Premium Essay

Software Testing Resume

In:

Submitted By faisalqwert
Words 1421
Pages 6
| | |
|Summary | |
| |Over 5 years of experience in Information Technology with extensive experience in performing Manual and Automated testing |
| | |
| |Extensive experience in testing Web and GUI based Client-Server applications by performing validation, manual as well automated testing in various |
| |industry domains |
| | |
| |Experienced in implementing QA methodologies, Test Case Design, Test Tool Usage, Test Execution, Defect Management and Defect Tracking |
| | |
| |Strong experience in System, GUI, Positive, Negative, Volume, Smoke, Regression, Black Box, Unit, UAT, Functional, Integration and Stress testing |
| |

Similar Documents

Premium Essay

Online Job Portal

...convenient manner and to enable employers to find suitable candidates. 1.3 SCOPE My project Entitled “ONLINE JOB PORTAL WITH PLACEMENT SERVICES FOR JOB SEEKERS AND JOB RECRUITERS SCHEME” is a web based application which allows applicants and employers to register their details. Applicants can browse through the vacancy details that are posted and can apply for the jobs online. Employers can browse through the posted resumes and select suitable candidates. This application has Administrator, Job Seeker, Recruiter, Resume Uploading Functionality Job Search Facility, Job Seeker and Recruiter Profile control, Placement registration, Recruiter login, etc. 1.4 LITERATURE SURVEY Normally, the quality of people hired is the key metric for measuring the effectiveness of the employment function, but in certain circumstances, the speed of hiring may actually be a more significant contributor to quality hiring [1]. A good productive hiring is not a matter of putting an advertisement in the newspaper, setting up some chairs and tables on the appointed day, and then taking in some resumes to be followed up later. The purpose of a hiring event is to reach out to prospective employees and bring the specific kind of skills and experiences in the organization especially those which cannot be built from within [2]. The question is how this could be made possible. Basic traditional recruiting begins with processing an...

Words: 5421 - Pages: 22

Premium Essay

Taylor's Professional Service

...manager. Once a client issues a staffing request, the system shall provide an automated response stating that the contract manager will validate their request within 24 hours of receipt. Once a staffing request has been issued, the client will be able to log into the site and search for a staff request by number. The staff request query will result in a page that contains all staff request information along with a field that states whether the staff request is valid, invalid, unable to fill, or filled. In addition, TPS staff members should be able update their resumes and picture through the web site. The two areas of the website will be partitioned so that only clients with valid contract numbers and password are able to enter the client area and staff members with only valid employee numbers and password will be able to enter the staff area. Only the contract manager has full access to both locations. Software Deliverables Description of Functionality The application will provide the following functionality: 1. Creation, modification, storage, and retrieval of staffing...

Words: 560 - Pages: 3

Premium Essay

Management Information System

...American International University-Bangladesh Software Quality and Testing (Sec: A) Project Name: Software Test Plan for Automated Ticket Issuing System for Dhaka Subway Systems. Submission Date: 19-02-2015 Datasoft, Inc. NAME | ID | SIGNATURE | DAS, RAJIB | 12-20768-1 | | HASAN, AMIT | 12-20759-1 | | KHAN, MD. NOMAN | 12-20672-1 | | ROY, PALLOB KANTI | 12- 20158-1 | | Table of Contents Test Plan Identifier..........................................................................................3 References ...........................................................................................…………3 Introduction.....................................................................................................4 Test Items.........................................................................................................5 Software risk issues......................................................................................... 5 Ticket availability information display function to be tested. .........................6 Features to be tested....................................................................................... 6 Features not to be tested................................................................................. 7 Approach……………............................................................................................ 7 Item Pass/Fail criteria…………...

