Premium Essay

Valves Question

In:

Submitted By sumirahsue
Words 863
Pages 4
FIN 465, Fall 2010-11 PROJECT # 3, FLINDER VALVES AND CONTROLS CASE STUDY

In this project, you will estimate the value of a target company in an acquisition and propose a range of exchange ratios acceptable for the target and the acquirer. Please find the full assignment below. You can use only Excel for all calculations. You can use Word for a write-up. There is no limit on the length of the write-up, but I ask you to be concise. Please annotate your Excel calculations so that I can understand them.

You can work individually or in couples (groups of two) on this project. Please write the names of group members in the top left corner of the first worksheet in your spreadsheet. The project counts for 15% of your grade. Each student in the group will receive the same grade. The project will be graded based on the quality of your analysis and the use of Excel. The due date is Wednesday, October 27. Please upload the completed assignment file or files to the Blackboard by the end of the due date. Please name your submitted files as “Yourlastnames _Project3.xls” and “Yourlastnames _Project3.doc”.

ASSIGNMENT:

Assume that you are employed by RSE’s financial department and that you are charged with performing financial analysis of the merger with FVC. You are given the data that are included as Exhibits 1 through 10 in the case study. Your tasks are as follows.

1. Estimate the value of FVC to RSE using the discounted cash flow (DCF) valuation method discussed in class. Your estimates should include: expected future free cash flows to the firm (FFCF), weighted average cost of capital (WACC), terminal value, enterprise value, value of non-operating assets, firm value, equity value, and share value. Assume that the terminal growth rate of about 6% is appropriate but do a sensitivity analysis to the changes in the terminal growth rate and the WACC.

Similar Documents

Premium Essay

Boswell Plumbing Products

...Boswell Plumbing Products Boswell Plumbing Products produces a variety of valves, connectors, and fixtures used in commercial and residential plumbing applications. Recently a senior manager walked into the cost accounting department and asked Nick Somner to tell her the cost of the D45 valve. Nick quickly replied, “why do you want to know?” Noticing that the manager appeared somewhat startled by this question, he explained, “The cost information you need depends on the decision you’re going to make. You might be thinking of increasing a scheduled production run of 3000 D45s by 100 units or scheduling an additional production run, or you might even be thinking of dropping the product. For each of these decisions, the cost information that you need is different.” Required Using the concept of incremental analysis, expand on Nick’s response of “Why do you want to know?” What cost information would be relevant to a decision to drop the product that would not be relevant to a decision to increase a production run by 100 units? According to the text, incremental analysis is the appropriate way to approach the solution to all business problems. It involves the calculation of the difference in revenue and the difference in cost between decision alternatives. The difference in revenue is the incremental revenue of one alternative over another, whereas the difference in cost is the incremental cost of one alternative over another. If an alternative yields an incremental...

Words: 324 - Pages: 2

Free Essay

Ctis

...PRESSURE. •USING CTIS A VEHICLE CAN BE OPERATED WITH TYRE PRESSURE APPROPRIATE TO THE SPEED AND STRENGTH OF THE ROAD SECTION BEING NEGOTIATED AND THE LOAD BEING CARRIED WITH INCREASED VEHICLE MOBILITY. This system is used to inflate/deflate tyres in order to adapt the vehicle's rolling capabilities to terrain conditions, in accordance with several pre-set categories: EMERGENCY, SOFT GROUND, TRACK and HIGHWAY. This function is controlled from the driving position by a special instrument panel •which activates a logic box to inflate/deflate the tyres, sending compressed air to the wheels via a rotary joint on the hub reducer of each wheel. • •MAJOR COMPONENETS IN THE SYSTEM •OCP (OPREATOR CONTROL PANEL) •PCU (PRESSUE CONTROL UNIT) •CTIS VALVES Central tyre inflation system (CTIS) vehicle Know your User Instruction Centralized tyre inflation Central tyre inflation system (CTIS) vehicle Press ON/OFF button to switch the device ON Know your At power up of system, the empty load signal will first fast blinking and will steady on when ECU is correctly initialized. If Load signal continuously blinks, the ECU initialization fails. The process initialization starts by blinking successively all panel signals (auto-test). After the initialization sequence and ECU hardware checks, the terrain button previously selected is automatically reactivated. At each powering up, a pressure check cycle is carried out to verify the conformity of the terrain pressure for...

