Free Essay

Term Paper

In:

Submitted By jahidul
Words 5453
Pages 22
Tariff for Data and Internet Services
Last Revision: Effective through BTTB letter dated 23/06/2008 For any query, please contact: Office of the Divisional Engineer Data and Internet Services, Moghbazar Telephone Bhaban, Dhaka Phone: 8361699 15% VAT will be added with usage and rental charges.

:::: Rates of IPLC Through Submarine Cable ::::
1.0 1.1 1.2 International Private Leased Circuit (IPLC) below E1/ 2 Mbps Registration Fee (Non-Refundable): Tk. 20,000 (USD 285) Installation Charge: In submarine cable segment For licensed Call Center operators For Others 1.3 Tk.14,000 (USD 200) Tk.21,000 (USD 300) In backhaul segment Tk.21,000 (USD 300) Tk.28,000 (USD 400)

Modem (Customer Premise’s Equipment- CPE) charge
Serial no. Speed Modem Charge - Lifetime (optional) one end Yearly Rental charge for Modem (if supplied by BTTB)

1 2 3 1.4

64 Kbps & 128 Kbps 192 Kbps to 1024Kbps Above 1 Mbps

Tk. 84,000 (USD 1200) Tk.126,000 (USD 1800) Tk. 231,000 (USD 3300)

Tk. 21,000 (USD300) Tk. 31,500 (USD 450) Tk. 57,750 (USD 825)

Rental charges for 64 Kbps bandwidth towards any SMW-4 landing station. MRC (USD) 180 250 MRC (BDT) 12,600 17,500

Half-circuit Full-circuit 1.5

Monthly Charges for nx64 Kbps domestic backhaul capacity CXB to CTG PoP Capacity 64 Kbps 128 Kbps 256 Kbps 512 Kbps 1024 Kbps MRC (USD) 25 35 60 80 100 MRC (BDT) 1,750 2,450 4,200 5,600 7,000 CXB to MOG PoP MRC (USD) 50 70 120 160 200 MRC (BDT) 3,500 4,900 8,400 11,200 14,000

1.6

Multiplication Factor for higher bandwidth up to 1024 Kbps (Through Submarine Cable) Speed in Kbps Multiplication. Factor 128 1.2 256 2.0
:: Page 1 of 14 ::

512 3.0

1024 4.0
Data and Internet Services

Full Tariff Chart

2. International Private Leased Circuit (IPLC) for E1/2Mbps & above: 2.1 2.2 Registration Fee (Non-Refundable): Installation Charge : Bandwidth E1 or 2 Mbps DS3 STM-1 4XSTM-1 STM-4 2.3 In submarine cable segment Tk.28,000 (USD 400) Tk.1,05,000 (USD 1,500) Tk.2,10,000 (USD 3,000) Tk,6,30,000 (USD 9,000) Tk.4,20,000 (USD 6,000) In backhaul segment Tk.45,500 (USD 650) Tk.1,40,000 (USD 2,000) Tk. 2,80,000 (USD 4,000) Tk.8,40,000 (USD12,000) Tk.5,60,000 (USD 8,000) Tk.20,000 (USD 285)

Standard Monthly Recurring Charge (MRC) for E1 or 2 Mbps wet segment i) Half Circuit: From Cox’s Bazar Landing Station to the imaginary half line between Cox’s bazar & other landing stations. ii) Full circuit: Between Cox’s Bazar Landing Station and distant end Cable Landing Station MRC (Half Circuit) Countries Singapore, Malaysia, Thailand, India, Sri Lanka Pakistan, UAE, KSA, Egypt. Italy, France, Tunisia, Algeria USD 1,000 1,200 1,400 BDT 70,000 84,000 9,80,00 MRC (Full Circuit) USD 1,500 1,800 2,100 BDT 1,05,000 1,26,000 1,47,000

2.4

Special Price for domestic backhaul only for IPLC Connectivity using BTTB’s wet segment It is to be noted that the present IPLC connectivity price includes both wet segment charge and backhaul charge. In that case, the charges for Cox’s bazar to Chattagong (Nandan Kanon PoP) and Cox’s Bazar to Dhaka (Moghbazar PoP) backhaul are included in the existing price. Now the backhaul charges are given separately below: Cox’s Bazar CLS to NandanKanon, Chittagong
Capacity MRC (USD) MRC (BDT)

Cox’s Bazar CLS to Moghbazar, Dhaka
MRC (USD) MRC (BDT)

Cox’s Bazar CLS to Mohakhali, Dhaka
MRC (USD) MRC (BDT)

E1 DS3 STM1 1*STM4 or 4*STM1

150 1,050 1,500 4,800

10,500 73,500 105,000 336,000

300 2,100 3,000 9,600

21,000 147,000 210,000 672,000

310 2,170 3,100 9,920

21,700 151,900 217,000 694,400

Moghbazar, Dhaka to Mohakhali Earth Station, Dhaka Capacity E1 DS3
Full Tariff Chart

MRC (USD) 25 175
:: Page 2 of 14 ::

MRC (BDT) 1,750 12,250
Data and Internet Services

STM1 1XSTM4 or 4XSTM1 2.5 Pricing Formula for higher BW
Bandwidth 2Mbps

250 800

17,500 56,000

34 Mbps

DS3 (45Mbps)

STM1 (155 Mbps)

1XSTM4 or 4xSTM1 (622 Mbps)

Multiplication Factor 3.0

1

6

7

10

32

Discount on recurring charge of wet segment (half and full circuit) and domestic backhaul segment for Long-term committed IPLC Commitment Period Discount 2-3 years 10% 4-5 years 12% above 5 years 15%

4.0

Discount on recurring charge of wet segment (half and full circuit) and domestic backhaul segment Existing Discount 60% 60% Revised Discount 60% 60%

Software Exporters, BPO, Call centre, Medical Transcription Service, IT Enable service Provider IIG (International Internet Gateway) Operator 5.0 Charge for bilateral voice carriers with BTTB

For opening wholly assigned capacity (WAC) basis connectivity, the bilateral voice carrier will pay one off charge USD 40,000 for each STM-1. 6.0 Mark up charge for IPLC under OSS agreement To cover BTTB overhead expenses and any variation in foreign currency rate, BTTB will add 10% markup to the other end price, when BTTB pays the other half charge to overseas counterpart on customer’s behalf.