Words: 3089 - Pages: 13

Premium Essay

Riordan Hr Service Request Sr-Rm-022

...Riordan HR Request Service Request SR-rm-022 Janet Chase BSA 375 February 11, 2013 Karen Knox Riordan Manufacturing Service Request SR-rm-022 Hugh McCauley, Riordan’s Chief Operating Officer, submitted Service Request SR-rm-022. In his request, he specifies a need to centralize the company’s human resources functions. With the “more sophisticated, state-of-the art, information systems” (Apollo Group, 2013, p. 1), Riordan desires an integration of all human resources tools into one platform. Completion date is set for six months allowing the new system to be in place by the beginning of the second quarter. The scope of this project will follow the System Classic Life Cycle (SCLC) Model. This model allows Riordan to complete this project in stages with the results of one stage aiding the completion of the next stage. High-level Scope: Deliverables (Mochal, 2007) The outcome of this project will integrate the human resources systems into one application. An analysis of this system will define the business requirements for the new system. Based on that definition a team will create a detailed system design and a project implementation plan to be put in place. High-level Scope: Boundaries This project will affect the human resources department of all Riordan plant locations. All other departments are out of scope. Low-level Scope: Process In an effort to fulfill the request in the short amount of time given, an analysis of the current system and needs for the...

Words: 3266 - Pages: 14

Premium Essay

Riordan Manufacturing

...Running head: RIORDAN MANUFACTURING Riordan Manufacturing BSA375 Ed Odjaghian July 16, 2012 Abstract Riordan Manufacturing Chief Operating Officer, Hugh McCauley, has hired Butner Consulting to integrate all existing Human Resource tools into a single integrated application for all Riordan Manufacturing locations. Riordan Manufacturing wants to take advantage of a more sophisticated, state-of-the art, information systems technology in their Human Resources department ("Service Request Riordan Manufacturing", 2011). Butner Consulting will be responsible for defining the business requirements for the development of the HR system to support the objective of this request. Butner consulting will create a detailed system design and project implementation plan required to complete this project. This project is expected to be completed within six months so the new system can be utilized in the second quarter of next year ("Service Request Riordan Manufacturing", 2011). Stakeholders During this System Development Life Cycle the first phase is “analysis.” Analysis involves detailing the business requirements for the project and what is expected. This stage places a great deal of emphasis upon stakeholder involvement in drafting, reviewing and approving the requirements. These requirements are prioritized in discussion amongst stakeholders so that critical success factors can be defined. Stakeholder involvement is essential to work towards success and satisfactory...

Words: 3201 - Pages: 13

Premium Essay

Testing

...Non-Functional Testing and Security Testing in Mobile Application Development Abstract Smart-phones have become part of human life. As smartphones become more powerful and usage rises, Smartphone makers have a much wider range of innovation possibilities than their PC counterparts. The personal nature and pocket size of mobile phones and their potential offer a wide scope for developing distinctive handset models targeted at a specific segment of the smart-phone market. The mobile application market’s growth is driven by the widespread push of advanced handset capabilities by the mobile industry and the increasingly-connected global consumer base. Progress of network technologies, restructuring of revenue-sharing pattern, lowering of mobile data usage cost, growing adoption of smart phones, and increase in application usability have contributed to the growth of mobile application adoption globally. This trend has led to substantial surge in the dependence and usage of the mobile Internet, specifically mobile applications. Mobile Application Development is the method by which application software is produced for low power handling devices, mobile devices, and other small digital equipment. As this technological development continues to gain momentum, it's quickly turning into one of the most powerful industries in the world. Majority of the mobile application testers tend to focus more on testing the product against client requirements – Functional testing and pay less attention...

