METALCO: THE SAP PROPOSAL

* Ambiguity in the project scoring synopsis
On the proposal, A.D Murrary weighted the degree of importance of each factors without providing any statement or evidence to support his selection. For example, he weighted the importance of “Economic Impact” to be “10”. What if the risk of uncertainty far out weighted the economic benefit, the final project score will be far below 80 as stated on the proposal. * Significant amount of money was not include in the budget
The initial budget leaves a significant amount of money out of considerations, which include up-front investment in staff, software, hardware, and management. More importantly, for the economic impact, the manager just focused on the installation cost in the initial year. For a system like SAP, it will definitely occur a material amount of maintaining and updating fee down the road after implementing the system. The total benefit, NPV and ROI will drive down to a certain amount when you consider about those costs in the future five years. * Other critical uncertainties need to be considered
The proposal shows limited risks of installing the new system, such as organizational risk, definitional uncertainty, technical uncertainty, IS infrastructure risk. Still, there are a number of critical uncertainties that need be considered by the company. Those uncertainties include delivery delayed, installment and implement failure, overrun the budget and so on. All these risks that are not taken into account may be caused to a failure of the whole project.

In Conclusion:
The weighted Score of the initial project-scoring synopsis made by A.D Murray was 80. If I take all elements into account for preparing the weighted score, the final project score will be dropped down at large extent. I deem that Metalco Inc. should not accept the proposal of the IMI

Similar Documents

Free Essay

La Cisis En Espana

...habla do d e ir a Noru ega.
 La ma dre: So is tonte ares. Yo n o qui ero que via jéis. Voso tras no sap éis na da so bre el pa ís. El hi jo de l ve cino con oce un a chi ca que tra baja en Ver gen. No e s fác il. Del B La situ ación d e Ye sica y Ana stasio es m uy proble mática. N o tie nen tra bajo o alo jam iento en Esp aña, aun que acab an a i r a Es paña de sde Gre cia porq ue crey eron q ue ha y má s traba jo. Pe ro Esp aña n o ha y tr abajo a ca usa de la cris is econó mica. Aho ra h an bus cado trab ajo ca da dí a pe ro sin gr an éx ito. Está n desesp erado po rque no tien en di nero y tien en q ue dor mir en u n sop ortal. Yo pien so q ue ha n he cho mucha s co sas p ara sac ar trab ajo. Yes ica ha ma ndado 300 cur rículos y l o q ue es m uchos. L a ún ica co sa qu e h ay es qu e visi tar las ocu paciones a efe ctos de l os emplea dores pue den verlo s. Pued en emp ezar a estu diar tambi én. Pe ro yo cre o qu e a lo m ejo r es ca ro. E n el tex to 2 encon tramos do s chic as, Susa na y Sis sy q ue está n en Be rgen en N oru ega p ara trabaj ar. E n Ber gen limpia n y frie gan p ara gan ar din ero. Ga nan 18 eur os l a ho ra y traba jan tre s hora s al d ía. ¡E s ni siqu iera 150 eur os al me s en tota l! Ademá s de es o dic e un es pañol an ónimo qu e él trab aja cua tro o ci nco hor as pe ro sola mente re cibe s alario par a t res hor as. E s incali ficable, pe ro no sap en ha cer nad a. Lo s sind icatos noru egos ha n res uelto q ue lo s inmi grantes tien en per miso...

Words: 596 - Pages: 3

Premium Essay

Sap Sd

...KAPIL SHARMA AND ASHUTOSH MUTSADDI Configuring SAP ERP Sales and Distribution ® SERIOUS SKILLS. Configuring SAP ERP Sales and Distribution ® Kapil Sharma Ashutosh Mutsaddi Acquisitions Editor: Agatha Kim Development Editor: Laurene Sorensen Technical Editor: Dheeraj Oswal Production Editor: Liz Britten Copy Editor: Kim Wimpsett Editorial Manager: Pete Gaughan Production Manager: Tim Tate Vice President and Executive Group Publisher: Richard Swadley Vice President and Publisher: Neil Edde Book Designer: Franz Baumhackl Compositor: Craig Johnson, Happenstance Type-O-Rama Proofreader: Word One, New York Indexer: Ted Laux Project Coordinator, Cover: Lynsey Stanford Cover Designer: Ryan Sneed Copyright © 2010 by Wiley Publishing, Inc., Indianapolis, Indiana Published simultaneously in Canada ISBN: 978-0-470-40473-7 No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, scanning or otherwise, except as permitted under Sections 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, (978) 750-8400, fax (978) 646-8600. Requests to the Publisher for permission should be addressed to the Permissions Department, John Wiley & Sons, Inc., 111 River Street, Hoboken,...

