System (OATRIS) General Description OATRIS is the system that help user to buy airplane ticket through Internet. It processes user’s preferred flight timeline and the payment. Then, transform it into e-ticket. Users and Functions Customer: * Input desired destination and the timeline * Check the flight availability * Choose the flight price and the payment method * Decide and make the payment * Printout the transaction evidence as the e-ticket Notification Information System:
Words: 707 - Pages: 3
Fact: Eric and his registered disabled wife jane decide to take a 2 week holiday in Cyprus Eric booked two flight only tickets on the internet with Eze Air who had recently commenced a daily schedule flight service from Luton to Larnaca. The flight was due to depart Luton at 14.55 pm on 1st may. The duration of the flight was 4 hours and the scheduled arrival time in Larnaca was 20.55 pm local on the same day. Eric and Jane arrived at Luton Airport in good time and were greeted at the check in desk
Words: 4045 - Pages: 17
expanded and added some. In addition, JetBlue has attempted to offer differentiation in service to improve the customer experience. Unlike most pointtopoint airlines, JetBlue decided to add a second airplane model in order to expand into the regional flights. A deal was struck to purchase up to 200 jets from Embraer through 2016. The growth the company forecasted was soon realized to not be in the best interests of the future of JetBlue. In 2006 the company executives discovered that the the ti
Words: 2665 - Pages: 11
Disruption Management in the Airline Industry: Dealing with the Airline Recovery Problem Andr´as Mavrocordatos e i6015437 Maastricht University School of Business and Economy Econometrics & Operations Research Master Thesis Supervisor: Tjark Vredeveld August 23, 2015 Abstract This thesis approaches the disruption management problem in the airline industry. The problem is proposed by the ROADEF 2009 Challenge and considers multiple objectives: minimize passenger disutility while
Words: 15844 - Pages: 64
discovered that the flights from San Francisco to Washington DC are not covering their expenses. Taking the cost of the flight into consideration and all of the extras one can then figure out what to do. The quick fix on this would be to raise the price of the tickets and see if there are enough people that would take the flight to cover the cost with some profit. If after trying to do this for a couple months there is still no change then it would be feasible to maybe not offer the flight at all. Another
Words: 424 - Pages: 2
JUN 16, I evaluated the LUH-72 visually on the ground and performed several maneuvers in flight for 1.4 hours. Environmental factors are as follows; winds were 280 degrees at 5 knots on the surface and aloft winds at 2000 feet MSL were 290 degrees at 15 knots. Light turbulence was found at altitude and multiple thermals were encountered throughout the flight. Sky condition was scattered and the average flight temperature was around 28 degrees Celsius. Evaluation of the helicopter began at preflight
Words: 546 - Pages: 3
immediate action. 2. A condition of urgent need for action or assistance WHAT IS FIRST AID? Emergency treatment administered to an injured or sick person before professional medical care is available. SAFETY RESPONSIBILITIES OF THE FLIGHT ATTENDANT Prior to flight f/a attend a safety briefing with the purser. The pilots may also be present. This briefing entails:- * Going over safety and emergency checklist * Locations and amounts of emergency equipment and other features specific to
Words: 1622 - Pages: 7
the college level project and is implementing under the guidance of college professors. This project is useful to everyone who travels in flights. 1.4 PROJECT SCOPE The purpose of the online system is to create convenient and easy-to-use online system for passengers, trying to buy airline tickets. The system is based on a relational database with its flight management and
Words: 1563 - Pages: 7
Introduction: Fly-by-wire control system is the leap from the mechanical control system to the electric one by the aid of wires, hence the name “Fly-by-wire” comes from. Since the mechanical and hydro-mechanical flight control systems require a large amount of human resource effort to have control on the components of cranks, shafts, pulleys, cables and hydraulic pipes which are relatively heavy, unlike the (FBW) which is less complicated and more reliable uses computer and wires to transmit the
Words: 1060 - Pages: 5
1,000 flights per week across six continents from its base at Dubai International airport, which has the capacity to handle 70 million passengers per year. Emirates was launched in 1985 with two leased aircraft from a rudimentary airport. It’s phenomenal growth is reflected in the 160-plus aircraft in its rapidly expanding fleet – a mix of the latest wide-body Airbus and Boeing aircraft - as well as Dubai’s state-of-the-art Emirates Terminal 3, which is used solely for the airline's flights. Its
Words: 3091 - Pages: 13