By:
LCDR Brandan Harris
LCDR Mike Chenowith
LT Joe Furco
LT Charles Scarcello
LT Jon Merritt
LT Chris Harris
LT Ryan Hill
Senior Consultant: LCOL Bryan Hudgens
THIS PAGE INTENTIONALLY LEFT BLANK [Title]
Executive Summary
THIS PAGE INTENTIONALLY LEFT BLANK
TABLE OF CONTENTS
I. INTRODUCTION AND BACKGROUND 8 A. iNTRODUCTION 8 B. Background 8 C. pROJECT oBJECTIVES 9 (1) Determine the financial costs of the relocation of VFA-204 to NAS Lemoore 9 (a) Cost of movement of materiel and personnel 9 (b) Cost, if any, of newly vacant NAS New Orleans spaces 9 (2) Determine the annualized cost savings, if any, of having VFA-204 at NAS Lemoore 9 (a) Savings from co-located adversary support 9 (b) Savings associated with Training and Readiness (T&R) 9 (c) Savings associated with maintenance 9 C. pROJECT Scope 9 D. mEthODOLOGY 10 1. Cost Data 10 a. Personnel 10 b. Materiel 10 2. Savings Data 10 a. Savings from co-location of adversaries with Lemoore squadrons 10 b. Savings associated with Training and Readiness (T&R) 10 c. Savings associated with maintenance 10
II. rESULTS 13 A. Costs 13 B. Savings 13 1. Savings from co-location of adversaries with Lemoore squadrons 13 2. Savings associated with Training and Readiness (T&R) 13 3. Savings associated with maintenance 13
iII. rECOMMENDATIONS AND CONCLUSION 16 A. rECOMMENDATIONS 16