Words: 176656 - Pages: 707

Premium Essay

Sales and Distribution

...ROLES_S_SD Sales and Distribution (SD) SAP AG Copyright © Copyright 2001 SAP AG. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft , WINDOWS , NT , EXCEL , Word , PowerPoint and SQL Server are registered trademarks of Microsoft Corporation. IBM , DB2 , OS/2 , DB2/6000 , Parallel Sysplex , MVS/ESA , RS/6000 , AIX , S/390 , ® ® ® AS/400 , OS/390 , and OS/400 are registered trademarks of IBM Corporation. ORACLE is a registered trademark of ORACLE Corporation. INFORMIX -OnLine for SAP and Informix Dynamic Server Informix Software Incorporated. ® ® ® ® ® ® TM ® ® ® ® ® ® ® ® ® ® ® ® ® ® ® ® ® are registered trademarks of UNIX , X/Open , OSF/1 , and Motif are registered trademarks of the Open Group. HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C , World Wide Web Consortium, Massachusetts Institute of Technology. JAVA is a registered trademark of Sun Microsystems, Inc. JAVASCRIPT is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. SAP, SAP Logo, R/2, RIVA, R/3, ABAP, SAP ArchiveLink, SAP Business Workflow, WebFlow, SAP EarlyWatch, BAPI, SAPPHIRE, Management Cockpit...

Words: 3188 - Pages: 13

Premium Essay

Globalization at Sap

...Globalization @ SAP Globalization Drives Business SAP Globalization Services Erik Törnqvist, LPM for ERP Financials, Sweden Agenda 1 2 3 4 Globalization @ SAP and Globalization Services Globalization Strategy Internationalization Localization 5 6 7 © Translation Service Offerings Highlights / Case Studies 2012 SAP AG. All rights reserved. 2 Agenda 1 2 3 4 Globalization @ SAP and Globalization Services Globalization Strategy Internationalization Localization 5 6 7 © Translation Service Offerings Highlights / Case Studies 2012 SAP AG. All rights reserved. 3 Business Trends That Foster SAP’s Value Proposition 1 Customers don’t want a product, they want to get a job done. 2 Growing speed and scope of global change. SAP offers the best solution portfolio to leverage these trends. With SAP, companies are ready for: Innovation at the speed of each business Transformation from built-to-last enterprises to built-to-adapt business networks Performance optimization closed loop from strategy to execution and back again The challenges of a globalized economy © 2012 SAP AG. All rights reserved. 4 Globalization @ SAP Facts and Figures Globalization is a key differentiator for SAP in a competitive market     Global customer base in >140 countries > 60 country version covering legal requirements delivered 39 languages delivered for various solutions ~ 1100 persons are working on globalization topics Strong commitment to customers ...

Words: 3162 - Pages: 13

Premium Essay

The Design and Development of Business Warehousw Systems

...is the SAP NetWeaver Business Warehouse systems on the IBM InfoSphere Warehouse that is on IBM. With a business intelligence database with common properties in a class that can be a wide variation. The SAP NetWeaver Business Warehouse databases tend to have some features that are typical, of a standard BI database. It will fit into the InfoSphere Balanced Warehouse design and there are many benefits to running SAP NetWeaver BW on InfoSphere Balance Warehouse. Timely access to relevant information has always been critical to business success, with new data sources and increased access, managing, processing and making sense of data volumes is important. With the SAP NetWeaver Business Warehouse will lead the way to providing a complete business from data sources. A comprehensive set of tools, planning and simulation capabilities as the components of the SAP NetWeaver platform to combines powerful business warehouse infrastructure and data warehousing functionality. It will give a timely access to relevant information that has been critical to business success. The decision will be based on the full range of information available as the volume of available information grows. The InfoSphere Balanced Warehouse is a complete data warehousing solution that is comprised on pretested, scalable and fully integrated system. The system is configured by linking balanced building blocks together to host a BI system and its data. Defining the scope of your implementation. The SAP NetWeaver...

