|CONTROL DE VERSIONES |
|VERSION |HECHA POR |REVISADA POR |APROBADA POR |FECHA |MOTIVO |
|1.0 |GMZ |LMZ/JMT/AZP |JLG |26/10/2015 |Versión Original |

PROJECT CHARTER

|NOMBRE DEL PROYECTO |SIGLAS DEL PROYECTO |
|SISTEMA DE INFORMACIÓN PARA LAS ÁREAS DE PRODUCCIÓN, ALMACÉN, PERSONAL Y CONTABILIDAD| |
|DE LA EMPRESA AGROINDUSTRIAS SUPE S.A.C. |SIPAPC |
|DEFINICION DEL PRODUCTO DEL PROYECTO: |
|El proyecto consiste en analizar, diseñar e implementar un sistema de información que permita integrar y mejorar los procesos de la empresa |
|AGROINDUSTRIAS SUPE S.A.C con el propósito de alcanzar sus objetivos estratégicos. |
| |
|El Equipo del proyecto está conformado por : |
| |
|· Sponsor : Juan Luyo Gonzales – Gerente de la Empresa (JLG) |
|· Líder Usuario : Omar Torres Lopez |
|· Jefe del Proyecto : Gustavo Melgarejo Zelaya (GMZ) |
|Equipo de Trabajo Módulos de Producción y Logística |
|· Analista Funcional 1 : Luis Melgarejo Zelaya (LMZ) |
|· Analista Programador 1 : Enrique Bustamante Perez |
|· Analista Programador 2 : Juan Guzman Ulloa |
|· Analista Programador 3 : Henry Lopez Suarez |
|Equipo de Trabajo Módulos de Personal y Contabilidad |
|· Analista Funcional 2 : Jimmy Medina Tinoco (JMT) |
|· Analista Programador 1 : Andrea Gonzales Montes |
|· Analista Programador 2 : Pablo Toledo Gomez |
|· Analista Programador 3: Alejando Villanueva Mendez |
|· Analista de Calidad 1: Abraham Zorrilla Pantoja (AZP) |
|· Analista de Calidad 2: Jesus Garcia Suarez |
|· Analista de Calidad 3: Carlos Benitez Torres |
|· Administrador de Base de Datos: Rosa Gonzales Flores |
| |
|El proyecto será realizado desde el 05 de enero del 2016 y finalizando el 07 de agosto del 2017. |
|El equipo de proyecto realizara la construcción del sistema netamente en las instalaciones de la organización AGROINDUSTRIAS SUPE S.A.C. |

|DEFINICIÓN DEL PRODUCTO DEL PROYECTO: DESCRIPCIÓN DEL PRODUCTO, SERVICIO O CAPACIDAD A GENERAR. |
|Producto: |
|Software que mediante interfaces graficas permita a los usuarios de las áreas de PRODUCCIÓN, LOGISTICA, PERSONAL Y CONTABILIDAD agilizar sus procesos|
|con el propósito de generar valor agregado a la organización. |
| |
|Los entregables son: |
| |
|Gestión del Proyecto: |
|• Project Charter |
|• Plan de gestión del proyecto. |
|• Informe de seguimiento del proyecto. |
|• Acta de fin del proyecto. |
|Adquisiciones: |
|• Contrato de un programador externo (consultora externa). |
|• Contrato de Licencias de Software. |
|• Contrato de Convenio con proveedores (establecimientos). |
|Análisis: |
|• CRQ – Catálogo de requerimientos. |
|• DAR – Documento de análisis funcional o requerimientos. |
|Diseño: |
|• DET - Documento de Especificaciones Técnicas. |
|• DPT - Documento de Prototipos. |
|• MCP - Matriz de casos de pruebas Funcionales. |
|• Plantilla de plan de pruebas. |
|Desarrollo: |
|• Modulo de aplicaciones orientadas al área de producción. |
|• Modulo de aplicaciones orientadas al área de Logística. |
|• Modulo de aplicaciones orientadas al área de Personal. |
|• Modulo de aplicaciones orientadas al área de Contabilidad. |
|Certificación: |
|• Catalogo de resultado de pruebas internas. |
|• Catalogo de pruebas de pruebas de aceptación. |
|• Acta de aceptación de Prueba. |
|• Informe de resultado pruebas internas. |
|Puesta en producción: |
|• Manual de usuario. |
|• Acta de Capacitaciones. |
|• Formato de pase a producción. |

