........................................... 1 Appendix I: Process Flow ..................................................................................................................................... 2 Appendix II: Break-even analysis for Drilling and Profiling processes ............................................................ 3 Appendix III: Standard operation times (setup and run time scaled per board) ............................................ 4 Appendix IV: Total operation time
Words: 1688 - Pages: 7
Operational work stations. They are Milling, Grinding, Boring, Drilling and Assembly. The one work station that can easily be adjusted, according to the engineering department is the assembly station. The Milling station has 5 machines that can produce 2 pieces per minute. The Grinding department has 7 machines can produce 3 pieces per minute. The Boring department can produce 1 piece per minute. The Drilling department has 6 machines that can produce 2.5 pieces per minute. The following table
Words: 377 - Pages: 2
Operations Management Term-2 Case Analysis DONNER COMPANY Contents Introduction ................................................................................................ 2 Process flow chart ....................................................................................... 2 Issues faced by Donner ............................................................................... 4 Problems in production process design ....................................................
Words: 1496 - Pages: 6
chips or the use of burning or melting. When sheets of metal are to be sheared along a straight line, squaring shears are frequently used. As the upper ram descends, a clamping bar or set of clamping fingers presses the sheet of metal against the machine table to hold firmly in formation. A moving blade then comes down across a fixed blade and shears the metal. On larger shears, the moving blade is often set at an angle of rocks as it descends, so the cut is made in a progressive fashion from one
Words: 615 - Pages: 3
L50/76280/2014 AN ASSIGNMENT SUBMITTED IN PARTIAL FULFILLMENT FOR REQUIREMENT FOR THE AWARD OF DEGREE OF MASTERS OF ARTS IN PROJECT PLANNING AND MANAGEMENT. 3RD NOVEMBER, 2014 Chilean Miners’ Rescue On 5th August, 2010 Chile hit the headlines with 33 miners drilling 2300 feet below the surface in a copper and gold mine in Atacama Desert, 800 kilometres North of Chile’s Capital Santiago were trapped by a massive cave- in. Chilean Mining Minister, Laurence Golborne, who had accompanied President, Sebastian Pinera
Words: 3583 - Pages: 15
state of Wyoming. Questar drills and operates in close proximity to wildlife habitats that rely on the mesa, sagebrush and high elevation for survival. The Bureau of Land Management has specific limitations based on the habitat surrounding the drilling sites that Questar must follow to protect the wildlife. Studies were conducted that indicated that the restrictions were not sufficient enough to address the decline in the sage grouse; although Questar have followed the guidelines set forth by
Words: 588 - Pages: 3
Step 6: Once the drilling gets about 500 feet above the shale formation, a downhole drilling motor with sophisticated measuring instruments begins the angle drilling creating a new horizontal path into the shale formation. Step 6: Once the drilling gets about 500 feet above the shale formation, a downhole drilling motor with sophisticated measuring instruments begins the angle drilling creating a new horizontal path into the shale formation. Step 4: The cement and casing are then pressure tested
Words: 724 - Pages: 3
Introduction: Donner Company, a customized printed circuit board manufacturer is facing three main problems: productivity, quality issues and delayed deliveries. We start analyzing with a diagram showing information flow beginning from the customer placing the order to the delivery of that order can be represented as below. Customer places order Customer places order Estimate Labour and Material costs Estimate Labour and Material costs Prepare and submit bid Prepare and submit bid Check
Words: 2220 - Pages: 9
and employees. The Deepwater Horizon vessel was an exploratory rig assigned the duty of finding oil, reporting it, and capping the well for another extracting type rig to come in and harvest the oil. While drilling the well, the rig encountered pockets of natural gas buildups where it was drilling. A week prior to the fatal explosion, Horizon encountered one of these pockets and the natural gas began to rise up the drill bore and began surfacing on the rig platform. When this happened, an immediate
Words: 5006 - Pages: 21
most useful type of control in this situation. The Deepwater Horizon accident had massive implications for the health of workers and nearby residents, the economy, and the environment. BP had a responsibility to take the potential dangers of their drilling operation seriously and plan for potential problems. There should have been backup protections to prevent accidents like the one that occurred. At the very least they should have practiced concurrent control. At the first signs of a problem they
Words: 315 - Pages: 2