is skilled at developing event trees and fault trees; providing a systematic method for investigating accident and/or failure scenarios involving complex systems. These trees evaluate the pathways leading to failure of a system and the associated risk(s). The event tree development process determines the boundaries of the particular analysis by defining the initiating event and the possible outcomes for each sequence of events. The event tree analysis defines possible scenarios including success
Words: 365 - Pages: 2
----------------------- Energy Trace Barrier Analysis (ETBA) – Qualitative analysis technique used to identify hazards by tracing energy flow into, thru, & out of a system. “Energy hazard” is defind as an energy source tht adversely impacts an unprotectd or vulnerable target. Assessment is conductd by following the energy path to determine if adequate controls are in place to assure undesird energy release does not occur.– Energy flow is tracd through the system operation & energy transfer points
Words: 2026 - Pages: 9
Planning 2 Scope 2 Statement of Work—Project Description and 3 WBS 5 Risk Identification 6 Negative Risks 6 Qualitative Risk Analysis 7 Positive Risks 7 Negative Risks 7 Risk Response Planning 7 Positive Risks 7 Negative Risks 9 Decision Tree Analysis 11 Discussion of Decision Tree 12 Event / Fault Tree Analysis 14 Discussin of Event / Fault Tree 15 Conclusion: 15 Works Cited 16 Introduction The
Words: 5550 - Pages: 23
When we look at the terms of risk reduction and hazard control we get the terms of eliminating and reducing the issues. Where control of hazards seek to maintain instead of removing the process. The term that risk reduction is applied to is a complete understanding of the intent of the criterion to ty risk- reducing the probability of the events occurring. In the terms of the second and third definitions of risk because they include both the probability of the event and the severity of
Words: 877 - Pages: 4
Title………………………………………………………………………….1 2. Summary…………………………………………………………………….3 3. Introduction of Case Study…………….…………………………………….4 4. Risk Scenario Development…….…………………………………………...5 5. Justification of Fault Tree Analysis…………………………………………6 6. Procedures of Fault Tree Analysis…………………………………………..7 7. Fault Tree Analysis…………………………………………………………8 8. Possible Risk Associated with Hazards….………………………………...11 9. Accident Consequences…………………………………………………….13 10. Method to Control the Risk………………………………………………
Words: 4500 - Pages: 18
planes in the air that provide the most comfort to passengers. We will be looking at two fault trees analysis for the Boeing 787 flight instrumentation failures. In the event that there is instrumentation failures inside Boeing 787 cockpit it can cost by loss of airspeed information which is fault tree one or by loss of advisory panel information which is fault tree two. Fault Tree One Fault Tree One Analysis The flight deck system for the Boeing 787 can fail but loss of cockpit instrumentation
Words: 506 - Pages: 3
Keller Graduate School of Management PM 595: Project Risk Management Development of the Boeing 787 Dreamliner Table of Contents I. Introduction II. Fault Tree One III. Discussion of Fault Tree One IV. Fault Tree Two V. Discussion of Fault Tree Two VI. Conclusions VII. Works cited I. Introduction I am the Project Manager developing the Boeing 787 Dreamliner. The development of this state-of-the-art airplane will include an international team of aerospace
Words: 927 - Pages: 4
MOM350 CONDITION MONITORING AND MANAGEMENT PROJECT 2 – SPRING 2013 LINN WETTELAND STUD.NR 204592 “USING FAULT TREES TO DETERMINE THE ROOT CAUSE OF ROTATING EQUIPMENT FAILURES” (Robert X. Perez) In the paper “Using fault trees to determine the root cause of rotating equipment failures”, the author, Robert X Perez, explains through his own experience as a senior reliability engineer at Citgo Petroleum Corporation, and through examples of various events in different systems the importance of
Words: 1529 - Pages: 7
Management Contents Introduction 4 Statement of work 5 Statement of Work—Project Description and 6 WBS 8 Risk Analysis and Probability Matrix – Qualitative Analysis 10 Risk Register 11 Decision Tree 11 Decision Tree Analysis 11 Fault Analysis Tree 12 Fault Tree Analysis Summary 12 Conclusions 13 Works Cited 13 Introduction Sherdon and Anissa Webb have been working parents for over 18 years. Both
Words: 2262 - Pages: 10
Table of Contents Introduction Page 3 Sources of Construction Project Risk Page 4 Systems to Address Construction Project Risk Page 6 Catastrophic Failure Fault Tree Page 8 Discussion of Fault Tree Page 8 Fault Tree One Page 10 Discussion of Fault Tree One Page 10 Fault Tree Two Page 11 Discussion of Fault Tree Two Page 11 Conclusions Page 14 Works Cited Page 15 Introduction Boeing Commercial Airplanes' launched the 787 Dreamliner, a super-efficient
Words: 2941 - Pages: 12