Words: 1876 - Pages: 8

Free Essay

Fluid Power

...HYDRAULICS LAB #1 The objective of this lab is to test the fluid flow provided by the power unit at various discharge pressures, and create a power unit characteristic curve. 1. Build on the trainer the hydraulic circuit shown in the figure below, using the components listed here. hydraulic power unit (2) pressure gauges flow control valve (FCV) – simulated load flow-meter Page 1 of 2 2. Initial setup: a. Fully close (CW) the FCV, and fully open (CCW) the pressure relief valve on the power unit. b. Start the power unit, and slowly adjust the pressure relief valve until pressure gauge P1 reaches 50 bar. Let the unit run for a few minutes then check and adjust P1 if necessary. c. Do not touch the pressure relief valve for the remainder of the lab. d. Fully open the FCV. 3. Test: a. Record the pressures P1, P2 and the flow rate under the “Min.” column in the table below. b. Slowly turn the FCV CW, adding a simulated load to the system. When the pressure at P1 increases to 15 bar, stop and record pressure P2 and the flow rate. c. Repeat for all columns listed in the table. The final column, listed as “Max Pres.” should be run with the FCV fully closed. Note the sound of the power unit during this test. You should detect changes in tone as the load (pressure) is increased. P1 Pressure (bar) P2 (bar) Flow Rate (lpm) Min * 15 20 25 30 35 40 45 46 47 48 49 Max. Pres. * minimum pressure attained, with flow control fully open HYDRAULICS LAB #1 Page 2 of 2 Lab Report: ...

Words: 638 - Pages: 3

Free Essay

Installation of Chart Cold Box

...MAINTENANCE Table of Contents 1 Introduction .......................................................................... 4 1.1 Cold Box Basic Components ....................................... 4 1.1.1 Frame Tubing ................................................. 4 1.1.2 Internal Support Members .............................. 4 1.1.3 Side Panels..................................................... 4 1.1.4 Roof & Floor Panel ......................................... 4 1.1.5 Flexible Insulated Closeouts ........................... 4 1.1.6 Lifting Lugs ..................................................... 4 1.1.7 Base Plates..................................................... 4 1.1.8 Emergency Vent / Upper Manway .................. 4 1.1.9 Breather Valve ................................................ 5 1.1.10 Lower Manway ................................................ 5 1.1.11 Perlite Fill Connections ................................... 5 1.1.12 Perlite Drain Connections ............................... 5 1.1.13 Stream Identification Tags .............................. 5 1.1.14 Stainless Steel Duplicate Nameplates ............ 5 1.1.15 Optional Equipment ........................................ 5 1.2 Codes and Materials of Construction .......................... 6 1.3 Nitrogen Purge System ............................................... 6 1.3.1 Principles...

Words: 5623 - Pages: 23

Premium Essay

Portable Water System

...Started on Tuesday, 19 March 2013, 11:05 PM Completed on Thursday, 21 March 2013, 09:11 PM Time taken 1 day 22 hours Marks 0/21 Grade 0 out of a maximum of 10 (0%) Question 1 Marks: --/1 What would be the CS 25 requirements with regard to aircraft water system? Answer: -not constitute a hazard to the aircraft and all replenishment connections should be so designed that misconnection of water services to any other systems is not possible They must not constitute a hazard to the aircraft and all replenishment connections should be so designed that misconnection of water services to any other systems is not possible Question 2 Marks: --/1 What does Potable Water systemmeans? Answer: -Portable water system is define as the drinking water system which consist of: Drinking water system. Question 3 Marks: --/1 Describe the aircraft drinking water system by naming the major components forming the system? Answer: -storage tanks -heating -cooling -distribution -content indication -anti frost system -removal of waste water  Storage tanks.  Heating.  Cooling.  Distribution.  Contents indication.  Anti-frost system.  Removal of waste water (gray water). Question 4 Marks: --/1 What would be the requirement by CS 25 if the water tank is located in the cargo compartment? Answer: -they must be separated from the freight bay potential fire region in some way and this is normally achieved through use of fire blanking material such as glass fibre...

