Course Project Part 2 Theme Park December 10, 2012 Mr. Billy Bob AAA Theme Parks 2222 Theme Park Expressway Theme Park Tower Theme Park, Texas Via Email: Billybob@themepark.com Re: Proposal for JJJ Theme Park Executive Summary We have prepared the following proposal for a new turnkey theme park for the AAA THEME PARKS newest addition in the Theme Park area as requested and detailed in your RFP. We appreciate this opportunity to be of service to AAA THEME PARKS, and we
Words: 662 - Pages: 3
Design and Construction of an Army Reserve Center Proposal Project name: Design and Construct a 150-member Army Reserve Center (ARC) in Rockford, Illinois. Primary facilities consist of three buildings: 1. Training Building of approximately 31,239 SF; 2. Organizational Maintenance Shop (OMS) of approximately 5,294 SF; and 3. Unheated Storage (UHS) of approximately 1,520 SF. All buildings are located in Winnebago County, IL. Solicitation Number: W912QR-12-R-0025 Agency: Department of the
Words: 3635 - Pages: 15
1.1 Introduction Industrialized Building System (IBS) is the phrase used by the industry and government in Malaysia which stand for the adoption of construction industry and the use of prefabrication of components in building construction. IBS is defined as a construction technique in which components are manufactured in a controlled environment (on or off site), transported, positioned and assembled into a structure with minimal additional site work [1-4]. It
Words: 3028 - Pages: 13
Running Head: PROJECT PROGESS REPORT 1 Project Progress Report The City of Charming – Ocean View Resort Project Magenta Construction, Inc. November 29, 2012 Courtney Bocage, Lyndsie DeVito, Keayan Emory, Kelli Keith, Atsoh Nyindem Project Progress 2 Change History Date changed October 2, 2012 October 3, 2012 Change details Added the Responsibility Matrix Increased the City of Charming’s budget from $25M to $100M Increased the number of parking spaces from 600 to 800 Added the
Words: 11446 - Pages: 46
design changes (Bennett and Flanagan, 1983). Variation can be known as change order that often happen during construction phase. (Turner, 1990) Lack of tender/contract information or error of it will cause the variation. The design team may have to modify the contract information when the issue of variations arising principally. After change the project scope or specification, the construction costs will increase and the profits also have to justify increasing. The controllable variation is one of the
Words: 268 - Pages: 2
FORMS OF PROJECT DELIVERY 1 INTRODUCTION 1.1 BACKGROUND .1 In the building industry today, conventional methods of project delivery are being challenged by Clients, Consultants and Contractors alike, in an attempt to save time, reduce costs, avoid litigation, minimize conflict or to improve the overall building quality. .2 All methods of project delivery can be defined to be in one of the four following primary categories: .1 Traditional Method (Design - Bid - Build) .2 Construction Management
Words: 4372 - Pages: 18
CHAPTER 5 Revenue Recognition and Profitability Analysis Part A: Introduction to Revenue Recognition I. Revenue Recognition in General A. FASB definition: "Revenues are inflows or other enhancements of assets of an entity or settlements of its liabilities (or a combination of both) from delivering or producing goods, rendering services, or other activities that constitute the entity's ongoing major or central operations." In other words, revenue tracks the inflow of net assets that occurs
Words: 3077 - Pages: 13
Athens Metro can be certainly considered as a Mega-Project. It is a high cost infrastructure project, it took many years to develop and build, it involved many public and private stakeholders and it changed the life of many Athenians and the public transportation network of Athens. Furthermore, around some metro stations the urban weave infrastructure transformed from its previous condition Public transportation in Athens Athens is the capital of Greece and the largest city in the country.
Words: 3536 - Pages: 15
Introduction On Monday, August 29th, Hurricane Katrina made landfall in New Orleans, Louisiana. This hurricane brought with it devastating winds and floods to the people of New Orleans. Following the aftermath of Hurricane Katrina, several investigations we opened to identify what went wrong with the hurricane protection system, including questions into the U.S. Army Corps of Engineers (USACE) and the failure of the levees causing billions of dollars in damage in the greater New Orleans area, and
Words: 1997 - Pages: 8
Integrated project based information systems provide good quality information but are not commonly adopted in the property and construction industries. The modern world is shaped by technology as it is the means through which various economic sectors engage in while executing their duties. With advancement in technology, various changes have been adopted regarding the manner in which businesses carry on with their operations. A major attributable factor to this end is the aspect of globalisation
Words: 2343 - Pages: 10