Words: 626 - Pages: 3

Premium Essay

Literature Review on Car Rental System

...MSIT Project Proposal – Example 1 Carnegie Mellon University Master of Science in Information Technology Software Engineering (MSIT-SE) MSIT Project (17-677) Approval Form Student Name: Jane Doe Date: 9/19/2002 Project Title: Re-Engineer the B2B Interface for a major Customer Project Proposal: Please attach a proposal that contains all of the components listed below. 1. Executive Summary of effort 2. A brief description of the industry, company, and specific facility at which the project will be conducted 3. Description of the problem 4. Project purpose and goals 5. Project approach and methodologies 6. Project deliverables 7. Timeline for deliverables 8. Identify Technical Advisor by name, contact information, position and responsibility 9. Identify Supervisor by name, contact information, position and responsibility Approvals Mr. Smith Application Development Supervisor Name Department Signature Date Mr. Jones Application Development Technical Advisor Name Department Signature Date Carnegie Mellon Approvals Mel Rosso-Llopart Faculty Advisor (Mentor) Signature Date Mel Rosso-Llopart MSIT-SE Director Signature Date MSIT Project Proposal – Example 2 1. Executive Summary of Effort SAP (which stands for Systems Applications and Products in Data Processing) is the ERP (Enterprise Resource Planning) package that is used by all of the Wireline facilities in North America. The SAP Business Connector is the integration tool component of the SAP system that...

Words: 4660 - Pages: 19

Premium Essay

E-Enabled

...Corporate Express Australia Limited solves the challenges of growth Switching to integrated software creates new opportunities Published on 06 Aug 2012 "With the new SAP software we can scale the business at a much more rapid rate, with fewer resources, which will allow us to be more aggressive in going to market. The IBM Global Business Services team provided us with the robust infrastructure that we can rely on to support the business as it continues to grow." - Garry Whatley, Chief Information Officer, Corporate Express Australia Limited Customer: Corporate Express Australia Limited Industry: Retail Deployment country: Australia Solution: Business Intelligence, Enterprise Resource Planning, Information Integration, Transforming Business IBM Business Partner: SAP Overview A wholly-owned subsidiary of US parent company Staples, Corporate Express Australia Limited is one of Australia and New Zealand’s leading single-source suppliers of business essentials. The company employs more than 2,500 people at some 38 locations throughout the region. Corporate Express offers products and services ranging from IT solutions to office products, and provides a reliable one-stop-shop for all business supply needs. Business need: Corporate Express Australia is a steadily-growing company, having acquired some 71 different businesses to date. Acquisition had led to a lack of consistent processes across the company. Corporate Express wanted to move from this environment and introduce...

Words: 1679 - Pages: 7

Premium Essay

Sap Implementation

...Inquiry and Design Phase of SAP Software Cody K. Hobson Upper Iowa University Inquiry and Design Phase of the SAP System PB Leiner USA and PB Gelatins have been working for numerous years with software that is not affiliated with another. Every system carries out the essential functions needed to run each plant facility located in different parts of the world yet there is no unified connection, nothing that ties all financials together. The inquiry phase of this paper will demonstrate the areas in which the Action-Learning Team will conduct a review into the corporate wide system of PB Leiner USA and PB Gelatins looking for potential improvement points. The design phase of this paper will demonstrate the creation and process steps of what the ALT formulated based on the PIP discoveries. Inquiry Phase PB Family The PB family is made up of six facilities across the globe and is the third largest gelatin manufacturer in the world. Each PB facility thrives on creating value for customers at competitive prices and is committed to achieving the highest standards of product safety and quality. There are high expectations of close cooperation with customers while offering the necessary technical support to jointly search for solutions that fit customers’ needs in terms of product applications and technology. Possible Improvement Points within PB Each site was initially using its own Enterprise Resource Planning (ERP) system, which resulted in each site’s...