Words: 2055 - Pages: 9

Free Essay

Ship

...|Vessel: | |Berth: |Port: | |Date of Arrival: |Time of Arrival: | Instructions for Completion The safety operations require that all questions should be answered affirmatively YES/NO. If an affirmative answer is not possible, the reason should be given and agreement reached upon appropriate precautions to be taken between the ship and the terminal. Where any question is not considered to be applicable, a note to that effect should be inserted in the remarks column. See ISGOTT Guidelines for Completing the Ship/Shore Safety Check List for more detail descriptions behind each specific question in below matrix. The presence of YES/NO in the columns "ships" and "terminal" indicates that checks shall be carried out by the party concerned. The presence of the letters A, P and R in the column "code" indicates the following: A The mentioned procedures and agreements shall be in writing and signed by both parties. P In case of a negative answer, the operation shall not be carried out without the permission of the Port Authority. R Indicates items to be re-checked at intervals not...

Words: 1912 - Pages: 8

Free Essay

Mechatronics

...check shut off valves Pressure relief valve simulation Function Leak free sealing of flow in one direction. Allows flow in only one direction. Provides positive back pressure on a system when fitted with a spring. Also used as simple low pressure relief valves. Setting Fixed spring to control the opening or cracking pressure Fit valves without springs vertically Variations Pilot operated – can be opened by pilot pressure to allow flow back through valves. Can be used as leak free directional valves. Typically for low flow, high pressure situations or for very high flows where directional valves are expensive or not suitable. Directional control valves Function Stops/starts flow or directs flow into A or B service lines. Variations Manual or electrical operation. Spool centre positions vary depending on free flow path or pressure venting. Pilot or direct operated valves. Low flows generally direct acting but large flows require pilot operation. Pressure relief valves Function Limits the maximum pressure in a circuit. Setting Generally set 15 bar above the working pressure of system. Back pressure - Changes in pilot drain or backpressure will generally be added to the set pressure; making a sequence valve. Variations Direct acting - quick response, low flow, leak free. Pilot operated - high flow, internal or external leakage. Unloading valve - e.g. relief valve that switches to minimum pressure for start up. Flow control or throttle valves Function ...

Words: 3753 - Pages: 16

Free Essay

Bissel Manual

...ProHeat 2X ® USER’S GUIDE 8920, 9200, 9300, 9400 SERIES 3 Safety Instructions 4 Product view / Accessories 5 Assembly 6-17 Features / Operations 17-18 Maintenance 19-20 Troubleshooting 21 Consumer Services 22-23 Replacement Parts 24 Warranty Thanks for buying a BISSELL ProHeat 2X® We’re glad you purchased a BISSELL ProHeat 2X heated formula deep cleaner. Everything we know about floor care went into the design and construction of this complete, high-tech home cleaning system. Your ProHeat 2X is well made, and we back it with a limited one-year warranty. We also stand behind it with a knowledgeable, dedicated Consumer Services department, so, should you ever have a problem, you’ll receive fast, considerate assistance. My great-grandfather invented the floor sweeper in 1876. Today, BISSELL is a global leader in the design, manufacture, and service of high quality homecare products like your ProHeat 2X. Thanks again, from all of us at BISSELL. Mark J. Bissell President and Chief Executive Officer 2 16 IMPORTANT SAFETY INSTRUCTIONS When using an electrical appliance, basic precautions should be observed, including the following: Read all instructions before using your PROHEAT 2X®. To reduce the risk of fire, electric shock, or injury: ■ Do not immerse. ■ Use only on surfaces moistened by cleaning process ■ Always connect to a properly grounded outlet. ■ See Grounding Instructions ■ Unplug from outlet when not...

Words: 6774 - Pages: 28

Free Essay

Essay

...BONUS ASSIGMENT BUSI 3040U: INFORMATION SYSTEMS PRIVACY VIOLATIONS AND THEIR RAMIFICATIONS ADEDAMOLA MAKINDE S/N 100367804 EI fraud investigator axed for leaking “quota” details This is the story of a private information leak by an employee of Service Canada. In February, Ms. Therrien went directly to the press and provided documents that were not authorized for public disclosure. Ms. Therrien leaked documents exposing a conservative crackdown on those receiving EI. The documents showed that EI investigators had been told to crackdown on about $485,000 in EI fraud each year. She further disclosed to the press that “fraud quotas” were just one of a culture in her office that encouraged benefits from as many recipients as possible to save money. As initial investigation was going on, she was suspended from her Job without pay from February 2013 until October 2013 when she was finally fired from the job. The letter sent on behalf of Employment and Social development Canada stated that she no longer met the conditions of her job. Certain control measures could have been taken to prevent this leak. The lady told the press that she felt bad that the government was not doing a good job by cutting down on EI payments. Her intention was good from what she told the press. In other words, these were private documents that involve government files and private files. There is no right for her to disclose any document that she is not authorized. Her Job does not permit her to...

