Free Essay

The Roles of Graduate Quantity Surveyors in the Malaysian Construction Industry

In:

Submitted By jota1114
Words 2355
Pages 10
2012 International Conference on Management and Education Innovation IPEDR vol.37 (2012) © (2012) IACSIT Press, Singapore

The Roles of Graduate Quantity Surveyors in the Malaysian Construction Industry
B. L. Chong+, W. P. Lee and C. C. Lim
Department of Built Environment, Faculty of Engineering and Science, Universiti Tunku Abdul Rahman

Abstract: The profession of quantity surveying has evolved as a result of clients’ additional needs and market requirements. Clients not only request for traditional services but also asking for the contemporary services such as project management, risk management, feasibility study, construction financial practice, arbitration and productivity improvement in today’s innovative and changing construction industry. The scope of works for graduate quantity surveyors is no longer limited to the regular practices of measurement, tendering or estimating but something further beyond than this boundary. Hence, the objective of this paper is to present a critical review on the traditional and contemporary roles of graduate quantity surveyors, the threats to graduate quantity surveyors and also the methods to improve graduate quantity surveyors’ practice. Overall, this paper would provide insight knowledge to construction industry players for better understanding of graduate quantity surveyors’ roles.

Keywords: Graduate Quantity Surveyors; Malaysian Contemporary Roles; Threats; Methods to Improve.

Construction Industry; Traditional and

1. Introduction
The quantity surveying profession in Malaysia has progressively developed since building work increased in volume and complexity over the last century. As described by Seeley (1997), QS is a profession who would prepare an accurate bill of quantities to be priced by tendering contractors and who would measure and value any variations that might occur during the progress of the works. However, the environments for quantity surveying practice today have changed along with the country’s rapid economic development. In recent years, many authors have reported on the evolving roles of quantity surveying profession together with the changes in the construction industry (Page et al., 1999; Page et al., 2001; Boon, 2001; Fellows et al., 2003; Hardie et al., 2005; Fadhlin and Ismail, 2006). The objective of this paper is to present a critical review on the traditional and contemporary roles of graduate quantity surveyors (QSs), the threats to graduate QSs and also the methods to improve graduate QSs’ practice.

2. Literature review
During the last thirty years, there are many authors who have commented on the future roles of the QSs within the construction industry. Hence, this section will present and discuss the quantity surveying profession in the Malaysian construction industry, the traditional roles of graduate QSs, threats to graduate QSs, and methods to improve their practice in view of the contemporary roles that are expected from them in future.

2.1 The quantity surveying profession in Malaysia

+

Chong Bee Ling. Tel: (+603) 4107 9802; Fax: (+603) 4107 9803 17

E-mail address: chongbl@utar.edu.my

In Malaysia the quantity surveying profession is governed by the Quantity Surveyors Act 1967 (incorporating all amendments up to 28 February 2002) and Regulations promulgated in relation to the Act. As at January 2012, 942 registered QSs and 1153 registered graduate QSs were registered with the Board of Quantity Surveyors (BQSM).

