Free Essay

Report on Construction Materials

In:

Submitted By jn7911
Words 817
Pages 4
Objective The first objective of this lab was to determine if the coarse aggregate meets ASTM C33 standards for coarse aggregates. Also this lab was used to determine the specific gravities of the coarse aggregate. Lastly, this lab helped to determine if this coarse aggregate could be used to make a good gravel driveway.

Apparatus and Materials 1. Ohaus Heavy Duty Solution Balance, model 1119, property of Bluefield State College. 2. Common sieves: 1 – ½”, 1”, ¾”, #4, #8, including the pan and lid. 3. Peerless Stove and Mfg. Co. oven, #2324DS (Solitest model L-90), property of Bluefield State College. 4. Common gravel aggregate. 5. Common flask. 6. “Bath Scale”, BSC # 18589.

Method
Sieve Analysis:

This lab exercise determined the size of coarse aggregate as it passed through the given sieves resulting in a percent that passed though, and a percent that was isolated on the sieves.

Gravel coarse aggregate was obtained and weighed using the Ohaus HD Solution Balance and approximately 1 kg of the gravel aggregate was measured. Sieves were obtained then stacked according to sieve size, from largest screen openings to finest, with the pan on the bottom. The 1kg of coarse aggregate was then poured over the top sieve and the lid was placed on top. The stack of sieves was then shaken by hand to sift the aggregate over the layers of sieves. The lid was removed and the coarse aggregate on each sieve was weighed and the weight was recorded on the Coarse Aggregate Lab. Data Sheet.

#200 Wash Test

This lab exercise consisted of weighing the coarse aggregate and then washing it though a #200 sieve to determine how coarse of an aggregate could be obtained by determining how much would pass through a #200 sieve. Approximately 1 kg of oven-dried coarse aggregate was weighed and recorded on the Coarse Aggregate Lab. Data Sheet. The gravel was then placed on a #200 sieve and rinsed with water until the water was clear that ran out the sieve. The coarse aggregate was then dried and weighed again, and it was recorded on the Coarse Aggregate Lab. Data Sheet.

Specific Gravity
This test determined the specific gravity of the coarse aggregate.
Oven dried gravel was saturated with water and allowed to oven dry to give a saturated surface-dried weight. 2kg of SSD gravel was obtained and was recorded on the Coarse Aggregate Lab. Data Sheet. The gravel was then submerged in a bowl of water and the weight of the 2kg of gravel that was submerged was obtained and recorded. The gravel was then removed and placed in an empty bowl of known weight and allowed to oven dry for at least 24 hours, the final oven-dried weight of the gravel is recorded on the Coarse Aggregate Lab. Data Sheet.

Results
The Coarse Aggregate Lab. Data Sheet contains the numerical data of all three of the aforementioned tests. The Aggregate Grading Chart 1 contains the data obtained in the sieve analysis plotted by sieve # vs. total percent passing.
The bulk specific gravity of the coarse aggregate was = 2.66.
The apparent specific gravity of the coarse sand aggregate was = 2.73.
The % absorption was = 0.92%.
The uniformity coefficient = 2.46.

Discussion
First in response to whether this would make a good aggregate for a gravel driveway, it appears that it would.
Next, in response to whether or not the aggregate met the requirements in C33 of the ASTM for coarse aggregates, it does not due to the condition that it retains more material on the #4 sieve than any one sieve and it meets the requirements in C33 Table 2.
Problems encountered during the lab exercise resulted in either miscalculation of weights or human error in loss of aggregate in regards to the sieve analysis.

Conclusions
The use of this lab experiment to determine factors such as specific densities and practical applications such as gravel were very conclusive. The data shows that this does not meet the ASTM C33 requirements for a coarse aggregate. This course aggregate would meet the gravel size #56 and #67.

Recommendations This lab could have been completed with greater care in 2 lab sessions.

