...Explaining a concept: Website migration project Name Course Instructor Date Website Migration Project In this current era, every business is going online, and most of the selling and buying of goods and services is being done n online. That is why Tony chips should also have a website where it can be able to advertize its business and reach many customers. This paper will cover the steps and requirements on how Tony chips will transfer web hosting from an external source to internal as well as how to make their website redundant. In the efforts to build that redundant and scalable website, the key principles of availability, performance, reliability, scalability, manageability and cost require much attention (Matsudaira, 2012). Also, the SDLC must be duly followed as it is the requirement of any system. These are systems planning, system analysis, system design, system implementation, and lastly system support/security (Shelly & Rosenblatt, 2012). System Planning In this phase, the familiarization of the processes involved and objectives of the business must be well highlighted. A formal business plan needs to be in place to show which operations the company will undertake. There is a need to know all participants in the whole migration process and the time when they will you require then in the migration process. As the one of the requirements is that the website needs to be hosting should be internal, it means that a server there is a server requirement. Besides that...
Words: 3258 - Pages: 14
...Website Migration Student’s name Institution Date Website Migration Introduction The process of moving the old Website from an externally hosted solution to an internal one requires a lot to be put in place. There is a need to follow the system development life cycle (SDLS) for it to be successful and have transformational effect on the company’s operation (Klein, S. 2007). If there is redundancy in the site of the company, some measures should be carried out to ensure that it functions well to serve the company’s information needs. There should be a back-up site available as a failover in case the main site goes down. There is also a need for the site to be redesigned to allow customers to order products online. The system development life cycle (SDLS) is involves seven phases or steps that are followed in developing an information system from conception up to disposition. The following is the seven-step phase of developing an information system by a software engineer: 1. Conceptual Planning 2. Planning and Requirements Definition 3. System design 4. Development and Testing 5. Implementation phase 6. Operations and Maintenance phase 7. Operations and Maintenance phase Conceptual Planning This is the first phase in the system development life cycle. In this phase the information system conceptual framework is constructed. This will include the evaluation and assessment of the system to be developed to determine the cost and risks associated with the system...
Words: 3420 - Pages: 14
...Web architecture refers to the structure or the organization of a website. It involves the description of the ways in which different pages relate to each other and also ensures that the information is organized in a predictable and consistent way in every page. In order to build the web architecture, the system analyst should into the company’s business needs, and come up with a clear statement of the goals. As there is an already existing old site running, it is crucial that the analyst understands the business and its technological issues involving the implementation of the project. Since we have an already running Tony’s chips website, it is important to gather the existing functional requirements of the website. The system analyst can get information from the employees of the old company; gather system documentation, production support and also using Fact finding techniques. On gathering this information the system analyst should make a decision on whether to go for a packed solution or develop the software in-house. If we decide to go for in-house development of the website, I recommend that we use; Apache as the web server, JEE as the language to develop the website, Linux as the Operating System and MYSQL for the database of the website. Since MYSQL, Apache and Linux are all open sources the company needs not to worry about their licenses and also by writing the software in Java helps us to deploy the code on any platform and the fact that it is not difficult to find...
Words: 1686 - Pages: 7
...Term Paper: Website Migration Project Term Paper: Website Migration Project Dimitri A. Brydie Professor Jennifer Merritt Systems Analysis and Development December 18, 2013 Tony’s Chips has recently been acquired by a new independent company and the organization leaders have decided to move the current website, which is hosted externally, to an internal host. The company wants the website to be redesigned so that after migration, customers will then be able to make orders online. The company’s leadership would also like to have a disaster recovery solution in place in case the main site goes down. The overall objective of the project is to plan and design a new effective platform to host the website and to efficiently transfer the current website with minimal downtime. In order to accomplish successful migration of the current website, the five phases of the systems development life cycle will be utilized. The five phases are: systems planning, systems analysis, systems design, systems implementation, and finally, systems support and security (Shelly & Rosenblatt 2012). The first phase in the website migration project will be to become familiarized with the business process and identify the objectives of the project. For an IT professional, this may consist of meeting with business leaders and studying the formal business plan to get a feel for the operations of the company. In this case, the company makes potato chips and distributes them. Another objective...