2.1.1

Traditional and contemporary roles of graduate quantity surveyors

It has been suggested that with the growth of comprehensive user-friendly estimating software for instance, the QS is dead, or “re-engineered” as a Construction Economist (Stacey and Wood, 1996). Smith (2004) pointed out the quantity surveying profession has experienced significant changes over the past decade in terms of scope and type of services provided within and outside the construction sector. As a result, quantity surveying firms expand and adapt their scope of services to meet changing industry demands. According to him, one of the largest Quantity Surveying firms in Australia provides a good example of these changes; in 1980 Bills of Quantities accounted for approximately 80% of their total workload whereas in 2003 this had declined to less than 10%. Nevertheless, rather than leading to the firm’s demise, the firm has adapted accordingly and now provides a greater volume and wider range of services. The scope of services provided by firms can be summarized as; Traditional Services (e.g. Contract administration, Specification preparation, Builders Quantities, Bills of Quantities and Estimating/Cost Planning), Non-Traditional Building Services (e.g. Cost benefit analysis, Due diligence reports, Premises Audits, Post Occupancy Evaluation, Facilities management, Quality management, Value management, Project management, Risk management, Insurance valuation, Expert witness, Arbitration/mediation, Tax advice, Construction Planning, Life Costs, Feasibility study and other), Non-Building services (e.g. Research/Publishing, Civil works, Infrastructure works, Marine works, Transport, Ship Building, Aeronautical, Mining, Manufacturing, Petrochemical/oil and gas etc). Due to this, Zakaria et al (2006) also agreed that the roles of quantity surveyors have been diversified to areas such as taxation, insurance valuation and several others. Quantity surveyors (QSs) need to expand and include an ever-widening scope of services. As a result, it has showed that QSs not only need to play traditional roles by offer traditional services but also have to play contemporary roles by giving additional or non-traditional services to fulfill the demand for this innovative and changing industry.

2.1.2

Threats to graduate quantity surveyors’ practice

There are still a lot of major factors inducing change in the quantity surveying profession. Many authors have identified intensive or severe fee competition is the significant factor that influences current market (Bowen and Rwelamila, 1995; Boon, 1996; Smith, 2004; Hasmawati, 2006; Davies, 2006). In addition, Computer Aided Design (CAD) (Frei, 2009), the attitude of conservatism or inability to change toward application Information Technology (Shen et al., 2003; Smith, 2004), competition from others professions which provide similar services and “one-stop shop” package (Smith, 2004; Frei, 2009) and including poor marketing can be considered as a threats to quantity surveyors even though they are aware of the need to improve the way their services ought to be promoted, yet many QSs still do not seem to pay enough attention to it (Low and Kok, 1997; Smith, 2004). Furthermore, Lay (1998) also indicated that the graduate quality is declining in surveying profession. The core competencies and skills in the profession were declining generally (Smith, 2004). “QSs are still hard to find, so we snap up good candidates whenever we can find them,” says Morgan HR director Andrea Walton (Mann, 2008). Apparently, the quantity surveying profession attracts fewer graduates (Lay, 1998). Obviously, it is lack of interest from school leavers. Additionally, QSs still do not function well in their traditional services. As pointed out by Hiew and Ng (2007), chief architect is not satisfied toward the services of QS. Lastly, another threats be identified is the clients today began looking for new ways of managing contracts (Davies, 2006). In essence, threats can be summarized as follows: fees, new technology, poor marketing etc. While the quality of students, there is another area which may have caused it, i.e. the changing of the curriculum by institutions of higher learning to place more emphasis on management subjects rather than on the traditional roles. This is happening to UK where they now need to look for QSs from other countries.
18

2.1.3

Methods to improve graduate quantity surveyors’ practice

QSs have to be aware that their success does not only depend upon their current abilities, but also needs to adapt to changes in many areas and repackaging it in order to maintain and enhance competitive advantage and profitability. Therefore, first and foremost firms need to ensure that their QSs have sufficient professional expertise in the core competencies and skills of the profession and continue to develop this expertise. Practitioners need to be far more adaptable and willing to change their standard work practices than in the past (Smith, 2004). Furthermore, Smith (2004; 2006) keep mentioned that all construction professionals need to utilize and gain expertise in CAD sooner rather than later. Today, there are many commercially developed software packages targeted at aiding the performance of quantity surveying duties (Odeyinka, 2008). Therefore, it is vital to invest in information technology (IT) and information communication technology (ICT) to improve productivity and performance (Frei, 2009). Specialization is also a method which was identified as necessary to the profession quantity surveying services. Grant (2004) proposed that quantity surveyors requires a continuous income stream enabling the professional to become more independent and less dependent on the rise and fall of traditional income areas. Diversification may therefore be part of further strategies. Anyway, despite diversification is important but it need to take a long time frame. So it is depends to the training for them and how fast they can adapt with the new knowledge and technology to apply in their practical. Additionally, other methods like the five pillars of a learned profession (education, research, training, mentorship and continuing professional development (CPD) (Verster, 2004), involvement in alternative procurement methods (Frei, 2009), knowledge management (Davis et al., 2007), marketing strategy (Low and Kok, 1997), competency-based review (Nkado and Mayer, 2001) and developing and cultivating the quantity surveyor’s attribute for meeting the client’s expectation (Zou et al., 2005) also been proposed to improve the graduate quantity surveyors’ practice.

