Solid models of all the components

1
1
The following dimensions have been put into place to ensure that the depth of the ridges are kept the same. Doing this will reduce all forms of likelihood of any abnormalities occuring when the driver worm is connect to the gear.

3
3
Here are the three stages of the creation of the driver worm. A sketch round the x axis of 360 degrees was drawn followed by a mirror bein created by the datum plane for the seep that was to be made.
2
2

The exact same steps were repeated in this stage, the only differences being a few dimensions and a change in the directions of the sweeps. To be more specific the difference in this case between the plane and the sweep was 6, this was to ensure that the heical sweepes were at an eaqual distance from each other in order for the two distances to stay equal when the overall size is changed. Doing this removes the likelhood of any mechanical issues.

5
5
4
4
3
3
2
2
1
1

Each of the 5 parts shown above are all derived from the centre of circles. Because they are each from the same centre circles they all then contain associativity from the same cross section of planes.

4
4
3
3
2
2
1
1

These are the creation and extrudes on the sides of the casing the bottom one is in a fixed position right at the bottom of the casing if it was to move problems with the final assembly may occur

Here the m8x1 holes are made with radial dimensions and are 45degrees to the plane and 50 away from the respective centre points. These hold association because they stay in the same position in terms of angle.
4
4
3
3
2
2

1
1

These extruded holes hold associativity with the extruded holes on the other side because if these bottom extrudes became bigger the bottom

The driven worm the casing and bush are linked together for the assembly to attach properly the driver worm size and length has to be proportional to the space left inside the casing or else the machine will think the casing is one big part with the driven worm locked inside unable to move.
If the seal is moved or made bigger it makes the sub-assembly of the end plate faulty so its size and placement is directly associated by these things.

The driver worm and the end plate share association in terms of the driver worm’s length

The end plate holds association with both worms in terms of the driver having to be able to fit through the extruded hole.
The driven worm also needs to end exactly inside the space given in the end plate.

Review from my personal experience of the design
Over 60 hours of using creo elements has made me come to the conclusion that the programme is very much user friendly, it is very simple to use once you get the hand of things but as the work becomes more complex, any small mistake could lead to a complete failure in the model you are creating. Which therefore means it would have to be redone from the start.
Features in the programme
Flex modelling: The feature is all about editing wherever and whenever changing geometries, features and patterns, which give the user the ability to easily edit saved models from any system without having to work out how someone laid the model out from the data tree.

Options modeller

This allows for making and validating assemblies in 3d. The feature allows checking for interferences in the models make up. The feature also allows for automated creation of any product by defining common architecture, product modules, and manages how they interface and assemble.

Freestyle: The freestyle feature allows the making of curves at the move of the mouse, the geometries stay ongoing.
Parts can be made up around images taken from sites like google and used as a template within the programme for design accuracy with a primitive

Ease of use
It was noticed that assembling of parts became fast and easy with very little frustration. Nevertheless, while learning from scratch how to do what inside the programme, the tools become quick and easy to use, the only real difficulty was when it came to assembling the final parts.

Problems
Some problems that were come across are as follows; The sweep continuously did things it wasn’t supposed to do; especially not cutting into the worm it would sometimes just leave patterned lines around the worm and nothing else happened neither could be corrected. Other problems included making the driver and driven worms became tedious when figuring out how to correctly place the helical sweeps accurately around the worms.
After assembling, saved models cannot be found and are still not found or are extremely difficult to find when the assembly is re-opened

Conclusion
Creo parametric has been a overall achieving in terms of doing what it is made to do with some of the functions that are there, the fact that the models can come out just the way the blue prints say it should of is a testament to its well and thorough programming the art is well presented and perfectly matches up with the dimension that are put in.
On the other hand Creo can become a lot more learner friendly because the amount of times and ease on basic designs that no progress can be made without deleting the whole model and starting again can be tiring and detrimental to any users motivation to wanting to learn how to use specific features.
Overall Creo parametric 2.0 is a very good model design programme and therefore I give it a 8/10 based on learning and putting into practice this project.