Appendix

Cumulative % retained = % retained sieve 4 Cumulative % retained = % retained sieves 4+8 Cumulative % retained=% retained sieves 4+8+16, etc.
%Passing = 100-Cumulative percent retained sieve 4 %Passing=100-Cumulative percent retained sieve 4+8, etc.
Cu = D60 / D10 Sieve Size | Wt. of Agg (g) | % Retained | Cumm % | % Passing | ASTM C33 Specs | 1 ½ in | 0 | 0 | 0 | 100 | 100 | 1 in | 0 | 0 | 0 | 100 | 95-100 | ¾ in | 284.1 | 28.4 | 28.4 | 71.6 | 25-60 | ½ in | 162.7 | 16.3 | 44.7 | 55.3 | 0-10 | #4 | 552.7 | 55.3 | 100 | 0 | 0-5 | #8 | .5 | 0 | 100.5 | 0 | 0 |

References
Basic Construction Materials, 7th Edition, by Theodore W. Marotta.

Similar Documents

Premium Essay

Systems Analysis Assignment the Tdc Construction Company

...Higher Diploma in Systems Analysis Applied Systems Analysis Assignment: The TDC Construction Company Requirements Determination and Analysis The TDC Construction Company Requirements Determination: Analyse of the conduct of the interview:  In general, what is your view of how the interview was conducted? Generally the interview was reasonably professional if a little rushed. The good points were: Inez begins well by reviewing the company’s business objectives which she has a grasp of from previous contacts with the company. There seems to be a good understanding on business matters between Inez and Gerry. She ensures that she has a firm understanding of many of the facts that she gathered. E.g. “Now, I understand one of the general objectives of the new information system is to be able to extract reports and inquiries on demand from any browser on a PC, laptop, Blackberry or PDA”. She pauses to jot some details of those facts down The bad points were: Inez seems to have her eye on the clock and she avoids going into detail on some of the new areas of business that Gerry wants in the new system e.g. the company’s proposed environmental specialist division, is not analysed by Inez. She also does not analyse sufficiently the Safety System. At times she does not seem to be listening to Gerry. Gerry talks about the environmental area more than once, but she does not to pick up on it sufficiently. However, to be fair to Inez, at the end of the interview she does say...

Words: 2368 - Pages: 10

Premium Essay

Managememnt

...FAR 600 CONSTRUCTION – IREKA CORPORATION BHD INDUSTRIAL PRODUCT – ADVANCED PACKAGING TECHNOLOGY (M) BHD Lecturer : Assoc. Prof. Dr. HanimNorza Baba Class : M1 AC220 8C Group Members :MohdShawalHidayat bin Samiun (2011820802) Muhamed Shazni bin Mohd Fuad (2012196529) NurSuhanibintiMohdAlid (2011833942) NurulfarhanabintiJamaludin (2011681414) LiliFathiHayyanbinti Ibrahim (2011824542) TABLE OF CONTENT NO. | ITEMS | PAGE | 1. | Acknowledgement | 3 | 2. | Introduction | 4 | 3. | Industry’s Background | 6 | 4. | Company’s Background | 7 | 5. | Findings | 9 | 6. | Discussion | 15 | 7. | Environmental Issues | 16 | 8. | Conclusion | 18 | ACKNOWLEDGEMENT Bissmillahirrahmanirrahim…… Alhamdulillah. Thanks to Allah SWT, whom with His willing giving us the opportunity to complete this Final Year Project. This project report was prepared for FAR600 subject. This report is based on the methods given by the university. Firstly, we would like to express our deepest thanks to, DrHanim, a lecturer at University Technology Mara and also assign, as our supervisor who had guided be a lot of task during our last semester session. we also want to thanks to our group members for their cooperation during completion of this project that had given valuable information, suggestions and guidance in the compilation and preparation this project report. Deepest thanks and appreciation to our parents, family, special mate of us, and others for their cooperation...