|DEFINICIÓN DE REQUISITOS DEL PROYECTO: DESCRIPCIÓN DE REQUERIMIENTOS FUNCIONALES, NO FUNCIONALES, DE CALIDAD, ETC., DEL PROYECTO/PRODUCTO |
|El Sponsor (Gerente General de la empresa AGROINDUSTRIAS SUPE S.A.C.) tiene los siguientes requisitos: |
|• Cumplir con los acuerdos presentados en la propuesta, y respetar los requerimientos del cliente. |
|• Participar en el inicio y término de cada fase o cuando el Jefe de Proyecto estime conveniente convocar su participación. |
|• Proponer al Líder Usuario como participante del proyecto. |
|• Promover la participación de los usuarios. |
|• Respaldar el proyecto respecto a la disponibilidad de recursos. |
| |
|El Líder Usuario (Jefe del Área de Contabilidad) tiene los siguientes requisitos: |
| |
|• Proporcionar al Equipo de Trabajo el detalle funcional de cada uno de los requerimientos de la solución. |
|• Convocar al Comité del Proyecto, cuando existan cambios que impacten la ejecución del proyecto. |
|• Participar activamente en todas las fases del proyecto. |
|• Definir los usuarios que usarán los entregables del proyecto. |
|• Coordinar la disponibilidad de los usuarios para la ejecución de las pruebas del proyecto. |
|• Actuar como intermediario entre el Jefe de Proyecto y los usuarios. |
|• Aprobar los entregables dirigidos a los usuarios finales que elabora el equipo de trabajo a lo largo del proyecto. |
|• Validar los informes y entregables de avance del proyecto. |
|• Aceptar formalmente el término del proyecto. |
| |
|El jefe de proyecto: |
|• Velar por el éxito y cumplimiento de los objetivos propuestos en el proyecto. |
|• Establecer hitos de control del proyecto. |
|• Convocar a las reuniones de seguimiento del proyecto. |
|• Convocar al Comité del Proyecto, cuando existan cambios que impacten la ejecución del proyecto. |
|• Entregar el producto en los plazos establecidos en el plan de trabajo, cumpliendo con los objetivos definidos y los estándares de calidad. |
|• Entregar la documentación actualizada del proyecto. |
|• Conocer el detalle funcional de los procesos de negocio asociados al proyecto. |
|• Gestionar riesgos y problemas. |
| |
|Personal de Tecnología de Información |
|• Realizar las actividades de desarrollo del Sistema de información de acuerdo a los alcances y metodología definidos. |
|• Ejecutar las pruebas integrales. |
|• Asegurar la calidad de la información presentada. |
|• Elaborar la documentación relacionada a la tarea asignada. |
| |
|Se define el correo electrónico como canal oficial de comunicación, por el cual para los siguientes eventos: |
|• Envío de documentación. |
|• Aprobar acuerdos/documentos. |
|• Presentar avances del proyecto. |