Extra Advantages of using creo are as follows:

* Advanced parametric 3D CAD abilities allows for remarkable flexibility in design and manufacturing. * Extensive scope of design possibilities enables faster implementation of new products. * Fully integrated with Creo product family, allowing for data sharing and user collaboration, as well as quicker and more effective product development. * Capable of adapting to design modifications, even late in the development, with the automatic propagation of any alterations into downstream processes. * Automatic creation of related manufacturing and service aspects of product development, decreasing time needed for product development and controlling costs.

Similar Documents

Free Essay

Pumps and Valves Opportunites

...Pump & Valve Industry – Overview & Opportunities About Singhi Advisors Your Partners in Growth . . . Private & Confidential Singhi Advisors Advantage Singhi Two Decades of delivering Success… Full service Investment bank with strong capabilities in M&A, PE & India Entry Strategy Many Services…One Goal MERGERS & ACQUISITIONS INDIA ENTRY STRATEGY PRIVATE EQUITY  One of the top ten Investment Bankers and winner of the M&A Atlas Awards – Deal of the Year 2011, ACQ Global Award 2009 for ‘Corporate and M&A Advisory firm of the year-India’ o Co po ate a d & dv so y o t e yea da  Multi–dimensional focus, covering all major sectors and industries  Current focus with mid market and growing Corporates, while having strong relationships with top business houses in the country E Experienced & S bl M i d Stable Management, l di leading a team of >35 f 35 professionals, 70% of the team averaging 6+ years with Singhi  Strong relationship and confidence from existing clients with 60% repeat business and 80% strike rate  Live relationship with >250 Corporates, resulting in >800 ve e at o s p w t 50 Co po ates, esu t g 800 completed assignments. CORPORATE RESTRUCTURING DEBT SYNDICATION CORPORATE ADVISORY Global Reach  Exclusive Indian Member of “Mergers-Alliance”, a leading international network of independent Investment Banking Firms and Corporate Finance advisory firms offering seamless services on mid-market transactions  With the successful closure of more than 90 transactions...

Words: 5831 - Pages: 24

Free Essay

System Design for Transport of Limestone

...Relevance of System Engineering to bulk materials handling and this project 3 Q3) Alternative Systems 4 Rail and Road 4 Aerial Ropeway 4 Building the Cement Plant near the Mine Site 4 Pipeline 4 Q4) Discuss the purpose of the items in Figure1 5 Q5) Discuss the purpose of Rheological and Flow test 15 Purpose of Rheological and Flow Tests. 15 Importance of Pilot Plant Tests 16 Q6) Design Selection 17 a. Delivery Pipeline 17 Quantity to Be Pumped 18 Size of Pipeline 19 Friction Head Hf for the Pipeline 19 Loss in Discharge Pipe Enlargement 20 Loss at Pipe Discharge 20 Loss of Head at Entrance to Suction Pipe 20 Total Dynamic Head on the Pump [Hm] 21 Equivalent Water Total Dynamic Head [Hw] 21 b. Warman Pump Selection 21 Piston Pumps and Pipe Validation 22 a. Piston Pumps 22 b. Pipe Design Parameters 23 8) Design Parameters of the main pipeline 23 Q9) Alternative Systems 26 References: 27 Q2) Relevance of System Engineering to bulk materials handling and this project Systems engineering is a methodical, disciplined approach for the design, realization, technical management, operations, and retirement of a system. A “system” is a construct or collection of different elements that together produce results not obtainable by the elements alone. The...