Words: 2720 - Pages: 11

Premium Essay

Infrastructure and Systems Implementation Plan

...Contact | Name | Rosanne Moran | | Phone | 732-930-3800 | | Email | rmoran@wint.net | Backup Contact | Name | Sabrenna Anderson | | Phone | 732-656-3575 | | Email | sanderson@wint.net | Proposal Type | Idea To Be Explored Potentially Identified Solution | Project Type | New Project Enhancement to Existing or Former Project | Working Title of Project | Infrastructure and Systems Implementation Plan | Project Sponsors | WInt IT department, Rosanne Moran, IT Director. | ------------------------------------------------- ------------------------------------------------- Introduction Widgets International, Inc. currently consists of Widgets USA, LLC and Widgets-R-Us, LTD. Combined Widgets International, Inc. has 50 years of experience in providing function critical assembly and machinery solutions. WUSA has cornered the Business to Business market while WRU has grown in leaps and bounds in the retail market. Together as Widgets International, Inc., they stand to increase their market share substantially by creating and offering innovative and cost effective assembly solutions globally. (Anderson, Unit1, 2014) ------------------------------------------------- ------------------------------------------------- Purpose and Justification This proposal will explore the requirements for the application and implementation of an easily manageable information system that will be an effective and efficient agent in expanding the organization internationally...

Words: 2927 - Pages: 12

Premium Essay

Whats an Erp System ?

...To better understand erp systems and to be able to truly evaluate the most effective systems in the market today, you need to first ask the question, what’s an erp system? enterprise resource planning better known for its shortcut (erp)systems integrate internal and external management information across an entire organization, embracing finance/accounting, manufacturing, sales and service, customer relationship management, etc. ERP systems automate this activity with an integrated software application. The purpose of ERP is to facilitate the flow of information between all business functions inside the boundaries of the organization and manage the connections to outside stakeholders.[1] ERP systems can run on a variety of computer hardware and network configurations, typically employing a database as a repository for information. After extensive uses and application from thousands of corporation and companies both global and local from mid size to large , we were able to assess and evaluate the ten best current erp systems and they are in none specific order : First, Openbravo Open bravo is a web-based, open source ERP business solution for small and medium sized companies. Already in production, Open bravo ERP encompasses a broad range of functionalities such as finance, supply chain, manufacturing & much more. Open bravo ERP has been designed with broad business functionality to help businesses improve overall performance. It is based on a single, integrated database...

Words: 2549 - Pages: 11

Premium Essay

Sap for Atlam

...Technology since it has been privatized by MICT Berhad and ATLAM had overhauled its Information Technology (IT) in year 2000.gain The system had not been functioned to produce financial statement. After knowing the weakness, ATLAM has two alternatives which is ACCPAC and Petra’s group-wide SAP. ATLAM has been asked to upgrade its accounting system with the Petra group-wide SAP system. Zulkifli as ATLAM’s finance manager need to critically assess the risks associated with the decision on whether to or not to implement SAP in ATLAM. Zulkifli has arranged a meeting to discuss the new system upgrade. He had invited Sani (Project Manager), Gopal (User Project Manager), Lim (User Representative) and Kamal (Functional Analyst) to discuss about implementing SAP in ATLAM. As it shown in the case, the first meeting have not come to a mutual agreement on whether to implement SAP in ATLAM as Lim has pointed out that implement ACCPAC is a cheaper option compared to SAP that would be incurred a huge cost for ATLAM as it will becomes a financial constraint and burden to ATLAM. In second meeting, Lim stated that the SAP is impractical in ATLAM as the the company don’t even have enough computer to operate SAP and some of the ATLAM staff...

Words: 1333 - Pages: 6

Premium Essay

Costco

...BDC Step-by-Step BDC Step-by-Step Applies to: SAP ABAP Summary This article demonstrates in a step-by-step process to write Backup Domain Controller (BDC) reports to do data transfer from legacy system, which is important work during SAP implementation projects. Author(s): Renjith Kumar. P Company: PRICOL Technologies Created on: 21 January 2007 Author Bio P. Renjith Kumar is SAP BI Consultant with PRICOL Technologies. He has extensive cross-functional experience and has been with end-to-end SAP implementations as ABAP Consultant. SAP DEVELOPER NETWORK | sdn.sap.com © 2007 SAP AG BUSINESS PROCESS EXPERT COMMUNITY | bpx.sap.com 1 BDC Step-by-Step Table of Contents Overview: How It Works .................................................................................................................. 2 Steps in data transfer....................................................................................................................... 2 Data Transfer Methods .................................................................................................................... 3 Step-by-Step Process...................................................................................................................... 3 Task 1: Recording............................................................................................................................ 3 Task 2: Creating ABAP Report based on recording done........................................