|OBJETIVOS DEL PROYECTO: METAS HACIA LAS CUALES SE DEBE DIRIGIR EL TRABAJO DEL PROYECTO EN TÉRMINOS | |
|DE LA TRIPLE RESTRICCIÓN. | |
|CONCEPTO |OBJETIVO |CRITERIO DE EXITO |
|1. ALCANCE |El proyecto comprende la realización de las siguientes |Cumplir con todos los entregables en cada una|
| |fases: |de las fases y que estos sean aprobados por |
| | |los usuarios involucrados en cada una de ellas|
| |Estudio de viabilidad del sistema (EVS) | |
| |Análisis del sistema de información (ASI) | |
| |Diseño del sistema de información (DSI) | |
| |Construcción del sistema de información (CSI) | |
| |Certificación Del Sistema De información (CSI) | |
| |Producción Del Sistema De Información (PSI) | |
| |Implantación y aceptación del sistema (IAS) | |
|2. TIEMPO |El proyecto concluirá 415 días Útiles, iniciándose el |Concluir el proyecto en el plazo definido |
| |lunes 05 de enero del 2016 y finalizando el lunes 07 de |(Inicio 05/01/2016 y con fecha de Término |
| |agosto del 2017. |07/08/2017) |
|3. COSTO |El proyecto cuenta con un presupuesto total de S/. |No exceder el presupuesto del Proyecto. |
| |300,000.00 nuevos soles. | |
|4. CALIDAD |La calidad del proyecto será aceptable si se cumple el |Optimizar las actividades de los procesos de |
| |80% de los objetivos en términos de satisfacción del |negocio que se están automatizando |
| |cliente (Usuario Interno/Externo). |(PRODUCCIÓN, LOGISTICA, PERSONAL Y |
| | |CONTABILIDAD) |
|5. SATISFACCIÓN DEL CLIENTE |80% de satisfacción en una escala del 1 al 5, es decir 4.|Reducir el tiempo de espera en la atención del|
| | |cliente. |
|FINALIDAD DEL PROYECTO: FIN ÚLTIMO, PROPÓSITO GENERAL, U OBJETIVO DE NIVEL SUPERIOR POR EL CUAL SE |
|EJECUTA EL PROYECTO. ENLACE CON PROGRAMAS, PORTAFOLIOS, O ESTRATEGIAS DE LA ORGANIZACIÓN. |
|1. Automatizar los principales procesos de las áreas involucradas. |
|2. Reducir el tiempo en las operaciones de las actividades. |
|3. Generar adecuados reportes para la toma de decisiones estratégicas. |
|4. Permitir una adecuada comunicación entre las áreas |
|5. Mantener la disponibilidad de la información en tiempo real. |
|6. Administrar la información de manera oportuna y adecuada a las instancias de la empresa que así lo requieran. |
|JUSTIFICACIÓN DEL PROYECTO: MOTIVOS, RAZONES, O ARGUMENTOS QUE JUSTIFICAN LA EJECUCIÓN DEL PROYECTO. | |
|1.- Incrementar el tiempo de respuesta de los procesos operativos en un 30%. |
|2.- Mejorar la satisfacción del cliente. |
|3.- Estandarización de los procesos operativos del negocio. |
|4.- Mejorar la comunicación con los clientes (interno/externos) y los proveedores. |
|5.- Incrementar la rentabilidad de la empresa mediante la optimización de los procesos. |

|DESIGNACIÓN DEL PROJECT MANAGER DEL PROYECTO. |
|NOMBRE | GMZ |NIVELES DE AUTORIDAD |
|REPORTA A | JLG | Exigir el cumplimiento de los entregables del proyecto. |
|SUPERVISA A | LMZ/JMT/AZP | |

|CRONOGRAMA DE HITOS DEL PROYECTO |
|HITO O EVENTO SIGNIFICATIVO |FECHA PROGRAMADA |
|Inicio del Proyecto |Lunes 05 enero del 2015 |
|ESTUDIO DE VIABILIDAD DEL SISTEMA (EVS) |DEL LUNES 05/01/2016 AL MARTES 09/02/2016 |
|ANÁLISIS DEL SISTEMA DE INFORMACIÓN (ASI) | DEL MIERCOLES 10/02/2016 AL MARTES 05/04/2016 |
|DISEÑO DEL SISTEMA DE INFORMACIÓN (DSI) | DEL MIERCOLES 06/04/2016 AL MARTES 07/06/2016 |
|CONSTRUCCIÓN DEL SISTEMA DE INFORMACIÓN (CSI) | DEL MIERCOLES 08/06/2016 AL VIERNES 03/02/2017|
|CERTIFICACION DEL SISTEMA DE INFORMACION (CSI) | LUNES 06/02/2017 AL JUEVES 06/04/2017 |
|PRODUCCION DEL SISTEMA DE INFORMACION (PSI) | VIERNES 07/04/2017 AL VIERNES 02/06/2017 |
|IMPLEMENTACION Y ACEPTACIÓN DEL SISTEMA (IAS) | LUNES 05/06/2017 AL LUNES 07/08/2017 |

