Performance Measurement and Control Approach

In order to monitor the progress of the project, we will be using tracking reports to determine the schedule performance and the earned value of the project. Using this information we can determine the cost that will be directly related to our budget broken down by each specific task. We will be able to determine which task is delayed and take appropriate measures to have it come back up to speed and on schedule. We will use the Gantt Tracking Chart to distinguish the critical path of the project and focus on tasks that will require the most attention.
The quality of the project will be measured by the Project Manager, Ndate Loeschke, and our client, Baker and Woods. There will be inspections and walk-throughs conducted by Ndate and our clients to approve the work and the completion of tasks. The client will be inspecting and doing a walk-through of the building while the construction is taking place, after the construction, and then the final inspection will be at the completion of the project. Any concerns the client has during their three inspections will be brought to the project manager’s attention and changes will be conducted through the project lead, Jazz Arken. We are committed to providing quality work that fits their standards of a professional architecture design and décor to please our clients and provide them a comfortable work place. With Ndate’s vast experience of being a project manager and building strong communication with the client and her team, as well as Jazz’s previous experience with architectural design and décor, we are assured that this team is well qualified to measure the quality of the project for the duration of the project to the likings of our client.
Audit Process and Timetable - Unscheduled Audits
The review committee will be conducting surprise audits of both project cost and

Similar Documents

Premium Essay

Project Management Pm 598 Week 6

...PROJ 598 Professor Samuels Answers to Questions in the ZAP Scenario 1. Understanding and Assumptions: Since John is not in the position anymore to explain what happened during the negotiation and contract signing, the following scenarios are assumed: a) The memo signed by John that Bear Construction Company indicating that ZAP is responsible for all permits and inspections had transpired during the negotiation portion, and prior to the finalizing and signing of the contract for this project. b) The fact that it happened prior to signing the contract is deduced from what the building manager, Iris said during the project team meeting. c) It is implied that during the finalization stage of the contract, the agreements probably changed thus the condition in the memo no longer holds as it did prior to this. Thus, as it was approved in the contract, it is Bear Construction’s responsibility to get all of the inspections and permits necessary to complete the job/project. Analysis Based on the assumptions stated above, it could be noted to be correct that ZAP Pharmaceutical Company to point out that it is Bear Construction’s role to speak with local township, and obtain all of the required inspections and secure all of the needed permits, as documented, agreed to, and signed for in the contract between the two parties. If the memo was to be considered as an amendment to the final contract, then that should have been noted in the memo originally as such, and have...

Words: 948 - Pages: 4

Premium Essay

Lokilloki

...Version 6 Project Management Puerto Rico Campus - Guaynabo Copyright © 2009, 2008, 2006, 2004 by University of Phoenix. All rights reserved. Course Description This course examines project management roles and environments, the project life cycle, and various techniques of work planning, control, and evaluation for project success. Policies Faculty and students/learners will be held responsible for understanding and adhering to all policies contained within the following two documents: • University policies: You must be logged into the student website to view this document. • Instructor policies: This document is posted in the Course Materials forum. University policies are subject to change. Be sure to read the policies at the beginning of each class. Policies may be slightly different depending on the modality in which you attend class. If you have recently changed modalities, read the policies governing your current class modality. Course Materials Kerzner, H. (2006). Project management: A systems approach to planning, scheduling, and controlling (9th ed.). Hoboken, NJ: Wiley. Meredith, J. R. & Mantel, S. J. (2006). Project management: A managerial approach (6th ed.). Hoboken, NJ: Wiley. All electronic materials are available on the student website. Microsoft® Project® 2007 (Virtual Desktop) Week One: Project Definition Details Due Points Objectives 1.1 Determine the importance of project management in the...