Words: 3188 - Pages: 13

Premium Essay

Case 1: Cj Industries and Heavey Pumps

...Industries and Heavey Pumps Section 2 Case 1 Chris Stowe Student number: 14210009 2014.11.19 Word Count: 1719 CJ Industries has an opportunity to provide Great Lakes Pleasure Boats with key engine components for their luxury line of pleasure boats. They earned this through the development of a strong buyer-supplier relationship with Great Lakes and this 5-year, $10 million annual contract offers them the chance to have an extended relationship if they can satisfy Great Lakes’ needs. The opportunity is critical for the successful future of CJI and the main goal of the company should be to completely satisfy the requirements of the contract with Great Lakes, and secure their future business with Great Lakes. While they do most manufacturing in-house, they have been sourcing their bilge pumps out to Heavey Pumps on an informal basis. While Heavey has been a reliable supplier, they are a small company and the expanded business will stress their production capabilities; so CJI has been contemplating whether to build the pumps in-house, or continue to subcontract them. Here are the questions from the reading regarding this issue: What are all the issues here, from both CJI’s and Heavey’s perspectives, that need to be researched by Mr. Ashby? From CJI’s perspective: Their number one priority is to maintain contract compliance with Great Lakes because it is the future of their business growth and success. With that in mind, they need to ensure the pumps from Heavey will arrive...

Words: 1866 - Pages: 8

Free Essay

Risk Analysis

...Pump Application Manual Simplified Selection and Application The Gorman-Rupp Company P.O. Box 1217 • Mansfield, Ohio 44901-1217 • Phone: 419.755.1011 • Fax 419.755.1251 Gorman-Rupp International Company P.O. Box 1217 • Mansfield, Ohio 44901-1217 • Tel: +1.419.755.1352 • Fax: +1.419.755.1266 Gorman-Rupp of Canada, Ltd. 70 Burwell Road • St. Thomas, Ontario N5P 3R7 • 519.631.2870 • Fax 519.631.4624 AMT 400 Spring Street • Royersford, Pennsylvania 19468 • (610) 948-3800 • Fax: (610) 948-5300 www.gormanrupp.com GL-05303 © 2003, The Gorman-Rupp Company. All rights reserved. Printed in the USA The purpose of this manual is to give you information needed to select the correct pump for the job in simple terms. This manual contains: Types of pumps in use today How to read a pump performance curve Figuring pump applications How to select the correct pump for the job Friction loss tables Useful information Where to use pumps Pages 1-4 Pages 5-6 Pages 7-8 Pages 9-10 Pages 10-11 Pages 12-14 Page 15 Index TYPES OF PUMPS IN USE TODAY STANDARD CENTRIFUGAL PUMPS The simplest of all types, it has been in use since the 1700’s. This pump operates on the centrifugal force principle, which can be seen in operation every time you drive your car on a wet road. The tire picks up water and throws it by centrifugal force against the fender. This AMT high head centrifugal pump is ideal for chemical processing, liquid transfer, heating and cooling and sprinkler/fire protection...

Words: 7367 - Pages: 30

Free Essay

Pump Product

...oSlurry pump solutions for the oil and gas industry Weir Minerals Hazleton Excellent Minerals Solutions Weir Minerals is committed to delivering long term solutions to the petroleum industries’ most difficult pumping needs. When the petroleum industry expose their pumping systems to erosive materials, such as coke, catalyst, sand, ash, coal or shale the pumps selected need to be durable, reliable, and of the highest quality. Since 1916, Weir Minerals has supplied long term slurry pumping solutions focused on longevity and reliability to meet the demands of challenging applications for the petroleum industry. The petroleum industry demands performance and pump reliability. Weir Minerals specializes in slurry systems and has been able to exceed the robust demands of the petroleum industry. Our Engineered-ToOrder slurry pumps are designed with longevity in mind to deliver reduced process down time and maintenance costs by extending mean times between planned maintenance intervals. To meet the customer’s requirements Hazleton slurry pumps are engineered to order for each application and incorporate design features and standards that not only ensure durability and reliability, but also differentiate us from the competition. Some of which include: • Hydraulic design incorporates unique “Controlled Diffusion” process to minimize erosive vortices and reduce volute velocities for longer wear life Utilization of materials and specialty coatings to achieve maximum wear life...

