1. Abstract The assignment will be exploring some design approaches on environmentally friendly buildings and to define what is mean by the term “sustainable architecture”? Green architecture is a sustainable method of green building design: it is design and construction with the environment in mind. Green architects generally work with the key concepts of creating an energy efficient, environmentally friendly house. The environmentally friendly building materials and construction methods will
Words: 1577 - Pages: 7
ATA/SE-DIP/TS-11/V1.34 Master of Technology in Software /Knowledge Engineering and Enterprise Business Analytics Table of Contents. MTECH ADVANCED ELECTIVES 1. INTRODUCTION. 1.1 Overview. 1.2 Courses. 1.3 Assessment. 1.4 Elective Selection Process. 2 2 2 2 3 3 2. SCHEDULE FOR ADVANCED ELECTIVES OFFERED DURING SEMESTER II 2014/2015. 2.1 MTech SE and KE Students. 2.2 MTech EBAC Students. 5 5 9 3. CURRICULUM. 12 4. DESCRIPTION OF COURSES. 4.1 Department of Electrical & Computer
Words: 15607 - Pages: 63
Service Request SR-rm-022, Part 2 Robert Townsend BSA/375 September 14, 2015 CHRISTOPHER CANTER Service Request SR-rm-022, Part 2 This paper will detail the application architecture and process design for service request SR-rm-022. I will explore the system’s architecture by discussing the data, processes, interfaces, and network. I will describe the security controls put in place for the proposed HR system. And finally I will present some flow charts and data flow diagrams. This system
Words: 471 - Pages: 2
ENVIRONMENTAL ENGINEERING II 010 . ENVIRONMENTAL ENGINEERING II 010 . ENVIRONMENTAL ENGINEERING II 020 . DAMS AND HYDRAULIC STRUCTURE 020 . DAMS AND HYDRAULIC STRUCTURE 020 . DAMS AND HYDRAULIC STRUCTURE 030 . STRUCTURAL DESIGN III 030 . STRUCTURAL DESIGN III 030 . STRUCTURAL DESIGN III 04B . SYSTEMS APPROACH IN CIVIL ENGG 04B . SYSTEMS APPROACH IN CIVIL ENGG 05E . ADVANCED CONCRETE TECHNOLOGY FIRST TERM TOTAL = B80130002 424/750. SUNITA PP TW OR PP TW OR PP TW OR PP TW PP 100 25 50 100 25 50 100 25
Words: 138108 - Pages: 553
in | United States - English | Preferences Expand MSDN A Comparison of the Top Four Enterprise-Architecture Methodologies Roger Sessions ObjectWatch, Inc. May 2007 Applies to: Enterprise Architecture Summary: Twenty years ago, a new field was born that soon came to be known as enterprise architecture. This paper covers a broad introduction to the field of enterprise architecture. Although the history of the field goes back 20 years, the field is still evolving—and rapidly so
Words: 14988 - Pages: 60
SCHEME OF EXAMINATION FOR MASTER OF COMPUTER APPLICATIONS (MCA) (SIX-SEMESTER Programme) |Semester – I | |Paper |Title of the Paper |Duration |Maximum Marks |Total | |No. | |Of Exam | | | |
Words: 13848 - Pages: 56
Research on Mobile Location Service Design Based on Android Xianhua Shu, Zhenjun Du, Rong Chen School of Information Science and Technology Dalian Maritime University Dalian, China xiansimba@163.com Abstract—Android platform is a new generation of smart mobile phone platform launched by Google. Android provides the support of mobile map and location service, which is probably a concern of vast numbers of developers. So far, the development of mobile map and location applications is complex and
Words: 2601 - Pages: 11
planning, detailed material and resource planning, and execution, such as production control and purchasing. Master planning is the executive level function that sets the operational business plan, supports the sales and operations planning (S&OP) process. Detailed material planning (Material Requirements Planning or MRP) uses bill of material and inventory information to develop a complete manufacturing and purchasing plan for all products, assemblies, components and materials. At this level capacity
Words: 2606 - Pages: 11
real time applications, strenuousness in effort in building software for reusing, new kind of system development in including off-the-shelf software components (COTS) and spending as much effort on designing and managing the software development process as was once spent creating the software product. This advanced version at present time is known as COCOMO II. The work for COCOMO II has been supported financially and technically by the COCOMO II Program Affiliates: Aerospace, Air Force Cost Analysis
Words: 1820 - Pages: 8
Request Riordan Manufacturing", 2011). Butner Consulting will be responsible for defining the business requirements for the development of the HR system to support the objective of this request. Butner consulting will create a detailed system design and project implementation plan required to complete this project. This project is expected to be completed within six months so the new system can be utilized in the second quarter of next year ("Service Request Riordan Manufacturing", 2011). Stakeholders
Words: 3201 - Pages: 13