|ORGANIZACIÓN INICIAL DEL PROYECTO: FORMA EN QUE SE ORGANIZARÁN LOS DISTINTOS COMPONENTES |
|(PERSONAS, ROLES, GRUPOS, EMPRESAS, INSTITUCIONES, ETC) QUE INTERVIENEN EN EL PROYECTO. |
|COMPONENTE |ROL O FUNCIÓN PRINCIPAL |
|Ing. Jacinto Luyo Arroyo |Gerente de AgroIndutrias Supe S.A.C |
|Melgarejo Zelaya, Gustavo Adolfo |Jefe Proyecto |
|Luis Melgarejo Zelaya |Analista Funcional |
|Jimmy Medina Tinoco |Analista Funcional |
|Abraham Zorrilla Pantoja |Analista de Calidad |
|Administrador de Base de Datos |Administrador De Base De Datos |
|Equipo de desarrolladores |Construcción del sistema |
|NOTA.- SE ADJUNTA ORGANIGRAMA INICIAL DEL PROYECTO. |
| |

|PRINCIPALES OPORTUNIDADES DEL PROYECTO (RIESGOS NEGATIVOS). |
|RIESGOS NEGATIVOS |
|RIESGOS POSITIVOS U OPORTUNIDADES |
|La disponibilidad de la información proporcionada por la empresa es insuficiente lo cual no permitirá Terminar el proyecto antes de la fecha |
|pactada. |
|Los informes mensuales no son aprobados por los responsables del proyecto. |
|Los costos del proyecto excedan al presupuesto presentado en la propuesta. |
|No cumplir el término de cada una de las fases en los tiempos especificados. |
|Mal análisis de los requisitos de las áreas involucradas. |
|Mala definición de la situación actual y de los procesos de cada una de las áreas involucradas |
|Inadecuado diseño del modelo Lógico/Físico de los datos. |
|No exista apoyo y compromiso total por parte del líder usuario del proyecto (En caso de ausencia durante el desarrollo del proyecto debe asignarse |
|un reemplazo) |
|No se realicen oportunamente, reuniones de definición, cambios y control del proyecto que el equipo técnico requiera |
|No se cuente con disponibilidad de los usuarios asignados para la ejecución de las pruebas funcionales según las fechas indicadas en el cronograma |
|del proyecto. |
|Ausencia de miembros del equipo por vacaciones, descansos médicos o renuncias. |
|Perdida de información por siniestros naturales y técnicos. |
|Los entregables no sean entregados en la fecha correspondiente, originando retrasos en la entrega de material a los usuarios. |
|Perdida de información por siniestros naturales y técnicos. |

|PRINCIPALES OPORTUNIDADES DEL PROYECTO (RIESGOS POSITIVOS). |
|RIESGOS Positivos |
|RIESGOS POSITIVOS U OPORTUNIDADES |
|Fortalecer el conocimiento del equipo de proyecto. |
|Se incrementara el número de operaciones en los procesos optimizados. |
|Mejorar el tiempo de respuesta de las transacciones. |

|PRESUPUESTO PRELIMINAR DEL PROYECTO: |
|CONCEPTO |BASE DE ESTIMACIÓN, CÁLCULO, SUPUESTO |MONTO (S./) |
|1. PERSONAL |Grupo de Desarrollo y personal adicional Contratado. |160,000.00 |
|2. MATERIALES |Licencias de SW de desarrollo, material de oficina. | 30,000.00 |
|3. MAQUINAS |Servidor, Equipos de red y Pc’s. |30,000.00 |
|4. OTROS COSTOS |Pago de servicios básicos, viáticos. |20,000.00 |
|TOTAL LÍNEA BASE | 240,000.00 |
|5. RESERVA DE CONTINGENCIA |-- |10,000.00 |
|6. RESERVA DE GESTIÓN |-- |10,000.00 |
|TOTAL PRESUPUESTO | S./ 260,000.00 |
|NIVEL DE PRECISIÓN DEL PRESUPUESTO PRELIMINAR |86.7% |

|SPONSOR QUE AUTORIZA EL PROYECTO. | |
|NOMBRE |EMPRESA |CARGO |FECHA |
|Juan Luyo Gonzales |AGROINDUSTRIAS SUPE S.A.C.|Gerente General |26/10/2015 |

Similar Documents

Premium Essay

Projects

...Project Estimating Technique Paper By: Efrain Gonzalez Jr. CPMGT/303 October 6, 2014 Chanda Sanders This paper describes each of the project estimating techniques by explaining when each technique would be used, and how each technique is used. The information being explained provides sources of information that is needed to figure out the most appropriate technique for a project. When justifying an estimate there are certain tools you could use that will help one justify an estimate correctly, and the information being provide explains what tools will be used to justify estimates. Project estimating techniques and tools are important aspects needed to achieve the goal and objective of a project. An analogous estimation is a very common estimation technique used to estimate activities within a project through previous experiences with different projects and extrapolates onto the current project at hand. This technique is mainly used for projects that have the same type of work, and the same resources being used between projects. Parametric model estimation is another precise, easy, accurate technique that is used to estimate time, and resources needed within a project to perform activities. The use of this technique is created upon historical experiences, and lessons learned on different projects. The three point estimation techniques is used to clarify and understand levels of uncertainty within an estimation through the use of three sets of assumption that are all different...