Words: 1977 - Pages: 8
...to move the current website, which is hosted externally, to an internal host. The company wants the website to be redesigned so that after migration, customers will then be able to make orders online. The company’s leadership would also like to have a disaster recovery solution in place in case the main site goes down. The overall objective of the project is to plan and design a new effective platform to host the website and to efficiently transfer the current website with minimal downtime. In order to accomplish successful migration of the current website, the five phases of the systems development life cycle will be utilized. The five phases are: systems planning, systems analysis, systems design, systems implementation, and finally, systems support and security (Shelly & Rosenblatt 2012). The first phase in the website migration project will be to become familiarized with the business process and identify the objectives of the project. For an IT professional, this may consist of meeting with business leaders and studying the formal business plan to get a feel for the operations of the company. In this case, the company makes potato chips and distributes them. Another objective in phase one of the website migration project, is to decide who will be involved and at what point during the project their involvement will be required. One of the purposes of the redesigned website is to give customers the ability to place orders online. Currently the website is hosted externally...
Words: 1950 - Pages: 8
...This type of analysis and investment no matter the size of the company should not only be successful, but should be a seamless and virtually transparent operation. This paper will briefly address some elements of this analysis and proposed expansion upgrade starting with a brief history of what will be named the RDI Photography Company or RDI in future reference. This will be followed by a basic introduction for the consulting company followed by their proposed actions. This will include a brief project description and proposal breakdown of services, plan for merging the existing small networks and preparations for a possible company merger. Also included is possible considerations needed to meet project equipment needs, budget and time constraints, and conclusion. An inclusive plan if completely fleshed out could also incorporate the five process areas and nine knowledge areas of the Project Management Body of Knowledge (PMBOK®), as well as a brief description of the projects risk and risk assessment and the monitoring and control plan. For this paper, this information will not be completely.addressed. Company Information RDI although small, has extensive digital photography experience and manages all their imagery with two small company networks. Recent Department of Defense contract awards have prompted RDI to merge these two networks with the possibility of future expansion to meet the new contract requirements and a possible merger with a larger...
Words: 2609 - Pages: 11
...Benjamin Porter 12/13/13 Benjamin Porter 12/13/13 Abstract Developing and designing an effective in house e-commerce website for Tony’s Chips. Abstract Developing and designing an effective in house e-commerce website for Tony’s Chips. Website MIGRATION PROJECT [Document subtitle] Website MIGRATION PROJECT [Document subtitle] Introduction Tony’s Chips has been acquired by a new independent company. The new company’s intention is to focus on the e-commerce website that they have planned. Currently, the old website is externally hosted and it is required to be moved to an internal one. This new system will store, retrieve, and have data recovery solutions for the company. An additional backup site will need to be created as a failover if the main site goes down. The new and improved site will need to allow customers access to order products online. Project Goal This project has an overall goal of producing a system and website that is in accordance to the demands of Tony’s Chips. The systems architecture will involve all of the systems requirements in its design. The architecture will make use of programs that perform efficiently and properly. Application compatibility is also key to for all of the system components that are going to be used in the system. The project is also aimed at creating a reliable backup and recovery solution for the system. Available system component alternatives The requirements for the system is one that has a system architecture...
Words: 2669 - Pages: 11
...Website Migration Project Chinnasut Nhurod CIS 210 – Systems Analysis and Development Dr. Wesley E. Phillips Strayer University September 15, 2013 Website Migration Project for Tony’s Chips Building the Web Architecture In order to build the web architecture, the system analyst would be required to analyse the business requirements of the organization and then develop a clear statement of goals of the organization. Since, the old site of the company is running it would be vital to understand the technological and business related issues associated with the previous website. Along, with that it should also be determined whether the IT staffs of the company possesses necessary experience and skills essential for the implementation of the project. The company might have to consider additional resources, training programs, and hiring of consultants for the project’s success (Nelson et.al, 2010). The project should be developed on a modular manner so the users can approve and test the various functional elements of the website. Since the Tony’s Chips website was already operating, it would be essential for the developer to gather the existing functional requirements for the website. During the data collection process the system analyst will conduct interviews of the people from the product support department, and they will gather the system documentation using the fact finding techniques (McArdle et.al, 2010). Once all the requirements are fulfilled the next step would...
