San Diego 8/9/14 – Saturday * Pick up rental car at Firefly (Driver: Duo Ning, reservation under Siting Feng) * Drive to hotel * Wyndham Garden San Diego 3737 Sports Arena Blvd * SeaWorld * Balboa Park 8/10/14 – Sunday * San Diego Zoo Safari Park San Diego – Anaheim – Los Angeles 8/11/14 – Monday * Check out hotel * Beach: La Jolla cove / Torrey Pines State Beach (on the way to Anaheim) * Drive to Anaheim * Check-in at hotel * Anaheim Portofino
Words: 3868 - Pages: 16
Argument Mapping Jessica Moody PAD 520 04/25/2016 Professor Dr. Thomas Create an argument map based on the influence diagram presented in Include in the map as many warrants, backings, objections, and rebuttals as possible. Claim: “The U.S. should return to the 55- mph speed limit in order to conserve fuel and save lives” Information: Experts say reducing highway speeds from 70 mph to 60 mph would reduce gasoline consumption between 2% and 3%. That could translate into a price reduction
Words: 1331 - Pages: 6
Part 1: Recognize & understand how time spent 30-min Diary Day 1: Saturday Time | Spent | Mood | Leisure | 9:30 AM | Woke up | Tired | - | 10:00 AM | Had a conversation with my boyfriend about dreams and what’s happening for the rest of the day. | Null | Yes | 10:30 AM | I got dressed, and discussed what to make for breakfast and had my coffee. | Null | No | 11:00 AM | Made two sausage English muffins. | Null | No | 11:30 AM | Brushed my teeth and got ready to go to work | A little
Words: 1413 - Pages: 6
over 12 hours. Trucks arrive evenly spaced over 12 hours. Each truck carries 75 BBLs Downstream processing begins at the same time as dumping (7 a.m.). Capacity Dumping = = [pic] = 2250 BBL/Hour Destoning = 3x 1,500 BBL/Hour = 4500 BBL/Hour Dechaffing (dry) = 2x1,500 BBL/Hour = 3,000 BBL/Hour Dechaffing (wet) =1x1,500 BBL/hour = 1,500 BBL/Hour Drying = 3x200 BBL/Hour = 600 BBL/Hour Separating = 3x400 BBL/Hour = 1200
Words: 1018 - Pages: 5
full-time employ- ees. Some number, F1, of them will work one hour of overtime between 5 PM and 6 PM each day and some number, F2, of the full- time employees will work overtime between 6 PM and 7 PM. There will be seven sets of part-time employees who begin their work day at hour j=j␣1,2,...,7,withP1beingthenumberofworkers beginning at 9 AM, P2 at 10 AM, . . . , P7 at 3 PM. Note that because part-time employees must work a minimum of four hours, none can start after 3 PM because the entire operation ends
Words: 993 - Pages: 4
Managing Change For 24 Hour Fitness By: Team C – Five Guys MGT/426 October 31, 2013 Instructor Kathleen Kemmer Managing Change For 24 Hour Fitness Change is important in today’s world of business because it is fast-moving environment looking for a pace of change to slow more likely to be sorely disappointed. Without change, organizations would likely lose competitive edge and fail to meet the needs of what most optimism to be a growing base of loyal customers
Words: 7081 - Pages: 29
LEARNING TEAM CHARTER – TEAM “D” |Course Title |BIS/220 | | | | | | | | | | | Team Members/Contact Information |Name
Words: 689 - Pages: 3
over duration of time. Usually the total distance covered divided by the total time. Instantaneous speed is the speed given at that instant within that span of time, measured with a real time speedometer. 4. The average speed in kilometers per hour for a horse that gallops a distance of 15 km in a time of 30 min is: Average speed = 15 km/30 min = 15 km/0.5 h = 30 km/h 5. Speed is the distance covered per unit of time. Acceleration is the rate in which an object changes its velocity.
Words: 495 - Pages: 2
About a week ago after driving my Mini Cooper for a short distance the EML light in the car would come on and the car would hesitate. The car then would loose pressure dropping the speed from normal speed limit to no more than 5 – 10 mph. After parking the car, I noticed that the fan would come on and remain on for an extended period. When I lifted the hood of the car, I noticed that the coolant supply would be low. Replacing the coolant supply did not seem to fix the problem. I attempted to figure
Words: 297 - Pages: 2
from muzzle (wind resistance and gravity). Volume for water = ((3.1417 * Radius^2) *Depth) * 7.47 = gallons *8.35lb = weight 97,001,173.49175lb’s E=10^(1.5(9)+4.8) = 10^(18.3) = 1.995262315x10^18jouls 1515.428229m/second .941643154 miles per hour 5500 miles My bullet goes 930 meters per second. The power is astronomically higher then that of the locomotive. The height of the building I chose is 827 meters which is a lot larger then 10 meters however when you compare it to the 15 mile dept
Words: 342 - Pages: 2