3. Conclusion
In summary, this paper has shown a critical review on the traditional and contemporary roles of graduate quantity surveyors, the threats to graduate quantity surveyors and also the methods to improve graduate quantity surveyors’ practice. The quantity surveying profession has evolved due to changing of clients’ need and market requirements. Clients not only request the traditional services but also ask for the additional or non traditional services such as value management, project management, and knowledge management in the current construction industry. The results presented would remind the graduate quantity surveyors about the changes and possible threats faced by the quantity surveying profession. Therefore, graduate quantity surveyors should be aware of the changes and willing to adapt these changes in order to improve their practice. The critical review presented in this paper could be used by the graduate quantity surveyors to equip themselves with these additional knowledge.

4. Acknowledgements
Thanks to UTAR for the research funding and support.

5. References
[1] Boon, J. (1996). Management of quantity surveying practices in a changing market, COBRA 1996. RICS Research. [2] Boon, J. (2001). New Zealand quantity surveying practices – continuing to adapt in a changing environment, COBRA 2001. RICS Research. [3] Bowen, P. and Rwelamila, P. (1995). Marketing of professional service by quantity surveying consultancy practices in South Africa, COBRA 1995. RICS Research. [4] Davies, R. (2006). The QS Transformation. RICS Business, March. [5] Davies, R., Watson, P., Man, C. L. (2007). Knowledge management for the quantity surveying profession. FIG Working week 2007, Hong Kong SAR, China, 13-17 May.
19