Full Tariff Chart

:: Page 3 of 14 ::

Data and Internet Services

:::: Rates for IPLC through Satellite ::::
1.0 2.0 3.0 Registration Fee (Non-Refundable): Tk.20, 000 (USD 285) Installation and Testing Fee Speed : Tk.120, 000 (USD 1720) Modem (Customer Premise’s Equipment- CPE) Charge:

Modem Charge - Lifetime (optional) one end
Tk. 84,000 (USD 1200) Tk.126,000 (USD 1800) Tk. 231,000 (USD 3300)

Yearly Rental charge for Modem (if supplied by BTTB)
Tk. 21,000 (USD300) Tk. 31,500 (USD 450) Tk. 57,750 (USD 825)

64 Kbps & 128 Kbps 192 Kbps to 1024Kbps Above 1 Mbps 4.0

Rental Charge for 64 Kbps satellite half circuit (Bangladesh half) to all destinations: Annual Charge (1 yr. Commitment) Tk. 680,000 (USD 9,715) Tk. 578,000 (USD 8,257) Tk. 510,000 (USD 7,286) Monthly Charge (1 yr. Commitment) Tk. 56,667 (USD 810) Tk. 48,167 (USD 688) Tk. 42,500 (USD 607) Month-to-Month Charge Tk. 68,000 (USD 971) Tk. 57,800 (USD 826) Tk. 51,000 (USD 729) Comment General users Internet Service Providers Call centers, BPO orgs. and Software Exporters .

5.0

Multiplication factor (Through Satellite): Speed in Kbps Mult. Factor 128 1.8 192 2.6 256 3.3 384 4.7 512 5.8 768 7.8 1024 9.6 1536 12.6 2048 15.0

6.0
A.1 A.1.1

Terms and conditions for IPLC
For Long-term and Temporary connection For Inland Portion of the circuit, special price from domestic backhaul capacity from Cox’s Bazar landing station to Nandan Kanon and Moghbazar PoPs will apply. Outside those PoPs, usual DDN rental charges will be added, which will be maximum Tk. 2,800 (USD 40) per month for 64 Kbps, Tk. 3,500 (USD 50) per month for 128 Kbps, Tk. 4,200 (USD 60) per month for 256 Kbps Tk. 4,900 (USD 70) per month for 512 Kbps, Tk. 5,600 (USD 80) per month for 1024 Kbps half-circuit/full-circuit. Registration & Installation charges for the DDN portion will not be charged. Inland distance will be calculated from Customer Premises to the respective BTTB Earth Station in case of satellite and to BTTB PoP at Cox’s Bazar in case of submarine cable. IPLCs may be terminated on Customer's private leased line network. Customer will inform the details of terminations. Sharing or further leasing of bandwidth is not allowed. Termination of IPLC to public telecommunication networks at either end is not allowed. Termination to Public Data Network will need a prior approval. Call centers can transmit voice for its functioning subject to the conditions laid in Call Center Policy. Use of voice-based applications for other categories needs prior approval from BTRC and is subject to the following conditions:
:: Page 4 of 14 :: Data and Internet Services

A.1.2 A.1.3 A.1.4 A.1.5 A.1.6 A.1.7 A.1.8

Full Tariff Chart

A.1.9

• Should be application specific. • Point to point and limited within close user groups. • Cannot be terminated to any PSTN or a public phone. • 50% charge will be added with the total rental charges of BTTB. If, any illegal transmission of voice is detected in IPLC, a) Tk 350,000 (USD 5,000) will be added to 64 kbps half circuit annual charge and respective multiplication factor will be applied for higher bandwidth (128 Kbps, 192 Kbps, 256 Kbps, 384 Kbps, 512 Kbps, 768 Kbps, 1024 Kbps and 1536 Kbps) to calculate total annual rental charges, which may be made effective from the day of commencement of service. b) Also Tk. 35,00,000 (USD 50,000) will be charged for E1 half circuit annual charge and respective multiplication factor will be applied for E3/DS3 to calculate total annual rental charges, which may be made effective from the day of commencement of service. BTTB may also terminate the IPLC for such illegal activities. If the customer is a licensed operator respective clauses of Telecom Laws will also be applicable.”

A.1.10 For restorable capacity, charges will be 1.25 times higher. Restorable capacity will be 25% of the main capacity, which is minimum 64 Kbps. A.2 A.2.1 A.2.2 For Long-term connection The charges will be applicable for connections having minimum commitment time of 6 (six) months and the charges shall be payable in advance on monthly basis. Discounts will only be applicable on the charges of BTTB, not on the charges of third party (if any). The discount for long-term commitment will not be applicable for Software Exporters, BPO, Call centre, Medical Transcription Service, IT Enable service Providers and IIG operators. Before installation, charge for one month shall be paid in advance in cash and charge of one month shall be paid as security deposit in the form of cash or Bank Guarantee. But Software Exporters, BPO companies, Call Centers, Medical Transcription Service Providers, and IT-Enabled Service Providers shall pay one month charges. There will be no security deposit for those organizations. A.2.4 After minimum commitment period is over, the circuit will be automatically renewed on monthly basis if the customer does not notify any further commitment. In such case, the commitment period will begin freshly. In any case, minimum one month prior notice is required for disconnection of the circuit. If customer terminates the IPLC during the initial commitment period (as mentioned in the application form/letter), customer shall pay BTTB the aggregate total of all Monthly Recurring Charges for the terminated Service(s) for the unexpired portion of the initial commitment period plus any cancellation or disconnection charges assessed

A.2.3

Full Tariff Chart

:: Page 5 of 14 ::