Words: 10078 - Pages: 41

Free Essay

Successful Product Line Development and Sustainment: a Dod Case Study

...Successful Product Line Development and Sustainment: A DoD Case Study Sholom Cohen, Software Engineering Institute Ed Dunn, Naval Undersea Warfare Center Albert Soule, Software Engineering Institute September 2002 Product Line Systems Unlimited distribution subject to the copyright. Technical Note. CMU/SEI-2002-TN-018. The Software Engineering Institute is a federally funded research and development center sponsored by the U.S. Department of Defense. Copyright 2002 by Carnegie Mellon University. NO WARRANTY THIS CARNEGIE MELLON UNIVERSITY AND SOFTWARE ENGINEERING INSTITUTE MATERIAL IS FURNISHED ON AN "AS-IS" BASIS. CARNEGIE MELLON UNIVERSITY MAKES NO WARRANTIES OF ANY KIND, EITHER EXPRESSED OR IMPLIED, AS TO ANY MATTER INCLUDING, BUT NOT LIMITED TO, WARRANTY OF FITNESS FOR PURPOSE OR MERCHANTABILITY, EXCLUSIVITY, OR RESULTS OBTAINED FROM USE OF THE MATERIAL. CARNEGIE MELLON UNIVERSITY DOES NOT MAKE ANY WARRANTY OF ANY KIND WITH RESPECT TO FREEDOM FROM PATENT, TRADEMARK, OR COPYRIGHT INFRINGEMENT. Use of any trademarks in this report is not intended in any way to infringe on the rights of the trademark holder. Internal use. Permission to reproduce this document and to prepare derivative works from this document for internal use is granted, provided the copyright and “No Warranty” statements are included with all reproductions and derivative works. External use. Requests for permission to reproduce this document or prepare derivative works of this document for external...

Words: 16988 - Pages: 68

Premium Essay

Srs Template

...Index : Technical Specification Sections Finalised by SRS Commiittee for Restructured APDRP under 11th Plan Page-1 Section – G1 :: General Technical requirements Sl. No. Title Page No. / Section No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Introduction Intent of specification Scope of work Other Services and Items Specific Exclusions Utility’s Current IT Infrastructure Arrangement by the Contractor Software tools Warranty, operational guarantee and system reliability with ‘on-site’ support Annual Maintenance Contract Price Loading for Evaluation of Bids Payment terms Project synopsis Bid Schedule Basic reference drawings Spares Time schedule Implementation schedule Quality assurance plan Qualifying requirements 2 of G1 2 of G1 4 of G1 19 of G1 23 of G1 23of G1 23of G1 24 of G1 24 of G1 26 of G1 26 of G1 27 of G1 27 of G1 27 of G1 27 of G1 27 of G1 28 of G1 28 of G1 28 of G1 29 of G1 Page-2 Section – G2 :: Technical specification requirements for Application Packages Sl. No. Title Page No. / Section No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Part-A – Essentially Required by most Utilities for setting up an IT backbone for collection of baseline data, Energy Accounting / Auditing and establishment of Customer care centers Introduction System Functionality Module : Meter Data Acquisition Module : Energy Audit Module : New Connection Module : Disconnection & Dismantling Module : GIS based customer Indexing and asset mapping Module...

Words: 90558 - Pages: 363

Premium Essay

Medical

...MEDICAL SHOP MANAGEMENT SYSTEM A mini project submitted to the Bharathidasan University in partial fulfillment of the requirements for the award of the degree of MASTER OF COMPUTER APPLICATIONS Submitted by N.RAJA RAHINAM Register Number: 4CA104236 Under the guidance of Miss.A.Sathya, M.C.A., M.PHIL., Assistant Professor DEPARTMENT OF COMPUTER APPLICATIONS BISHOP HEBER COLLEGE (AUTONOMOUS) (Nationally Reaccredited at the A+ Level by NAAC) (Recognized by UGC as “College with Potential for Excellence”) TIRUCHIRAPPALLI-620 017 NOVEMBER – 2012 DECLARATION I hereby declare that the mini project work presented is originally done by me under the guidance of Miss.A.Sathya MCA., M.phil., Assistant Professor, Department of Computer Applications, Bishop Heber College (Autonomous), Tiruchirappalli-17 and has not been included in any other thesis/project submitted for any other degree. Name of the Candidate : N.RAJARATHINAM Register Number : 4CA104236 Batch : 2010-2013 Signature of the Candidate Miss.A.SATHYA MCA., M.PHIL.,, Assistant Professor Department of Computer Applications Bishop Heber College (Autonomous) Tiruchirappalli – 620017. Date: CERTIFICATE This is to certify that the mini project work entitled “MEDICAL SHOP MANAGEMENT SYSTEM” is a bonafide record work done by N.RAJARATHINAM, Register Number: 4CA104236 in partial fulfillment of the requirements for the award of the degree of MASTER OF COMPUTER APPLICATIONS...

