when deadlines are not effectively managed and the lack of time within the research to deliver effective outcomes for all the staff involved in the project. This short document outlines some of the key tools which you can utilise within research contracts to lead to more successful outcomes. Clearly understanding what success means for your project. The starting point for managing a project effectively is to have a clear understanding of what you are trying to achieve. A simple model to start to explore this is to distinguish between outputs and outcomes.  Outputs are the physical deliverables of the project  Outcomes are what happens as a result of the outputs For example in a clinical based trial the output could be a paper with the related outcome being the changes in clinical practise. The starting point for a project is to define what the desired outcomes...

Words: 2908 - Pages: 12

Premium Essay

It Project

...frame: Coalitions composed of varied individuals and interest groups. Conflict and power are key issues Symbolic frame: Symbols and meanings related to events. Culture, language, traditions, and image are all parts of this frame Organization structure: Project organization structure (is hierarchical, but instead of functional managers or vice presidents reporting to the CEO, program managers report to the CEO.) Matrix organization: • represents the middle ground between functional and project structures. Process of Project management: 1. Starts the project 2. Initiate (the planning) 3. Plan 4. Execute 5. Close (end the project) Project management Process Groups: 1 Initiate (start) include defining and authorizing a project or project phase. Initiating processes take place during each phase of a project. 2 Planning (Scope document, schedule management plan, cost mgr plan, and procurement plan) 3 Execute (Implementation phase, acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations,)building and testing 4 Monitor and control: include regularly measuring and monitoring progress to ensure that the project team...

Words: 323 - Pages: 2

Premium Essay

Project

...Strategy & Project Management: Project orientated organisations Finnland 2005 Prof. (FH) Peter J. Mirski Prof.(FH) Mag. Peter J. Mirski Tel.: +43-512-2070-3510 E-Mail: peter.mirski@mci.edu http://www.mci.edu Current Position MCI, University of Applied Sciences: Director of studies „Management & IT“, Head of IT-Services Academical Profile Research projectmangement, knowledgemanagement strategic information management, e-learning Education process, project, information management Publications and articles in journals Practice Profile Management, R&D Project Management, CEO, CIO Consulting & Training Agenda 10:00 – 14:00 Brief project management overview Project orientated organisations Project scorecard Discussion Literature De Marco T., „The Deadline“, Dorset House Publishing Co ,1997 Goldratt E., “The Critical Chain“, North River Press, 1997 Heerkins G., „project management“, briefcase books 2002 PMBOK Guide, „A Guide to the Project Management Body of Knowledge“, PM Institute, 2000 Links •www.p-m-a.at (pm baseline english, german) •www.pmi.com (pm information) project management overview Importance of Project Management • Projects represent change and allow organizations to effectively introduce new products, new processes, new programs • Project management offers a means for dealing with dramatically reduced product cycle times • Projects are becoming globalised, making them more difficult to manage without a formal methodology –...

Words: 1737 - Pages: 7

Premium Essay

Project

...seek a Project Manager in their Washington DC offices. Provides program support to team members as needed related to projects and program activities. Tasks include task tracking, program change management support, administrative support and project and program reporting. Helps with the preparation of project and program schedules and coordinates the necessary internal and external resources to fulfill the project and program activities within the prescribed time frames and funding parameters to ensure project and program objectives and stakeholders expectations are met. Specific responsibilities include: * Coordinates activities within the project life-cycle including initiation, planning, execution, monitoring and control phases. * * Helps with the preparation of Project and Program Weekly Status report as necessary and upload to the Project Server in a timely fashion. * Generates various other Project, Program and department related status reports as needed. * Helps prepare responses for anticipated questions during the weekly ITIL meeting (in case of a Red project). * Helps Identify and schedules project deliverables, milestones, and required tasks. * Prepares change management documentation in support of the change management process and supports the Change Management meeting. * Documents all change management decisions according to the change management process * Coordinates selection and assignment of SMEs to the project team...

Words: 343 - Pages: 2

Premium Essay

Project

...Project Plan Outline 1.0 Goals and Objectives This section presents a general description of the project along with any general or technical constraints and/or considerations. Please include the sub-sections below. 1. Project name 2. Business goals and project goals 3. Scope 4. Time and budget constraints 5. General and technical requirements 6. Training and documentation 7. Installation 2.0 Project Estimates This section presents a set of estimates for the completion of the project, including people, hardware and software. Please include the following sub-sections. 1. People costs a. Historical or researched data used for estimates (Requires annotation listing where you got this information) b. Salary requirements 2. Equipment costs (Requires costs for all hardware and software used. It is assumed that all hardware and software will be new). a. Hardware b. Software 3. Estimation techniques and results a. Process-based (use the format shown in section 1.2.1 of the lecture) b. Second method c. Triangulation results 3.0 Project Schedule This section presents an overview of project tasks and the output of a project scheduling tool. The following sub-sections should be included: 3.1 Project task list The tasks that have been selected for the project are presented in this section. 3.2 Task network Project tasks and their dependencies are noted in this diagrammatic form. 3.3 Timeline chart A project timeline chart (Gantt chart) is presented...

Words: 508 - Pages: 3

Premium Essay

Projects

...Projects Without Borders Elizabeth Harrin (October 5, 2006) Managing international projects requires much more than calculating that when it’s 9 a.m. in Paris, Texas, it’s 4 p.m. in Paris, France. Crosscultural teams and customers won’t necessarily work the same way as you. Here are some strategies for discovering the differences and dealing with them. As the world gets smaller, projects seem to expand to fill the available space, and now many of us are tackling the challenge of managing cross-cultural project teams and cross-cultural project customers. When your project team spans different countries, getting everyone together for a conference call is a new kind of administrative nightmare. But it’s not just the practicalities of working out time zone disparities and correcting the occasional bit of awkward grammar that make crossborder projects so challenging. National culture plays a big part in how we act and work. Get a group of people together from around the world and they can’t even agree on what noise a rooster makes, so how are they going to come to a conclusion on how to communicate project progress to the stakeholders? Or, to put it another way, the people you are working with won’t necessarily work in the same way as you, and the people you are working for won’t necessarily want the same things. One financial project manager I know was sent to Spain for a year to set up a new process improvement initiative in one of his company’s call centers. The Madridbased office...

Words: 1095 - Pages: 5