Words: 793 - Pages: 4

Premium Essay

Project

...Chapter 3 Planning the Project This chapter begins by discussing the nine key elements of the project plan. The following two sections address the planning process in greater detail with considerable emphasis placed on the project launch meeting and the hierarchical planning process by which parts of the plan are sequentially broken down into finer levels of detail. This provides a natural transition to the creation of the Work Breakdown Structure. Finally, the chapter is concluded with a discussion of multidisciplinary teams including the topics of integration management and concurrent engineering. Cases and Readings Some cases appropriate to the subject of this chapter are: Harvard: 9-692-058 Taco Bell Corp. This 31-page best-selling case describes a project to implement a new strategic plan involving major changes in layout, staffing, quality, product design, and information systems. The coordination and integration of all these project activities is what makes the plan successful, and hard for competitors to imitate. Two teaching notes are available for this case: 5-692-091 (20 pages) and 5-196-073 (12 pages). Harvard: 9-694-059 Hardcard Project: Plus Development Corp. (A1); 9-694-060 Hardcard Project: Plus Development Corp. (A2) This 10-page (12-pages for A2) case allows the students to evaluate, using Microsoft Project software, the time line, resource allocations, and other aspects of a major project concerned with developing a hard disk drive...

Words: 3660 - Pages: 15

Premium Essay

Projects

...THE CONTRIBUTION OF PROJECT MANAGEMENT TO THE DEVELOPMENT OF GHANA INTRODUCTION Project management as a management discipline underpins much economic activity. In industries as diverse as pharmaceuticals, software and aerospace, projects drive business. And in the public sector, it is effective project management that translates politicians' promises of new roads, schools and hospitals into gleaming new constructions that improve everyday life. The development of Ghana Successive Ghanaian governments pursued various models of economic development throughout the 1960s, 70s and 80s. In the immediate post independent era of the early 1960s, Ghana’s economic development objectives were geared towards the ‘Big Push’ primary economic policies. These revolved around: a major investment effort; an industrialization drive; increased import substitution; processing of commodities and minerals previously exported in their raw form; and direct state participation in leading areas of the economy. The 1970s ushered in a policy of increased ‘Ghanaianisation’ or indigenisation with specified industrial activities reserved for state participation, Ghana-foreign ownership, and exclusive Ghana ownership, among others. The early 1980s saw the liberalization of the Ghanaian economy and the encouragement of foreign investments. All these approaches, however, fell far short of expectations and the failures were exacerbated by adverse terms of trade, falling commodity prices, and crippling debt by...

Words: 1230 - Pages: 5

Premium Essay

Project

...State University of New York Empire State College, MBA Program Course 651644: Tools and Processes in Project Management Summer 2013 term Instructor: Dr. Adams Assignment #1: X-philes Data Management Corporation: RFP Matters By Jose M Collazo What is the basis for the problem? There are two primary problems with how X-philes Data Management Corporation handled the request for proposal. The first one was the lack of communication by the managers who selected the same vendor for two different projects. This problem led to the creation of the second problem which is proper resource allocation. When dealing with multiple projects with the same vendor, the company runs the risk of creating multiple interdependencies. Any resource allocation decisions made in one project by the vendor are likely to have ramifications in the other projects. According to Pinto, Some of the better known problems include inefficient use of resources, resource bottlenecks, ripple effects, and the heightened pressure on personnel to multitask (Pinto 2013). The personnel issue in particular, was a main cause of schedule slippage as employees quit at the contractor and they were unable to maintain sufficient staffing levels to keep the projects on track. While bottleneck’s restricts a vendor's ability to make money, they realize that the best way to maximize income is to fully exploit the bottleneck resource (Chakravorty & Atwater§, 2006)...