Words: 3035 - Pages: 13

Premium Essay

Week 1

...MGMT- 404 PROJECT MANAGEMENT STATEMENT OF PARTICIPation This document will contain the information needed for your team operations, guidelines and commitment. It should be kept in doc sharing and each update should have a version control identifier (e.g., Team A SOP v1, v2, v3, etc.). IMPORTANT NOTE: The statement of participation must be posted in the team’s doc sharing area and the final submission must be available for the team to review and approve each week. Approval can be achieved by downloading the document. If you have disagreements, it is critical to contact your project leader and get a correction posted immediately. The professor should be notified of any disagreements. If the statement of participation is not submitted, the entire team will receive the same grade (including any point loss from other team members). I. Team Information PROJECT NAME: | MEMBER NAME | # | PHONE # | | EMAIL | | MEETING AVAILABILITY | Jade Xiong | 1 | | | | | Monday at 5 / email/ phone | Raquel Godoy | 2 | | | | | Monday at 5/ email/ phone | Genaro Zavala | 3 | | | | | Monday at 5/ email /phone | | 4 | | | | | | | 5 | | | | | | | 6 | | | | | | II. Weekly meeting schedule The most successful teams schedule at least (2) meetings a week throughout the course. Scheduling standing meetings allows everyone to schedule this time in advance and coordinate other activities around the scheduled meeting times. Meetings can change...

Words: 1698 - Pages: 7

Premium Essay

Project Management-for This Project, You May

...Project management-For this project, you may Click Link Below To Buy: http://hwcampus.com/shop/project-management-for-this-project-you-may/ Project management-For this project, you may For this project, you may choose one that is of interest to you, or you may choose to begin planning for your senior project. When selecting a project, avoid picking one that is either too big or too small. For example, do not decide to build a new stadium for your local sports team (too big) or to plant your summer garden (too small). Here are some successful past project ideas. • The opening of a coffee shop • A charity event for a local social service agency • A meditation pool and platform in the center of town • A redevelopment of a local playground • Design and installation of a computer network for a small business • Software development project A project to build a house or create a website is NOT acceptable. You are not limited to the list of projects above. Please refer all questions concerning what is acceptable as a class project to your instructor. Milestones: • Due Week 1: Project Outline Proposal/Approval • Due Week 2: Project Charter • Due Week 3: Scope Statement • Due Week 4: Work Breakdown Structure/Gantt Chart • Due Week 5: Risk Management Plan • Due Week 6: Project Schedule and Budget • Due Week 7: Communication Plan • Due Week 8: Final Project Package Week 1 Back to Top Due Week 1: Project Outline Proposal/Approval To begin Week 1, all...

Words: 1512 - Pages: 7

Premium Essay

Drew

...Syllabus NT2799 Network Systems Administration Capstone Project SYLLABUS Credit hours: 4.5 Contact hours: 56 (34 Theory, 22 Lab) Prerequisite(s): Completion of a minimum of 72 credits earned in the program of study including NT2640 IP Networking or equivalent. © ITT Educational Services, Inc. All Rights Reserved. -1- 13/01/2013 Network Systems Administration Capstone Project SYLLABUS COURSE SUMMARY COURSE DESCRIPTION This course provides an opportunity for students to work on a comprehensive project that includes the design, planning and implementation of a network solution for solving specific business problems. Common project management processes are applied to identify deliverables and outcomes of the project. MAJOR INSTRUCTIONAL AREAS 1. Project Management Techniques 2. A Fundamental Review of the Basics of Electronics in the AASNSA Program 3. Capstone Project 4. Research of Current and Emerging Technology COURSE OBJECTIVES 1. Apply important concepts of project management to the actual capstone project proposed for this course. 2. Use Microsoft Office Project to help plan and manage the actual capstone project. 3. Analyze the requirements for the capstone project. 4. Integrate and apply the knowledge acquired in the program to provide effective technological solutions for given problems. 5. Work in teams on a large-scope project. 6. Document solutions to a problem in detail by applying...