[6] Fadhlin, A. and Ismail, H. (2006). Profile of the Quantity Surveying Practice in Malaysia. International Conference on Construction Industry 2006, June. [7] Fellows, R., Liu, A. and Fong, C. (2003). Leadership style and power relations in quantity surveying in Hong Kong. Construction Management and Economics, 21(8), 809-818. [8] Frei, M. (2009). A New Zealand perspective on the future of quantity surveying: likely changes, threats and opportunities. URL: http://www.nziob.org.nz/global/files/Images/Documents/QS_survey_questionnaire.pdf. Accessed on 28th July 2009. [9] Grant, M. (2004). Competitive Strategies for the Professional Quantity Surveyor in South Africa. ICEC 4th World Congress, Cape Town, South Africa, 17-21 April. [10] Hardie, M., Miller, G., Manley, K. and McFallan, S. (2005). The quantity surveyor’s roles in innovation generation, adoption and diffusion in the Australian Construction Industry. The Queensland University of Technology Research Week International Conference, Brisbane, Australia, 4-8 July. [11] [11] Hasmawati, H. and Johan, V. T. A. (2006). Drivers of Changes: New Challenges for the Quantity Surveyors. International Conference on Construction Industry 2006, June. [12] Hiew, H. and Ng, P. (2007). How the QS Can Create Values in the Procurement of Construction Works in Hong Kong. Strategic Integration of Surveying Services, FIG Working week 2007, Hong Kong SAR, China, 13-17 May. [13] Lay, R. (1998). The Agenda for Change: 1998 Presidential Address. London: RICS. [14] Low, S. P. and Kok, H. P. (1997). Formulating a strategic marketing mix for quantity surveyors. Marketing Intelligence & Planning, 15 (6), 273-280. [15] Mann, W. (2008). Job Opportunities: Quantity Surveyors. Contract Journal, 30 July, 444, 6686, pp. 18. [16] Nkado, R., and Meyer, T. (2001). Competencies of professional quantity surveyors: a South African perspective. Construction Management and Economics, 19 (5), 481-491. [17] Odeyinka, H. A. (2008). An Evaluation of Quantity Surveying Software Usage in Northern Ireland. COBRA 2008. RICS Research. [18] Page, M., Limeneh, M., Pearson, S., and Pryke, S. (1999). Understanding innovation in construction profession service firms. RICS Foundation, London. [19] [19] Page, M., Pearson, S., and Pryke, S. (2001). Innovation, business strategy and the quantity surveying firm in the UK. RICS Foundation, London. [20] Seeley, I. H. (1997). Quantity Surveying Practice Second Edition. The Building Team and the Design Process (pp. 36-65). London: Macmillan Press Ltd. [21] Shen, Q., Li, H., Shen, L. Derek, D., and Jacky, C. (2003). Benchmarking the use of information technology by the QS profession. Benchmarking, 10 (6), 581-596. [22] Smith, P. (2004). Trends in the Australian Quantity surveying Profession: 1995-2003. ICEC 4th World Congress, Cape Town, South Africa, 17-21 April. [23] Stacey, N. and Wood, B. (1996). An analysis of potential future demand for building surveying services. COBRA 1996. RICS Research. [24] Verster, J. J. P. (2004). Managing cost, contracts, communication and claims: a quantity surveying perspective on future opportunities. ICEC 4th World Congress, Cape Town, South Africa, 17-21 April. [25] Vester, J. J. P., Kotze, B. G., and Hauptfleisch, A. C. (2008). The Pillars of Quantity Surveying for a Learned Society. AACE International Transactions, DE.13.1-DE.13.12. [26] Zakaria, N., Munaaim, M. E. C., and Khan, S. I. (2006). Malaysian Quantity Surveying Education Framework. BEECON 2006, Bloomsbury, London, 12– 13 September. [27] Zou, P. X. W., Scoufis, M., Earl, G. and Kim, J. (2005) "Developing Graduate Attributes in Construction Management and Real Estate Studies", Proceeding of the 30th Annual Conference of AUBEA, Brisbane, Queensland, Australia, (in press), 4-8 July.

20

Similar Documents

Premium Essay

Improving Quality in the Management of Property Development and Construction Projects

...IMPROVING QUALITY IN THE MANAGEMENT OF PROPERTY DEVELOPMENT AND CONSTRUCTION PROJECTS Portfolio presented on 29th October 2004 in partial fulfillment of the requirements for the degree of DOCTOR OF BUSINESS ADMINISTRATION (DBA) JOHN PANIL MIEM, PEng (Msia) Bsc. (Hons) Civil Eng. MBA (Tech. Mgmt.) International Graduate School of Management Division of Business and Enterprise University of South Australia DOCTOR OF BUSINESS ADMINISTRATION PORTFOLIO/DISSERTATION SUBMISSION SUPERVISOR APPROVAL DECLARATION Candidate Name: John Panil UniSA Candidate ID Number: 00112656C Dear Sir To the best of my knowledge, the portfolio contains all of the candidate's own work completed under my supervision, and is worthy of examination. I have approved for submission the portfolio that is being submitted for examination. 5.001) Signature: Supervi or Professor Si Heng Loke Date Signa re: Supervisor Dr Karlos Knapp Date Supported by: j (\Professor David Richards Chair, IGSM Doctoral Board of Examiners a% Date DECLARATION I hereby declare that this portfolio does not incorporate without acknowledgment any materials previously submitted for a degree or diploma in any university and that to the best of my knowledge, it also does not contain any materials previously published or written by another person, except where due reference is made in the text. Si Date: John anil Can date, Doctor of Business Administration II ACKNOWLEDGMENT ...