Words: 1246 - Pages: 5

Premium Essay

Tap Water vs Bottled Water

...Bottled water Vs Tap Water? Abstract This is a repot about what is better Bottled water or tap water. This report will show that for the most part there is no difference for your health but a big difference in price. So it will show that tap water is better for the most part. What is better Bottled water or Tap Water? What is better tap water or bottled water? People spend a lot of money on bottled water so some people think it’s better, but is it? All Tap and Bottled water is different so if you really want to know get the water tested. Bottled water is less regulated than tap water. Tap water is regulated by the EPA while bottled water is regulated by the FDA. The FDA tries to meet the EPA standard. Bottled water has a loophole so if it’s sold in the state it’s made then it’s not tested.[1][4] There have been some recalls of bottled water[2] Bottled water can go bad. Some of the plastic can get into the water, if you leave it outside.[4] don’t store Bottled water in hot places. Tap water will get metals in it from pipes. So if you have bad piping you may want to buy bottled water, but bottled water might not be better its tested way less,[5] so before you change to bottled water check to see if the brand is better than the Tap. Fluoride isn’t in some Bottled water. Fluoride is really good for your teeth. One of the top medical achievements of the 21st century according to the CDC. The cost of bottle water is more than Tap water. Tap water is cents for a gallon...

Words: 555 - Pages: 3

Free Essay

The Concept of Adaption

...The Concept of Adaption JoAnn Wade American InterContinental University Online December 9, 2013 The Concept of Adaption The first experiment that was performed was rubbing a finger gently over a piece of very coarse sandpaper a few times and rates its coarseness on a scale from 1 being very soft to 7 being very coarse. Then after a minute or two, rub the same finger over the paper and again rate its coarseness. The first time the perception rating was a 6 or a 7, very coarse. After a minute or two the same finger was rubbed along the sandpaper again. This time the rating was a 3 or a 4 softer than the first time. The reason for the rating scale to have lowered was that the finger had adapted to the coarseness of the sandpaper. It still felt the roughness of the paper but it was not as rough the second time. The second experiment was to prepare one cup of sugar water and one with fresh water. Take a sip of the sugar water and swish it around in your mouth for several seconds without swallowing it. Gradually, it should taste less sweet, dispose of the water. Taste the cup containing fresh water. With the sugar water your mouth became adapted to the taste of the sweetness. The second taste of the fresh water was a surprise because your mouth had become adapted to the sugar water and the fresh water was a sudden, different change. The third experiment was fill three medium-sized bowls as follows: bowl 1 with very hot tap water; bowl 2 with very cold tap water; bowl 3...

Words: 481 - Pages: 2

Free Essay

Stg Starting Process

...ANY LEAKAGES AND ATTAND THE SAME IF ANY CHECK THAT OIL IS COMING OUT IN THE DRAIN LINE AS VIEWED FROM THE SIDE GLASS, PROVIDED IN THE DRAIN LINE. 10. CLEAN THE STRAINERS IN THE BFP SUCTION LINE IF DP WAS GREATER THAN 0.5 KG/SQCM BEFORE STARTING THE HP AND LP BFPs. 11. CHECK INTERLOCK AND PROTECTIONS OF BOILER FEED PUMPS IF IT WAS LONG S/D. CHECK SEQUENCE OPERATION. 12. CHARGE ALL BFPs BY OPENING THE SUCTION VALVE VENT UP TO THE DISCHARGE VALVE. 13. CHARGE THE SEALING AND COOLING WATER TO THE BFP GLANDS. ENSURE WATER IN THE RETURN LINE BY VIEWING THRU THE SIGHT GLASS. 14. START BOILER FEED PUMPS AND MAKE UP DRUM LEVEL BOTH HP AND LP DRUM LEVEL. 15. MONITOR THE BEARING TEMPERATURES OF THE BFP BEARING. 16. DRAIN WATER IN CONDENSER HOTWELL AND MAKE WITH FRESH DM WATER UNTIL CHEMIST GIVES CLEARANCE. 17. CHECK THE OIL LEVEL IN THE TRUST BEARING HOUSING OF CEPs AND THE THOROUGHNESS OF THE COOLING WATER CIRCUIT OF THE BEARING HSG. SEE WATER IN THE OUTLET OF THE COOLING CIRCUIT ALSO ENSURE THAT THE SEALING WATER CIRCUIT IS THROUGH WITH ALL THE VALVES...

