principles of the United Nations Goal Compact ➢ Conduct all business in an ethical manner and encourage and support our partners to conduct business ethically ➢ Engage with stakeholders, consider their opinions at all stages of planning and operations ➢ Encourage supply chains to implement sustainable strategies and manage them ➢ Inculcate sustainability concept and views in strategic decision-making ➢ Use sustainable processes in organizational
Words: 1508 - Pages: 7
ng making non profit organisation SESSION MORNING 4/2/2014 A COBRANDED product its a commercial activity in which a company and a NGO join forces to build an image, a service or a product in order to take mutuel benefit from it. Cause related marketing: * Sponsoring * Sales promotion activities * Merchandising * Co-branding License ≠ own product. What to develop co branded product? * Develop the brand and improve notoriety * Get closer to the general
Words: 1299 - Pages: 6
Facility Planning Part II HCS 446 Facility Planning Part II Introduction Development and growing a facility takes much time and contemplation with respect to regulatory requirements, budgets, planning and development of the building and the interior design of the building. Making certain code requirements are met which is usually to help the architect and contractor. Many matters must be well-thought-out during the preliminary design created by the stakeholders in the blueprint. Color collections
Words: 1190 - Pages: 5
Business continuity planning and Disaster recovery planning are the most important components of a business yet are frequently overlooked. Organizations must make a very much organized arrangement and record for calamity recuperation and business continuation, even before a fiasco happens. Disasters can be short or may keep going for quite a while, yet when an association is prepared for any difficulty, it flourishes hard and survives. This paper will unmistakably recognize the distinction between
Words: 802 - Pages: 4
Coastal Management at Barcelona/Catalonia Location: Barcelona is located in the east of Spain on the coast near the Mediterranean Sea. It has a population of 5 million Background: Many Catalan beaches are losing their sand. The November storms have starkly revealed this problem and the long term solution is a complex one involving a range of environmental, economic and social issues. The estimated costs of 1.690 million ptas to restore the damaged beaches and promenades are overshadowed
Words: 848 - Pages: 4
SUMMER TRAINING PROJECT REPORT ON UNDERSTANDING THE SALES PROCESS, PREPARING A STANDARD OPERATING PROCEDURE MANUAL & A STUDY OF THE FUTURE OF LED LIGHTS IN INDIA FOR INLITE PVT LTD. BANDRA, MUMBAI BY KIRAN UIKEY (roll no.171) (MMS 2012-14) IN PARTIAL FULFILLMENT OF THE REQUIREMENT FOR THE DEGREE IN masters IN management studies (m.m.s) FROM MET – INSTITUTE OF MANAGEMENT, MUMBAI. ACKNOWLEDGEMENT It is my immense pleasure to present this report of summer training. I am grateful
Words: 9031 - Pages: 37
Monday 17th October 2010 Facilities Design and Management Course Work 1 Table of Contents 1.0 Introduction 3 2.0 Feasibility Study 4 2.1 Local Area Analysis 4 2.2 Lodging Market Analysis 4 2.3 Proposed Facilities 5 3.0 Site Planning 6 4.0 Planning of Exterior and Interior Design 7 4.1 Exterior Design and Engineeing Amenities 7 4.2 Interior Design and Engineering Amenities 7 4.2.1 Lobby Facilities 7 4.2.2 Guest Rooms and Floors 8 4.2.3 Food and Beverage Outlets 9 4.2.4 Recreational
Words: 3479 - Pages: 14
business? Example. 2.4.1 THE ENVIRONMENTAL MANAGEMENT SYSTEM (EMS) Definition: the environmental management system (EMS) refer to one part of the comprehensive management system that relate to organizational structure, planning activities and documented manner, it includes planning, implementation, checking, management review and environmental policy. An environmental management system (EMS) 1. It is environmental performance improving tool. 2. It is effective way to manage organizational companies
Words: 3017 - Pages: 13
FPL – An Overview FPL Group, Inc. is Florida’s largest electric utility company. In 1925, through the consolidation of numerous electric and gas companies, they formed Florida Power & Light Company (FP&L). FP&L grew steadily over the next 50 years until rising fuel costs, operating issues, and construction costs began to decrease profitability. In the mid-1980s, FPL diversified with four major acquisitions - Colonial Penn Life Insurance Company, Telesat Cablevision, Inc., CBR Information
Words: 676 - Pages: 3
transport infrastructure projects? Flyvbjerg, Bent, Holm, Skamris, M., Buhl, & Soren. (2002). Underestimating Costs in Public Works Projects: Error or lie? Journal of the American Planning Association, 279-295. Gezinus, J., & Nicholas, J. ( 2009). Reducing I.T. Project Management Failures: A Research Proposal . Hawaii International Conference on System Sciences, 1-10. Glass, R. (1999). Computer Calamities: Lesson learned from product, project, and companies that
Words: 729 - Pages: 3