Words: 41815 - Pages: 168

Premium Essay

Project Management

...com/locate/ijproman Causes and effects of delays in Malaysian construction industry Murali Sambasivan *, Yau Wen Soon Graduate School of Management, Universiti Putra Malaysia, 43400 UPM, Serdang Selangor, Malaysia Received 21 April 2006; received in revised form 27 June 2006; accepted 21 November 2006 Abstract The problem of delays in the construction industry is a global phenomenon and the construction industry in Malaysia is no exception. The main purpose of this study is to identify the delay factors and their impact (effect) on project completion. Earlier studies either considered the causes or the effects of project delays, separately. This study takes an integrated approach and attempts to analyze the impact of specific causes on specific effects. A questionnaire survey was conducted to solicit the causes and effects of delay from clients, consultants, and contractors. About 150 respondents participated in the survey. This study identified 10 most important causes of delay from a list of 28 different causes and 6 different effects of delay. Ten most important causes were: (1) contractor’s improper planning, (2) contractor’s poor site management, (3) inadequate contractor experience, (4) inadequate client’s finance and payments for completed work, (5) problems with subcontractors, (6) shortage in material, (7) labor supply, (8) equipment availability and failure, (9) lack of communication between parties, and (10) mistakes during the construction stage. Six main effects of delay were: (1) time...

Words: 7920 - Pages: 32

Free Essay

Sustainability Report

...rtYTL CORPORATION BERHAD 92647-H www.ytl.com.my www.ytlcommunity.com YTL CORPORATION BERHAD 92647-H 11th Floor Yeoh Tiong Lay Plaza 55 Jalan Bukit Bintang 55100 Kuala Lumpur Malaysia Tel • 603 2117 0088 603 2142 6633 Fax • 603 2141 2703 the journey continues... YTL CORPORATION BERHAD 92647-H sustainability report 2011 sustainability report 2011 This report is printed on environmentally friendly paper. YTL CORPORATION BERHAD 92647-H Table of Contents 2 10 12 20 38 102 114 116 Managing Director’s Review Corporate Responsibility Promotion Of Arts & Culture 14 Starhill Gallery Arts Festival 15 The Kuala Lumpur Performing Arts Centre (KLPac) 17 Singapore Dance Theatre 17 The Actor’s Studio at the Rooftop, Lot 10 17 A Midsummer Nights Feast at Starhill Gallery 18 Feast Village Junior 18 Hutong – A Gourmet Heritage Village at Lot 10 19 YTL Concerts of Celebration Supporting Education & Community Development 22 Education Initiatives 28 Community Support & Development Initiatives 36 Employee Welfare Protection of the Environment 40 The YTL Group’s Environmental Vision 42 Utilities 61 Cement Manufacturing 65 Express Rail Link 68 Property Development & Sustainable Design 85 Hotels & Resorts 87 Carbon Credit Consultancy Services 88 Biodiversity & Nature Conservation Programmes & Collaborations 102 Earth Hour 2011 105 Ongoing Outreach Through Climate Change Week 106 National Geographic Store, Kuala Lumpur 108 The Copenhagen Communiqué on Climate Change...

Words: 48018 - Pages: 193

Free Essay

Spa & Wellness Industry

...http://www.nckvietnam.com Understanding the Global Spa Industry http://www.nckvietnam.com This page intentionally left blank http://www.nckvietnam.com Understanding the Global Spa Industry: Spa Management Marc Cohen and Gerard Bodeker AMSTERDAM • BOSTON • HEIDELBERG • LONDON • NEWYORK • OXFORD • PARIS • SAN DIEGO • SAN FRANCISCO • SINGAPORE • SYDNEY • TOKYO Butterworth-Heinemann is an imprint of Elsevier http://www.nckvietnam.com Butterworth-Heinemann is an imprint of Elsevier Linacre House, Jordan Hill, Oxford OX2 8DP, UK 30 Corporate Drive, Suite 400, Burlington, MA01803, USA First edition 2008 Copyright © 2008 Elsevier Ltd. All rights reserved No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means electronic, mechanical, photocopying, recording or otherwise without the prior written permission of the publisher Permissions may be sought directly from Elsevier’s Science & Technology Rights Department in Oxford, UK: phone ( 44) (0) 1865 843830; fax ( 44) (0) 1865 853333; email: permissions@elsevier.com. Alternatively you can submit your request online by visiting the Elsevier web site at http:/ /elsevier.com/locate/permissions, and selecting Obtaining permission to use Elsevier material Notice No responsibility is assumed by the publisher for any injury and/or damage to persons or property as a matter of products liability, negligence or otherwise, or from any use or operation of any...