Words: 1868 - Pages: 8

Premium Essay

Cj Industry

...to completely satisfy the requirements of the contract with Great Lakes, and secure their future business with Great Lakes. While they do most manufacturing in-house, they have been sourcing their bilge pumps out to Heavey Pumps on an informal basis. While Heavey has been a reliable supplier, they are a small company and the expanded business will stress their production capabilities; so CJI has been contemplating whether to build the pumps in-house, or continue to subcontract them. Here are the questions from the reading regarding this issue: What are all the issues here, from both CJI’s and Heavey’s perspectives, that need to be researched by Mr. Ashby? From CJI’s perspective: Their number one priority is to maintain contract compliance with Great Lakes because it is the future of their business growth and success. With that in mind, they need to ensure the pumps from Heavey will arrive on-time and be of a high quality. Traditionally, this relationship has been professional and satisfactory, even though informal. However CJI had usually ordered 50 pumps, 8-10 weeks ahead of time, every 4-6 months and this allowed Heavey to stay on top of the orders and deliver the products as needed. This time though, their new contract with Great Lakes will require CJI to have 50 pumps per month, with the possibility that this could increase during the 5 year contract period. This would exceed the...

Words: 1846 - Pages: 8

Premium Essay

Business Consultant

...customer has the opportunity to return a pump to Wärtsilä GLS for reconditioning after the estimated lifetime of the fuel pump is reached (“Reconditioning of pilot fuel pumps,” 2014). In this paper I will analyze the internal process used by Wärtsilä Ltd and will advise them how it could be reengineered in order to give the company an even more competitive edge. Introduction In order to stay competitive in today’s global economy more and more businesses are making use of business consultants (Ariño, 2014). A business consultant assists an organization in improving performance and efficiency, by analyzing the business, creating solutions, and assisting companies to meet their goals (Hom, 2013). Nowadays, it is very important for companies to reinvent their operational capabilities, and this is mainly caused by customer sophistication, competitive pressure, and a move to services (Chase, Jacobs, & Aquilano, 2006). Operations consultants can help an organization in developing new and improved strategies, and improving their internal processes. The Process I will examine the reconditioning process of fuel pumps of the engine builder company Wärtsilä Ltd. The reconditioning process was established to decrease warranty and maintenance cost, and it is a process in which a customer has the opportunity to return a pump to Wärtsilä GLS for reconditioning after the estimated lifetime of the fuel pump is reached (“Reconditioning of pilot fuel pumps,” 2014). Reconditioning decreases the...

Words: 1522 - Pages: 7

Premium Essay

Organization Study

...CHAPTER - 1 INTRODUCTION 1 INTRODUCTION OF THE STUDY In the modern world of tough competition and rivalry among the companies it has become necessary that one should be able to understand each and every aspect of the functioning of the organization than only concentrating on his work alone. So in order to make students aware of the overall working of the organization the university as well as the institution has made it mandatory to conduct a detailed study into the working of an organization and also to submit a report at the end of the study. Since the industrial revolution in the early 18th century, the world has witnessed a significant growth in the field of infrastructure, industry and allied activities. In India after the globalization in 1993, the foreign counterparts started coming to India and the need for doing project was realized and now it has become an important component of economic development. Projects are defined as an economic activity with well defined objectives and having a specific beginning and end. The engineering industry is one of the second largest components of India‟s manufacturing sector over the year. This particular sector has registered an average growth of 16% during the last two decades. It includes production of the electronic gadgets and machines and drives to run those machines. Need for the study      To learn about the origin and development of the company. The role of each department in an organization dealing in industrial...

Words: 6531 - Pages: 27

Free Essay

Piston Less Pump

...ABSTRACT: Pistonless pump for rocket has been proved to be the most economical than piston pump or turbopump. In pistonless pumps, piston is absent. It has very much less rotating parts than that of piston pumps or turbo pumps. So, it has less friction losses and there by it helps to improve the efficiency of the engine considerably.They can be easily installed in the rocket than turbopumps.Also,it reduces the weight of rocket. This article discusses the working , advantages of pistonless pump over turbopump. Pistonless pumps are 80-90% economical than that of piston pump or turbo pumps.Nasa has manufactured such kind of pump and tested it actually,and they found it works conveneiently. I NTRODUCTI ON: NASA have developed a Low cost rocket fuel pump which has Comparable performance to turbopump at 80-90% lower cost. Perhaps the most difficult barrier to entry in the liquid rocket business is the turbo pump. A turbo pump design requires a large engineering effort and is expensive to mfg. and test. Starting a turbo pump fed rocket engine is a complex process, requiring a careful of many valves and subsystems.In fact ,Beal aerospace tried to avoid the issue entirely by building a huge pressure feed booster. Their booster never flew, but the engineering behind it was sound and ,if they had a low cost pump at their disposal ,they might be competing against Boeing. This pump saves up to 90% of the mass of the tanks as compared to a pressure fed system. This pump has really proved...