Words: 1457 - Pages: 6

Free Essay

Investigation Report

...U.S. CHEMIC AL S AFETY AND H AZ ARD INVESTIG ATION BOARD INVESTIGATION REPORT LPG FIRE AT VALERO – MCKEE REFINERY (Four Injured, Total Refinery Evacuation, and Extended Shutdown) Photo: Associated Press VALERO ENERGY CORPORATION SUNRAY, TEXAS FEBRUARY 16, 2007 KEY ISSUES: • FREEZE PROTECTION OF DEAD-LEGS • EMERGENCY ISOLATION OF EQUIPMENT • FIREPROOFING OF SUPPORT STEEL • FIRE PROTECTION FOR HIGH PRESSURE LPG SERVICE • CHLORINE RELEASE REPORT NO. 2007-05-I-TX JULY 2008 Valero - Sunray July 2008 Contents EXECUTIVE SUMMARY ..........................................................................................................................6 1.0 INTRODUCTION .........................................................................................................................10 1.1 1.2 2.0 Background....................................................................................................................... 10 Investigative Process......................................................................................................... 10 VALERO ENERGY CORPORATION.........................................................................................11 2.1 2.2 McKee Refinery................................................................................................................ 11 2.3 3.0 Company History .......................................................................................

Words: 13395 - Pages: 54

Free Essay

The Annular

...University of Western Ontario Department of Chemical and Biochemical Engineering CBE 2221 – Fluid Flow Air Through Annubar Performed: January 20th, 2011 Group members: Ashley Ching, Christopher Chai, Tanuj Dutta Student no: 250523377 Date of submission: February 3rd, 2011 Table of Contents Introduction 3 Theory and Nomenclature 3 Experimental Setup 3 Experimental Procedure 4 Results and Discussion 5 Conclusion and Recommendations 6 Citations and References 6 Appendix A…………………………………………………………………………………………………………..7 Appendix B 10 Introduction The objective of this lab is to calculate the mass flow rates across an annubar by measuring the pressure losses through the straight length of pipe and various fittings at different gas flow rates. The gas used in this experiment is air. The elbow meter was also calibrated and the fanning friction factor across the pipe was calculated. The friction loss due to the velocity head through the straight pipe and other fittings was also calculated. Theory and Nomenclature To measure the gas flow in a pipe, an annubar is used. An annubar is a set of Pitot tubes mounted across a pipe. It measures the differential pressure between the static pressure and the full pressure of the stream. The Pitot tube’s full pressure chamber opening is facing against the stream so that is allows for conical aerodynamics. Applying Bernoulli’s principle and varying the pressure difference calculated...

Words: 3214 - Pages: 13

Free Essay

Permaswage

...circumference. 3. The interference between the fitting and tube produce a leak resistant seal that is structurally sound. 4. This system can be used to produce new tubing systems, or to repair existing ones. 5. Because the system is simple and lightweight, it can be used on or off aircraft. Question: What can you produce using the Permaswage system? Answer: New tubing or repairs to existing tubing. Question: What does the interference between the fitting and tube produce? Answer: Leak resistant seal b. Basic components 1. The Permaswage kit is powered by a hand operated pump. Pump includes pressure gauge, pressure relief knob, hydraulic quick disconnect and pressure relief valve (factory preset @ 10,000 psi +/- 250 psi. 2. Power unit, head assembly and lower die block assembly. These are the components that do the work. 3. Marking tool, deburring tool, inspection gage, chipless cutter with hex key. NOTE: Do a Check on Learning on this Learning Step/Activity Question: Which component produces power to the Permaswage kit? Answer: Hand operated pump. Question: What is the pressure relief valve on the hydraulic hand pump set to?...

Words: 290 - Pages: 2