Drilling Innovation

Page 1 of 50 - About 500 Essays
  • Premium Essay

    Drilling Innovation

    Describe the production characteristics (for example, high-volume, specialty, etc.) of the three products manufactured by Drilling Innovations, Inc. in our case study. The three products manufactured by Drilling Innovations, Inc includes: 1) GS-157, 2) HS-241, and 3) OS-367. One way to solve misallocation problems Edmonds, Tsay & Olds (2011, p. 156) is to find a more suitable volume-based cost driver to allocate utility costs using machine hours instead of direct labor hours

    Words: 302 - Pages: 2

  • Free Essay

    Donner Case

    ........................................... 1 Appendix I: Process Flow ..................................................................................................................................... 2 Appendix II: Break-even analysis for Drilling and Profiling processes ............................................................ 3 Appendix III: Standard operation times (setup and run time scaled per board) ............................................ 4 Appendix IV: Total operation time

    Words: 1688 - Pages: 7

  • Premium Essay

    Business Ethics

    state of Wyoming. Questar drills and operates in close proximity to wildlife habitats that rely on the mesa, sagebrush and high elevation for survival. The Bureau of Land Management has specific limitations based on the habitat surrounding the drilling sites that Questar must follow to protect the wildlife. Studies were conducted that indicated that the restrictions were not sufficient enough to address the decline in the sage grouse; although Questar have followed the guidelines set forth by

    Words: 588 - Pages: 3

  • Free Essay

    Steps in the Fracking Process

    Step 6: Once the drilling gets about 500 feet above the shale formation, a downhole drilling motor with sophisticated measuring instruments begins the angle drilling creating a new horizontal path into the shale formation. Step 6: Once the drilling gets about 500 feet above the shale formation, a downhole drilling motor with sophisticated measuring instruments begins the angle drilling creating a new horizontal path into the shale formation. Step 4: The cement and casing are then pressure tested

    Words: 724 - Pages: 3

  • Free Essay

    Donner Case Partial

    Introduction: Donner Company, a customized printed circuit board manufacturer is facing three main problems: productivity, quality issues and delayed deliveries. We start analyzing with a diagram showing information flow beginning from the customer placing the order to the delivery of that order can be represented as below. Customer places order Customer places order Estimate Labour and Material costs Estimate Labour and Material costs Prepare and submit bid Prepare and submit bid Check

    Words: 2220 - Pages: 9

  • Premium Essay

    Ethics Overview Bp Oil Spill

    and employees. The Deepwater Horizon vessel was an exploratory rig assigned the duty of finding oil, reporting it, and capping the well for another extracting type rig to come in and harvest the oil. While drilling the well, the rig encountered pockets of natural gas buildups where it was drilling. A week prior to the fatal explosion, Horizon encountered one of these pockets and the natural gas began to rise up the drill bore and began surfacing on the rig platform. When this happened, an immediate

    Words: 5006 - Pages: 21

  • Premium Essay

    Management

    most useful type of control in this situation. The Deepwater Horizon accident had massive implications for the health of workers and nearby residents, the economy, and the environment. BP had a responsibility to take the potential dangers of their drilling operation seriously and plan for potential problems. There should have been backup protections to prevent accidents like the one that occurred. At the very least they should have practiced concurrent control. At the first signs of a problem they

    Words: 315 - Pages: 2

  • Premium Essay

    Donner

    Operations Management Term-2 Case Analysis DONNER COMPANY Contents Introduction ................................................................................................ 2 Process flow chart ....................................................................................... 2 Issues faced by Donner ............................................................................... 4 Problems in production process design ....................................................

    Words: 1496 - Pages: 6

  • Premium Essay

    Beck Manufacturing

    Manufacturing has 5 Operational work stations. They are Milling, Grinding, Boring, Drilling and Assembly. The one work station that can easily be adjusted, according to the engineering department is the assembly station. The Milling station has 5 machines that can produce 2 pieces per minute. The Grinding department has 7 machines can produce 3 pieces per minute. The Boring department can produce 1 piece per minute. The Drilling department has 6 machines that can produce 2.5 pieces per minute. The following

    Words: 377 - Pages: 2

  • Free Essay

    Rock Excavation

    the aesthetics of the rock matter in the end product? And is there any local regulations restricting particular methods? These are all questions that need to be answered before any rock excavation method begins. The traditional methods are ripping, drilling, breaking and blasting. Blasting is the controlled use of explosives to excavate rock and has been used for many years. When blasting a careful

    Words: 3885 - Pages: 16

Previous
Page   1 2 3 4 5 6 7 8 9 50