Words: 2693 - Pages: 11

Premium Essay

Manager

...RAJEEV KUMAR Professional Summary: • Highly talented and accomplished Information Technology professional with extensive background in QA engineering, Project Management and Scrum Master. • Improve software quality, meet customer expectations and reduce defects by supporting proven software quality practices and implementing practical and effective process improvement methods. • Plan and perform effective software testing through a combination of familiar structured test techniques, rapid test practices and test automation where applicable. Experience Summary: ✓ Sound Experience in Full Software Testing Life Cycle (Involvement in Test Strategy, Test cases, Test Scripts/Data, Defect tracking/prevention) and its most of phases e.g. Unit Testing, Functional Testing, Regression Testing, Integration Testing, System Testing and User Acceptance Testing, Ajax Testing. ✓ Adherence to software development life cycle, quality methodologies (ISO 9001/CMM) and best practices of software testing models (Agile Methodology). ✓ Expert in both Manual testing and Automated testing Using tools Selenium - Java. ✓ Experience in Functional & GUI testing in CRM and ERP domain. ✓ Experience in Database Testing (MySql). ✓ Successfully Participated in 32 hrs training on automation tools such as Mercury Interactive Quick Test Pro 9.2, Test Director (QC). ✓ Solid communicator with exceptional team-building skills. ✓ Strong problem-solver...

Words: 1430 - Pages: 6

Premium Essay

Testable Code

...How to write: Clean, Testable code Psychology of Testing (or why our intuition of testing is wrong) -- Miško Hevery http://goo.gl/V0aWx Testing is not like frosting Micro Development Model Develop Check-In Test automate Development Model Software Engineers Develop Design Testing magic QA Manual Tests Exploratory Tests Test Engineers Automated Tests Tools Testing magic Excuses Valid Excuse Legacy code-base Don’t know how I write UI “Dirties Design” No Tests Testing is for QA It doesn’t catch bugs It’s slower It’s boring Too many interfaces Hard to change Common Misconception How do you write HARD TO TEST code? Less Theory more Hands-on http://www.flickr.com/photos/doozzle/149885028/ Imaginary Interview Your mission, should you chose to accept it, is to make this code testable ● I did not say understand what it does ● I did not say write a test http://bit.ly/92Ozrz public class InboxSyncer { private static final InboxSyncer instance = new InboxSyncer(Config.get()); public static getInstance() { return instance; } private final Certificate cert; private final String username; private final String password; private long lastSync = -1; private InboxSyncer(Config config) { this.cert = DESReader.read(config.get(“cert.path”)); User user = config.getUser(); this.username = user.getUsername(); this.password = user.getPassword(); } public sync() { long syncFrom = lastSync; if (syncFrom == -1) syncFrom...

Words: 1253 - Pages: 6

Premium Essay

Introduction to Testing

...IBM, Bangalore A White Paper Challenges of Managing a Testing Project: (A White Paper) A White Paper Page 1 of 20 Vinod Kumar Suvarna IBM, Bangalore A White Paper Introduction Testing is expected to consume 30 – 50 % of the Project Effort, Still properly managing testing project is not considered seriously. Project Managers always undermine the impact the testing activity has on the Project Cost and Schedule. Hence the testing activity is usually unplanned and uncontrollable. As the project manager assumes that the main focus of the testing activity in the project is not to meet the project schedule. But Its is a reality that a thorough and close monitoring of the Testing project is required to increase productivity, reduce cycle -time and improve quality. Below pie chart depicts the Project effort distribution by phase for a development project, where independent testing team performs the testing activity. Project Effort Distribution by Phase 21 35 Requirement Design Code & Unit testing Testing 25 19 A White Paper Page 2 of 20 Vinod Kumar Suvarna IBM, Bangalore A White Paper The Problem / Issues / Improvement Opportunity in Hand: Ask a Tester ‘Why he/she needs to burn midnight oil to churn a Quality Product?’ Answer is obvious ‘Needs to put extra time and effort to overcome the Project schedule slippage ‘ Ask a Project Manager ‘Why the Project is in trouble during the last phase?’ Answer is obvious ‘Not Sure, Did not anticipate...