Data and Internet Services

:::: Rates for Leased Internet Access ::::
[A] Leased Internet Access Through Submarine Cable up to 2 Mbps: a. b. Registration Charge: Tk. 10,000 Installation and Rental Charges for Port and Modem: Speed 64 Kbps 128 Kbps 256 Kbps 512 Kbps 1 Mbps 2 Mbps Installation Charge Tk. 10,000 Tk. 10,000 Tk. 10,000 Tk. 15,000 Tk. 15,000 Tk. 20,000 Yearly Rent for Port 90,000 1,44,000 2,16,000 3,24,000 4,80,000 9,00,000 Yearly Rent for Modem* (optional) 18,000 18,000 27,000 30,000 36,000 48,000 Yearly Local Loop Charges (up to 5 Km) 8,000 12,000 18,000 30,000 48,000 65,000

* Alcatel HDSL modem may be rented subject to availability in the reserve. [B] Leased Internet Access through Submarine Cable above 2 Mbps :

a. b.
Slab

Registration Charge : 20,000 Tk. Installation and Testing Charge above 2Mbps:
Slab Bandwidth (Duplex) 3-18 Mbps 20-45 Mbps 50-90 Mbps 100 Mbps and above STM-1 Installation & Testing Charge Tk. 20,000 Tk. 30,000 Tk. 40,000 Tk. 50,000 Tk. 60,000

Slab-1 Slab-2 Slab-3 Slab-4 Slab-5

c.

Rental Charges (Excluding VAT):
Bandwidth through Ethernet port: Slab Slab-1 Slab-2 Slab-3 Slab-4 Slab Bandwidth (Duplex) 3-18 Mbps 20-45 Mbps 50-90 Mbps 100 Mbps and above Monthly Rent/Mbps (duplex) Tk. 27,000 Tk. 26,000 Tk. 24,000 Tk. 22,000

For licensed International call centers, monthly rent per Mbps (duplex) shall be Tk. 27,000 for 1 to 18 Mbps slab. The bandwidth will be delivered to the customers’ premise as per BTTB’s prevailing policy subject to the prior approval of BTRC.

Full Tariff Chart

:: Page 6 of 14 ::

Data and Internet Services

d.

Bandwidth through STM-1 port
Port Capacity Slab-5 STM-1 Revised Total Monthly Rent (duplex) Tk. 32,56,000

[C]

Rates for Leased Internet Access through Satellite a. Registration Charge : Tk. 10,000 : Tk. Nil for existing submarine bandwidth users Installation & Monthly Rent/Mbps Comment Testing Charge (simplex) Local lead has to be Tk. 10,000 Tk.115,000 arranged by the Tk. 20,000 Tk.110,000 customer Tk. 30,000 Tk.105,000

Total Bandwidth (Uplink+downlink) 1-5 Mbps 6-10 Mbps 11-15 Mbps [D]

Up gradation / Degradation: • • Up gradation to higher bandwidth: Equal to the difference of Installation charges; minimum charge Tk.10, 000 (USD 143). Degradation to lower bandwidth: Tk.10, 000 (USD 143).

[E]
1.0
1.1 1.2

Terms and Conditions for Leased Line Internet
For Long-term connection
Connection will be given from the nearest Data Node/Internet Point of Presence (PoPs). For bandwidth below or equal to 2 Mbps, connection will be provided normally through copper wire from the nearest Data Node. In this case, local loop charges will be added with the bandwidth charges. In special case, BTTB may allow customers optical fiber for such connection provided that the customer has to undertake all arrangement by himself. For 3 Mbps or higher Internet bandwidth through submarine cable, connection will be provided from the nearest PoP through optical fiber. The optical fiber shall be arranged by the customer himself. BTTB, in any case, shall not provide optical fiber to the customer. The customers, who will subscribe submarine cable bandwidth, may only be allowed to subscribe separate BTTB satellite bandwidth, subject to availability of the bandwidth, through optical fiber arranged by them.

1.3

Public Universities, Colleges, Schools, Madrasas, Training & Research Institutes and MPOlisted educational institutions will get 75% discount on total rental charges for connections of bandwidth provided that no commercial data will be transmitted over it and the bandwidth is not shared with any other organization. Only accredited Private universities/Medical Colleges/Engineering Colleges/High Schools and Colleges will be entitled to get 20% discount on rental charge up to 3 Mbps. Govt. Primary Schools can use 64 Kbps bandwidth free of charge. There will be no registration, but 50% of installation and testing charge will be applicable.

Full Tariff Chart

:: Page 7 of 14 ::

Data and Internet Services

1.4

Government, Semi-government, Autonomous Organizations/Commissions, 100% Govt. owned companies, and non-profit research organizations shall get 30% discount on total rental charges provided that no commercial data will be transmitted over it. In case of non-profit research organizations, the decision of BTTB will be final. Software incubators & parks under govt. control, software development companies/IT Enabled Services (ITES) companies earning at least US$ 100,000 or equivalent amount per annum in foreign currency shall get 25% discount on total standard rental charges on bandwidth for that year. If the company can not prove such earning, the company shall pay the bandwidth charges on standard rates. Other software development companies/IT Enabled Services (ITES) companies, upon recommendation of Bangladesh Association of Software and Information Services (BASIS) shall get 25% discount on rental charges up to 128 Kbps. Discount will not be applicable on bandwidth through BTTB Satellite. Leased Internet Access may be terminated on Customer's private leased line network. Customer will inform the details of terminations. Temporary suspension of any connection upon request of the customer is not allowed. The customer shall pay the charges for the period temporarily suspended the connection by himself or for the period of disconnection due to non-payment of the rental charges. BTTB may temporarily suspend the connection if any technical problem persists at BTTB end. In such case, the customer shall be exempted from the rental charges for the suspended period. Termination of Leased Circuits to Public Telephone Networks is not permitted. In case of extension of the connectivity from BTTB node to customer’s premise by wireless/optical fiber, Customer will arrange for that subject to the approval from the concerned authority of BTTB. In such case, charges related to power consumption, rack space, tower installation etc. will be fixed by BTTB’s relevant notification. Rental Charges for one month shall be paid in advance in cash and charge of one month shall be paid as security deposit in the form of cash or Bank Guarantee. The security deposit already provided to BTTB shall be adjusted with the rental bills. For long term connection or temporary connection rented on monthly basis, any broken month will be considered as a full month. At least one month prior notice is required to discontinue services. In all cases, shifting charge shall be equal to the Installation charge of the services and the distance will be recalculated for further rental charge. For the customers subscribed at least 60 Mbps, total Bandwidth may be delivered from two different access nodes in the same area (load sharing mode) or from the same access node using two access ports (redundant mode), subject to availability of the resources. The facility shall be withdrawn if bandwidth is down-graded below 60 Mbps upon customer’s request. For the customers subscribed STM-1 capacity, a separate physical local loop will be allowed without providing extra STM-1 port in the Router at the access node to ensure redundancy of the connection. Rental charge for redundant physical path (copper loop) from the nearest BTTB DDN node to subscriber premise is Tk. 10,000/- per year up to 128 Kbps. The security deposit will not be taken from public educational/ training/ research institutions and government/ semi-government/ autonomous organisations/Commissions/100% government-owned companies. Change of Name of the owner due to merger, acquisition and or company name change is Tk. 1,500.

