Kamazon Company Network System Upgrade This bid is for the Kamazon Company network upgrade. I have included in the network upgrade bid the total labor and equipment costs, the IP revision for all 7 company departments, and layout of cabling for the network upgrade. Kamazon is in need of a serious upgrade from its old network to one that is up to date with all new equipment to keep its competitive edge in retail sales market. By updating all the associated networking hardware in the company’s area
Words: 844 - Pages: 4
Conclusion…………………………………………………………………………………………………………………………………………….35 References 37 Appendix 1: Competency Matrix 38 Appendix 2: Cisco ASA 5555-X Firewall Specifications…………………………………………………………….40 Appendix 3: ABC Inc. Project Schedule…………………………………………………………………………………….44 Appendix 4: High-Availability Design Screenshots……………………………………………………………………45 Appendix 5: Screenshots of inside to outside access; outside to DMZ access; NAT rules and configurations; and performance graphs and performance results….......................................
Words: 9337 - Pages: 38
Acme Manufacturing Network Plan Ann Johnson IT/242 October 23, 2011 David Edwards Acme Manufacturing Network Plan Acme Manufacturing needs a new network plan implemented for corporate, three distribution centers in Chicago, Phoenix, and New York, and is expecting to expand with a new facility in China. A successful network design provides future growth within the organization. Meetings are scheduled weekly in the main Atlanta Headquarters conference room with the facilities from Phoenix
Words: 1193 - Pages: 5
headquarters means it probably was the first to get any kind of upgrade were as the remote sites in china and Georgia would get overlooked. The back bone of the network is a pretty standard 10BASET Ethernet connecting 35 Dell OptiPlex PC’s through two cisco 24 port 2950 switches. The Pc’s are running windows 2K with only 2.6 GHz processors so the switching power of 10/100 suites the network’s
Words: 2038 - Pages: 9
DesignIT Network Proposal Strayer University CIS 105 DesignIT Network Proposal Executive Summary DesignIT started as a graphics art company that contracted their work until now. The company has since grown into a popular graphic arts company. The kind of growth that DesignIT has experienced in the short time they have been in business has created a need for operational expansion. DesignIT’s rapid growth through the graphic arts industry allowed DesignIT the ability
Words: 1237 - Pages: 5
Operating and Configuring a Cisco IOS Device Lab Assignment SwitchAA> SwitchAA>? Exec commands: access-enable Create a temporary Access-List entry clear Reset functions connect Open a terminal connection crypto Encryption related commands. disable Turn off privileged commands disconnect Disconnect an existing network connection enable Turn on privileged commands exit Exit from the EXEC help
Words: 1231 - Pages: 5
WWTC Project Implementation Schedule | Dates | Project Milestones | 15 Oct 13 | Purchase Equipment | 15 Oct 13 | Purchase Software | 20 Oct 13 | Installation of leased lines between buildings | 31 Oct 13 | Bench test of network design completed | 01 - 02 Nov 13 | Network Administrators receive necessary training for new systems | 05 – 06 Nov 13 | End users trained on new system | 01 – 15 Nov 13 | All cabling and equipment installation complete | 16 Nov 13 | Phased approach to implementation
Words: 6657 - Pages: 27
WIRELESS LOCAL AREA NETWORK: SECURITY ISSUES AND COUNTERMEASURES IN ORGANISATION Nor Rasyidah Binti Haminudin2011634444M. Sc. (Information Technology)Faculty Of Computer And Mathematical SciencesUniversity Technology MARA, Malaysianorrasyidah.haminudin@gmail.com | | | ABSTRACT Every organisation today is looking to implement Wireless Local Area Network (WLAN) infrastructure to improve its communication capabilities by providing access anywhere for employees, and more importantly, convenient
Words: 3541 - Pages: 15
Lab Unit 4 4-1 Task 1 CDP only shows information about directly connected Cisco devices. Task 2 Clock rate is set to 56000, interface Serial0 The no shutdown command brings up the interface. Task 3 two Serial0 and FastEthernet 0 Task 4 Switch, Fas 0/2 | Fas 0 | 148 | TS | WS-C2950-1 | BHM, Ser 0/1 | Ser 0 | 178 | R | 2621 | 4-2 Task 1 56000, Serial0 Task 2 GAD FastEthernet 0 | Administratively down | Down | Serial 0 | Administratively down | Down | Task 3 GAD(config)#interface
Words: 1696 - Pages: 7
NT2580-M1 Introduction to Information Security Unit 1: Information Systems Security Fundamentals 2015-Summer, 6/20/2015, Saturday (9:00am – 1:30pm) Student Name ___________________________________ Lesson Plan Theory (in class, Lab #2)……………………………..…………………..……...2 Reading Kim and Solomon, Chapter 1: Information Systems Security. Objectives……………..………………….……………………………….2 Student Assignments for this Unit Unit 1 Lab Perform Reconnaissance & Probing Using ZenMap GUI (Nmap) Lab #1: Performing