Words: 4485 - Pages: 18

Premium Essay

: 器人,扎昆

...Design Scenario 1: Adam’s Peak GROUP A1: Nikolce Mitrevski Joe Doyle Shihab Khan Zhenpeng Dong October 20th 2014 ABSTRACT The purpose of this scenario is to reduce the amount of waste along the “Adam’s peak” mountain. The local population of various cultures as well as tourists have failed to recycle or properly dispose of their wastes that they bring onto the mountain and Group A1 aims to significantly eradicate this waste and provide a long term solution to keeping the waste down on the mountain. Transportation is the main issue on the mountain as the only access remains by foot, and the combustion of the waste by use of steel drums in-situ causes a pollution issue, which raises a serious concern for the future of the mountain. Group A1 found the best way to resolve the issues on the mountain is to create a solution at the source of the waste. The group found that installing a gate at the base of the mountain and charging access would provide a cost-friendly and effective solution. The caretakers would then provide recyclable bags to the population entering the mountain, which then would pickup rubbish along the mountain until the bag reaches full capacity. Upon returning to the base of the mountain with a full bag, a rebate would be offered for their contribution in collecting waste. The idea is that the population would be paid for their efforts in assisting to the mountains health and waste collection. Coupled with extra signage, installing of a compost...

Words: 4865 - Pages: 20

Free Essay

Report on Inventory

...PROCUREMENT FROM: PROCUREMENT OFFICER SUBJECT: REPORT FOR THE MONTH OF NOVEMBER, 2013 DATE: 30TH NOVEMBER, 2013 INTRODUCTION: This report covers the period of November 1st - November 30th, 2013. Highlighting requisitions arising from other departmental operation, construction of princess gogoba and warehouse / workshop. GOALS AND OBJECTIVE: The objectives for this reporting period include: A. Ensure that all requisition for other departmental operations, construction of princess gogoba and Warehouse / workshop that are relevant to the purchasing and supply are duly followed and closed out. B. The quality of goods and services supplied is acceptable by set standards and made available in time to meet the overall timeline for completion of relevant projects or operation. C. Progress on vendor registration and vendor registration code issuance process. D. Diesel dispensary. E. Materials management. E. Summary on purchases for the month. REQUISITION ARISING FROM RELEVANT OPERATIONS: CONSTRUCTION OF PRINCESS GOGOBA The request of materials and services for the completion of princess gogoba is being processed as vendors for the needed materials are mobilizing for delivery. WAREHOUSE / WORK SHOP CONSTRUCTION: All materials request for the warehouse / work shop construction for the preliminaries, excavation, earthworks and Ironmonger...

Words: 507 - Pages: 3

Premium Essay

Portakabin Brochure

...Brochure More information from http://www.researchandmarkets.com/reports/614719/ Modular & Portable Buildings UK Description: This market research report analyses the UK market for modular and portable buildings for a five year review period and a five year forecast period up until 2012. The report includes permanent modular, portable units and semi-permanent portable buildings. Semi permanent portable buildings and portable units have been further segmented by type of frame material, by type of wall material, by type of client and by end-user sector and permanent modular buildings have been further segmented by type of frame material, by type of wall material and by end user sector. This report identifies factors that affect demand as well as analysing distribution and the industry structure within the UK which includes 28 company profiles. With this report, you will find essential data to help you plan your business strategy and budgeting. The quantitative and qualitative analysis in this report includes: UK market for modular and portable buildings, in value, 2003 2012 UK market for modular and portable buildings, by type of building, in value, 2003 2012: - permanent modular - portable units - semi-permanent portable UK market for modular and portable buildings, by end-user sector, in value, 2007: - education - healthcare - construction - offices - hotels - retail - leisure & events - commercial & industrial - prison - military - housing UK market for semi permanent portable...