Words: 1044 - Pages: 5

Premium Essay

Project

...with any project team is a lack of good communication.This type issue could arrise where team members are scareterd all over the world without face to face communication.The communication through the internet, skype or some of the other communication technologies that are now available are sometimes not reliable and could cause miscommunication. what about one of the team members performing one of the tasks without informing the other team members about it. Overdetermining - project managers sometimes overstates their capabilities of comleting a project on time. That is when a project will take say two months to accomplish they use presure or lack of experience or presure to perform even the other factors that ignores reality for something that is not imporsimble to accomples in the time given. When everyone is not available at the same time to work as a team on the project this could cause a delay to finish and deliver the project on time. The trade offs that is to make a clear policy of communication from the begining of the project that nobody goes off course and that everyone have to work as a team and must be on the sameline with everyone on the team. The project head must make him or herself available at all time to make sure that all the policys are met by everyone in the group. Handster inc. 1. Which projects would you recommend Handstar pursue based on the NPV approach? The spreadsheet bellow summarizes the NPV calculations for the six projects assuming...

Words: 518 - Pages: 3

Premium Essay

Projects

...Project Kick-Off Meeting Dwayne A. Blanchette BUS 611: Project Planning and Management Dr.: Donald McKay April 25, 2016 Recently the project charter for transitioning the Quick Drop 100 (QD100) from New York to Florida received final authorization. I was awarded the project and assigned as project manager (PM) to lead a team of qualified individuals and complete the task of relocating the QD100 program to the state of Florida. The next step in the preparation phase is to hold a project kickoff meeting. This meeting will be used to acclimate team members, clients, and other attendants to ensure everyone understands the key players and their respective roles. As the PM I plan to generate enthusiasm, motivation, and excitement while maintaining a guided discussion regarding the content, schedule, and duration of the project from start to finish. To prepare for the meeting I will accomplish several preliminary tasks. The most important areas to consider during preparation include identifying stakeholders, communication methods, team building, accountability and code of conduct. Once the tone has been set and key points discussed the meeting will conclude by first reiterating member expectations and responsibilities followed by a summary of all pertinent information. The bottom line is this kickoff meeting will be presented as such to ensure all relevant attendants and stakeholders are provided a transparent achievable list of goals. Stakeholders A significant...

Words: 1862 - Pages: 8

Premium Essay

Project

...PROJECT MANAGEMENT COURSE ASSESSMENT 1 The final date for submission of this assessment without penalty is 24th March 2014 Assessment will be accepted for marking 14 days prior to the due date Late Penalty System Please refer to the Student/Programme Handbook This module is being delivered through the Manchester Blackboard virtual learning environment. All assessments must be submitted through Blackboard at: http://online.manchester.ac.uk/ If you have any technical difficulties using blackboard, please visit our support pages at: http://www.studentnet.manchester.ac.uk/blackboard Submitting your Assignment 1. Assignments should be typed, 10 or 11 point font size (Times Roman or similar if possible) double spaced with a 4 cm margin on the right side of the page with the page size specified as UK A4. All pages must be numbered. 2. Assignments should be submitted in either Microsoft Office and/or PDF format (.doc, .docx, .pdf etc.). File names should be kept simple and only contain alphanumeric characters (a-z0-9), spaces and underscores (e.g. Valid_filename_1.doc). Files with other characters such as apostrophes, brackets or commas may not be accessible by markers. 3. Assignments may be uploaded only once; substitutions are not permitted and students should therefore ensure that the version uploaded is their final submission. 4. Please ensure you include your student number and the assignment reference (PM/Student Number/Jan14/1) in all submitted assignments and that assignments...