Words: 2191 - Pages: 9

Free Essay

Pumps

...Mechanical pumps may be submerged in the fluid they are pumping or external to the fluid. Pumps can be classified by their method of displacement into positive displacement pumps, impulse pumps, velocity pumps, gravity pumps, steam pumps and valveless pumps. Positive displacement pump A lobe pump lobe pump internals Mechanism of a scroll pump A positive displacement pump makes a fluid move by trapping a fixed amount and forcing (displacing) that trapped volume into the discharge pipe. Some positive displacement pumps use an expanding cavity on the suction side and a decreasing cavity on the discharge side. Liquid flows into the pump as the cavity on the suction side expands and the liquid flows out of the discharge as the cavity collapses. The volume is constant through each cycle of operation. Positive displacement pump behavior and safety Positive displacement pumps, unlike centrifugal or roto-dynamic pumps, theoretically can produce the same flow at a given speed (RPM) no matter what the discharge pressure. Thus, positive displacement pumps are constant flow machines. However, a slight increase in internal leakage as the pressure increases prevents a truly constant flow rate. A positive displacement pump must not operate against a closed valve on the discharge side of the pump, because it has no shutoff head like centrifugal pumps. A positive displacement pump operating against a closed discharge valve continues to produce flow and the pressure in the discharge...

Words: 3276 - Pages: 14

Free Essay

Deposition Technique

...California Institute of Technology Physics 77 Vacuum Techniques and Thin Film Deposition Experiment 3 (October 2001) 1 Introduction Much of modern experimental physics is done under vacuum. Design and construction of vacuum apparatus is one of the most useful ”bread and butter” skills an experimentalist in condensed matter, atomic, or optical physics can have, and the subject of vacuum engineering is a vast one. This lab serves as an introduction to basic vacuum techniques and thin film growth, another often essential skill for condensed matter physicists. This lab is an optional prerequisite for Experiment 10, Condensed Matter Physics at Cryogenic Temperatures, for which you can grow your own samples for Weak Localization measurements if you choose. 2 Pressure and gas flow In vacuum work, pressures are almost always measured in millimeters of mercury, or torr. One torr is just the pressure necessary to support a column of mercury with a height of one millimeter. The conversion to units more familiar to readers of physics textbooks is 1atmosphere = 101kPa = 760torr There are two pressure regimes of interest to the scientist working with vacuum systems, and gases behave differently in each regime. The first, the viscous flow regime, describes the case where gas flows as a fluid, where the mean free path of the gas molecules is much smaller than the dimensions of the apparatus. The second, the molecular flow regime, describes the high-vacuum case, where the mean...

Words: 3525 - Pages: 15

Free Essay

Ms Word

...ENGINE COOLING SYSTEM B ENGINE A SECTION CO ENGINE COOLING SYSTEM C D CONTENTS APPLICATION NOTICE ............................................. 2 . How to Check Vehicle Type .................................... 2 . PRECAUTIONS ......................................................... 3 . Precautions for Supplemental Restraint System (SRS) “AIR BAG” and “SEAT BELT PRE-TENSIONER” ................................................................. 3 . Precautions for Liquid Gasket ................................. 3 . REMOVAL OF LIQUID GASKET SEALING ......... 3 . LIQUID GASKET APPLICATION PROCEDURE 3 ..... PREPARATION .......................................................... 5 . Special Service Tools .............................................. 5 . Commercial Service Tools ....................................... 6 . OVERHEATING CAUSE ANALYSIS ......................... 7 . Troubleshooting Chart ............................................. 7 . COOLING SYSTEM ................................................... 9 . Cooling Circuit ......................................................... 9 . . System Chart ........................................................ 10 ENGINE COOLANT ..................................................11 . Inspection ...............................................................11 . LEVEL CHECK ...................................................11 . LEAK CHECK .....................................................11 . Changing Engine...