Words: 2302 - Pages: 10

Premium Essay

Gw Project Report

...WASHGON UNIVERISTY Tacheng Wind Power Plant Project Plan School of Engineering & Applied Science Team Member: Shiyue Jiang, Ruiyu Liu, Kufre Essiet, Juan Wang, Mengpei Jia Project Report Table of Content 1. General description of project activity ..................................................................................... 4 1.1 Title of the project ............................................................................................................. 4 1.2 Description of the project ................................................................................................... 4 1.3 Detail of physical location ................................................................................................. 5 2. Understanding of scope of work .............................................................................................. 6 2.1 Scope of work ................................................................................................................... 6 3. Technical Approach ................................................................................................................ 7 3.1 Basic Construction part ...................................................................................................... 7 3.2 Basic Construction for fan ................................................................................................. 9 3.3 Fan Installation ...............................................................

Words: 6914 - Pages: 28

Premium Essay

Sample Project

...Running Head: PROJECT PROGESS REPORT 1 Project Progress Report The City of Charming – Ocean View Resort Project Magenta Construction, Inc. November 29, 2012 Courtney Bocage, Lyndsie DeVito, Keayan Emory, Kelli Keith, Atsoh Nyindem Project Progress 2 Change History Date changed October 2, 2012 October 3, 2012 Change details Added the Responsibility Matrix Increased the City of Charming’s budget from $25M to $100M Increased the number of parking spaces from 600 to 800 Added the Project Communication Plan Added the Project Team Organization section Added the Project Schedule section and the work breakdown structure Phases were updated to include three tiers and then three phases within the construction tier Added the Roles and Responsibilities table Changed the working days constraint to include working days of only Monday – Friday, instead of Monday – Saturday Added the Project Cost Estimation section and the cash flow analysis section Added the Risk Management Plan Added Overallocated Resources and Project Crashing section Added the Crystal Ball risk analysis/cost uncertainty tables Removed “Designer” staff Working days were setup as Monday – Friday in the MS Project WBS We originally had only included the construction phases and had to create a place for the pre- and post-construction work Reason for change (if applicable) For the length and detail of the project, $100M is a more realistic budget. For 600 hotel rooms, 800 spaces were more realistic. ...

Words: 11446 - Pages: 46

Premium Essay

Advantages And Disadvantages Of Construction Methods

...study also showed that 4 of the 5 developers who were part of the study had used construction methods that were not certified. Advantages found in the study were that these alternative construction methods were cost-effective on the part of developers, enhanced speedy delivery, and some construction methods were found to be easy to maintain. The disadvantages were the inability of the houses to resist extreme weather conditions, structural defects such as cracks that are not easy to repair in some materials, poor workmanship, and structures that are not compatible to future extensions (Mgiba, 2007: 16). 2.4.1.2 Inadequate Material According to Metri, 2005 supplier quality management includes fewer dependable subcontractors, reliance on suppliers process control, strong inter dependence of supplier and customer, purchasing policy, emphasizing quality rather than price, supplier quality control and supplier assistance in quality development. Materials are often a major source of quality problems and affect buyer satisfaction. Instead of relying on tools such as acceptance sampling to establish the quality of incoming materials and component parts, it is preferable for constructors to purchase from a more limited number of qualified or certified suppliers....

Words: 1388 - Pages: 6

Premium Essay

Level 1 Award in Health and Safety

...Pearson BTEC Level 1 Award in Health and Safety in a Construction Environment (QCF) – Workbook Pearson BTEC Level 1 Award in Health and Safety in a Construction Environment (QCF) Level 1: 4 Credits Learner name: | | Learner registration number: | | Centre name/number: | | Assessor/tutor name: | | Your job role (if applicable): | | Main Organization:(This will either be the organization the Learner is employed by or, if the Learner is not currently employed within the construction sector an organization they are familiar with.) | UNIT SIGN OFFI confirm that the answers given within this workbook are my own work. Learner signature: Date: | I confirm that the evidence in this workbook has been assessed against the assessment criteria for this unit and has judged for validity, authenticity, currency, reliability and sufficiency.Assessor/tutor signature: Date: | Assessment Guidance It is expected that the majority of learners who will be undertaking this qualification will be preparing for employment within a construction role in an organization. The expectation is that learners will choose to complete this workbook in the context of their own job role. This method should allow learners to access the material required with ease and utilize the information in the workbook as evidence against a knowledge-based qualification where appropriate. However, it is necessary...