Words: 3871 - Pages: 16
...Technology Migration 2 3.3.1 Hardware and Software Procurement 2 3.3.2 Systems 2 3.3.3 Development 2 3.3.4 Migration/Roll-out 2 3.3.5 Training 2 4. PROJECT OVERVIEW 2 4.1 Project Description 3 4.2 Goals and Objectives 3 4.3 Project Benefits 3 4.4 Project Constraints 3 4.5 Risk Management 3 4.6 Project Milestones 3 5. STRATEGIC ALIGNMENT 3 6. COST BENEFIT ANALYSIS 3 7. ALTERNATIVE ANALYSIS 3 8. APPROVALS 3 1. EXECUTIVE SUMMARY This business case summaries how we will address the present business, benefits of this project, and justifications and recommendations of the project. It also provides detailed project goals, performance measures, assumptions, constraints, and alternative options. 2.1 Issue Beacon Vale Community Frail Care Centre is a semi-private NGO, which means they are not fully funded by the government and they need further assistance from the public e.g. via donation and fundraising from businesses and the community. Lack of awareness from the public is the biggest constraint that hinders the organization from receiving funding from the public. Improving their website and giving them a presence in social networks is an important step to solve this problem and will contribute to key objectives, to ensure that their clients have a “home away from home” atmosphere and environment as well as to be at peace and content until their final days. 2.2 Anticipated outcomes * Creating a new website and giving...
Words: 1834 - Pages: 8
...Website Migration Project What is information architecture (IA)? Information architecture (IA) refers to the structure or organization of your website. It describes the ways in which the different pages of your site relate to one another and ensures information is organized in a consistent and predictable way on each page. It involves steps such as: 1. assessing existing and needed content, 2. organizing the pages, 3. providing clues to help use the site efficiently, and 4. developing navigational structure The website architect needs to have a solid understanding of usability, in-depth knowledge of web development tools, online marketing technologies, and everything else involved in the construction and maintenance of a website. The following are the general overview of website architecture process: 1: Project Brief- Gathering the needed data from the client and your team can usually take 2 days figuring out the information in the architecture process. Info such as Determine Goals and Expected Outcomes, Brainstorm with the Client, Client Idea Summary, Determine the Target Audience, Determine Competitors, Meet the Decision Makers. 2: Website Goal Definition- The goals define the direction of the entire website production process. 3: Define the Target Audience- This stage involves researching the target audience. We need to identify what types of users will go to the site, and also define the needs of each group. This involves gather characteristics data,...
Words: 1171 - Pages: 5
...Kingfish Datacenter Migration By Reginald L. Cobb PROJ 592 Professor Keith Bluestein Executive Summary/Proposal When an organization decides to migrate to a state-of-the-art data center, it is considered a strategic initiative that, if done correctly, will help the organization in several key areas. The migration will help the enterprise and service providers maintain market leadership, increase business agility, reduce total cost of ownership (TCO), meet regulatory requirement, and position the organization for future growth. The Kingfish Datacenter Migration plan relocation to the Connection Factory converted warehouse will save the organization an estimated fifty thousand dollars annually in lease and indirect cost. The TOC is reduced by timing the migration with a total hardware refresh to more energy efficient servers and appliances. Kingfish will also be virtualizing 50% of the application that now sit on individual servers. This initiative will not only save the datacenter the cost of running an inefficient server but will pass on saving to the customer while providing a robust and scalable environment. Kingfish Datacenter Migration Kingfish Datacenter is a medium size datacenter that is used primarily as a hosting center. The datacenter is primarily oriented toward a client-server which means that the data traffic flows north-south (in and out of the facility). The data center has lost its lease in its current location and will have to move within...
