Business Continuity Plan

Page 36 of 50 - About 500 Essays
  • Premium Essay

    Appendix D

    Disaster Recovery Plan Student Name: Dustin Weese University of Phoenix IT/244 Intro to IT Security Instructor’s Name: KEVIN SWINSON Date: 10/18/2015 Disaster Recovery Plan Due in Week Three: For your selected scenario, describe the key elements of the Disaster Recovery Plan to be used in case of a disaster and the plan for testing the DRP. 1 Risk Assessment 1 Critical business processes List the mission-critical business systems and services

    Words: 773 - Pages: 4

  • Free Essay

    Network Design

    connect to the internet with a T-3 connection. T-3 lines are a combination of 28 T-1 circuits and produce 44.736 Mbps of total bandwidth for the network. T-3 lines are commonly used for building a business network at one centralized location. Although T-3 line is costly, it is required for a large business network because of the speed and the amount of bandwidth it provides (Mitchell, n.d.). For location 2 and 3 to operate on the same network, VPN is a viable option. It provides an enhanced level

    Words: 900 - Pages: 4

  • Premium Essay

    Management

    1. Overview The Business Impact Analysis presented here was developed on March 18, 2012. It is developed as a part of Omega Research’s contingency Planning process. The report here will analyze different aspects related to Omega business processes. The report will analyze the business processes carried in the organization, requirements of data and resources and priority related to them. 1.1 Purpose BIS aims for identification and prioritization of components of system by correlating system’s

    Words: 1531 - Pages: 7

  • Free Essay

    Disaster Recovery Sites

    Title Name Institution 1) With respect to disaster recovery - describe the difference between hot, warm, and cold recovery sites. Cold recovery sites This is an appropriately configured room or space in a building with no server-related equipment pre-installed. It provides power, cooling and office which is used in case of an outage or disaster in the main work site. The staff moves to this site when a disaster is declared. It does not include any backed up copies of the data and information

    Words: 693 - Pages: 3

  • Premium Essay

    The Disaster Recovery Plan

    Disaster Recovery Plan Student Name: Enter Your Name Here UNIVERSITY OF PHOENIX IT/244 INTRO TO IT SECURITY Instructor’s Name: Enter Your Instructor's Name Here Date: Enter the date here 1. Disaster Recovery Plan Due in Week Three: For your selected scenario, describe the key elements of the Disaster Recovery Plan to be used in case of a disaster and the plan for testing the DRP. 1.1. Risk Assessment 1.1.1. Critical business processes List the mission-critical business systems and services

    Words: 860 - Pages: 4

  • Free Essay

    Disaster Recovery Template

    Section 6. Disaster recovery procedures For any disaster recovery plan, the following three elements should be addressed. Emergency Response Procedures To document the appropriate emergency response to a fire, natural disaster, or any other activity in order to protect lives and limit damage. Backup Operations Procedures To ensure that essential data processing operational tasks can be conducted after the disruption. Recovery Actions Procedures To facilitate the rapid restoration of a data

    Words: 495 - Pages: 2

  • Free Essay

    Disaster Recovery

    from the site for safekeeping and disaster recovery purposes. RTO - The recovery time objective (RTO) is the targeted duration of time and a service level within which a business process must be restored after a disaster (or disruption) in order to avoid unacceptable consequences associated with a break in business continuity.[1] It can include the time for trying to fix the problem without a recovery, the recovery itself, testing, and the communication to the users. Decision time for users representative

    Words: 369 - Pages: 2

  • Free Essay

    Back Up Plan

    Project Part 4 Design a Backup plan First World Bank Savings and Loans IT task team will be responsible for designing a backup plan for all servers on First world banks network. All servers on the network, owned by First World Bank, will be backed up each day at 2:30 am. There will be a designated on site server, and also an off site server. This better protects the data, by storing a backup configuration on site and off site as part of the disaster recovery plan. A third party will be used

    Words: 351 - Pages: 2

  • Premium Essay

    Checklist

    There are many areas and elements of information systems (IS) audit. Based on the scope of the assignment, the annual audit plan and other factors, the IS auditor may undertake the review of a specific area. (Refer to the "IT Audit Basics" column in Journal, volume 1, 2002, for the elements of IS audit.) Auditing General Controls A general controls review attempts to gain an overall impression of the controls that are present in the environment surrounding the information systems. These include

    Words: 1756 - Pages: 8

  • Free Essay

    4. as a Part of a Business Continuity Plan, Many Businesses Identify Cold Sites or Hot Sites to Which They Can Move to Carry on Their Business Activities. What About a Hospital Like Roger Williams? What If It Suffered a

    Khristle Joy Hutalla BSBA 2301 Questions 1. In the case study, we referred to the systems being developed and used as decision support systems. However, we also identified various artificial intelligence (AI) technologies. How can a decision support system incorporate and use AI technologies such as pattern recognition? - Artificial Intelligence (AI) tools and techniques can aid in the diagnosis of disease states and assessment of treatment outcomes, so AI can be used by a decision support

    Words: 716 - Pages: 3

Page   1 33 34 35 36 37 38 39 40 50