Words: 1329 - Pages: 6

Premium Essay

Term Paper

... Chapter -1 | 1.1 Background of report 7 1.2 Objective of the report 7 1.3 Scope of study 7 1.4 Methodology used 8 1.5 Preview of presentation 8 | Chapter -2 | 2.1 Technological evolution in modern communication 8 2.2 Electronic media in written communication 9 2.2.1 E-mail 9 2.2.2 Word processing 9 2.2.3 Electronic bulletin board 10 2.2.4 On line database 10 2.2.5 Internet 10 2.2.5.1 On line internet 10 2.2.5.2 Off line internet 11 2.2.7 Computer printer 11 2.2.8 Scanner 12 2.2.9 Others 12-13 | Chapter -3 | 3.1 Software mostly used in business 12 3.1.1 Brainkeeper 13 3.1.2 Stata 14-16 3.1.3 Saga one 16 3.1.4 Quick books 17 3.1.5 Quick books pro 17 3.1.6 SAP Business Suit 18-19 3.1.7 Oracle E-Business Suite 19-20 3.1.8 Voice Recognition Software...

Words: 6229 - Pages: 25

Premium Essay

Pemm

...For the exclusive use of M. Wilcox, 2016. Harvard Business School 9-996-005 September 8, 1995 Order Management Reengineering at Heatway Allan Firestone, president of Heatway Corporation’s Industrial Products Division, sighed in frustration. Bob Hemphill, a vice president charged with designing and implementing a new process for selling and delivering Heatway products, had just left Firestone’s office in corporate headquarters, closing his door with more than the needed amount of force. They had finished an important meeting on implementation of the new process, called Proposal to Payment (PTP). PTP was a sweeping, radical change involving not only a new process, but also a new organizational structure, a new IT architecture, and even a new philosophy of business. Hemphill left the meeting upset because he had requested $35 million for the 1995 implementation of PTP. He felt that this amount was necessary if Heatway was to meet its objective of full implementation of PTP by 1997. Firestone, however, had told Hemphill that he had only $15 million to spend on PTP in 1995. Firestone wondered how he could get the money for PTP without sacrificing his profit objectives for the year. Could Corporate pay for the rest? Could some of the other international divisions that had expressed interest contribute? Though there was widespread support for the initiative, all the way up to Ralph Salada, Heatway’s chairman, Firestone doubted that the funds could easily be found. Firestone himself...

Words: 4260 - Pages: 18

Free Essay

Accounting Procedures of Bank

...6C HELP.FIBL Bank Accounting (FI-BL) SAP AG Copyright © Copyright 2001 SAP AG. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP AG. The information contained herein may be changed without prior notice. Some software products marketed by SAP AG and its distributors contain proprietary software components of other software vendors. Microsoft , WINDOWS , NT , EXCEL , Word , PowerPoint and SQL Server are registered trademarks of Microsoft Corporation. IBM , DB2 , OS/2 , DB2/6000 , Parallel Sysplex , MVS/ESA , RS/6000 , AIX , S/390 , ® ® ® AS/400 , OS/390 , and OS/400 are registered trademarks of IBM Corporation. ORACLE is a registered trademark of ORACLE Corporation. INFORMIX -OnLine for SAP and Informix Dynamic Server Informix Software Incorporated. ® ® ® ® ® ® TM ® ® ® ® ® ® ® ® ® ® ® ® ® ® ® ® ® are registered trademarks of UNIX , X/Open , OSF/1 , and Motif are registered trademarks of the Open Group. HTML, DHTML, XML, XHTML are trademarks or registered trademarks of W3C , World Wide Web Consortium, Massachusetts Institute of Technology. JAVA is a registered trademark of Sun Microsystems, Inc. JAVASCRIPT is a registered trademark of Sun Microsystems, Inc., used under license for technology invented and implemented by Netscape. SAP, SAP Logo, R/2, RIVA, R/3, ABAP, SAP ArchiveLink, SAP Business Workflow, WebFlow, SAP EarlyWatch, BAPI, SAPPHIRE, Management Cockpit...

Words: 35242 - Pages: 141