Words: 740 - Pages: 3

Premium Essay

Project

...decision to earn a project management certification is a big one, so make sure you choose one that best fits your current expertise and your future career plans. You can apply for any certification that matches your qualifications, and no certification serves as a prerequisite for another. * Certified Associate in Project Management (CAPM)® * Project Management Professional (PMP)® * Program Management Professional (PgMP)® * PMI Agile Certified Practitioner (PMI-ACP)SM * PMI Risk Management Professional (PMI-RMP)® * PMI Scheduling Professional (PMI-SP)® Already have a PMI certificate PMI Educational Foundation Mission and Vision Join PMI Educational Foundation in Building Better Futures through project Management. PMI Educational Foundation (PMIEF), the philanthropic arm of PMI, announces the Building Better Futures capital campaign to expand its mission to champion project management knowledge and skill for educational and social good globally. Donations to the campaign support sustainable programs that further the very project management principles and practices that project management practitioners, employers and suppliers believe in by developing: * A Better Prepared Project Management Workforce for the Future * A Better Prepared Society for Future Success   * A Better Prepared Response in Future Times of Need Donations to the Building Better Futures campaign demonstrate a clear commitment to bringing the benefits of project management to...

Words: 554 - Pages: 3

Premium Essay

Project

...The Project manager will put together a human resources team that will be responsible for building a cross-cultural team that will work closely together. Individuals who are bilingual and have worked on a global scale will be given priority. Employees will be selected through a thorough interview process that includes background checks and drug testing. We will only hire qualified individual because they will represent the Acme Company in Mexico and will help us establish a relationship with the community we will be serving An approach is to work with a reputable local employment agency, another one is to hire translators to assist management and local staff. The human resources team will implement current company policies and procedures A marketing and communication team will be responsible for: * promoting Acme products * Supporting project management in achieving the aims and objectives of the project. * Implementation and evolution of the brand guidelines. * Instilling and communicating good marketing and communications practice across Acme * Marketing analysis and environmental scanning (the team will ensure that Acme offers competitive prices than local competitors. * Helping the company communicate with the public. * Creating advertisements, campaigning, offering coupons In order to have an effective marketing strategy, we will work with local marketing companies because they have better understanding on how to market Acme’s products...

Words: 319 - Pages: 2

Premium Essay

Project

...Research Project Management Key Concepts Dr Robin Henderson robin@myconsultants.net Research Project Management - Key Concepts © My Consultants Ltd 2010 Introduction The successful management of a research project depends upon the researchers ability to plan, coordinate and perform the research. Many researchers do not formally manage their research and whilst this does not necessarily mean that the research will not be completed successfully this approach has impacts on the staff whom are involved in the project. For example an unplanned approach can often lead to stress in members of the research team, crises management when deadlines are not effectively managed and the lack of time within the research to deliver effective outcomes for all the staff involved in the project. This short document outlines some of the key tools which you can utilise within research contracts to lead to more successful outcomes. Clearly understanding what success means for your project. The starting point for managing a project effectively is to have a clear understanding of what you are trying to achieve. A simple model to start to explore this is to distinguish between outputs and outcomes.  Outputs are the physical deliverables of the project  Outcomes are what happens as a result of the outputs For example in a clinical based trial the output could be a paper with the related outcome being the changes in clinical practise. The starting point for a project is to define what the desired outcomes...

Words: 2908 - Pages: 12

Premium Essay

It Project

...frame: Coalitions composed of varied individuals and interest groups. Conflict and power are key issues Symbolic frame: Symbols and meanings related to events. Culture, language, traditions, and image are all parts of this frame Organization structure: Project organization structure (is hierarchical, but instead of functional managers or vice presidents reporting to the CEO, program managers report to the CEO.) Matrix organization: • represents the middle ground between functional and project structures. Process of Project management: 1. Starts the project 2. Initiate (the planning) 3. Plan 4. Execute 5. Close (end the project) Project management Process Groups: 1 Initiate (start) include defining and authorizing a project or project phase. Initiating processes take place during each phase of a project. 2 Planning (Scope document, schedule management plan, cost mgr plan, and procurement plan) 3 Execute (Implementation phase, acquiring and developing the project team, performing quality assurance, distributing information, managing stakeholder expectations,)building and testing 4 Monitor and control: include regularly measuring and monitoring progress to ensure that the project team...

