...Equation 1: dS/dt= 〖- βIS〗^( 3) dS/dt is representative of the instantaneous rate of change for the number of people susceptible to the disease over time, a negative number as susceptible individuals will become infected. Firstly, dS/dt must decrease proportionally to I because individuals that are infected are no longer susceptible to the disease; to maintain a relative rate of change for infected and susceptible individuals, the value for I must also decrease.3 The only way people can leave the set of individuals in the susceptible (S) population is to become infected in the first place; as we can see on the right half of the equation, the rate of infection is multiplied by the susceptible and infected populations, providing a value for the number of individuals who will transfer over from S to I relative to the size of said populations. Being the derivative of the susceptible graph over time, this is an instantaneous rate of change for S between each day.3 Equation 2: dR/dt=〖γI〗^( 3)...
Words: 771 - Pages: 4
...3.5 Routing After placement of modules on to the chip, the routing determines the paths for wires on the chip layout to interconnect the pins on the design blocks or pads at the chip boundary. These paths must satisfy the DRC rules to ensure that the chip can be correctly manufactured. The main objective of routing step is to complete all the connections. If all the required connections are not completed then the chip would not function properly and may even get fail also. Routing should also satisfy other objectives like (1) reduce the wire-length between modules and (2) ensure each net satisfy its required timing properties Routing is basically a very complex process. To make it simpler, the routing process is divided in to two steps like global routing followed by detailed routing. In global routing the available routing region is divided into tiles and tile-to-tile paths. Then, in the detailed routing actual tracks and vias for nets are assigned....
Words: 1106 - Pages: 5
...Exercise One Nt1310 Week 1 In: Computers and Technology Exercise One Nt1310 Week 1 NT1310:Week 1 Telecommunications By: Kenneth Martin You are an IT Network Specialist and are required to develop the design of the company’s telephone system for its new building which will begin construction in a few months. In order to get a background which will help when developing the new system, your supervisor asked you to research the current Plain Old Telephone Service (POTS) currently used by the company. You must research the system components and report back to your supervisor , the Telecommunications Manager, within a week. 1. Describe a local land line phone system based on the following Landline Telephone Components: a. Local Loop a local loop is the wired connection from a telephone company's central office in a locality to its customers' telephones at homes and businesses. This connection is usually on a pair of copper wires called twisted pair. The system was originally designed for voice transmission only using analog transmission technology on a single voice channel. Today, your computer's modem makes the conversion between analog signals and digital signals. With Integrated Services Digital Network (ISDN) or Digital Subscriber Line (DSL), the local loop can carry digital signals directly and at a much higher bandwidth than they do for voice only. b. Central Office In telephone communication in the United States, a central office (CO) is an office in a locality...
Words: 496 - Pages: 2
...routine adminstrative tasks of popular desktop operating system(s) for standalone and network client computers, and related aspects of typical network server functions. Client-Server Networking I Syllabus Where Does This Course Belong? 1st QTR GS1140 NT1110 GS1145 Problem Solving Theory Computer Structure and Logic Strategies for the Technical Professional 2nd QTR NT1210 Introduction to Networking NT1230 Client-Server Networking I MA1210 College Mathematics I 3rd QTR NT1310 NT1330 MA1310 4th QTR PT1420 NT1430 EN1320 5th QTR PT2520 NT2580 EN1420 6th QTR NT2640 NT2670 CO2520 7th QTR NT2799 SP2750 Physical Networking Client-Server Networking II College Mathematics II Introduction to Programming Linux Networking Composition I Database Concepts Introduction to Information Security Composition II IP Networking Email and Web Services Communications Network Systems Administration Capstone Project Group Theory The follow diagram indicates how this course relates to other courses in the NSA program: 1 Date: 8/31/2012 Client-Server Networking I Syllabus NT2799 NSA Capstone Project NT2580 Introduction to Information Security NT2670 Email and Web Services NT2640 IP Networking PT2520 Database Concepts NT1330 Client-Server Networking II NT1230 Client-Server Networking I NT1430 Linux Networking PT1420...
Words: 1834 - Pages: 8
...ITT Technical Institute NT1310 Physical Networking Student Course Package Bring this document with you each week Students are required to complete each assignment and lab in this course package on time whether or not they are in class. Late penalties will be assessed for any assignments or labs handed in past the due date. The student is responsible for replacement of the package if lost. Table of Contents Syllabus 2 Student Professional Experience 19 Graded Assignments and Exercises 23 Labs 47 Documenting your Student Professional Experience 57 ITT Technical Institute NT1310 Physical Networking Onsite Course SYLLABUS Credit hours: 4.5 Contact/Instructional hours: 56 (34 Theory Hours, 22 Lab Hours) Prerequisite(s) and/or Corequisite(s): Prerequisites: NT1210 Introduction to Networking or equivalent Course Description: This course examines industry standards and practices involving the physical components of networking technologies (such as wiring standards and practices, various media and interconnection components), networking devices and their specifications and functions. Students will practice designing physical network solutions based on appropriate capacity planning and implementing various installation, testing and troubleshooting techniques for a computer network. Where Does This Course Belong? | | | NT2799 | | | | | | | | NSA Capstone | | | | | | | Project | | | | | NT2580...