Words: 153860 - Pages: 616

Free Essay

Factors That Affects the Study Habits of Bachelor of Science in Information Technology Students of Neust

...IGOROTS * Home * IGOROT SONGS * IGOROT DANCE * IGOROT TRADITIONS * MONEY ON THE MOUNTAIN IGOROT TRADITIONS IGOROT TRADITIONS When we talk about Igorot identity and culture, we also have to consider the time. My point is that: what I am going to share in this article concerning the Igorot culture might not be the same practiced by the Igorots of today. It has made variations by the passing of time, which is also normally happening to many other cultures, but the main core of respect and reverence to ancestors and to those who had just passed is still there. The Igorot culture that I like to share is about our practices and beliefs during the "time of Death". Death is part of the cycle of life. Igorots practice this part of life cycle with a great meaning and importance. Before the advent of Christianity in the Igorotlandia, the Igorots or the people of the Cordilleran region in the Philippines were animist or pagans. Our reverence or the importance of giving honor to our ancestors is a part of our daily activities. We consider our ancestors still to be with us, only that they exist in another world or dimension. Whenever we have some special feasts (e.g., occasions during death, wedding, family gathering, etc.), when we undertake something special (like going somewhere to look for a job or during thanksgiving), we perform some special offer. We call this "Menpalti/ Menkanyaw", an act of butchering and offering animals. During these times we call them...

Words: 53758 - Pages: 216

Free Essay

Test2

...62118 0/nm 1/n1 2/nm 3/nm 4/nm 5/nm 6/nm 7/nm 8/nm 9/nm 1990s 0th/pt 1st/p 1th/tc 2nd/p 2th/tc 3rd/p 3th/tc 4th/pt 5th/pt 6th/pt 7th/pt 8th/pt 9th/pt 0s/pt a A AA AAA Aachen/M aardvark/SM Aaren/M Aarhus/M Aarika/M Aaron/M AB aback abacus/SM abaft Abagael/M Abagail/M abalone/SM abandoner/M abandon/LGDRS abandonment/SM abase/LGDSR abasement/S abaser/M abashed/UY abashment/MS abash/SDLG abate/DSRLG abated/U abatement/MS abater/M abattoir/SM Abba/M Abbe/M abbé/S abbess/SM Abbey/M abbey/MS Abbie/M Abbi/M Abbot/M abbot/MS Abbott/M abbr abbrev abbreviated/UA abbreviates/A abbreviate/XDSNG abbreviating/A abbreviation/M Abbye/M Abby/M ABC/M Abdel/M abdicate/NGDSX abdication/M abdomen/SM abdominal/YS abduct/DGS abduction/SM abductor/SM Abdul/M ab/DY abeam Abelard/M Abel/M Abelson/M Abe/M Aberdeen/M Abernathy/M aberrant/YS aberrational aberration/SM abet/S abetted abetting abettor/SM Abeu/M abeyance/MS abeyant Abey/M abhorred abhorrence/MS abhorrent/Y abhorrer/M abhorring abhor/S abidance/MS abide/JGSR abider/M abiding/Y Abidjan/M Abie/M Abigael/M Abigail/M Abigale/M Abilene/M ability/IMES abjection/MS abjectness/SM abject/SGPDY abjuration/SM abjuratory abjurer/M abjure/ZGSRD ablate/VGNSDX ablation/M ablative/SY ablaze abler/E ables/E ablest able/U abloom ablution/MS Ab/M ABM/S abnegate/NGSDX abnegation/M Abner/M abnormality/SM abnormal/SY aboard ...

Words: 113589 - Pages: 455