Words: 323 - Pages: 2

Premium Essay

Project

...Strategy & Project Management: Project orientated organisations Finnland 2005 Prof. (FH) Peter J. Mirski Prof.(FH) Mag. Peter J. Mirski Tel.: +43-512-2070-3510 E-Mail: peter.mirski@mci.edu http://www.mci.edu Current Position MCI, University of Applied Sciences: Director of studies „Management & IT“, Head of IT-Services Academical Profile Research projectmangement, knowledgemanagement strategic information management, e-learning Education process, project, information management Publications and articles in journals Practice Profile Management, R&D Project Management, CEO, CIO Consulting & Training Agenda 10:00 – 14:00 Brief project management overview Project orientated organisations Project scorecard Discussion Literature De Marco T., „The Deadline“, Dorset House Publishing Co ,1997 Goldratt E., “The Critical Chain“, North River Press, 1997 Heerkins G., „project management“, briefcase books 2002 PMBOK Guide, „A Guide to the Project Management Body of Knowledge“, PM Institute, 2000 Links •www.p-m-a.at (pm baseline english, german) •www.pmi.com (pm information) project management overview Importance of Project Management • Projects represent change and allow organizations to effectively introduce new products, new processes, new programs • Project management offers a means for dealing with dramatically reduced product cycle times • Projects are becoming globalised, making them more difficult to manage without a formal methodology –...

Words: 1737 - Pages: 7

Premium Essay

Project

...seek a Project Manager in their Washington DC offices. Provides program support to team members as needed related to projects and program activities. Tasks include task tracking, program change management support, administrative support and project and program reporting. Helps with the preparation of project and program schedules and coordinates the necessary internal and external resources to fulfill the project and program activities within the prescribed time frames and funding parameters to ensure project and program objectives and stakeholders expectations are met. Specific responsibilities include: * Coordinates activities within the project life-cycle including initiation, planning, execution, monitoring and control phases. * * Helps with the preparation of Project and Program Weekly Status report as necessary and upload to the Project Server in a timely fashion. * Generates various other Project, Program and department related status reports as needed. * Helps prepare responses for anticipated questions during the weekly ITIL meeting (in case of a Red project). * Helps Identify and schedules project deliverables, milestones, and required tasks. * Prepares change management documentation in support of the change management process and supports the Change Management meeting. * Documents all change management decisions according to the change management process * Coordinates selection and assignment of SMEs to the project team...

Words: 343 - Pages: 2

Premium Essay

Project

...Project Plan Outline 1.0 Goals and Objectives This section presents a general description of the project along with any general or technical constraints and/or considerations. Please include the sub-sections below. 1. Project name 2. Business goals and project goals 3. Scope 4. Time and budget constraints 5. General and technical requirements 6. Training and documentation 7. Installation 2.0 Project Estimates This section presents a set of estimates for the completion of the project, including people, hardware and software. Please include the following sub-sections. 1. People costs a. Historical or researched data used for estimates (Requires annotation listing where you got this information) b. Salary requirements 2. Equipment costs (Requires costs for all hardware and software used. It is assumed that all hardware and software will be new). a. Hardware b. Software 3. Estimation techniques and results a. Process-based (use the format shown in section 1.2.1 of the lecture) b. Second method c. Triangulation results 3.0 Project Schedule This section presents an overview of project tasks and the output of a project scheduling tool. The following sub-sections should be included: 3.1 Project task list The tasks that have been selected for the project are presented in this section. 3.2 Task network Project tasks and their dependencies are noted in this diagrammatic form. 3.3 Timeline chart A project timeline chart (Gantt chart) is presented...

Words: 508 - Pages: 3

Premium Essay

Projects

...Projects Without Borders Elizabeth Harrin (October 5, 2006) Managing international projects requires much more than calculating that when it’s 9 a.m. in Paris, Texas, it’s 4 p.m. in Paris, France. Crosscultural teams and customers won’t necessarily work the same way as you. Here are some strategies for discovering the differences and dealing with them. As the world gets smaller, projects seem to expand to fill the available space, and now many of us are tackling the challenge of managing cross-cultural project teams and cross-cultural project customers. When your project team spans different countries, getting everyone together for a conference call is a new kind of administrative nightmare. But it’s not just the practicalities of working out time zone disparities and correcting the occasional bit of awkward grammar that make crossborder projects so challenging. National culture plays a big part in how we act and work. Get a group of people together from around the world and they can’t even agree on what noise a rooster makes, so how are they going to come to a conclusion on how to communicate project progress to the stakeholders? Or, to put it another way, the people you are working with won’t necessarily work in the same way as you, and the people you are working for won’t necessarily want the same things. One financial project manager I know was sent to Spain for a year to set up a new process improvement initiative in one of his company’s call centers. The Madridbased office...

Words: 1095 - Pages: 5