1.5

1.6 1.7 1.8

1.9 1.10

1.11

1.12 1.13 1.14 1.15

1.16

1.17 1.18

1.19

Full Tariff Chart

:: Page 8 of 14 ::

Data and Internet Services

1.20

The customer shall mention the minimum commitment period (to get the discount) for bandwidth to be rented during the first application. Down-gradation below that bandwidth will not be allowed during the commitment period. But the customers can up-grade the bandwidth time to time. The upgraded bandwidth amount shall also have the minimum commitment period of six months. At the time of up-gradation, two months advance rental shall be charged for the up-gradation bandwidth. Advance rental already paid for old bandwidth shall be adjusted in the next billing cycle. The security deposit shall also be taken for up-gradation bandwidth to maintain two months security deposits for the upgraded bandwidth. The rental charge of up-gradation bandwidth shall be taken from that rate-slab where the total bandwidth amount falls after upgradation. In case of allowable downgrade, the rentals already paid may be adjusted in the next billing cycle. But the security deposit shall not be down-graded/ returned instantly. The security deposit for the down-gradation bandwidth may be adjusted in the next billing cycle. Security deposit shall be refunded/ adjusted at the time of disconnection only. Security deposit shall not bear any interests. BTTB shall arrange to take security deposits from the existing customers as soon as the revised tariff schedule is effective. After the revised tariff schedule is effective, the excess amount of the already paid rental charge (if any) shall be adjusted in the next billing cycle. If a customer requests to discontinue the service within initial commitment period, his security deposit and the rentals already paid shall not be returned. After initial contract period, at least one month prior notice is required to discontinue service, otherwise one month rental (including VAT) will be deducted from the security deposit. Customers having bandwidth equal to or below 2 Mbps and using BTTB’s allocated IP addresses may be given satellite backup (subject to availability) in case of any disruption in the Submarine Cable links. Down-gradation of STM-1 capacity will not be allowed. Organizations providing web-hosting/search engine/root server/database server/News Server/FTP service etc. having equipment installed at BTTB co-location center shal get 50% discount on rental charges. The licensed/registered news agency/media and Association for Disabled People shall get 20% discount on the rental charges Charges quoted for Leased Line Internet service are without any backup service. For Temporary connection 2.1 2.2 2.4 Minimum charge shall be equivalent to 5 days charge. Full charges for the intended period should be paid in advance. Discount will not be applicable.

1.21

1.22

1.23 1.24 1.25 1.26

1.27

1.28 1.29

1.30 2.0

3.0 4.0

BTTB will decide other operational terms and conditions as and when necessary for the sake of the quality service. Any of the above condition in conflict with Telecommunication policies or the License provided to BTTB by BTRC will be deemed to be ineffective.

Full Tariff Chart

:: Page 9 of 14 ::

Data and Internet Services

:::: Tariff related to Dial-up Internet Service ::::
1.
[A] No Use No Pay Package: Item Registration Charge Peak-hour usage charge Off-peak-hour usage charge Peak-hour: 10:00 AM to 12:00 Midnight [B] Unlimited Package: Registration Charge Monthly Charge [C] Other Packages: Name of Package Registration Charge EduCare (Only for School, College & Tk. 100 Madrasah) OfficeMate Tk 300 (Only for Official customers) OfficePack (Only for Corporate Customer Tk. 100 having 50+ connections) * unlimited use within this time period. [D] Other Charges for Dial-up Internet Item Installation/Configuration (optional) Additional E-mail ID (up to 3) Changing ID Reactivation Conversion from regular to unlimited Conversion from service/government connection to private Charge Remarks Tk. 200 Tk. 300 each for 3 yrs Tk. 200 each time Tk. 100 each time For disconnection period beyond 59 days and less than 1 year. Tk. 300 Conversion in the reverse direction is free of charge. Tk. 100 Usage time* 08:00-18:00 08:00-19:00 08:00-20:00 Monthly Charge Tk. 400 Tk. 800 Tk. 700 Charge Nil Tk. 700 Charge Nil 40 paisa/min 20 paisa/min

Post-paid Dial-up Charges

Premium Dial-up Charge
Rate Same as prevailing local voice call charges

:::: Web Hosting Charges ::::
Full Tariff Chart :: Page 10 of 14 :: Data and Internet Services

Package 1

Web space

Facility

25 MB 50 MB 100 MB 250 MB 500 MB

2

3

4

5

DNS resolving FTP service User friendly control terminal DNS resolving FTP service User friendly control terminal DNS resolving FTP service User friendly control terminal DNS resolving FTP service User friendly control terminal DNS resolving FTP service User friendly control terminal

Registration Fee Tk. 500

Annual Service Charge Tk. 2,500

Tk. 500

Tk. 4,000

Tk. 500

Tk. 6,000

Tk. 500

Tk. 10,000

Tk. 500

Tk. 18,000

:::: Charges for .BD Domain Name Registration ::::
Registration Fee Service Charge Renewal Fee Tk. 500/year Tk. 1500 for two years

