Premium Essay

Site Inspection Report

In:

Submitted By 7enu7
Words 651
Pages 3
TO: Dr. Fike, CEO
FROM: Lamis Niggis
SUBECT: Site Inspection Report - Belk
DATE: June 27, 2013

The Location
This store is located in Valdosta, GA at the Valdosta mall. The mall is located on the intersection of Norman Drive and Saint Augustine Road. The mall has one of the highest visitor counts in all of South Georgia. Belk can be found on the west side of the mall in between Old Navy and JC Penny if you come in through the front mall entrance. I have included a map of the mall so that you will know exactly where it is.
[pic]

Customer Service
This Belk serves over 350 patrons while bringing in over $15,000 in sales on an average day. The average transaction takes 7 minutes and costs $45. ¾ of sales come from Belk credit card holders. Card holders enjoy many benefits that regular customers do not, including: special sale days, more coupons, tailoring, free shipping, and cash back. One negative is that at times due to not enough workers being present the wait times for a transaction can rise.
Décor
The store has white ceiling and walls with carpet on the areas containing clothing. The store in laid out in a way that I feel is somewhat cluttered and lacking space between the clothing racks. As I walked between the clothing areas I felt that I was rubbing shoulders with other customers. There isn’t any art or real design to the store.

Market Potential
The current demographics for Belk are centered on 35 year old White women. After speaking with the Men’s department manager Barbara Roberts there seems to be massive room for improvement in the market size. Youth and African American make up less than 30% of all sales. Males make up 17%, Latin Americans less than 10%, and Asian Americans less than 5%. With the Valdosta area steadily growing there is huge potential for

Similar Documents

Free Essay

Inspection Report: Private on-Site Sewage System Installation

...* Table of Contents: Table of Contents: 2 1.0. Introduction: 3 1.1. Provincial Regulations, Standards and Application Process: 4 2.0. Discussion: 6 2.1. File Review and Site Inspection 6 2.2. Site Evaluation: Soil Suitability and Percolation Test 8 2.3. The Septic Tank: Function, Design and Inspection. 10 2.4. Distribution Box: Function, Design and Inspection. 12 2.5. Absorption Trenches: Function, Design and Inspection 13 3.0. Conclusion: 16 4.0. References: 18 5.0. Additional Resourses: 19 Introduction: The World Health Organization estimated in 2013 that roughly one-quarter (or 2.4 billion) of the world’s population shall lack access to “Improved Sanitation Facilities” in 2015.(7) Improved Sanitation Facilities are those that help eliminate human contact with sewage, and include flush or pit toilets/latrines and composting toilets.(1) In many regions of the world (even when such facilities are available) untreated sewage is often discharged into drains and streams, due to lack of expensive collection and treatment infrastructure. Thus, surface water surrounding many urban areas in the world remain grossly contaminated with fecal matter, and often contamination seeps into groundwater.(1) Waterborne communicable diseases such as Cholera, Typhoid, Dysentery, Hepatitis A, Schistosomiasis, or Intestinal Nematode infections generally spread through fecal-oral route. Potable water contaminated with untreated sewage poses serious health risks...

Words: 5940 - Pages: 24

Premium Essay

African Leadership

...YES NO ____________________________________ Construction Monitoring and Staffing: Was a pre-construction meeting held for this project? YES NO Date of meeting:_____________________ Has a Construction Monitoring Plan (CMP) been prepared for this project? YES NO Is the CMP available for review? YES NO (Please make a copy and attach to report) Does the plan specify a required level of on-site project staffing? YES NO If YES, what is the specified project staffing:______ EIC/RE/PM _______ Office Engineer ________ On-site Inspectors Is the project staffing requirement being met? YES NO N/A If NO, why? _________________________________________________________________________________________ ACTUAL on-site construction inspection staff: Local Forces Consultant:__________________________________________ ____ EIC/RE ____ Office Engineer ____ Inspectors Are Inspectors NICET Certified: YES NO Does the project rely on off-site project personnel? YES NO Role:______________________________________ Review the project visitation logs to verify the frequency of visits from the following individuals: - Designated off-site project personnel such as EIC/Project Manager:...