Words: 10839 - Pages: 44
...NT1310 Unit 6 Exercise 1 Luz Garcia 7/22/14 Connector Installations Twisted-pair cable: Step 1: Measure the cable you want to put ends on and trim it to the proper length using the cable cutter. Step 2: Use the cable stripper to strip about 1.5" of the jacket from the end of the cable. Then, rotate the stripper around the cable twice. This will cut through the jacket. Step 3: Remove the stripper from the cable and pull the trimmed jacket from the cable, exposing the inner conductors. If a jacket slitting cord (usually a white thread) is present, separate it from the conductors and trim it back to the edge of the jacket. Step 4: Untwist all the inner conductor pairs and spread them apart so that you can see each individual conductor. Step 5: Line up the individual conductors so that the color code matches the color-coding standard you are using. Step 6: This step includes two points. First, trim the conductors so that the ends are even with each other, making sure that the jacket of the cable will be inside the connector. Second, the total length of exposed connectors after trimming should be no longer than 0.5" to 0.625". Step 7: Insert the conductors in the connector, ensuring that all conductors line up properly with the pins as they were in the previous step. If they don't line up, pull them out and line up. Do this carefully, as it's the last...
Words: 591 - Pages: 3
...ITT TECHNICAL INSTITUTE NT1310 Physical Networking GRADED ASSIGNMENTS ------------------------------------------------- Student Professional Experience Project NSA SPE Project 1 (to be completed by the end of NT1310): Install, Configure, Test, Maintain and/or Document the Worksite Local Area Network and Its Components Purpose The purpose of the Student Professional Experience (SPE) project is to provide you an opportunity for work experience in your field or in a related field to add to your résumé. You may have an opportunity to serve your community or work for a local employer for a project that will take between 20 and 30 hours. Project Logistics Career Services will identify an employer with needs in the following areas: Network related tasks (mostly confined to the LAN and Microsoft Windows Server 2008 environments) Students are expected to practice various skills discussed in all the technical courses in Quarters 1 through 3 of the NSA program at an employer’s site on network related tasks (more confined to the LAN and Microsoft Windows Networking with Server 2008 environments) that would involve installation, configuration, testing, maintenance and documentation of the worksite network and its components, and to properly document the technical information in all involved activities. Such documentation will be used as the source material for Items 2 and 3 defined in the Deliverables section of this document. Possible example projects could...
Words: 6762 - Pages: 28
...Montie Ramsarran August 11th, 2014 NT1310 Mr. Amos Unit 9 Exercise 1 Light Source and Components-Definitions 1. Forward Biased LED: A bias voltage that is applied to a pn-junction in the direction that causes a large current flow; used in some semiconductor diode circuits. 2. Incoherent Light: Light in which the electric and magnetic fields of photons are completely random in orientation. Incoherent light is typically emitted from light bulbs and LEDs. 3. Laser: Acronym for light amplification by stimulated emission of radiation. The laser produces a coherent source of light with a narrow beam and a narrow spectral bandwidth (about 2cm). Lasers in fiber optics are usually solid-state semiconductor types. Lasers are used to provide the high-powered, tightly controlled light wave lengths necessary for high-speed, long-distance optical fiber transmissions. 4. Output Pattern: A setting that selects the output pattern for comparison outputs. This enables outputs for changes in levels rather than just upper/lower limit comparisons to set value. It can be set according to the control applications. Note: The settings must be as follows for correct zone outputs. 5. Output Power: The useful signal or power delivered by a circuit or device. 6. Modulation Speed: (1) Coding of information onto the carrier frequency. Types of modulation include amplitude modulation (AM), frequency modulation (FM), and phase modulation...
Words: 1207 - Pages: 5
...associate degree in Mobile Communications Technology. The following diagrams indicate how this course relates to other courses in respective programs: Network Systems Administration NT2799 NSA Capstone Project NT2580 Introduction to Information Security NT2670 Email and Web Services NT2640 IP Networking PT2520 Database Concepts NT1330 Client-Server Networking II NT1230 Client-Server Networking I NT1430 Linux Networking PT1420 Introduction to Programming NT1110 Computer Structure and Logic NT1201 Introduction to Networking NT1310 Physical Networking CO2520 Communications SP2750 Group Theories EN1420 Composition II EN1320 Composition I GS1140 Problem Solving Theory GS1145 Strategies for the Technical Professional MA1210 College Mathematics I MA1310 College Mathematics II Networking Technology Courses Programming Technology Courses General Education/ General Studies 1 Date: 7/18/2011 IP Networking Syllabus Mobile Communications Technology MC2799 MCT Capstone Project NT2640 IP Networking MC2560 Mobile Wireless Communication I MC2660 Mobile Wireless Communication II MC2665 Mobile...
Words: 2573 - Pages: 11
...have one domain controller (not recommended), there is nothing to do since all roles must be on this server, but if you have multiple servers you should move some of theese roles on to more servers. It is also important to be aware of what servers are Global Catalog servers, especially if you have more than one domain and even if only one domain, they will be prefered by applications like Exchange server. It is recommended to place the forest roles on one Domain Controller (DC) and the domain roles on another server. If not all Domain Controllers are Global Catalog servers, it is also important to place the infrastructure master on a server that is NOT a Global Catalog server. Recommended Best Practice setup of FSMO roles. Domain Controller #1 Place the two forest roles on this server. * Schema Master * Domain Master Domain Controller #2 Place the domain roles on this server. * RID Master * Infrastructure Master * PDC Emulator If more domains exist in the forest, place the domain roles on a server in theese domains like Domain Controller #2 Global Catalog configuration. In Windows 2008 Active Directory all Domain Controllers are by default Global Catalog servers, personally...
Words: 10360 - Pages: 42