Words: 2954 - Pages: 12

Premium Essay

Doc2. How Much of Apple's Success Can Be Linked Directly Back to Its Culture? Why?

...Paper Presentation on Cloud Functional Automation Testing Pavan Kumar Vangala Kalyan Pallapolu Software Engineer Senior Software Engineer Bibliography Pavan Vangala is working as a Software Engineer is having 5+Years of experience in Manual and Automation testing. Good Communicator and trained the members on automation tool (QTP). ISTQB Certified Professional. Kalyan Pallapolu is working as a Senior Software Engineer is having 6+Years of experience in Manaul and Automation testing. Expertise in Functional Automation using QTP. Handled different teams and having good management Skills Contents Abstract Keywords 1 2 3 4 5 6 7 8 9 10 4 4 4 4 4 5 5 6 7 8 8 8 Introduction- Cloud Computing About Cloud Testing Resource Sharing Functional Testing Functional Automation Apply Cloud Testing to Functional Automation Benefits Concerns Conclusion References Cloud Functional Automation Testing Abstract The Purpose of this Paper is to discuss the implementation of Cloud technology for Functional Automation Testing to overcome the challenges for environment setup, resource Utilization and to reduce cost in terms of Utilities, Infrastructure and other factors involved in day to day software development. Also the advantages and disadvantages of cloud Testing in real world and how the Organizations are benefited by adopting the Cloud Computing Technology. Keywords Cloud Computing, Cloud testing, Functional Automation 1. Introduction -Cloud Computing: Cloud Computing comes...

Words: 1605 - Pages: 7

Premium Essay

Bsa375

...organization’s decision making framework. Coding As the new human resource management system is designed for Riordan Manufacturing, it is imperative to consider all its essential features and functions so as to ensure a flawless module is developed. These features and functions are tied firmly to computer programs for end users as well as those for system administrators. Databases for keeping and maintaining all the information within the system are also of prime importance during the implementation stage. It is therefore imperative that the group of professionals from the Information Technology department, more so the system developers bear in mind the usability of the system so as to ensure they generate the correct types of computer software for application within the...

Words: 1472 - Pages: 6

Premium Essay

Default Papaer

...first class and 11+ years of IT experience in Software Testing. I have good exposure on Insurance, Banking, ERP and Retailing domain. And objective is to seek challenging position in Software industry, where I can use strength of my knowledge for the benefit of the organization. Hardware and Software Environment: Operating System : Windows 98/2000/2007/XP,DOS, Products/Tools : Test Director, JIRA, VSS 6.0, QC 9.10 Languages : VB 6.0, JAVA, C, C++, HTML, Mainframe RDBMS : Oracle8i/9i Business Domains : Banking (for e.g. Finance & Banking, Insurance, Fund Transfer, Retail, etc.) PROFESSIONAL EXPERIENCE Duration : 01-June-2011 to 31-Dec-2011 Environment : VME Cobol, Legacy Skill/Tools : Quality Center 10.0, StarTeam 2008 Release 2 Role : Module Lead / Test Lead Description : Social Fund Computer System (SFCS) is a government fund for helping those in need to cope with sudden or irregular demands on their finances. SFCS caters to the needs of the citizens of UK .The reward which is given to its citizens it termed as Social Fund. Depending on the needs the funds are given to the customers. This project mainly supports the processing and payment of social fund awards. Responsibilities: • Conduct peer review of test deliverables and technical documents. • Track project issues and risks & mitigation on a continuous basis. • Responsible for Green status of overall testing activities and progress status. • Ensure...

Words: 2762 - Pages: 12