Words: 961 - Pages: 4

Premium Essay

Zzzz Best

...& Whinney not liable to Union Bank of California which allegedly relied on Ernst’s review report in extending $ 7 million to ZZZZ Best Co. I agree with court’s decision because Ernst & Whinney never issued an audit opinion on financial statements it was just a review report which was disclosed. However, I do not justify Ernst & Whinney because the auditors besides from failure to notice ‘red flags’ had done few mistakes which lead to the law suit. The first mistake that the auditors made involved Mr. George Greenspan during the 1986 audit. This was the first audit since ZZZZ Best became a public company and the mistake involved the inspection of the insurance restoration sites. Mr. Greenspan had talked with Tom Padgett, and Mr. Padgett confirmed the insurance contracts were real and showed proper documents to back them up, Mr. Greenspan never actually inspected any of the actual insurance restoration sites. Doing so could have stopped the scam from hurting the public stockholders, especially because they take in such a huge percentage of income for ZZZZ Best. The second mistake involved Ernst & Whinney, was that Greenspan reported during the interview to the congressional subcommittee, that Ernst & Whinney never got in touch with him to talk about ZZZZ. If this conversation occurred, Greenspan might have been able to discuss his neglection to inspect the insurance restoration sites, which therefore could have given Ernst & Whinney a heads up to do so. Ernst & Whinney should...

Words: 980 - Pages: 4

Premium Essay

Thfeegrhey

...NEBOSH International General Certificate in Occupational Health and Safety [pic] UNIT IGC3: HEALTH AND SAFETY PRACTICAL APPLICATION IGC3 – The Health and Safety Practical Application Candidate and course provider declarations: For completion by the candidate: I declare that the work submitted for this practical application assessment ie. the completed observation sheets and the report to management, is my own work. I recognise that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy. Name (Print) Signature Date 15/06/2014 For completion by a course provider representative (e.g. internal practical assessor): I declare that the work marked is identical to that received from the candidate. I recognise that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy. Name (Print) Maitha Hassan Abdulla Signature Date 15/06/2014 For completion by the course provider’s internal practical assessor: I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise that contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy. ...

Words: 1970 - Pages: 8

Premium Essay

Fiber Optic Connector Assembly Paper

...Marcus Mason 08/05/2013 Unit 7. Lab 1. New Building-Safety Plan On site Management commits the necessary resources of staff, money, and time to ensure that all persons on the worksite are protected from injury and illness hazards. In addition, management visibly leads in the design, implementation, and continuous improvement of the site’s safety and health activities. Specifically, the highest level management establishes and reviews annually the site’s safety and health policy and ensures that all employees know, understand, and support that policy. All management levels, with input from hourly employees, develop an annual safety and health goal with objectives and action plans to reach that goal. At the end of each year all management levels, with input from hourly employees, evaluate progress in accomplishing the action plans, achieving all objectives, and meeting the annual goal. This evaluation and plan, which also includes an evaluation of the overall safety and health program, results in a written report that includes the next year’s goal, objectives, and action plans, including any remaining action needed to accomplish the current year’s goal. Management ensures that all employees, including themselves, have clearly written safety and health responsibilities included within their job description, with appropriate authority to carry out those responsibilities. Also, management ensures that all employees, including all levels of management, receive performance evaluations...

Words: 1030 - Pages: 5

Premium Essay

Property Building Report Format

...PROPERTY INSPECTORS Pre-purchase Property Report 7 Oak Manor Drive Albany Provided for Jay YIN 04/08/2014 Dear Jay YIN, RE: Pre Purchase Inspection: 7 Oak Manor Drive, Albany, Auckland. Thank you for the opportunity to inspect your proposed purchase which was undertaken in fine conditions on 04/08/2014. Please find following my completed report which I encourage you to read in its entirety. The property report is not a guarantee that all defects (and/or future defects) have been identified. The inspection is carried out solely on a visual basis. All efforts have been made to identify possible defects (and/or future defects). The property report is not a guarantee that the house meets all the requirements under the Building Act at the time of construction and/or under the Building Act at the time of inspection. The purpose of the report is to identify areas of interest/concern, NOT to provide independent expert advice on specific elements and NOT to recommend solutions to faults identified. The purpose of the inspection is to provide an impartial, technically knowledgeable and visually thorough account of the properties general state being the next best step toward assisting a purchaser in determining the appropriateness of the purchase to their individual threshold for maintenance and repair. The Property Inspectors recommend that quotes and advice are sought from Independent Qualified Persons on receipt of the property report for a more specific qualification of comments...