:::: Charges for DNS Parking ::::
Up to 20 Hosting Tk. 1200 per year For each additional hosting Tk. 300 per year

:::: Charges for E1 Access to PSTN from ISP ::::
E1 Port Charge Registration Fee Installation and Testing charge Annual rental Charge Tk. 10,000 Tk. 30,000 Tk. 60,000 Media (Local loop) Charge Tk. 5,000 Tk. 30,000 Tk. 48,000 Total Tk. 15,000 Tk. 60,000 Tk. 1,08,000




Registration, Installation and Testing Charge are one time and non-refundable
The charge does not include Customer Premise equipment (CPE) at Customer end

:::: Leasing out IP Addresses ::::
(Only for BTTB’s bandwidth subscribers)
First 4 (four) IP For additional each IP address One full block of Class C IP address Charge Tk. 3,200/year Tk. 200/year Tk. 40,000/year

Full Tariff Chart

:: Page 11 of 14 ::

Data and Internet Services

:::: Co-location Charges ::::
Co-location facility will be provided wherever feasible considering the type of equipment, power consumption, floor loading and such other technical feasibility. However, the purpose of co-location will be only for i. Accessing submarine cable capacity, ii. Accessing satellite segment capacity or A) B) Optical Fiber charges inside the exchange compound with ports and connectors in patch panel (ODF) at both ends: Tk 1000 per month/fiber Charges for Rack space (19’’- wide, 7’- height) in the designated co-location center: 1) 2) 3) 4) 5) C) Full Rack: Tk. 6400 per month Half Rack: Tk. 3700 per month Quarter Rack: Tk. 2000 per month 1 U (1.75”): Tk. 400 per month Each additional U: Tk. 225 per month

Charges for floor space in the designated co-location center for Cage to be installed by renter 1) Occupied floor space @ Tk. 300 per sq. ft. per month plus Free space (Face-width of the space in ft*2 ft) @ Tk. 300 per sq. ft. per month plus Air-conditioning charge for total space (occupied+free) @ Tk. 300 per sq. ft. per month plus Tk. 2000 for grounding, lighting, fire fighting and smoke detection facilities, security and monitoring etc. Charges for Rack (19” – wide, 7’ – height) installation in other Rooms/Sites. 1) 2) With Air-conditioning facility: Actual occupancy of floor @ Tk. 1350 per sq. ft. per month Without Air-conditioning facility: Actual occupancy of floor @ Tk. 850 per sq. ft. per month

D)

E)

Media Converter co-location charge (including power): Tk. 1000 per month

:::: Charges for Interconnection between operators co-located in BTTB’s Premise ::::
The operators are intended to co-locate their equipment in BTTB’s premises to interconnect with BTTB’s facilities. However, if the operators wish to be interconnected between themselves, the following charges (excluding VAT) will be applied for each operator. Port E1 DS3 STM1 Charge/month Tk. 1,000 Tk. 5,000 Tk. 10,000 Maximum Charge/month Tk. 10,000 Tk. 10,000 Tk. 20,000

Full Tariff Chart

:: Page 12 of 14 ::

Data and Internet Services

:::: Terms and conditions for Domestic Leased Line Digital Data Circuit ::::
B.1 For Long-term and temporary Domestic Digital Data circuit B.1.1 B.1.2 Distance between two points will be calculated by adding local copper cable length and optical fiber length and/or Microwave links’ hop distances. The shortest direct connectivity distance (if any, either by optical fiber and/or Microwave link) of the Transmission Network will be applicable for internode/intercity distance calculation whatever the actual connection is established in the National Data Network. Leased Circuits may be terminated on Customer's private leased line network. Customer will inform the details of terminations. Termination of Leased Circuits to Public Telephone Networks at either end is not permitted. Transmission of voice in any form is not normally allowed. This will need prior approval of BTTB and an annual fee @50% of the annual circuit rental shall be applicable. Internetworking for general communication with other organizations using Leased Circuits is not normally allowed. It will need a prior approval of BTTB and an annual Termination fee of Tk 1,00,000 per termination. In case of extension of data circuit from BTTB node to customer’s premise by wireless, Customer will arrange for that subject to the approval of concerned authority of BTTB. In such case, charges related to power consumption, rack space, tower installation etc. will be fixed by BTTB’s relevant notification. Rental Charges for 6 (six) months should be paid in advance at the time of Installation. Of this two months rental shall be kept as security deposit. At the end of first 4 (four) months, rental charges shall be payable in advance on two-month basis. The security deposit will not be taken from public educational/ training/ research institutions and government/ semi-government/ autonomous organisations.”

B.1.3 B.1.4 B.1.5

B.1.6

B.1.7

B.1.8

B.1.10 For any broken month, the rental charge will be calculated on the actual usage-day basis. B.1.11 At least one month prior notice is required to discontinue service, otherwise one month rental (including VAT) will be deducted from the security deposit. B.1.12 In all cases, shifting charge shall be equal to the Installation charge of the services and the distance will be recalculated for further rental charge. B.1.14 Public Accredited Universities, Colleges, Schools, Madrasa, Training and Research Institutes, Government/Semi-government/Autonomous Organizations, and non-profit research organizations shall get 25% discount on the rental charges provided that no commercial data will be transmitted over it. B.1.15 Software incubators & parks under govt. control, software companies/IT Enabled Services (ITES) companies earning at least US$ 100,000 or equivalent amount per annum in foreign currency shall get 25% discount on total standard rental charges for that year. If the company can not prove such earning, the company shall pay the rental charges on standard rates. B.1.18 For 5 connections or more at a time, 50% discount will be applicable on Registration, Installation and Testing charges for those connections. B.1.19 Rental charge for redundant physical path from nearest BTTB node to subscriber premise for each end is Tk. 10,000/- per year up to 128 Kbps.
Full Tariff Chart :: Page 13 of 14 :: Data and Internet Services