Words: 1361 - Pages: 6
...Term Paper Website Migration CIS University 09/07/15 Tony’s Chips has recently been sold to a new independent company. The new company has hired me to manage a project that will move the old Website from an externally hosted solution to an internal one. The company’s leadership is very concerned about redundancy for their site, insisting that a back-up site be available as a failover in case the main site goes down. Therefore, the site will be redesigned so that customers will be able to place orders through the website and have them delivered as before. The design of the new system will be able to provide more data storage, faster retrieval, better security features and recovery solutions in the event that the website has any problems. With the operational reliability of the existing system, this will make it easier to improve the new system. The first part of the project goal is to discuss what it will take to build the web architecture, then what will have to be done to move the existing Website with minimal downtime, and then provide a disaster recovery plan in the event that the website should crash or stop working. In order to build the architecture, migrate the existing website along with adding the ability for the customers to place orders online and providing for redundancy of the site the system development life cycle (SDLC) will be used. The SDLC consists of five phases that will be utilized in this project and the five phases are systems planning, systems analysis...
Words: 2274 - Pages: 10
...Migration to Australia & Canada -Supriyo Kumar Chacrabarty, CEO, SA Associates. At present, out of five countries of most happy, affluent & economically solvent country around the world, Australia & Canada are main two. Because, comparing to the area of the country, the most feature of these two countries are less population, state guarantee of providing highest citizen facility, high salary, ensured of leading luxurious life, facility of letting the children's of international quality of high education. Sometimes these countries are told the country of ''Migration''. And yes, really this is. For, considering High Skilled Professionals of around the world are brought here by giving them Citizenship under the migration program run by government. For this, no longer time of a country is taken to touch the highest of development for out of total number of population 94% are highly educated, conscious citizen and hard worker. Political stableness is also a main cause of this improvement. However, many weight-less advertisements are visible about the migration of Australia & Canada, and heard of many saying that these all least do not see the light of goal. The main cause behind this belief is Negative Result that made after 2-3 years long waiting & investing a huge number of money. This may, of course, take a longer time, but if the causes of being negative result are discussed, then answers will be got of some imperceptible information about Australia & Canada migration. At present...
Words: 1202 - Pages: 5
...it needs to be replaced or enhanced to fit new and changing needs. There are very less things that are sustainable to change. Software Applications are no different. As time progresses, as new technology arrives, new ways of doing things become the “norm”, things that were developed years ago start to age, appear old and tacky and calls for migration to the new system. However migration is not always easy, not always necessary. Biting the bullet of migration is also a challenging task and there are certain things that need to be carefully determined before we jump in migration. Still reading? Lets take a look at what things we should consider before jumping to migration. Current System Life of a software as it is As we just discussed, software application have an expiry date and though they are kind of working and get some work done, they tend to be replaced with a newer better version of it, specially when new technology comes often. Applications that are end user exposed example, website, mobile and desktop apps tend to expire more early then those backend applications, just because as new user experience techniques comes in to market, the old and not upgraded systems look outdated and are prone to loose business and are not appealing to the user. So how do we determine if an application is aged and needs to be replaced? Here are the hints ...
Words: 2269 - Pages: 10
...Technical Writing Project Cover Sheet Capstone Project Name: | Managed Service Provider Migration | Student Name: | xxxxxxx | Degree Program: | Bachelor of Science IT, Network Emphasis | Student Mentor Name: | xxxxxxxx | Table of Contents Capstone Introduction 1 Review of Other Work 3 Project Rationale 8 Systems Analysis and Methodology 10 Goals and Objectives 14 Project Deliverables 16 Project Plan and Timelines 21 Project Development 22 Accomplishments 26 Conclusion 26 References 28 Appendix: 29 Capstone Introduction With the rising costs of running a business and the goals to increase profits, organizations are constantly looking at ways to reduce operating expenses. In the technology realm of an organization, reduction of costs can be achieved by streamlining processes and automation. Another option that can be explored within organizations to reduce costs is the outsourcing of their technology departments to a manage service provider. Organizations are looking into options to utilize technology to reduce costs by migrating their technology to a 3rd party to managed their infrastructure. Concordia is mid-sized bank based out of California that has a wide area network consisting of 125 branch offices spread out through California and the surrounding states. Concordia has implemented a project to get out of the information technology area so that they can focus on their core principles of the banking industry. Concordia preferred to...
Words: 8397 - Pages: 34