Words: 5973 - Pages: 24

Premium Essay

Health and Safety in a Construction Place

...& Welfare subject. The scenario of a construction site is given with the situations that occurred and occurring and we have to provide solutions for the health and safety concerns as the appointed safety manager. Table of contents Task 2 Task 2.1 a. Analyzing of existing safety policy and procedures b. Roles of individuals Task 2.2 * Recommended Training for the present situation Task 2.3 * Methods of recording health and safety inspections Task 2 Task 2.1 a. Analyzing of existing safety policy and procedures * Safety Policy of the organization As the organization states XYZ Co Limited is bound to ensure the health, safety and welfare of all the employees employed and the contractors. Also their policy states that they will accept the responsibilities for their activities which affect other persons. * Provide and maintain safe machinery and reasonable, practical safe systems of work to ensure health and safety by assessing risk periodically. As the above policy state, the XYZ construction Co Ltd is committed to provide and maintain the safety of the employees by ensuring the equipment and machines present in the construction site is properly maintained and free of making hazards. Also safe systems of working are introduced to ensure health and safety of the employees by carrying out risk assessment. As for the machine maintenance, the machines available in the construction site must be check regularly and should be maintained, and...

Words: 3700 - Pages: 15

Premium Essay

Inspection Report

...(Ryan) Back, Safety Inspector, CanSafe Workplace Safety LLC Date: March 21, 2016 Inspection of Meadowlands Development for Safety This is Seoungho(Ryan) Back and I performed the safety inspection exam for the Meadowlands Development construction site. I found many deficiencies in my inspection that included improper basic safety regulations. Some of these deficiencies included nails in boards and a poorly maintained construction site. This inspection did not meet expectations. I am an occupational health and safety inspector working for CanSafe Workplace Safety LLC. My job is to conduct safety and health inspections for companies who require this in their workplace by WorkSafe BC. Our firm has been hired by Welbit Construction Ltd to conduct spot safety inspections on one of their larger worksites because they have been forced to divide the construction supervisor’s time between two projects. This inspection would determine whether the Meadowlands Townhome Estates was following the safety regulations according to WorkSafe BC. I started at about 10:30 a.m. and finished write my report its closer to 4:00 p.m. Overall, I concluded that the worksite poorly followed the standards and regulations according to WorkSafe BC. The exterior of a building is good, but there is some problem inside of building. The specific safety violations I found included the following: * Wood lying all over the site. * Some of nails have been hammered flat. * Nails sticking up in the lumber...

Words: 412 - Pages: 2

Premium Essay

Unit 5 Health And Social Care Case Summary

...risk controls. Low Supervisor Question 2 For this task you and/or your team need to complete the following “Incident Notification Report” using the information in the scenario description. Incident Notification Report This form must be completed in full immediately after an incident has occurred Workers Compensation Claim must be completed for ALL injuries other than : First aid treatment only, report only or property damage A copy of the completed form MUST be given to the IMS Team within 24 hours of incident Section 1 - PERSONNEL DETAILS Surname Khomotso Kgaphola Address 185 Endulwini Section Tembisa, 1632 1992/12/10; 0838609607 Company Contractor Yes 1 No 0 Occupation Painter - 2014/01/02 Employment Status 2014/09/08 to (current) Number of hours worked in this shift 8 hours Supervisors Name Jake Thompson Witness Drew Brown Witnesses must complete separate incident notification report Section 2 – INCIDENT DETAILS Incident Classification (Please circle) LTI MTI FAI PD ED RO RSI Date of occurrence: 2014/01/02 Time: 11:45pm Incident Location: In the building Date Reported: 2014/01/03 Time Reported: 12:15am Treatment of incident (Please tick) Reported to: To the supervisor No injury First Aid Medical treatment (Doctor) 0 0 1 Hospital Spill Kit Report Only Report to External Authority 1 0 0 0 Main Task being performed at the time of incident: Moving two chairs downstairs that they may not be covered...