Words: 6160 - Pages: 25

Free Essay

Solar Power Pump

...Summary A solar powered pump is a pump running on electricity generated by photo voltaic. Unlike a normal pump, solar power pump being powered by the renewable electricity generated from the sun. Basically, a solar power pump consists of 4 parts which is the actual fluid pump, the controller, the engine which usually powered by electric motor and the energy source being powered by the sun. Dr. Mohd. Azree named this project as solar power pump and being assigned to all group leader of the class. The main objective of this project is to select a solar power pump by identifying whether the existing of pump is really ideal or need to be replaced. Actually, there is already had existing solar power pump build at BH building and in order to achieve our main objective, early research need to be done about the existing solar power pump which lead by Mr.Halil. Besides that, details calculation will be done in order to approve the existing pump suitable or not. Discussion about the project will also be done and some recommendation will be list out if the existing pump is not suitable. Lastly, I hope that this project will achieve the target and will bring benefit to the future research in solar power pump area. Abstract This project serves the purpose of being a validation to the existing solar powered water pumping system installed in Universiti Tenaga Nasional (UNITEN). The solar powered pump is an effort of UNITEN’s collaboration with an agency that are investing in providing...

Words: 2372 - Pages: 10

Premium Essay

John Snow and the Cholera Outbreak

...discovery came to influence public health and the construction of improved sanitation facilities beginning in the 19th century. Later, the term "focus of infection" would be used to describe places like the Broad Street pump in which conditions are good for transmission of an infection. In the mid-19th century, the Soho district of London had a serious problem with filth due to the large influx of people and a lack of proper sanitary services: the London sewer system had not reached Soho. Many cellars (basements) had cesspools underneath their floorboards. Since the cesspools were overrunning, the London government decided to dump the waste into the River Thames. That specific action contaminated the water supply, leading to a cholera outbreak. On 31 August 1854, after several other outbreaks had occurred elsewhere in the city, a major outbreak of cholera reached Soho. John Snow, the physician who eventually linked the outbreak to contaminated water, later called it "the most terrible outbreak of cholera which ever occurred in this kingdom."[1] Over the next three days, 127 people on or near Broad Street died. In the next week, three quarters of the residents had fled the area. By 10 September, 500 people had died and the mortality rate was 12.8 percent in some parts of the city. By the end of the outbreak, 616 people had died.Snow was a skeptic of the then-dominant miasma theory that stated that diseases such as cholera or the Black Death were caused by pollution or a noxious form...

Words: 822 - Pages: 4

Premium Essay

Pumps on Board Ship

...* Learning Objective : Know the marine pump, types, design features and operation on board. * Specific Learning Objectives : • State the design features of centrifugal and positive displacement pumps. • State the uses of various pumps onboard. • Explain the pump types and principles of operation of marine pump. • State and explain the operation of each components of the following pump; Reciprocating pump. Screw pump. Gear pump. Centrifugal pump • With the aid of diagram, explain the type and working principle of the gland seals. • State the requirement of relief valves that may be fitted on marine pumps. • State the requirement of air vessel that may be fitted on marine pumps. * Key Functions of Pumps : • Raise the liquid from one level to another • To give it a high velocity • To transport it through a pipe • To move it against resistance • To force it through a hydraulic system against various resistance * Main Classification : • Positive Displacement pumps • Dynamic pressure pumps (rotor-dynamic pumps or nonpositive displacement pumps) * Positive Displacement pumps : • This is one in which a definite volume of liquid is delivered for each cycle of pump operation, regardless of the resistance offered. In other word in which one or more chambers are alternately filled then emptied. • These include reciprocating, gear, screw, etc …They do not required a priming device, in fact they may used as priming devices...

Words: 508 - Pages: 3