Words: 4807 - Pages: 20

Free Essay

Disaster Risk Mangement

...LDRRMF Accountability Form No. 1 “A” REPORT OF LOCAL DISASTER RISK REDUCTION AND MANAGEMENT FUND UTILIZATION For the Quarter Ending September 30, 2012 GENERAL FUND Province/City/Municipality: CITY OF MATI P 543,188,677.00 p 22,257,663.93 Estimated Revenue from Regular Sources: CALAMITY FUND Less: DISBURSEMENTS Pre-Disaster Preparedness Programs Management/Operational Expenses: Fuel, Oil & Lubricants Travelling Expenses Office Supplies Capital Outlay: Purchase of Office Equipment for OpCen Purchase of Vehicle for (OpCen) Projects and Programs: Construction of Flood Control – Sitio Calasagan, Barangay Sanghay __________________________________________________________________ Post-DisasterPrograms Aid given to Fire Victims in Mati during 3rd quarter of 201 Aid sent to DSWD for the Flood Victims in Manila _____________________________________________ _____________________________________________ Payment of Premiums on Calamity Insurance __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ __________________________________________________________________ SUBTOTAL BALANCE 102,920.00 13,980.00 7,780.00 68,000.00 1,482,000.00 99,530.00 ______________________ 1,095,000.00 500,000.00 _______________ _______________ ______________________ ______________________ ______________________ ______________________ P 3,369...

Words: 2037 - Pages: 9

Free Essay

Accounting

...its product leadership customer value proposition. The annual report mentions in numerous places that Toll Brothers focuses on Luxury Homes and Communities and high quality construction. Page 8 of the 10-K says ‘We believe our marketing strategy, which emphasizes our more expensive “Estate” and “Executive” lines of homes, has enhanced our reputation as a builder-developer of high-quality upscale housing.” Page 2 of the 10-K says “We are the only publicly traded national home builder to have won all three of the industry’s highest honors: America’s Best Builder (1996), the National Housing Quality Award (1995), and Builder of the Year (1988).” Toll Brothers seeks to realize manufacturing efficiencies for the benefit of its shareholders, but its customers choose Toll Brothers for its leadership position in the luxury home market. 2. Toll Brothers faces numerous business risks as described in pages 10-11 of the 10-K. Students may mention other risks beyond those specifically mentioned in the 10-K. Here are four risks faced by Toll Brothers with suggested control activities: * Risk: Downturns in the real estate market could adversely impact Toll Brothers’ sales. Control activities: Diversify geographic markets served so that a downturn in one region of the country will not cripple the company. * Risk: Large sums of money may be spent buying land that, geologically speaking, cannot support home construction. For example, soil conditions may be too unstable to support the...

Words: 1410 - Pages: 6

Premium Essay

Architecture

...Materials Study Guide Reasons for Material selections/ being observant - Functional and aesthetic - economical - design intent - emotional feelings - maintenance - owner mandated/ context - required by health dept - “green materials” - performance value - cultural context - expected life - brand imaging - effects lifestyle Learning lessons from being observant - commercial vs. residential buildings Typical phases of a project 1. Schematic design - building materials defined - ID materials - schematic in nature - 15% of contract 2. Design Development -Building materials selected - Develop the design - 20% 3. Construction drawings -Building materials assembled - More how than why - Detailed instructions for contractors - 40% 4. Bidding/ Negotiation - issue and give construction drawings to contractors for “bidding” - 5% 5. Construction Administration - Materials Realized - Design Professional observes construction contractors build - 20% Primary Project Players 1. Design Professional- Design 2. Client (Owner)- Money and program 3. Contractor- Build Responsibilities- Architect does the sets of drawings, organizes the spaces, coordinates all the other project players, and plans the building, enforces codes, and keeps safety in mind. ID decorates the space, a team player, not captain but works with arch, supply chain manager. Contract- legal document that binds the client to the designer and the client to the contractor through...