B.1.20 ISDN connections is available from some exchanges of BTTB to be used as back-up for data circuit. The subscribers may contact to the concerned Divisions for ISDN back-up connection. B.1.21 Change of Name of the owner due to merger, acquisition and or company name change is Tk. 1,000. B.1.22 Security deposit shall be refunded/ adjusted at the time of disconnection only. Security deposit shall not bear any interests. B.1.23 BTTB shall arrange to take security deposits from the existing customers as soon as the revised condition is effective. B.1.24 Temporary suspension of any connection upon request of the customer is not allowed. But BTTB may temporarily suspend the connection if any technical problem persists at BTTB end. The customer shall pay the charges for the period temporarily disconnected due to non-payment of the rental charges. B.2 For Temporary connection B.2.1 B.2.2 B.2.4 B.3 Minimum Charge shall be equivalent to 5 days charge. Full charges for the intended period should be paid in advance. Discount will not be applicable.

User of the Leased Line Data Connectivity Point to point Leased line data connectivity is provided mainly to the organizations for internal communications between their different offices/industries/sales offices located in same cities or different cities. In special circumstances the connectivity can be given to connect more than one legal entity if they form “Close User Group”. The following entities can fall under “Close User Group” (i) (ii) (iii) (iv) (v) Corporations/Holding companies and their subsidiary companies Companies under the same management Producers of goods and services and their wholesaler or selling agents. Computerized Reservation System service provider owned by Airline organizations. Shared networks of Banks for using Automatic Teller Machines (ATMs), Electronic Point of Sales or credit card authorization terminals etc. (vi) Producers of same types of goods and services. (vii) Travel agents issuing tickets of the members Airlines whose network they use.

B.4

Any of the above condition in conflict with Telecommunication policies or the License provided to BTTB by BTRC will be deemed to be ineffective.

Full Tariff Chart

:: Page 14 of 14 ::

Data and Internet Services

Similar Documents

Free Essay

Term Paper

...Term Papers COMPARING APA FORMAT IN A RESEARCH/LAB REPORT AND A TERM PAPER? WHAT IS THE SAME? * Margins (one inch) * Rules regarding quotations (long and short) * Rules for citations * Rules for references * Rules for page numbers * Rules for title page WHAT IS DIFFERENT?
 Parts * In a lab/research report, you test people/animals to collect data. You then statistically analyze that data and draw conclusions. Because you must report all these activities, a lab/research report must have a Methods, Results and Discussion section. * Term papers are usually about other people's research. Since you do not test people or animals yourself, you do NOT need a Methods, Results or Discussion section. Introduction * In a lab/research report, the introduction must explain what question your data will answer and how your study will help build a body of scientific knowledge. Because of this, the introduction of a lab/research report briefly describes related research by other people (that is, a literature review with citations).. * The introduction in a term paper is more like the Abstract of a lab/research report. It is an overview of the entire paper. In a term paper the literature review (with citations) is found mostly in the body of the paper. 
 HOW TO WRITE A TERM/RESEARCH PAPER IN PSYCHOLOGY PURPOSE:A research paper describes and summarizes a specific area of research by providing a summary and evaluation of the research already done as well...

Words: 835 - Pages: 4

Free Essay

Term Paper

...WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER 250 WORDS TERM PAPER TERM PAPER TERMPAPER 250 WORDS TERMPAPER...

Words: 340 - Pages: 2

Free Essay

Term Paper

...TermPaperWarehouse.com - Free Term Papers, Essays and Research Documents The Research Paper Factory JoinSearchBrowseSaved Papers Home page » Social Issues Why Social Networking Sites Are Addictive In: Social Issues Why Social Networking Sites Are Addictive “Why Social Networking sites are so addictive” Next to the numerous games that often hooks are attention, another thing that most parents problems today towards their children is the social networking sites that is said to be addictive due to its unlimited offers. The connection that can be made between two people distant to each other is such a thing that you simply cannot resist. Not only is discovering new content through all the retweets almost invaluable, but simply striking a conversation about common interests or thanking people for retweets, is a joy! Once you've gotten involved in networking sites, things can escalate quickly. One reason these sites are so addictive is that there's a nonstop stream of messages, photos, updates and information coming from those in your network. If you have 10 friends, it shouldn't be a problem keeping up with them. If your network is 100 friends or more, you might end up online for hours every day, trying to check all of the updates. If you're trading messages back and forth with other members, you might find yourself even more caught up in the exchange, just as you would in a normal conversation. We’re able to communicate with so many people from all across the globe...

Words: 523 - Pages: 3

Free Essay

Term Paper

...How to Make  Term Papers Outline ?   A good term paper outline should have the following sequence and contents to write a term paper. Introduction Introduce the topic of your term paper about which you have to write the term paper and proceed to write thesis statement. Thesis statement Thesis statement is an essential part of any term paper. Develop a thesis statement which clearly states the point you are discussing. Body of the Term Paper The body of the term paper has all the points to discuss and support with favorable evidences, experiments or examples. Present the collected data in a way that supports the thesis statement. Conclusions It is the final part where you have to present all the results you got from the research and make suggestions for further development in the field. Bibliography It is the list of references of the sources of information. There are different formats of referencing the information resources such as APA, MLA, Harvard, etc. So use the one instructed by your supervisor. CONTENTS: STEP 1. CHOOSE A TOPIC STEP 2. FIND INFORMATION STEP 3. STATE YOUR THESIS STEP 4. MAKE A TENTATIVE OUTLINE STEP 5. ORGANIZE YOUR NOTES STEP 6. WRITE YOUR FIRST DRAFT STEP 7. REVISE YOUR OUTLINE AND DRAFT               Checklist One   Checklist Two STEP 8. TYPE FINAL PAPER STEP 1. CHOOSE A TOPIC Choose a topic which interests and challenges you. Your attitude towards the topic may well determine the amount of effort and...