Words: 2331 - Pages: 10

Premium Essay

Safety Management Plan

...APLNG Project HSEMP Plan AUSTRALIA PACIFIC LNG HEALTH, SAFETY, AND ENVIRONMENTAL MANAGEMENT PLAN (HSEMP) Electronic documents, once printed, are uncontrolled and may become outdated. Refer to the electronic document management system (EDMS) for the current revision. Bechtel Confidential © Bechtel Oil, Gas and Chemicals, Inc. 2011. All rights reserved. This document contains information that is confidential and proprietary to Bechtel or its affiliates, clients or suppliers, and may not be used, reproduced or disclosed without Bechtel’s prior written permission. 0 5/21/11 A Issue for Use Issued for Review REV DATE RSB CM BS REASON FOR REVISION BY CK’D APPR BECHTEL Client Acceptance JOB NO. 25509 OG&C, INC. Document Number Revision 25509-100-GPP-GHX-00001 0 AUSTRALIA PACIFIC LNG PROJECT Client Doc No.: Page 1 of 82 Bechtel Confidential. © 2011 Bechtel Oil, Gas and Chemicals, Inc. All rights reserved. APLNG Project HSEMP Plan TABLE OF CONTENTS 1 .  INTRODUCTION ...................................................................................................... 5  2.  HSE MANAGEMENT SYSTEM ................................................................................ 6  3.  PURPOSE ................................................................................................................ 6  4.  SCOPE .......................................................

Words: 2400 - Pages: 10

Free Essay

Framework for School Inspection

...framework for school inspection The framework for inspecting schools in England under section 5 of the Education Act 2005 (as amended). |This framework sets out the statutory basis for inspections conducted under section 5 of the Education Act 2005 (as amended) from | |September 2012. It summarises the main features of school inspections and describes how the general principles and processes of | |inspection are applied to maintained schools, academies and some other types of school in England. This version of the framework is | |effective from September 2014. | Age group: 0–19 Published: January 2015 Reference no: 120100 Contents Introduction 4 What is the purpose of school inspection? 4 How does inspection promote improvement? 4 Key features of the framework for school inspection 5 What are the legal requirements for the inspection of schools? 7 What determines the timing of a school’s inspection? 10 What are the principles of school inspection? 13 What is the relationship between school self-evaluation and inspection? 14 Who inspects schools? 15 Inspection grades used to make judgements 15 Schools judged to be causing concern 17 Part B. The process of inspection 18 What happens before the inspection? 18 What happens during the inspection? 19 What happens after the inspection? 22 Introduction ...

Words: 7537 - Pages: 31

Premium Essay

Account

...INTERNSHIP PROJECT FINAL REPORT DES/SBTAP Automotive Repair and Refinishing Environmental Compliance On-Site Evaluations Ali Etebari INTERNSHIP PROJECT FINAL REPORT DES/SBTAP Automotive Repair and Refinishing Environmental Compliance On-Site Evaluations Ali Etebari (603) 868-1447 E-mail: aetebari@vt.edu Facility: New Hampshire Department of Environmental Services (NH DES) Small Business Technical Assistance Program (SBTAP) 64 North Main St P. O. Box 2033 Concord, NH 03302-2033 Contact: Rudy Cartier NH DES Small Business Ombudsman Phone: 1-800-837-0656 Fax: 271-1381 E-mail: cartier@desarsb.mv.com Faculty Advisor: Dr. Ihab Farag 255 Kingsbury Hall University of New Hampshire Durham, NH 03824 TABLE OF CONTENTS Executive Summary 3 Introduction/Background 3 Goals/Objectives 4 Approach/Methodology 4 Chemical Usage, Equipment Needs 4 Releases/Wastes Generated at the Facility 5 Details of Work Accomplished/Project Results 5 Pollution Prevention Benefits 5 Recommendations for Future Efforts 6 References 6 Appendices: A. Sample Report 6 B. Evaluation Checklist 10 C. Microsoft Excel Spreadsheet 13 Executive Summary: SBTAP is offering small-scale automotive repair and refinishing businesses free confidential on-site inspections in order to increase their awareness...