Words: 7871 - Pages: 32

Premium Essay

Nomad

...cmgt 410 PROJECT PLANNING & IMPLEMENTATION [pic] CONTRIBUTORS THE UNIVERSITY GRATEFULLY ACKNOWLEDGES THE CONTRIBUTION OF THE FOLLOWING PROFESSIONALS TO THE COMPLETION OF THIS COURSE. 1. Stephen Northam, MA, Faculty Member, University of Phoenix. 2. Kenneth Sardoni, MCIS, Faculty Member, University of Phoenix. 3. Blair Smith, MBA, Associate Dean, College of Information Systems and Technology. 4. Claudia Avila, BSBA, Curriculum Development Manager, College of Information Systems and Technology. 5. Adam Honea, Ph.D., Dean, College of Information Systems and Technology. Copyright ( 2001 by the University of Phoenix. All rights reserved. The University of Phoenix® and UniModuleTM are marks of Apollo Group, Inc. in the United States and/or other countries. Edited in accordance with University of PhoenixSM editorial standards and practices. (Template U1.0) Overview COURSE DESCRIPTION This course provides the foundation for understanding the broad concepts of successful planning, organization, and implementation within the realm of information technology. This course uses real-world examples and identifies common mistakes and pitfalls in project management. Topics covered include project scoping, estimating, budgeting, scheduling, tracking and controlling. TOPICS AND OBJECTIVES Project Management and the Organization • Define Project Life Cycle. • Identify roles in project management. • Identify project manager's skills. • Demonstrate...

Words: 3448 - Pages: 14

Premium Essay

Syllabus

... COURSE TITLE: Project and Change Management COURSE NUMBER: IST 7060 TEXT BOOK: Project Management, the Managerial Process. 6thEdition. Author Erik W. Larson & Clifford F. Gray OFFICE HOURS/METHOD OF CONTACT: I do not have an office on campus but can be reached in the evening using blackboard. I also respond to e-mails within 24 hours of receiving them. My e-mail address is: debra.x.gordon@wilmu.edu PREREQUISITE: IST 7000, IST 7020, and IST 7040 1. COURSE DESCRIPTION This course focuses on managing projects within an organizational context, including the processes related to initiating, planning, executing, controlling, reporting, and closing a project. Project integration, scope, time, cost, quality control, and risk management are also explored. Other areas covered in the course are: managing the changes in organizations resulting from the introduction or revision of information systems, identifying project champions, working with user teams, training, documentation, and the change management role of the IS specialist. 2. RATIONALE This course integrates two major related topics, project and change management. As projects evolve and implementation strategies are developed, the role of change management becomes critically important...

Words: 1358 - Pages: 6

Premium Essay

Bus 519 Week 1 Bus519 Week 1

... http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2421 - Pages: 10

Premium Essay

Bus 519 Week 5 Bus519 Week 5

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Week 11 Bus519 Week 11

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Complete Course Bus519 Complete Course

... http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2421 - Pages: 10

Premium Essay

Bus 519 Week 4 Bus519 Week 4

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Week 7 Bus519 Week 7

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Week 8 Bus519 Week 8

...Answer: http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2422 - Pages: 10

Premium Essay

Bus 519 Week 2 Bus519 Week 2

... http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 http://workbank247.com/q/bus-519-complete-course-bus519-complete-course/22300 BUS 519 Week 1 Discussion "What is Risk?"  Please respond to the following: * There are three (3) schools of thought regarding risk. The first considers the positive and negative aspects of risk, but sees them as separate. The second group believes that there are benefits from treating threats and opportunities together, while the third school does not label uncertainties, but addresses uncertainty as part of “doing the job.” Argue the value of having a risk strategy despite the cost associated with it. Include an example to support your response. Provide a rationale for your selection and determine how this approach helps a project to be successful. BUS 519 Week 2 Discussion "Need for Risk Management" Please respond to the following: * There are four (4) critical success factors that are important for effective risk management: supportive organization; competent people; appropriate methods, tools and techniques; and simple, scalable process. Determine three (3) obstacles for an organization to manage risk effectively. Suggest strategies from the perspective of a project manager to avoid the obstacles. BUS 519 Week 3 Discussion "Project Initiation" Please respond to the following: * Using the “Stakeholder Analysis Template” (Appendix B2 in the Hillson and Simon text) for a company that you currently work...

Words: 2421 - Pages: 10