Words: 2167 - Pages: 9

Premium Essay

Term Paper

...A term paper is a semester written project that can be in a form of either an essay or a structured research paper. Basically it intends to enhance or develop the skills of the students in the aspects of communication, resourcefulness and discipline. Now what are the parts of a term paper that you should know about? Let me give you the five basic parts necessary for this article. 1. The cover page is the first part of the term paper. Actually it does not contain anything about the topic you have selected. It is just a page that provides the title of your work as well as details about you as the writer. A standard term paper usually has a separate cover page before the main pages of the article. 2. The next part of a term paper is the introduction. This is integrated in the actual page structure of the project. You need to provide a background of the topic that you have written. In this paragraph, make sure that you provide details why the topic is important and what is to be expected in the contents of discussions. You also need to place the thesis statement at the introductory paragraph. 3. The third part of a term paper is the body. Actually you are not limited to using only one paragraph. Depending on the discussions of the topic, you can expand the number of body paragraphs indefinitely. Some research term papers for school will have to contain discussions like methodology, literature review or pictures and diagrams. But always make sure that the body can support the thesis...

Words: 352 - Pages: 2

Premium Essay

Final Term Paper

...Unit 10 Research Paper Part 6: Final Draft of Research Paper Course Objectives and Learning Outcomes * Demonstrate mastery of the writing process, from invention to revision. * Apply principles of composition to evaluate the effectiveness of multiple rhetorical strategies. * Explain and employ the concepts of purpose, audience and tone in relation to compositions. * Locate, analyze, evaluate, and use information from a variety of sources, including the ITT Tech Virtual Library. * Formulate and execute a practical research plan. * Refine the research paper’s introduction and conclusion. * Revise and complete a final draft based on peer and instructor feedback. Assignment Requirements Use your research diary and the revised copy of your research paper to create your final draft. In your final draft, be sure to include: Introduction 1. Consider to whom you will be delivering this information. * If nothing really comes to mind, free-write about everything you know about your audience. 2. Overall, start broadly and narrow as you go. Consider your thesis as the target. * Other strategies also work well, but remember that the goal of an introduction is to help your reader understand why this information is important and/or interesting. 3. Decide which of the five introductory moves works best. * You may have to try a couple different methods here. Don’t be afraid to experiment with your writing. Talk it out with a...

Words: 1538 - Pages: 7

Free Essay

Term Paper on Physical Planning

...StudyMode - Premium and Free Essays, Term Papers & Book Notes Essays Resource Center Sign Up Sign In Products Home Research Drive Answers About Company Legal Site Map Contact Advertise ©2015 StudyMode.com HOME > LITERATURE > PERIODICALS > PHYSICAL ENVIRONMENT IN... Physical Environment in Counseling and Planning Only available on StudyMode Topic: Feeling, Office Pages(s): 7 (1656 words) Download(s): 99 Published: October 18, 2008 READ FULL DOCUMENT SAVE TO MY LIBRARY Please sign up to read full document. TEXT PREVIEW Physical Environment in Counseling and Planning I have recently read an interesting article about the impact of physical environment on the financial counseling and planning relationship and process. The publication raised my great interest because I have noticed before that our offices have several deficiencies that may have negative effects on the quality of our relationships with clients. The physical environment includes many aspects of our surrounding, including furniture and room design, color, accessories, lighting, sound, smell, thermal conditions and others. I have learned that all of these aspects can have bigger impact on relationships and the quality of our work that most people would expect. Therefore I took the initiative and researched the topic a little further to get a better understanding of the issue. Although there’s not a lot of a material available that refers strictly to financial planning...

Words: 463 - Pages: 2

Free Essay

Term Paper

...Looking Where to Order Term Paper Writing Services? Great, than you have come to the right place, as we are ready to deliver them 24/7. Having troubles with essays and research papers? Difficult topics and strict professors? Don’t worry – our term papers for sale will solve your problems. If you are still hesitating whether to buy term paper online or try writing it yourself, let us tell you something: your time is priceless. Do not waste it on something you won’t really need in future. Will it help you make a career? No. Will you become more attractive for potential employers? Most likely, no. Then why bother? Buy term paper online and make a difference Modern educational system sometimes leaves no other option but to address term paper writing services. It may seem that you are just supposed to ask someone for help. And when this time comes, try to make the right choice. Let the first things come first, namely your personal life issues, family and friends etc. And we will take care of the rest. Why do we dare offering your help? Because we can provide it. You may rest assured that our term paper writers will work 24/7 to deliver your precious paper on time. Deadlines met and customers satisfied – that is how we do business here, at Term-paper-writing-services.com. Excellent term paper writers One of the main reasons why we keep positions close to the top is because our term paper help online is delivered by professionals only. No novice writers, no students...

Words: 426 - Pages: 2

Free Essay

Term Paper

...avoid plagiarism. Why have we accommodated the latest software for capturing plagiarism? The reason is quite simple. Student example papers can be of different types (example essay papers, example term papers, example research papers, example theses and example dissertations) and students can use example papers in almost all academic subjects. Most commonly example papers online turn out to be APA example papers, MLA example papers, and MBA example papers. Whenever there is a need of student example papers, a simple research can show you a load of free downloads, but you should know that it is all risky and you should not drive your academic career to a dead end. As a matter of principle student example papers such as example essays, example research papers, example term papers and example theses/dissertations can never inspire students to work harder. But custom written papers give students ideas and they can attempt to write the paper with little effort. Only specially written papers, but not free examples of papers, can give you guidelines on how to write your own papers. It is strongly believed that when students look through example papers, none of the new thoughts or ideas can be further generated on the topic. Thus such practice is claimed to be unsuccessful. Example papers (whether it is an essay paper example, research paper example, example of a...