Words: 889 - Pages: 4

Premium Essay

Cost Control in Construction Projects

...Construction Project Controls: Cost, Schedule, and Change Management UP-201 September 2004 CURT Owner Member Companies Abbott Laboratories Air Products & Chemicals, Inc. Ameren American Electric Power Baxter Healthcare Corporation Boeing Company Caterpillar Inc. Citigroup ConocoPhillips DTE Energy The Dow Chemical Company E.I. Dupont De Nemours & Company Eastman Kodak Company Ernst & Young ExxonMobil Chemical Company FMC Corporation FirstEnergy Corporation General Electric Company General Mills, Inc. General Motors Corporation HCA Healthcare Corporation Hercules, Inc. Honda of America Mfg., Inc. IBM Intel Corporation Johnson & Johnson Kansas City Power & Light Company The McGraw-Hill Companies MeadWestvaco Corporation Merck & Company, Inc. Owens Corning PSEG Power, LLC Pfizer, Inc. The Procter & Gamble Company Rohm and Haas Shell Global Solutions (U.S.), Inc. Southern Companies Sunoco, Inc. TECO Tampa Electric Company Toyota Motor Mfg. North America Tyco International U.S. Army Corps Of Engineers U.S. General Services Administration The University Of Cincinnati Associate Member Companies Alberici Group, Inc. BE&K Bechtel Egizii Electric, Inc. Fluor Corporation Hunt Construction Group Jacobs Engineering Group Rudolph/Libbe Companies The Shaw Group, Inc. Tetra Tech FW Inc. Turner Construction Company Zachry Construction Corporation Association Associate Members Associated Builders and Contractors (ABC) Associated General Contractors of America (AGC) Mechanical Contractors...

Words: 2779 - Pages: 12

Free Essay

Business Communication

...lecturer/tutor concerned I am aware that this work will be reproduced and submitted to plagiarism detection software programs for the purpose of detecting possible plagiarism (which may retain a copy on its database for future plagiarism checking) Signature: ______________________________________ Note: An examiner or lecturer/tutor has the right to not mark this assignment if the above declaration has not been signed. Acknowledged receipt by:Name : ______________ Signature : ______________Date : | TABLE OF CONTENT No | Content | Page | 1 | E-mail | 3 | 2 | Letter | 4 | 3 | Report | 5 | | | | | | | Task 1 E-mail To: janetteolson@gmail.com From: Lukeadministrator@gmail.com Date: 12th October 2016 Subject: Complaint from Venus Construction I have received complaints...

Words: 1049 - Pages: 5

Premium Essay

African Leadership

...Completion Date: ___________ % Complete ________ Award Amount: $_________________ Interviewed: ___________________________________________ EIC ____ Res. Engr.____ Off Engr. ____ Inspt. ____ NYSDOT RLPL (or representative) Present During Review? YES NO ____________________________________ Local Sponsor Official Present During Review? YES NO ____________________________________ Construction Monitoring and Staffing: Was a pre-construction meeting held for this project? YES NO Date of meeting:_____________________ Has a Construction Monitoring Plan (CMP) been prepared for this project? YES NO Is the CMP available for review? YES NO (Please make a copy and attach to report) Does the plan specify a required level of on-site project staffing? YES NO If YES, what is the specified project staffing:______ EIC/RE/PM _______ Office Engineer ________ On-site Inspectors Is the project staffing requirement being met? YES NO N/A If NO, why? _________________________________________________________________________________________ ACTUAL on-site construction inspection staff: Local Forces Consultant:__________________________________________ ____ EIC/RE ____ Office Engineer ____ Inspectors Are Inspectors NICET Certified: YES NO Does the project rely on off-site project personnel? YES NO Role:______________________________________ Review the project visitation logs to verify the frequency of visits from the following individuals: - Designated...

Words: 961 - Pages: 4