a customer satisfaction survey in order to measure satisfaction with the service on London buses and tube services to identify areas for improvement. The research focused on the following area of London underground service: * Service at the station; * Service on the train; * Timetable; * Value for money. Methodology The methods used for my research is Survey Research method by which qualitative data is collected through questionnaires and face to face interviews with passengers
Words: 982 - Pages: 4
load 1)Base load tariff could correspond the costs of nuclear plant (23 €/kW/month and 17 €/MWh) 2)Intermediate load tariff could corresponds to the costs of coal fired plant (14 €/kW/m and 48 €/MWh) 3)Peak load tariff corresponds to the costs of gas engine (9 €/kW/m and 75 €/MWh) or diesel engine plant (5.7 €/kW/m and 109 €/MWh) * See presentation ”Planning of national power systems” 8 Traditional electricity markets
Words: 1388 - Pages: 6
Consumer Behavior – Week Three 1/25/2015 Aero Motors has been trying to make their way into the US market, and now they have come up with the idea to come out with a compact car that could compete in the current market. Aero motors new compact car model is called the Horizon, because this name gives the impression of the new and improved future. The Horizon would be fairly easy to advertise for because the car could have a trademark picture of it riding into the sunset or television
Words: 746 - Pages: 3
Sociocognitive Dynamics in a Product Market Author(s): José Antonio Rosa, Joseph F. Porac, Jelena Runser-Spanjol and Michael S. Saxon Source: Journal of Marketing, Vol. 63, Fundamental Issues and Directions for Marketing (1999), pp. 64-77 Published by: American Marketing Association Stable URL: http://www.jstor.org/stable/1252102 Accessed: 28-09-2015 11:20 UTC REFERENCES Linked references are available on JSTOR for this article: http://www.jstor.org/stable/1252102?seq=1&cid=pdf-reference#references_tab_contents
Words: 10776 - Pages: 44
Mirai is expected to be on sale in 2015 starting in California, where the infrastructure for hydrogen fueling exists, currently Southern California has fewer than a dozen hydrogen stations but Toyota expects that number to double by next summer. The company also just announced a collaboration to open 12 hydrogen stations in the Northeast in 2016. Is going to be really challenging for the company to make this car successful. "This is the very beginning of this hydrogen society, so you may have to
Words: 1355 - Pages: 6
Introduction This case study Luotang Power: Variances Explained is mainly concerned with a study of variances that will show the changes in performance in the company and the external environment that is not within the power plant’s control. The Luotang Power Company (Luotang) is a 600 Mega Watt (MW) coal fired power plant located in the Hubei Province, China. Luotang first started in 1997, when the Provincial Planning Commission, working on behald of the Hubei Provincial Government, had solicited
Words: 3218 - Pages: 13
increase in crime nearby any of the WMATA metro rail stations. This class project was inspired from the concerns of the Purple Line construction through the College Park campus. This specific construction project was something I supported at the time because I was a frequent traveler to Washington D.C. via the metro rail system and would like the convenience of having a metro rail station at the campus, rather than riding a shuttle to another station.
Words: 507 - Pages: 3
which sustainability can be achieved. (40 MARKS) Transport management; PLAN: Speed bumps, traffic lights, round-a-bouts, speed limits, zebras crossings, speed cameras, speed awareness Increase the prevalence of pedestrian areas (MK train station)- achieved by increasing the use of PUBLIC transport, park ‘n ride (Oxford), charge people for using cars= congestion charge in London Introduce bus lanes Boris bikes in London Social, economic and environmental implications of all the strategies
Words: 1085 - Pages: 5
Length | Washermenpet to Airport | 23.1 kms. | Chennai Central to St.Thomas Mount | 22.0 kms. | Total | 45.1 kms. | The details of the two corridors are given below: Corridor-1: Washermenpet – Broadway (Prakasam Road) – Chennai Central Station – Rippon Building – along Cooum River – Government Estate – Tarapore Towers – Spencers – Gemini – Anna Salai – Saidapet – Guindy – Chennai Airport. Corridor-2: Chennai Central – along EVR Periyar Salai – Vepery – Kilpauk Medical College – Aminjikarai
Words: 1839 - Pages: 8
ASSIGNMENT: 1 Write a reflective report on the impact of social media and mobile communication in your daily life. How should an organization manage its information systems to meet the demand of your generation? Executive Summary Social media and mobile communication both are becoming interrelated and major way of communication. The assignment contains exploration of these two major ways of communication based on personal reflection and possible ways to manage information system
Words: 1184 - Pages: 5