Words: 3029 - Pages: 13

Premium Essay

The Teen Outreach Project

...The Teen Outreach Project Takesha McCaleb MGMT404 Project Management Jennifer Paul December 13, 2011 Table of Contents Scope Statement1 Reporting Structure of team members………………………………………………………………………………………………………………………………………...3 Work Breakdown Structure4 Risk Management Plan5 Communication Plan…………………………………………………………………………………………………………………………11 Scope Statement: Goal Definition There are so many teens in the city of Dayton and surrounding cities that have gotten off to a bad start and would like the chance to turn their life around with a little assistance. We have teens that are having babies with no place to go. There are teens that are on drugs and would like to get away from that lifestyle. There are teens that have runaway to escape an abusive situation and are now living on the streets. The goal of this project is to find a facility that these teens can go to, in order to get off of the streets. Get counseling and a chance to make a better life for themselves. With finding this shelter it is my thought that the City of Dayton can have less crime because these teens are off the street and don’t have to do bad things to get money and hopefully make room in the jails for serious offenders not teens trying to support themselves. Goals that address the mission * The major focus of this teen outreach project is to concentrate on the mission to pave a way for our misguided youth. * Provide an environment of learning and education that benefits our...

Words: 2461 - Pages: 10

Premium Essay

Safety Submission

...6.0 Se Factor 6 - Safety Program XXXXX Safety Program is described in this section as required by the RFP. Copies of any documents not included with this proposal as an Attachment, Appendix or Exhibit will be provided immediately upon request. 6.1 Required Safety Forms and Data and Experience Modification Rate (EMR): XXXXX’ and its significant subcontractors’ Safety Forms and Data are included in this section as required by the RFP. 6.1.1 XXXXX Experience Modification Rate (EMR) (Insert Form Here) 6.1.2 OSHA Form 300A Summary of Work-Related Injuries and Illnesses Reports (Insert Form Here) 6.1.3 OSHA Total Recordable Cases Incidence Rate (TCIR) (Insert Form Here) 6.1.4 Days Away from Work, Job Transfer, or Restriction (DART) Rate (Insert Form Here) 6.1.5 Data and Trends Narrative (Need whatever explanation SME’s are going to use to explain away our “High Risk” to “Extremely High Risk” rating in these categories) 6.2 Significant Subcontractors’ Experience Modification Rate (EMR) (Insert Form Here) 6.2.1 Significant Subcontractors’ OSHA Form 300A (Insert Form Here) 6.2.3 Significant Subcontractors’ OSHA (TCIR) Rate (Insert Form Here) 6.2.4 Significant Subcontractors’ (DART) Rate (Insert Form Here) 6.2.5 Significant Subcontractors’ Data and Trends Narrative (Insert Form Here) 6.3 Safety Program and Procedures XXXXX approach to Safety on all worksites includes adherence to contract-specific safety requirements...

Words: 3195 - Pages: 13

Premium Essay

Nt1330 Unit 3 Assignment

...Meet John and Mike, they both are Roofing professionals. Every month they visit dozens of sites to make condition assessments, taking photos and making notes of observations. At the end of the day they need to turn these observations into concise reports, a client proposal, or transfer the observation information to others. That's a big job, especially since each site is unique, and requires documenting the complexities of commercial roofing information, and the critical observation areas of the roofing system. In the past John would use his tablet computer to take pictures and make notes to transfer to a word document for his reports. Mike, took lots of photos with digital camera and updated his companies home grown web application....

Words: 527 - Pages: 3