Words: 326 - Pages: 2

Premium Essay

Mba Term Paper

...There are many types of MBA papers that are required in most MBA institutions. The most common of these are the MBA term papers. The MBA term paper is one of the most basic of all MBA papers. You can write an MBA term paper on any topic, as long as it is connected with what you are learning in your course. However, it is not everyone who finds it easy to write a good term paper and hand it over to his lecturer on time. This is mainly because many MBA students have no time to do all the research required in an MBA term paper. If you are one of those having trouble writing and finishing a good business term paper, then you should ask for assistance. Instantly calculate the price for your order! Type of Paper Needed Please note that any orders related to thesis and dissertation papers, as well as their parts/chapters, are only available for University (College 3-4) academic level and higher. Academic Level Pagesinfo Deadlineinfo Select Academic Level first! Total Price Select type of paper first! The price for any of the additional services, such as progressive delivery, writer's samples and/or any extra charge for selecting a particular category of writer will be calculated and added automatically as you fill in the order form. Buy custom MBA term papers online There are many places from where you can get assistance to write your MBA term paper. For instance, you can ask someone in your college to do the paper for you for a certain fee. However, there...

Words: 680 - Pages: 3

Premium Essay

Math Term Paper

...six tips for writing great academic term papers Academic papers are a large part of anyone’s education, and largely responsible for the grade one receives at the end of the term. Writing a great term paper requires a variety of skills and having knowledge of a topic is not enough on its own. You will need to combine that knowledge with good technique and writing style to end up with a great paper. Follow the six tips below to make sure your next paper is right on the mark. Research First. Order is important in academic term papers, so don’t get ahead of yourself by starting to write before you have all of your information collected. As a rule of thumb, try to collect about 50% research documentation than you think you will need. Inevitably, you will decide some of the research doesn’t work in the paper and leave it out. Rather than being forced to go back and look for more, collect a little extra in the first place to make it easier on yourself during the writing process. Make an Outline. This is a key step. After collecting research, take the time to write up a detailed outline that you will follow closely while actually writing the paper. Start Early. Nothing kills a good term paper faster than running up against a deadline. Give yourself plenty of lead time so you aren’t rushed towards the end of the project. You want your brain to be able to think clearly, free of the distraction that a due date can cause. Write Freely. Once you start writing, just keep going. Don’t...

Words: 416 - Pages: 2

Free Essay

Term Paper Structure

...Term Paper Process The term paper is not a single submission assignment. You have to follow a process and you will earn you grade through all the steps of the process: Conduct background research on your country of choice Write a Term Paper developed through a process of drafting & review: Submit a FIRST DRAFT of your paper Review the drafts of 3 (three) other students and apply the rubric to their drafts After review by 3 other students and the instructor/writing consultant you will receive feedback on your first draft from at least 4 individuals Submit a SECOND DRAFT of your paper After review by 3 other students and the instructor/writing consultant you will receive feedback on your first draft from at least 4 individuals Rework, improve and refine your paper and resubmit it for final grading. Term Paper Format The paper should be: At least 1, 500 (one thousand five hundred) and no more than 2,000 (two thousand) words. Use proper reference citation using formal APA or MLA style and Include a list of sources cited (bibliography). Paper Topic You will need to select a term paper topic from one of the following topics: Outsourcing and offshoring Foreign Direct Investment (FDI) The impact of trade on economic development Cross-cultural challenges in international business The prospects of continued globalization Other topics specifically approved by the instructor. Resources You are provided with several resources that will allow you to submit...

Words: 1007 - Pages: 5

Premium Essay

Science Term Paper

...Science paper, which should be written carefully. A writer should be able to present all his/her arguments, authorial quotations, examples, ideas and other relevant details in a concise manner. Unlike dissertation writing, thesis writing, research paper writing or term paper writing, Science essay writing is considered an activity that requires less time. Science essay writing needs precise and authentic information collected from authentic resources but all writing should be properly cited or there are chances of plagiarism. If you are in search of online Science essay help - contact our custom Science writing service. Our Master's; Ph.D. writers will help write a Science essay for you on any scientific topic. Science term paper writing is done on a higher educational level. Science term paper writing should be done after a good research. Before writing a Science term paper, always make a draft to include relevant as well as irrelevant rough ideas. After assembling all the ideas, filter those ideas that are relevant and consider them as headings and start including details. A Science term paper writing is an activity that needs time and effort. As it is a higher-level activity, the students are expected to come up with something that is persuasive and commendable. Our academic writing company is committed to supply you with quality Science term paper help for any academic course level: High School, College and University. Contact us and we will help write a Science term paper...

Words: 626 - Pages: 3

Premium Essay

Term Paper

...develop ethical and environmental guidelines for the sourcing of its coffee beans. Starbucks is committed to enhancing and providing an excellent work environment for its employees and partners are treated with respect and dignity. Starbucks, founded in 1985, by Howard Shultz has achieved an impressive rate of growth in earning per share of 20% per year for the past decade. The company has witnessed steady revenue growth in this time period, in spite of overall economic downturns. In addition, an impressive growth rate in store openings and success in maintaining the profitability of current operations. Starbucks has demonstrated its ability to grow steadily and responsibly. Although short term margins have tightened as a result of this aggressive expansion, its long term growth projections show promising growth in retail locations, steady sales growth at existing locations, and a continuously expanding product line that differentiate it from the competition and keep its customers coming back. Starbucks’ ability to combat the risks and external threats that it faces from world economic factors, competitive forces come from its solid brand image, and its dedication to continual product innovation and the quality services that it offers its customers prove it to be a worthy investment. The financial analysis of the company also provides us with more than ample reason to purchase Starbucks stock. Through our analysis using the SWOT Model, we’ve found that Starbucks...

Words: 328 - Pages: 2

Free Essay

Term Paper

... They want to asses if the spread of technology would become a distraction or a help to a student. The investigators were appealed to the topic because gadgets are now able to provide easier access to information and educational advantages. Gadgets get the attention of the students because of its engrossing and fascinating presentations of information. This also helps the parents who are unaware of the effects of gadgets to their child’s study. Overuse of gadgets may result to interference with the student determination and ability to learn. Technology can be used for many things some positive and some negative. The effects that are now being documented on children whom are left unattended for hours on end are nothing but negative. Long term damage is more prevalent in the recent studies than ever before. Researchers are finding that many parents are using the internet and other form of technology to “raise” their children. Thus...

Words: 2595 - Pages: 11